Loading...
BLD2024-0908_Supplementals_Plumbing_Fixture_Counts_7.11.2024_4.54.35_PM_4372529MyBuildingPermit.com Jurisdiction: Edmonds Project Name: South Hill Pain & Wellness Application ID: 1516536 Supplemental Name: Plumbing Fixture Counts Enter the # of plumbing fixtures being - installed, altered, repaired, added or relocated Water Heater - Specify GAS or ELECTRIC - QTY # Plumbing fixture on 1 trap or set of fixtures on 1 trap - Include sinks, toilets, tubs, showers, etc. - QTY # 5 Hand Sinks Drains w/in footprint of building - Rainwater systems, roof deck drains, etc. - QTY # 0 Re -pipe - Drain, vent, or water piping for each fixture served - QTY # 5 Water service line - Replacement or repair - QTY # 0 Water service line - New - QTY # 0 Water treating equipment (water softener) - QTY # 0 Backflow protective device - 2" and smaller - QTY # 0 Backflow protective device - Over 2" - QTY # 0 Graywater or reclaimed water system - In addition to fixtures - QTY # 0 Non -grease waste pre-treatment interceptor - Oil/water separator -QTY# 0 Medical gas piping system - QTY # 0 Grease trap - HGI inside building -QTY# 0 Gravity grease interceptor - GGI - QTY # 0 Gas piping outlets - QTY # 0