Loading...
Building PermitType: SIGN Subtype: MONUMENT SIGN I Status: ISSUED Parcel No: 00434206702700 Subdivision: 004342 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 951 MAIN ST EDMONDS,WA 98020 Lot: 0 Lot Area: 9900 Zoning: RS-8 Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: SHELL CREEK PARK - SIGN WA State Contractor L & I #: Applied: 1/18/2024 Issued: 8/6/2024 Final: Expiration Date: 8/6/2026 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT KYLE WOODS 700 MAIN ST, EDMONDS WA (425)599-3847 KYLE.WOODS@EDMONDSWA.GOV 98020 CONTACT CITY OF EDMONDS, PARKS 700 MAIN ST, EDMONDS WA (425)599-3847 kyle.woods@edmondswa.gov AND REC 98020 CONTRACTOR CONTRACTOR UNKNOWN OWNER EDMONDS CITY OF 121 5TH AVE N, EDMONDS WA (425)344-1505 98020 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# BLD - PERMIT BASE FEE 001.000.322.10.000.00 $100.00 $100.00 1/26/24 R34414 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 1/26/24 R34414 PERMIT MONUMENT - PER SIGN 001.000.345.83.000.00 $88.00 $88.00 1/26/24 R34414 STATE BUILDING CODE SURCHARGE 001.000.237.150 $25.00 $25.00 1/26/24 R34414 - COM TOTALS: $258.00 $258.00 7 • • CONDITION TYPE STATUS NOTES Printed: Tuesday, August 06, 2024 9:38:25 AM 1 of 2 -SIGN PermitCity - • • • • 980i 1 1 D . •. - 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-3 BUILDING FINAL" Printed: Tuesday, August 06, 2024 9:38:25 AM 2 of 2