Loading...
BLD2024-0939_Structural_Calculations_7.19.2024_9.31.48_AM_4388815VECTOR E M G I M E E R S VSE Project Number: U4703.0900.241 June 4, 2024 Infinity Solar USA 6405 E Mill Plain Vancouver, WA 98661 REFERENCE: Steven Handley - Edmonds Wa Residence: 23109 97th Avenue West, Edmonds, WA 98020 Solar Array Installation To Whom It May Concern: We have reviewed the existing structure at the above referenced site. The purpose of our review was to determine the adequacy of the existing structure to support the proposed installation of solar panels on the roof as shown on the panel layout plan. Based upon our review, we conclude that the existing structure is adequate to support the proposed solar panel installation. Design Parameters Code: 2021 Washington State Residential Code (2021 IRC) Risk Category: II Design wind speed, Vult: 115 mph (3-sec gust) Wind exposure category: C Ground snow load, Pg: 20 psf Seismic design category: D Existing Roof Structure Roof structure: 2x6 rafters @ 16" o.c. Roofing material: rolled asphalt Roof slope: 9° Connection to Roof Mounting connection: (4) #14 wood screws w/ min. V threaded embedment into framing at max. 48" o.c. along rails Install (2) rails per row of panels, evenly spaced; panel length perpendicular to the rails shall not exceed 68 in Rail cantilever shall not exceed the lesser of 50% of the connection spacing or maximum cantilever allowed by manufacturer Connections shall be staggered so as not to overload any existing structural member Conclusions Based upon our review, we conclude that the existing structure is adequate to support the proposed solar panel installation. The gravity loads, and thus the stresses of the structural elements, in the area of the solar array are either decreased or increased by no more than 5%. Stress decreases or increases of no more than 5% are considered acceptable. Therefore, the structure is permitted to remain unaltered. 651 W. Galena Park Blvd., Ste. 101 / Draper, UT 84020 / T (801) 990-1775 / F (801) 990-1776 / www.vectorse.com VSE Project Number: U4703.0900.241 Steven Handley - Edmonds Wa Residence Y To R 6/4/2024 fl G I fl E E R S The solar array will be flush -mounted (no more than 10" above the roof surface) and parallel to the roof surface. Thus, we conclude that any additional wind loading on the structure related to the addition of the proposed solar array is negligible. The attached calculations verify the capacity of the connections of the solar array to the existing roof against wind (uplift), the governing load case. Regarding seismic loads, we conclude that any additional forces will be small. Conservatively neglecting the weight of existing wall materials, the installation of the solar panels represents an increase in the total weight (and resulting seismic load) of 4.2%. Increases in lateral forces less than 10% are considered acceptable. Thus the existing lateral force resisting system is permitted to remain unaltered. Limitations Installation of the solar panels must be performed in accordance with manufacturer recommendations. All work performed must be in accordance with accepted industry -wide methods and applicable safety standards. The contractor must notify Vector Structural Engineering, LLC should any damage, deterioration or discrepancies between the as -built condition of the structure and the condition described in this letter be found. The use of solar panel support span tables provided by others is allowed only where the building type, site conditions, site -specific design parameters, and solar panel configuration match the description of the span tables. The design of the solar panels, solar racking (mounts, rails, etc.) and electrical engineering is the responsibility of others. Waterproofing around the roof penetrations is the responsibility of others. Vector Structural Engineering assumes no responsibility for improper installation of the solar array. Vector Structural Engineering shall be notified of any changes from the approved layout prior to installation. VECTOR STRUCTURAL ENGINEERING, LLC WA Firm License: 2202 06/04/2024 Wells Holmes, S.E. WA License: 51006 - Expires: 10/06/2024 Project Engineer Enclosures WLH/bpp 651 W. Galena Park Blvd., Ste. 101 / Draper, UT 84020 / T (801) 990-1775 / F (801) 990-1776 / www.vectorse.com ECTOR�, n G I n E E R S PROJECT: Steven Handley - Edmonds Wa Residence CHECK INCREASE IN OVERALL SEISMIC LOADS Estimated Roof Dead Load 10.0 Solar Dead Load 3.0 % Roof Covered 14% Equiv. Total Dead Load 10.5 Addt'I Seismic Weight 4.2% psf psf psf JOB NO.: U4703.0900.241 SUBJECT: SEISMIC LOADS Conservatively neglecting the weight of existing wall materials, the installation of the solar panels represents an increase in the total weight (and resulting seismic load) of 4.2%. Increases in lateral forces less than 10% are considered acceptable. YEECTOR® fl G I E R S PROJECT: Steven Handley - Edmonds Wa Residence Com onents and Cladding Wind Calculations Label: Isolar Panel Array SITE -SPECIFIC WIND PARAMETERS: Basic Wind Speed [mph]: 115 Notes: Exposure Category: C Risk Category: II ADDITIONAL INPUT & CALCULATIONS: Height of Roof, h [ft]: 15 (Approximate) Comp/Cladding Location: Gable Roofs 7° < 6 <_ 20° Enclosure Classification: Enclosed Buildings Zone 1, 2e GCp: 2.00 Figure 30.3-213 Zone 2n, 2r, 3e GCp: 2.92 (negative coeff.) Zone 3r GCp: 3.50 a: Zg [ft]: Kh: Ke: KZt: Kd: Velocity Pressure, qh [psf]: YE. WIND PRESSURES: Zone 1, 2e, p [psf] Zone 2n, 2r, 3e, p [psf] Zone 3r, p [psf] 9.5 Table 26.11-1 900 Table 26.11-1 0.85 Table 26.10-1 0.99 Table 26.9-1 1 Equation 26.8-1 0.85 Table 26.6-1 24.1 Equation 26.10-1 1.50 Section 29.4.4 JOB NO.: U4703.0900.241 SUBJECT: WIND PRESSURE Note: Calculations per ASCE 7-16 Zone 1, 2e Ya: 0.78 Fig. Zone 2n, 2r, 3e Ya: 0.78 29.4-8 Zone 3r Ya: 0.78 Equation 29.4-7 p = q h (GC p)(Y E)(Y a) 56.2 psf (1.0 W ) 82.1 psf (1.0 W ) 98.3 psf (1.0 W ) (a = 3 ft) Y ECTOR y n G i n E E R S PROJECT: Steven Handley - Edmonds Wa Residence Calculate Uplift Forces on Connection Zone 1, 2e Zone 2n, 2r, 3e Zone 3r JOB NO.: U4703.0900.241 SUBJECT: CONNECTION Pressure Max Trib. Width 2 Max Trib. Max Uplift (0.6 Dead -0.6 Wind) Area Force (psf) (ft) (ft) (Ibs) 31.9 4.0 11.3 362 47.4 4.0 11.3 538 57.2 4.0 11.3 648 Calculate Connection Capacity Wood Screw Size: Cd: Embedment3 [in]: Grade: Nominal Capacity [Ibs/in]: Number of Screws: Prying Coefficient: Total Capacity [Ibs]: Determine Result Notes #14 1.6 1 SPF (G = 0.42) 121 4 1 774 NDS Table 2.3.2 NDS Table 12.213 Maximum Demand [Ibs]: 648 Wood Screw Capacity [Ibs]: 774 Result: Capacity > Demand, Connection is adequate. 1. 'Max Trib. Width' is the width along the rails tributary to the connection. 2. 'Max Trib Area' is the product of the 'Max. Trib Width' and 1/2 the panel width/height perpendicular to the rails. (2) rails per row of panels. Length of panels perpendicular to the rails shall not exceed 68". 3. Embedment is measured from the top of the framing member to the beginning of the tapered tip of the wood screw. Embedment in sheathing or other material is not effective. The length of the tapered tip is not part of the embedment length. ECTOR r1 G 1 r1 E E R S PROJECT: Steven Handley - Edmonds Wa Residence JOB NO.: U4703.0900.241 SUBJECT: GRAVITY LOADS GRAVITY LOADS Roof Pitch: 1 1.9 :12 Design material Increase due to Material weight ROOF DEAD LOAD (D) weight [psf] pitch [psf] Rolled Asphalt 2.0 1.01 2.0 1 /2" Plywood 1.0 1.01 1.0 Framing 3.0 3.0 Insulation 0.0 0.0 1/2" Gypsum Clg. 0.0 1.01 0.0 M, E & Misc 0.0 0.0 Total Existing Roof DL 6.0 PV Array DL 3.0 1.01 3 ROOF LIVE LOAD (Lr) Existing Design Roof Live Load [psf] 20 ASCE 7-16 Table 4.3-1 Roof Live Load With PV Array [psf] 0 2021 IRC, Section R324.4.1.1 SNOW LOAD (S): Existing w/ Solar Array Roof Slope [x:12]: Roof Slope [°]: Ground Snow Load, pg [psf]: Terrain Category: Exposure of Roof: Exposure Factor, Ce: Thermal Factor, Ct: Risk Category: Importance Factor, Is: Flat Roof Snow Load, pf [psf]: Minimum Roof Snow Load, pm [psf]: Unobstructed Slippery Surface? Slope Factor Figure: Roof Slope Factor, Cs: Sloped Roof Snow Load, ps [psf]: Design Snow Load, S [psf]: 1.9 1.9 9 9 20 20 C C Fully Exposed Fully Exposed 0.9 0.9 1.1 1.1 II II 1.0 1.0 14 14 20 20 No Yes Figure 7-2b Figure 7-2b 1.00 1.00 14 14 20 20 ASCE 7-16, Section 7.2 ASCE 7-16, Table 7.3-1 ASCE 7-16, Table 7.3-1 ASCE 7-16, Table 7.3-1 ASCE 7-16, Table 7.3-2 ASCE 7-16, Table 1.5-1 ASCE 7-16, Table 1.5-2 ASCE 7-16, Equation 7.3-1 ASCE 7-16, Section 7.3.4 ASCE 7-16, Section 7.4 ASCE 7-16, Section 7.4 ASCE 7-16, Figure 7.4-1 ASCE 7-16, Equation 7.4-1 ECTORm M G 1 n E E R S PROJECT: Steven Handley - Edmonds Wa Residence Summary of Loads D [psf] Lr [psf] S [psf] Maximum Gravity Loads: JOB NO.: U4703.0900.241 SUBJECT: LOAD COMPARISON Existina With PV Arrav 6 9 20 0 20 20 Existing With PV Array (D + Lr) / Cd [psf] 21 10 JASCE 7-16, Section 2.4.1 (D + S) / Cd [psf] 23 25 JASCE 7-16, Section 2.4.1 (Cd = Load Duration Factor = 0.9 for D, 1.15 for S, and 1.25 for Lr) Maximum Gravity Load [psf]:l 23 1 25 Maximum Member Forces: (-.Pr)NAFTRV Span(ft) 15.5 (Approximate) Solar Panel Array Start, a (ft) 0.9 (Approximate) Solar Panel Array Length, b (ft) 5.6 (Approximate) Framing Spacing (ft) 1.3 MEMBER FORCES Vertical Reaction, V1(lbs) Vertical Reaction, VZ (Ibs) Shear Capacity Shear Demand Ratio 743 249 34% 743 239 32% OK Existing With PV Array Ratio Moment @ Center, M (Ibs-ft) 907 1 943 104% JOK The gravity loads, and thus the stresses of the structural elements, in the area of the solar array are either decreased or increased by no more than 5%. Stress decreases or increases of no more than 5% are considered acceptable. Therefore, the structure is permitted to remain unaltered.