APPROVED ENG2024-0295 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
:0i •
www.edmondswa.gov i
Description: ASTOUND - TRANSFER COMM LINES TO NEW POLES ISSUED: 07/22/2024
Address: 217 9TH AVE S EDMONDS WA 98020-3349
EXPIRES: 01/22/2025
Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00434206903702
NAME TYPE NAME ADDRESS PHONE
APPLICANT MARTA SANCHEZ 4766 1ST AVE S, SEATTLE WA 98134 (425)389-3647
CONTACT ASTOUND BROADBAND 4766 1ST AVE S, SEATTLE WA 98134 (425)389-3647
CONTRACTOR DIVERSIFIED NORTHWEST INC PO BOX 685, LAKE STEVENS WA 98258 (425)710-0753
OWNER BRANDON S & KRISTINA FREEMAN 217 9TH AVE S, EDMONDS WA 98020-3349
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS - 4.1.24
$264.00 $264.00
ROW - MINOR - 4.1.24 $132.00 $132.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 07/22/2024
Printed: Monday, July 22, 2024 12:22:35 PM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NU �!BEJ
City of Edmonds
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL**
Printed: Monday, July 22, 2024 12:22:35 PM 2 of 2
Lti�y of EDiyO�o�
ANC. 1 g90
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E63.
RECEIVED
Jun 14 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General•
Project Name 217 9th Ave S
Site Address or if no site address use Property Address at NW corner of project area: 217 9th Ave S
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name of Company Astound Broadband Franchise Ordinance No:
Point of Contact Marta Sanchez
Title Joint Use Administrator III
Address 4766 1 st Ave S Seattle, WA 98134
CitySeattle
State WA
Zip 98134
Phone425.389.3647
Email marta.sanchez@astound.com
Contractor and Authorized Agent of • • - •• •w)
Name of Company See above
Contractor ContactsDuring Construction
PrimaryNameDNI, Christina Barkley
Agent Name
Title Safety Coordinator
Title
Mobile 425-330-3176
Address
Email Christina@diversifiednw.com
City
State
Zip
Secondary Name Joe Ahmu
Phone
Title Owner
Email
Mobile 206-571-4216
City of Edmonds Business License No: 601-766-647
Email
joe@diversifiednw.com
State License No: 601 766 647
Rr Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other v6 Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
\-� Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
❑ Utility Franchise Work (no associated development)
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Snohomish PUD has replaced several utility poles on Maple St. The Astound Contractor will transfer the aerial comm to three new poles already set. This should be
done within 3 hours. (Pole #s 294675, 294677, 294679
I suspect sett up and take down of the traffic control will be the crux of the time used.
Pedestrtians will be assisted as needed.
This is a reA iron lane sift m4ion
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
JxJ
LF
SF
NA
Alley 72 hours +
LF
JxJ
F
SF
NA
Parking 72 hours +
LF
JxJ
LF
SF
NA
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
16 telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details
1.
of Work to be CompletedNo
Does the utility owner have existing overhead infrastructure in the area of work?
x
2.
Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
x
If yes, describe: Aerial transfer of comm from old pole to already set new pole.
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
X
5.
Does the work involve proposed additions to an aboveground utility system? If es:
x
Are the additions for the purpose of serving new commercial development?
x
Are the additions for the purpose of serving a single-family residential subdivision?
x
Details of • to be Completed
®i
6. Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
x
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing? 13 1 How many are to be added? qadditional straight tran
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area? 3
What is the height of the existing poles? 45'/45'/50'
How many poles are to be removed? 0
Are additional poles to be laced? no
How many? 10 1 What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes: no
X
How many? 10 1 What is the height of the poles after? NA
Describe the modification rebuild: NA
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
6/13/24
APPLICANT PRINTED NAME: Marta Sanchez
APPLICANT TITLE: .joint Use Administrator III
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
RECEIVED
Jun 14 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
ENGINEERING DIVISION
APPROVED AS NOTED
JgU LU gZu.,04z 07/22/2024
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25 1
30
1 35 1
40
1 45
50
55
60
1 65
1 70
LENGTH (feet)
155
200
250
305
1 360
1 425
495
570
645
1 730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 Ibs.
HOST VEHICLE WEIGHT
> 22,000 Ibs.
< 45 MPH
45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
PROTECTIVE VEHICLE (WORK VEHICLE) = R
NO SPECIFIED DISTANCE REQUIRED
N <_
9th Ave S
SIGN
SPACING = X (1)
RURAL HIGHWAYS
60 165 MPH
800't
RURAL ROADS
45 /55 MPH
5D0't
RURAL ROADS & URBAN
ARTERIALS
35 /40 MPH
350'i
RURAL ROADS & URBAN
RESIDENTAL & BUSINESS
ARTERIALS
DISTRICTS
25 / 30 MPH
200't (2)
URBAN STREETS
25 MPH OR LESS
100'3 (2)
(1) ALL SPACING MAY BE ADJUSTED
RAMPS, AT -GRADE INTERSECTIONS
(2) THIS SPACING MAY BE REDUCED
ROADWAY CONDITIONS.
TO ACCOMMODATE INTERCHANGE
AND DRIVEWAYS.
IN URBAN A
24"
KEEP
30"
RIGHT
0R4-7B
BIW u
-I
MINIMUM TAPER LENGTH = L (feet)
LANE
Posted Speed (mph)
WIDTH
(feet)
25
30
35
40
1 45
1 50
1 55
1 60
1 65
1 70
10
105
150
205
270
450
1 500
1 550
11
115
165
225
295
495
1 550
1 605
1 660
-
-
12
125
180
245
320
540
1 600
1 660
1 720
780
-
REAS TO FIT
g4�8
W20-1
48'
\� 48'
Wl-4(L) r
B U2 X X I_
WORK AREA
O N a
®
o
13
48"
ROAD
WORK
AH
EAD 48
W4.2R
LEGEND
LEFT LANE
CLOSED
K
TEMPORARY SIGN LOCATION
AHEAD
13
CHANNELIZING DEVICES
w
t>>D
SEQUENTIAL ARROW SIGN
W20-51.
TRANSPORTABLE ATTENUATOR
PCMS
PORTABLE CHANGEABLE MESSAGE SIGN
E
TEMPORARY SIGN LOCATION (5'MOUNTING
HEIGHT)
BY
® 13 l7 G D D ®
CHANNELIZATION DEVICE
SPACING feet
MPH
TAPER
TANGENT
50160
40
80
35145
30
60
25130
20
40
PCMS #1
1 2
LEFT 1 MILE
LANE AHEAD
CLOSURE
2.0 SEC 2.0 SEC
FIELD LOCATE IN ADVANCE
OF TEMPORARY SIGNS.
OPPOSING TRAFFIC DEVICES I r_�
PCMS #2
TRAFFIC CONTROL INSPECTION SHALL BE
1
2
REQUIRED WHENEVER WORK ZONE IS SET UP
LANE
SHIFTS
1 MILE
AHEAD
LEFT
RECEIVED ENGINEERING DIVISION
2.0 SEC
2.0 SEC
APPROVED AS NOTED
FIELD LOCATE IN ADVANCE
Jun 14 2024
OF TEMPORARY SIGNS.
CITY OF EDMONDS jell W 0✓J? 07/22/2024
DEVELOPMENT SERVICES vv
NOTES
DEPARTMENT
1. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS.
2. FOR SPEED LIMIT OF 30 MPH OR LESS, USE SIGN W1-3 IN LIEU OF SIGN W1-4.
LANE SHIFT -THREE LANE ROADWAY
3. RECOMMENDED EXTENDING DEVICE TAPER (U3)ACROSS SHOULDER.
NOT TO SCALE
4. ALL SIGNS ARE BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.
:onlrol\TC-12
Lane Shik-Three Lane Roaj \TC-1
o„ sT""
Bgn
Plot 1
FED.AID PROJ.NO.
xnx „v xo
WAS
TC12
xxxxE„
Washington State
s„r.T
11„T—T1
�ewrox „o.
Department
of Transportation
or
rr
o<.E
TRAFFIC CONTROL PLAN
x„�
ev
RECEIVED
CITY OF EDMONDS
Right -of -Way Application #1503654 - 217_9thAveS
Jun 14 2024
MyBuildingPermit.com
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Applicant
First Name Last Name Company Name
Marta Sanchez Astound Broadband
Number Street Apartment or Suite Number E-mail Address
4766 1 st Ave S marta.sanchez@astound.com
City State Zip Phone Number Extension
Seattle WA 98134 (425) 389-3647
Contractor
Company Name
Contractor Unknown
Number Street Apartment or Suite Number
City State Zip Phone Number Extension
State License Number License Expiration Date UBI # E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
217 9TH AVE S
City Zip Code County Parcel Number
EDMONDS 98020 00434206903702
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Brandon S & Kristina K Freeman
Number Street Apartment or Suite Number
217 9TH AVE S
City State Zip
EDMONDS WA 98020-3349
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 6/13/2024 Submitted By: Marta Sanchez
Page 1 of 2
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1503654 - 217_9thAveS
Project Contact
Company Name: Astound Broadband
Name: Marta Sanchez Email: marta.sanchez@astound.com
Address: 4766 1 st Ave S Phone #: (425) 389-3647
Seattle WA 98134
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work No Disturbance of Surface
Project Name: 217_9thAveS
Description of Work: Snohomish County PUD set 3 new poles Astound will transfer comms to new
poles. Aerial work.
Project Details
Project Information
Job Number
217_9thAveS
Page 2 of 2