APPROVED ENG2024-0234 ROW PERMITRIGHT OF WAY EUC PERMIT
IM
PERMIT NUME
BE
City •Edmonds
:0
LM
www.edmondswa.gov i
Description: ZIPLY - REMOVE 2 POLES & 1 CONDUIT WITH SIDEWALK/ADA REPAIR
ISSUED: 08/13/2024
Address: 604 GLEN ST EDMONDS WA 98020-3084
EXPIRES: 02/13/2025
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00395710200100
NAME TYPE NAME ADDRESS PHONE
APPLICANT ARIANNE MOMMSEN 426 E CASINO ROAD, EVERETT WA 98208 (402)670-8384
CONTACT ZIPLY FIBER 426 E CASINO ROAD, EVERETT WA 98208 (402)670-8384
CONTRACTOR ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230
OWNER ERIC AGOL 651 BIRCH ST, EDMONDS WA 98020-4633
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS - 4.1.24
$792.00 $792.00
ROW - STANDARD - 4.1.24 $396.00 $396.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 08/13/2024
Printed: Tuesday, August 13, 2024 11:47:48 AM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NUM11BE
City of Edmonds
....121
Sth Ave N, Edmonds WA •:0
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL**
E-7 CONCRETE SIDEWALK
E-7 CURB GUTTER
E-7 CURB RAMP
E-7 DWY APPROACH
E-7 RESTOR LIMITS
Printed: Tuesday, August 13, 2024 11:47:48 AM 2 of 2
Lti�y of ED%�O�
ANC. 1 g90
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E63.
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General Info
Project Name W0963970
Site Address or if no site address use Property Address at NW corner of project area: 604 GLEN ST
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name of Company Ziply Fiber Northwest, LLC Franchise Ordinance No: WN U-17
PointofContact Mike Hakahan
Title Engineer
Address426 E Casino Rd
city Everett
State WA
zip 98208
Phone 425-949-0230
Email mike.hakahan@ziply.com
AuthorizedContractor and Agent •below)
Name of Company Ziply Fiber Northwest, LLC
Primary Name Mike Hakahan
Agent Name Mike Hakahan
Title Engineer
Title Engineer
Mobile 425-949-0230
Address426 E Casino Rd.
Email mike.hakahan@ziply.com
city Everett
I State WA
zip 98208
Secondary Name
Phone 425-949-0230
Title
Email mike.hakahan@ziply.com
Mobile
City of Edmonds Business License No: 3 1 3-0 1 3-420
Email
State License No: ZIPLYFN782L3
0 Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
0 Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
\4 Utility Franchise Work (no associated development)
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Telecommunications and broadband provider Ziply Fiber to
Acess poles to correct violations
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
JxJ
LF
SF
Alley 72 hours +
LF
JxJ
F
SF
Parking 72 hours +
LF
JxJ
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
* telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details
1.
of Work to be Completed
Does the utility owner have existin overhead infrastructure in the area of work?
2.
Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve mored7
than one lot or commercial development?
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
5.
Does the work involve proposed additions to an aboveground utility system? If es:
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details of • to be Completed
®i
6. Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing? I N/A I How many are to be added? I N/A
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area?
3
What is the height of the existing poles?
N/A
How many poles are to be removed?
o
Are additional poles to be laced?
o
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How many? What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: 7/4V CZ� Z_Zl, DATE: 5/15/2024
APPLICANT PRINTED NAME: Marcus tuna
APPLICANT TITLE: TCP sPECAiusT
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
LEGEND:
EXISTING UTILITY POLE
® PROPOSED NEW POLE
WORK DETAILS:
PUD HAS PLACE NEW POLES. ZILPY TO ACCESS POLES
668 AND 282148 TO TRANSFER ATTACHMENTS AND REMOVE
OLD POLES, NO GROUND DISTURBANCE ALL❑WEWD BEHIND
THE FIRE HYDRANT, ALL WORK WILL BE DONE ABOVE
GROUND, NO WORK INV❑LVING UNDERGROUND C❑NDUIT, SEE
ATTACHED CITY STANDARD DETAIL TR-543 FOR ALLEY
DRIVEWAY APPROACH.
Utility patches shall be combined and full width or half
width overlay will be required depending on the extent
of disturbance. Where utility patches fall entirely within
one travel lane, the overlay shall extend to the
centerline of roadway. Where utility patches extend into
both travel lanes then a full width overlay is required.
RESUB
Jul 09 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Al"a __N
ATCO COMMUNICATIONS SERVICES, LLC
www.atcoteiecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
DATE:
7.9.2024
DESIGNED BY:
M. LUNA
ATCO CONTACT:
606.369.5721
marcus.luna@atcotelecom.com
SCALE:
SHEET:
NOT TO
O'
SCALE
NO: 1 OF 2
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
LEGEND:
EXISTING UTILITY POLE
® PROPOSED NEW POLE
ST
n
WORK DETAILS:
PUD HAS PLACE NEW POLES, ZILPY TO
ACCESS POLE 282155 TO TRANSFER
ATTACHMENTS AND REMOVE OLD POLE, ALL
WORK WILL BE DONE ABOVE GROUND. NO
WORK INV❑LVING UNDERGROUND C❑NDUIT,
Utility patches shall be combined and full width or half
width overlay will be required depending on the extent
of disturbance. Where utility patches fall entirely within
one travel lane, the overlay shall extend to the
centerline of roadway. Where utility patches extend into
both travel lanes then a full width overlay is required.
RESTORATION LIMITS TO BE DETERMINED
BY CITY ENGINEERING INSPECTOR
C/G & SIDEWALK FORM
INSPECTIONS REQUIRED
i
AT POLE 282155 A NEW ADA COMPLIANT DRIVEWAY
APPROACH SHALL BE INSTALLED
OWNER/CONTRACTOR IS RESPONSIBLE FOR
POLE 282155
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
r
LE 1-1 FT
L' - E-
RESUB
Jul 09 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
I
6 0
i W r
_M111—
ENGINEERING DIVISION
APPROVED AS NOTED
,1PJI jVLj,.j,.0 z 08/02/2024
VV
ATCO COMMUNICATIONS SERVICES, LLC
www.otcoteiecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
DATE:
7.9.2024
DESIGNED BY:
M. LUNA
ATCO CONTACT:
606.369.5721
marcus.luna@atcotelecom.com
SCALE:
SHEET:
NOT TO
02
SCALE
NO: 2OF2
TRANSITION 5
DRIVEWAY WIDTH O STANDARD 1/2"
PANEL
FULL DEPTH CONCRETE
11 EXPANSION JOINT SIDEWALK
Q (TYP) SEE COE STD
O DTL TR-531
w
2 Z
b\I
p
NIA
W
W
O
o
Of PLANTER I
Of
I PLANTER
Q
CONCRETE CURB DRIVEWAY APPROACH
3'
AND GUTTER, SEE SIDE SLOPE (TYP)
O8
COE STD DTL FLOWLINE
SLOPE AS NEEDED
TR-520 TO MATCH PLANTER
DRIVEWAY APPROACH GRADES
DRIVEWAY APPROACH
WIDTH VARIES O 5' MIN 8'-12'
2' MIN 7
SAWCUT
Og 8 % V� _ 2% MAX SLOPE
r,
ROUNDING
..........
6" CONCRETE
DRIVEWAY APPROACH RESUB
2" 5/8" MINUS CSTC
COMPACTED SUBGRADE 10 Jul 2024
CITY OF EDMONDS
OF
SECTION A -A DEVELOPMENTEPARTMENRVICES
NOTES:
O1 CURB AND GUTTER SHALL BE POURED SEPARATELY FROM SIDEWALK. CITY INSPECTION REQUIRED ON FORM WORK PRIOR
TO POUR.
2 CONCRETE SHALL BE CLASS 3000.
3
FINISH SHALL BE LIGHT BROOM.
O4 FULL DEPTH 1/2" THRU EXPANSION JOINTS SHALL BE PLACED AT BACK, SIDES AND FRONT. MAXIMUM EXPANSION JOINT
SPACING IS 10' CENTER TO CENTER. WHERE DRIVEWAY WIDTH IS LESS THAN 20', EXPANSION SHALL BE PLACED AT
CENTER OF DRIVEWAY.
O5 DRIVEWAY WIDTHS TO BE CONSISTENT WITH CITY STD DTL TR-541. DRIVEWAY WIDTH DOES NOT INCLUDE ADJACENT
RAMPS.
O6 A MINIMUM 4' RAMP TO BE INSTALLED UNLESS APPROVED OTHERWISE BY CITY ENGINEER.
O7 FULL DEPTH 1/2" EXPANSION JOINT REQUIRED BETWEEN CURB AND DRIVEWAY APPROACH.
O8 MAINTAIN 1/2" LIP AT GUTTER ADJACENT TO DRIVEWAY APPROACH.
O9 2' ASPHALT SAWCUT MAY BE REQUIRED WITH CURB/GUTTER INSTALLATION. REFER TO COE STD DTL TR-520.
10 SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DENSITY.
11
INSTALL MINIMUM 5—FT TRANSITION PANEL BETWEEN DRIVEWAYS AND WHEN CONNECTING TO EXISTING SIDEWALK.
REVISION DATE
DRIVEWAY APPROACH
JANUARY 2018
CITY OF EDMONDS
TYPE III
om PUBLIC WORKS
STANDARD
DEPARTMENT
DETAIL
s } g
T R - 5 43
APPROVED BY: R. ENGLISH
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
SYMBOL LEGEND:
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
O SIGNALIZED INTERSECTION MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY PHASE 1
O ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
CONE (CANDLESTICK) SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
® TYPE III BARRICADE O
WORK TRUCK ATCO COMMUNICATIONS SERVICES. LLC
SIGN LEGEND: www.otcoteiecom.com
9000
WORK ZONE LIMITS 08 First
Street
708 First Street
PORTABLE SIGN Snohomish, WA 98290
ROAD SIDEWALK WORK DETAILS:
Q EXISTING SIGN WORK SHOULDER CLOSED
® DRIVEWAY AHEAD WORK ZI I f i be r
ACCESS POLES TO CORRECT VI❑LATI❑NS P y
(WHERE REQUIRED) EvARROW BOARD
erett, WA 98206
DIRECTION OF TRAFFIC
W20-1 W21-5 R9-g R8-3a
(NOT PAVEMENT MARKINGS)
Z
FLAGGER-SPOTTER �m � ILL
i Z
FLAGGER STATION CONTRACTOR TO PLACE NO O ¢ LU
� ` O
= J 7 FLAGGERS WILL HAVE WORK STOP TO PARKING SIGNS 72 HOURS 3:m
ESCORT PEDESTRIANS THROUGH WORKZONE PRIOR TO START WORK CD
O
a J
a
40'SHOULDER
t GLEN ST TAPER J
X X O,01 (25 MPH) R9-9 R9-9 W21-5 W20-1 15 MIN. PARKING �'�/
® R8-3a ct
z E EP SIDEWALK
LU = SHOULDER EP EP • • P
SIDEWALK
> SHOULDER EP EP z
Q O= Ln ,—
SHOULDER
EP SIDEWf,EP EP E jEi�ZjERC EP SHOULDER
EPEP EP U
Y SIDEWALK EP
2 Z
Y
> J 0 _0
7W20-1 � u_
U U_
LU woF LU w Uj W
m uJ of
M uJ
H
Z Q z
6i
i t a UOf
U LU Q
I—
Z
ILL
I of D-' LU J
d d Z LL
CHANNELIZATION DEVICE
SPACING (feet)
TRAFFIC CONTROL INSPECTION SHALL BE MPH TAPER TANGENT
50 / 70 40 80
REQUIRED WHENEVER WORK ZONE IS SET UP FMON
35/45 30 60
FRI. = 7:00am TO 4:00pm 25 / 30 20 40
ENGINEERING DIVISION RECEIVED
APPROVED AS NOTED May 20 2024
/ I, ./ CITY OF EDMONDS
jell iA%Q✓.X��p08�02�2024 DEVELOPMENT SERVICES
y DEPARTMENT
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8
40
40
60
90
120
130
150
160
170
190
10
40
60
90
90
150
170
190
220
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
SIGN SPACING = X (1)
FREEWAY &EXPRESSWAYS 55 / 70 MPH
1500'±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS &URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS &URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL &BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
DATE:
5.15.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M.LUNA
ATCO CONTACT:
606.369.5721
marcus.luna@atcotelecom.com
SCALE:
SHEET:
1 "=50'
02
NO: 2 OF 3
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
SYMBOL LEGEND:
OS
SIGNALIZED INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
PORTABLE SIGN
Q
EXISTING SIGN
®
DRIVEWAY
ARROW BOARD
REQUIRED)
(WHERE
�•+"
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
11
FLAGGER-SPOTTER
FLAGGER STATION
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
SIGN LEGEND:
ROAD
WORK
AHEAD
W20-1
SIDEWALK
SHOULDER CLOSED
WORK
W21-5 R9- R8-3a
d3 d3
SHOULDE
— d3 d3 SHOULD51
SIDEWALK
\-W20-1 W21-5
TRAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
ENGINEERING DIVISION
APPROVED AS NOTED
Jul W, 1,,04z 08/02/2024
vv
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
PHASE 2 ��
WORK DETAILS:
ACCESS POLES TO CORRECT VI❑LATI❑NSI
O
ATCO COMMUNICATIONS SERVICES, LLC
www.otcoteiecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
n
I_z
W
U)
C.0
Q
W
l
CONTRACTOR TO PLACE NO
PARKING SIGNS 72 HOURS
�
J
�
06
m FLAGGERS WILL HAVE WORK STOP TO
PRIOR TO START WORKCD
a
ESCORT PEDESTRIANS THROUGH WORKZONE
W
x
a
=
✓20-1
6l H AVE N
I—
(25 MPH)
w20-1
:��
SIDEWALK
d3
EP Ep EP EP
SIC
SHOULDER
EP
04
co
N
4—
d3
Q.
_i
40' SHOULDER
Y
a W
W
Y
J
TAPER
w
�
w
w ❑
U) _
W
J �
w
a
W
Pam+ EP EP SHOULDER EP
SIDEWALK — EP EP
SIDEWALK
R9-9 W 9-9
CONTRACTOR TO PLACE R8-3a BOTH
SIDES OF STREET
i�- -W20-1
m
W20-1 J
_J
Q W
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8
40
40
60
90
120
130
150
160
170
190
10
40
60
90
90
150
170
190
220
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
I I CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER TANGENT
50 / 70 40 80
NOTE: 35/45 30 60
MON. - FRI. = 7:00am TO 4:00pm 25/30 20 40
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
z
O
H
U
W
LU m � IY
M W
I—
z Q z
H H H
LU
LU
� fY
O O Q
of fl' W
a- a- z
3
a
ZC)
M
J a
U
H
J
O
`ct
1
Z
O
CU
U_
LL
LL
W
Q
z
W
J
LL
DATE:
5.15.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M.LUNA
ATCO CONTACT:
606.369.5721
marcus.luna@atcotelecom.com
SCALE:
SHEET:
111=50'
01.11
NO: 3 OF 3
CITY OF EDMONDS
PHASE 1
VICINITY MAP
O
ATCO COMMUNICATIONS SERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
zipyett,fiber
WA 98206
o zw U 3
cQ z a
CD
w w
J
0>
co at$ cl)
V 0')
>O
Q
a
~ C)
W
TW
�r
V' )
..t'
'IL
W
O
�(
w
w
U
Cocas Shop& Drop
6 27
Z
w
Q
w
z
..
Lu
g
d
0�
a.
O
J
z
J_
LL
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
DATE:
3.1.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M. LUNA
ATCO CONTACT:
606.369.5721
marcus.luna@atcotelecom.com
SCALE:
SHEET:
NOT TO
SCALE
NO: 1 OF 3
RECEIVED
May 20 2024 M BuildingPermit.com
CITY OF EDMONDS CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Right -of -Way Application #1489032 - Ziply Fiber-W0963970
Applicant
First Name Last Name Company Name
Arianne Mommsen Ziply Fiber
Number Street Apartment or Suite Number E-mail Address
426 E Casino Road Arianne.Mommsen@Ziply.com
City State Zip Phone Number Extension
Everett WA 98208 (402) 670-8384
Contractor
Company Name
ZIPLY FIBER NORTHWEST LLC
Number Street Apartment or Suite Number
1220 75th St SW
City State Zip Phone Number Extension
Everett WA 98203 (425) 231-3928
State License Number License Expiration Date UBI # E-mail Address
ZIPLYFN782L3 5/25/2024 iyini i4gn caitlin.reid@ziply.com
Project Location
Number Street Floor Number Suite or Room Number
604 GLEN ST
City Zip Code County Parcel Number
EDMONDS 98020 00395710200100
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Eric Agol
Number Street Apartment or Suite Number
651 BIRCH ST
City State Zip
EDMONDS WA 98020-4633
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 5/15/2024 Submitted By: Arianne Mommsen
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1489032 - Ziply Fiber-W0963970
Project Contact
Company Name: Ziply Fiber
Name: dawn frank Email: Arianne.Mommsen@Ziply.com
Address: 426 E Casino Road Phone #: (402) 670-8384
Everett WA 98208
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work No Disturbance of Surface
Project Name: Ziply Fiber-W0963970
Description of Work: Access pole to correct violations
Project Details
Project Information
Job Number
ZILPY-WO963970
Page 2 of 2