Building PermitType: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED
Parcel No: 00434204002101 Site Address: 109 OLYMPIC AVE EDMONDS,WA 98020-2910
Subdivision: SP AFN 8411090231, 004342 Lot: 0
Fire Sprinklers: Lot Area: Zoning: RS-6
Valuation: $20,751.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: SCHEUERMAN- FOUNDATION STABILIZATION
Applied: 6/17/2024
Issued:7/23/2024
Final:
Expiration Date: 7/23/2026
Issued by: NED
I WA State Contractor L & I #: RAMJAW*852PW I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MEGHANN MINGLE
1068 CHIPMAN DRIVE,
(571)271-9835
UPDATES@PERMITFLOW.COM
MILPITAS CA 95035
CONTACT
PERMITFLOW
1068 CHIPMAN DRIVE,
(571)271-9835
updates@permitflow.com
MILPITAS CA 95035
CONTRACTOR
RAMIACK WEST
PO BOX 11701, EUGENE OR
(541)688-7177
PERMITS@RAMJACKWEST.COM
97440
109 OLYMPIC AVE, EDMONDS
OWNER
JOHN F SCHEUERMAN
WA 98020
• ' I •
DESCRIPTION
7BLD,.RES
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
-PERMIT -VALUATION
001.000.345.83. 000.00
$441.00
$441.007/22/24
R38776
BAS
BLD - RES - PLAN REVIEW
001.000.345.83.000.00
$374.85
$374.85
6/17/24
R37897
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
6/17/24
R37897
PERMIT
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
7/22/24
R38776
- RES
TOTALS: $867.35
$867.35
77
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, July 23, 2024 10:11:58 AM 1 of 2
'RESIDENTIAL
BLDG PermitCity
• • • • -
EL
98020 1 1 •
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
FOR
The engineering division requires 48 hours notice prior to the date of the FINAL
FINAL INSPECTION SCHEDULING
INFORMATION
Inspection.
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
REQUIRED SPECIAL
FOR
SEVEN (7) HELICAL PILES ON SOUTH AND SOUTHWESTERN FACADES.
INSPECTIONS
INFORMATION
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
A-1 BUILDING PRECON
B-3 RETROFIT ANCHORAGE
B-5 BLDG SPECIAL
INSPECTION
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL**
Printed: Tuesday, July 23, 2024 10:11:58 AM 2 of 2