Loading...
APPROVED ENG2024-0314 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of • • . Edmonds•:0 www.edmondswa.gov i Description: PSE-INSTALL GAS SERVICE ISSUED: 08/14/2024 Address: 20030 81STAVE W EDMONDS WA 98026-6708 EXPIRES: 02/14/2025 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00431200002602 Isle] NAME TYPE NAME ADDRESS PHONE APPLICANT SUSAN SIDICK 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353 CONTACT PUGET SOUND ENERGY 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353 CONTRACTOR PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)466-4771 OWNER GARY E & BRENDA K WATSON 20030 81ST AVE W, EDMONDS WA 98026 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS - 4.1.24 $264.00 $264.00 ROW - STANDARD - 4.1.24 $396.00 $396.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 08/14/2024 Printed: Wednesday, August 14, 2024 9:09:09 AM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMBE City of Edmonds 31 www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL** E-7 RESTOR LIMITS Printed: Wednesday, August 14, 2024 9:09:09 AM 2 of 2 of EpM04O� /'V.isa° SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right-of-Wgy permit Handout E6�. RECEIVED Jun 25 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. General • Project Name 109156292 Site Address or if no site address use Property Address at NW corner of project area: 200 O 81 AVE W Associated Permits: BLD PLN ENG X Owner and Entity Holding Franchise (if applicable) Name of Company PSE/Infrasource Franchise Ordinance No: Point of Contact Susan Sid ick Title SR Permit Specialist Address 1660 Park lane city Burlington State WA Zip 98233 Phone 425-457-6353 Email susan.sidickapse.com Contractor and Authorized Agent of Owner Name of Company (see note below) Contractor Contacts During Construction Primary Name PSE/Infrasource Susan Sidick Agent Name PSE/Infrasource Title SR Permit Specialist Title SR Permit Specialist Mobile 425-457-6353 Address 1660 Park lane Email susan.sidick@pse.com City Burlington State WA Zip 98233 Secondary Name Phone 425-457-6353 Title SR Permit Specialist Email susan.sidick@pse.com Mobile City of Edmonds Business License No: Email State License No: INFRASL871 C2 [N Contractor verifies it is currently bonded d( Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ix Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) ❑ Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Install gas service at approx 335' S c/1 of tooth ST SW & 14'Wc/1 of 81st AVE W (1) 3x5 paving RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley 72 hours + LF Ix I LF SF Parking 72 hours + LF Ix I LF SF 1 SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power 3xgas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No x 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? x If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? x 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? x 5. Does the work involve proposed additions to an aboveground utility stem? If es: x Are the additions for the purpose of serving new commercial development? x Are the additions for the purpose of serving a single-family residential subdivision? x Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? x If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: x How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: x How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: x How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: Susan Sidick DATE: 06/20/24 APPLICANT PRINTED NAME: Susan Sidick APPLICANT TITLE: SR Permit Specialist NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM Puget Sound Energy Gas Pre -Inspect Form Job #: 109156292 Service Address: 20030 81stAve W Date: 6/10/24 City Edmonds Jurisdiction: Edmonds Customer: ROW Permit: Customer Email: Est. Start Date: PM / Inspector: Kevin Klacsan Est. Duration: Site Contact Email: Job Description Install new 1 1/8" service to 05 Loc. Install 1 ballard and retire existing service at P/L OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. Zip: 98026 Phone: Phone: 253-244-0919 Phone: New Construction: NO Construction Method Hole Hog Building Foundation Type Slab Septic System No RECEIVED Jun 25 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PLAT Map: 262.069 t I 3 ; i RESTORATION LIMITS TO BE DETERMINED ' I Power/Comms OH BY CITY ENGINEERING INSPECTOR I I � I I � I I � I I 335' 1 S I of CL 1200thStSW Of CL Service Information iameter: =V: 10 er Loc: Press: 2.5" # 1 1 4" # ' I I Work Location Size of Cut Surface Type & 1 14' 1 1 ofCL 181st Ave W 3 X 5 X 3 A & I of CL Street Information Job Type Flaggers #: 0 Arterial: No Service Replacement Police #: 0 TCP: No Tie -In Fitting Speed Limit: 0 No Parks #: 0 Svc Tee Trolley Lines: No Mtr Hoods #: 0 Traffic Signal: Bus Stop: No ADA Ramps #: 0 R —w-w—L.—d i Applicant shall repair/replace all ENGINEERING DIVISION dama a to utilities or fronta e OWNER/CONTRACTOR IS RESPONSIBLE FOR improvements in City right -of --way APPROVED AS NOTED EROSION CONTROL AND DRAINAGE per city standards that is caused or 1 ,I, occurs during the permitted project. r/p,� WQ✓..yri.ifnp 07/31/2024 Ob'3Hb o 1i2IOM \OVO2I N) OdHV 08 3Nb'13NO P. fV O 44 i 20030 81 st Ave W Edmonds WA 98026 USA RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE Notes: 1. All signs and spacing to conform to the MUTCD and city of EDMONDS standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated, if indicated use ADA compliant channelization. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 1 O' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non -arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, signaling and flaggers shall conform to WAC 296-155-305. Night time work to take place between and ) 8. All Flagger and Downstream tapers shall be 50'-100' 9. Work area will be 335' South of centerline of 200TH ST SW, and 14' West of centerline of 81 ST AVE W. 200TH ST SW O , o , O O 4:4 12112 6 T T TEMPORARY TRAFFIC CONTROL PLAN ., LL �I zU) � w CD_ LL Of • tl321V AV AV MOl �/1 v J 0 Q •PARKING •I Oo. �,.cw Wl^ Y vJ rzau� *o C TOW ALWAVAREA ® • oNli,avd • U I Q • • 000 • I o 0 El r` 0 C14 O O ROAD AHEAD o O I i E ENGINEERING DIVISION ' ROAD APPROVED AS NOTED WORK CD AHEAD N %X 1A/Q✓,10..44p 07/31 /2024 VV SIGN SPACING MPH 'X" 60/65 1000, 45/55 500' 35/40 350' 30 200' 25 100' CHANNELIZATION DEVICE SPACING MPH TAPER TANGENT 55/70 40 80 35/45 30 60 25/30 20 40 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 20 25 POSTED SPEED (MPH) 30 35 40 45 50 55 60 65 70 10 70 105 150 205 270 475 500 550 - - - 11 75 115 165 225 295 495 550 605 660 - - 12 80 125 180 245 320 540 600 660 720 780 840 PUGET Designer: SOUND Matlock Highbarger ENERGY 808-375-4152 Project Address: Matlock.Highbarger@pse.com 20030 81 st Ave W, Edmonds, WA RECEIVED Jun 25 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT LEGEND ® WORK PIT ® 28" TRAFFIC CONE TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS SIGN LOCATION RIGHT OF WAY Row WORK AREA OCHEVRON ARROW BOARD UNIFORMED POLICE OFFICER FLAGGER Puget Sound Energy REV Traffic Control Supervisor: Gfe9°""a"°°° C06/14/2024 0 ard N°. ES2 000299 Card Exp. 09/3012027 gregory.hamood@pse.com Job # (425924-6425 11974797 Page 1 OF 1 RECEIVED Jun 25 2024 CITY OF EDMONDS CITY OF EDMONDS MyBuildingPermit.com DEVELOPMENT SERVICES DEPARTMENT Right -of -Way Application #1507288 - 109156292 Applicant First Name Last Name Company Name Susan Sidick Puget Sound Energy Number Street Apartment or Suite Number E-mail Address 1660 Park Lane susan.sidick@pse.com City State Zip Phone Number Extension Burlington WA 98233 (425) 457-6353 Contractor Company Name PUGET SOUND ENERGY INC Number Street Apartment or Suite Number 1660 Park Lane City State Zip Phone Number Extension Burlington WA 98233 (425) 457-6353 State License Number License Expiration Date UBI # E-mail Address PUGETSE033DD 3/28/2025 17gn 1 nns.si susan.sidick@pse.com Project Location Number Street Floor Number Suite or Room Number 20030 81 ST AVE W City Zip Code County Parcel Number EDMONDS 98026 00431200002602 Associated Building Permit Number Tenant Name 109156292 Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Gary E & Brenda K Watson Number Street Apartment or Suite Number 20030 81 ST AVE W City State Zip EDMONDS WA 98026 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 6/20/2024 Submitted By: Susan Sidick Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1507288 - 109156292 Project Contact Company Name: Puget Sound Energy Name: Susan Sidick Email: susan.sidick@pse.com Address: 1660 Park Lane Phone #: (425) 457-6353 Burlington WA 98233 Project Type Utility Purveyor Activity Type Utility Work Scope of Work Disturbance of Surface Project Name: 109156292 Description of Work: Install gas service at approx 335' S c/I of200th ST SW & 14' W c/I of 81 st AVE W (1) 3x5 paving cut anticipated Project Details Project Information Job Number 109156292 Page 2 of 2