Building PermitType: RE ROOF Subtype: COMMERCIAL RR I Status: ISSUED
Parcel No: 00566900500103 Site Address: 7228 210TH ST SW EDMONDS,WA 98026-7220 Applied: 7/16/2024
Subdivision: 005669 Lot: 0 Issued: 7/16/2024
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $3,220.00 Occupancy Type: Construction Type: Expiration Date: 7/16/2026
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED
Scope of Work: RE ROOF- METAL
I WA State Contractor L & I #: 3DROOSL982CJ I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
DUSTIN KATHOL
PO BOX 330, LYNNWOOD WA
(425)775-0232
DUSTIN@3-DROOFSYSTEMS.COM
98046
CONTACT
3-D ROOF SYSTEMS LLC
PO BOX 330, LYNNWOOD WA
(425)775-0232
dustin@3-droofsystems.com
98046
CONTRACTOR
3-D ROOF SYSTEMS
PO BOX 330, LYNNWOOD WA
(425)775-0232
THREEDROOFSYSTEMS@YAHOO.COM
98046-
7228 210TH ST SW, EDMONDS
OWNER
DKK PROPERTIES LLC
WA 98026
• ' 1 11111 •
DESCRIPTION
7PE
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
7/16/24
R38583
MIT
RE -ROOF - COM - PERMIT -
001.000.345.83.000.00
$223.60
$223.60
7/16/24
R38583
VALUATION BASED
STATE BUILDING CODE SURCHARGE
001.000.237.150
$25.00
$25.00
7/16/24
R38583
- COM
TOTALS: $293.60
$293.60
• 0 •
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, July 16, 2024 4:16:17 PM 1 of 2
RE ROOF Permit
-
City of • • •
98020 1 1 •
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
INSPECTIONS - Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED
RESULT
NOTES
B-5 TEAR OFF OR
SHEATHING
X-3 BUILDING FINAL"
Printed: Tuesday, July 16, 2024 4:16:17 PM 2 of 2