BLD2023-0550_Other_9.29.2023_2.07.25_PM_3813159K s as Date: 9-24-23 Beam over entry Inspection 209 Dayton St Edmonds WA Prepared for: Art and Nelson Kasko Konstruction Engineering did a site visit at the above location to investigate a beam replacement over the first -floor front entry and to see if the home made beam meets the requirements of the 2018 IBC code. Kasko Konstruction reviewed some pictures and video during the process of the construction and also reviewed the original Framing plan design drawings dated in 1978 when the building was first constructed. After reviewing the load path it was determined that this beam was not a load bearing beam and the floor and roof joints ran parallel with the beam bearing on either side on existing glulam beams and posts. The beam that was replaced because it was rotten on the outside was non load bearing, and the homemade glulam beam will have way more capacity than is required to resist code prescribed loads. Kasko Konstruction recommends Approving the existing beam as installed. r9lM Y KAS JQ �f WASy k� Pew ��r ita signed by 7 va im asko k 3742 a t 23.09.28 T �otS•r R� kL 5-07'00' sSt�NALE��l Vadim Kasko, P.E. 53742 (360) 201-9655 Kasko Konstruction Engineering Design & Consulting LLC 1of1