Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
APPROVED ENG2024-0364 ROW PERMIT
RIGHT OF WAY EUC PERMIT PERMIT NUMBER City of • • . Edmonds98020 ENG2024-0364 www.edmondswa.gov i Description: OVWSD-TEMPORARY EMERGENCY WATER SERVICE REPAIR ISSUED: 08/14/2024 Address: 23926 84TH AVE W EDMONDS WA 98026-9151 EXPIRES: 02/14/2025 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00463301600104 NAME TYPE NAME ADDRESS PHONE APPLICANT MARTY HENNINGER 8128 228TH ST SW, EDMONDS WA 98026 (425)774-7769 CONTACT OLYMPIC VIEW WATER AND SEWER 8128 228TH ST SW, EDMONDS WA 98026 (425)774-7769 DISTRICT CONTRACTOR OLYMPIC VIEW WATER & SEWER 8128 228TH ST SW, EDMONDS WA 98026 (425)670-1856 DISTRICT OWNER ZHANG JIAYING & CHEN JIAHUI 4026 96TH AVE SE, MERCER ISLAND WA 98040 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS - 4.1.24 $132.00 $132.00 ROW - STANDARD - 4.1.24 $396.00 $396.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 08/14/2024 Printed: Wednesday, August 14, 2024 9:25:49 AM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds :• • 1 1 .� www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL** Printed: Wednesday, August 14, 2024 9:25:49 AM 2 of 2 "_t of EDA1041 RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION lowComplete and submit this Application in accol•daAgq,'h the Submittal INC. Ioo Requirements outlined in Right-of-Way_perrnWHa %6 . If any field is not applicable to your project, wrKOI�N' Igftead of leaving blank. All fields required. Incomplete Appl* A&&UTAIeMed. VlAou SECTION A General Info Project Name Water Service Upgrade Site Address or if no site address use Property Address at NW corner of project area: 23930 Hwy 99 Associated Permits: BLD PLN ENG Owner and Entity Holdingapplicable) NameofCompany Olympic View Water and Sewer District Franchise Ordinance No: Point of contact Marty Henninger Title Lead Utility Worker Address 8128 228th St SW city Edmonds State Wa zip 98026 Phone (425)&&4-7769 Email marty@ovwater.com Contractor and Authorized Agent of Owner (see note below) Name of company Olympic View Water and Sewer District Contractor Contacts During Construction Primary Name Agent Name Marty Henninger Title Title Lead Utility Worker Mobile Address8128 228th St SW Email city Edmonds State Wa. Zip 98026 Secondary Name Phone(425)774-7769 Title Email marty@ovwater.com Mobile City of Edmonds Business License No: Email State License No: o Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC iB.6o.020 requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. Type of D• • apply ❑ Multifamily residential ❑ Commercial o City project ❑ Single family residential subdivision o Single family -other ❑ Industrial o Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well o Traffic Control Only (no associated development) NUtility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) We had to do an emergency temporary repair on this water service. We now want to upgrade the water service to copper. The work will be done on the gravel shoulder on 84th Ave W. All work will be nydro excavated. ne RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 72 hours + LF x LF SF Parking 72 hours + LF x LF SF SECTION B - If you are not a utility company peiforming work in the City ROW, skip to SECTIONC. Type of Utility Facilities 1. The work in the right of way is on or for the following type of facilities:.. ❑ telecommunications ❑ cable ❑ power ❑ gas Nwater ❑ sewer ❑ storm Details of Woi,k to be Completed 1. 1 Does the utility owner have existing overhead infrastructure in the area of work? Yes No X 2. 1 Will any equipment be added underground or above ground (e.. pedestals, vaults etc.)? X If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? X 5. Does the work involve proposed additions to an aboveground utility system? If es: X Are the additions for the purpose of sei ving new commercial development? X Are the additions for the purpose of serving a single-family residential subdivision? X 1 No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? X If yes, answer the following questions related to project area, i.e. the actual area in which the ro'ectis proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing ? N/A How many are to be added? N/A City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. I Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additional oles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? What is the height of the poles after? Describe the modification rebuild: SECTION C required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permi kA.. N. A APPLICANT SIGNATURE: APPLICANT PRINTED NAME: APPLICANT TITLE: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 7/16/2024 City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 Ic- Dm >z Om m X 0 z � � z Ocl) m0 �z O -p 0 3 D 0 Ca N0 (Q Q 3 O (� cn Q0 3 C ) =3 N o � o m �co 0 _ Eel 0 3 23522 D4-16 _—��� > I20027-1I985 10 8420 1 8414 1 8408 24 23622 <� c— m� c 0 Z o 22??6M 23626 mcn� � zm0 p �co m� rn 23706 E 1" COPPER - I 23720� cc 1 8415 23727 ?1 165 LF - h 2" STEEL IIN 16" CASING � _L 8„ Di 2 I 23808 0 I i I 238>4 1 23820 I 23828�> I 23904 .'3914 23912� 23920 421 23926 _-1 ST_ SW 5 D6—! 1 N 1 E4— V10 3 6 1 1020-1983'-'--- �. E5—V12 Q ' — "E5—VIm o �I w L' c)1 23715 I N 23721( ij 23721-19841 ` I 23725 8319Lo w w I Lo L 0 I N I o� 6 E5-12 23619C 23619A i rn I � U 1f- N 23619D 23619B 1 I 23625 23709 I 23711 ! E5-13 23713 FIRE DETECTOR I VAULT o� 2 0IU rn �) rn N n 10 '38T WINK a® _ _ I 8" DI 24034-19 2-1" COPPER 8" DI _2C 23809 % E5-V6 E5-3 �w 9&3821 ! o -- 23827 / FIRE DETECTOR / VAULT �- 23830/—E5 23921 E5-2 VILLAGE 1 28904 TRANSMISSION TACO TIME 12" IS 25.5' FROM CURB GOLDEN WEST / MOTEL 23916 / - E5—V12 23930 ®o A E5-1 / f MINIMUM LANE CLOSURE TAPER LENGTH = L (feet) LANS_ Posted Speed (mph) k" 1 25 i 30 35 40 45 I 50 SS 60 GS 70 10 j 105 i 1w E)5 2TJ 450 SCO 550 it 215 1S5 225 295 495 SSC i 505 6fA - - 12 in 101 245 no SAC 000 6G0 720 7Lq 80.7 MINMUM SHOULDER TAPER LENGTH = LI3 (foot) SHOULDER 0t1DTH (R." Posted Speed (mph) —^ 25 30 1 35 40 i 15 SD SS 60 65 70 g 40 40 1 00 90 i M 130 150 160 170 190 10 4C 60 1 So 90 ISO 170 190 200 22C 240 USE A MINIMUM 3 DEVICES TAPER FOR S'6—JLD.R LESS THEN, r. SIGN SPACING = X (1) FREEWAYS 6 E!PRESSWXYS SS 170 MPH IS== RURAL HLGW AYS 6o 165 MPH 800E RURAL ROADS 45 I S MPH 5w. RURAL ROADS S URBAN ARTERIALS 35 140 MPH 35C'S RURAL ROADS & URBAN ARTERIALS 25 130 MPH 2OC= (2) R£SOSM71AL L BUSINESS DISTRICTS URStN STREETS 25 i:1PH OP. LESS 100'= r) (1)ALL SPACING LAAY BE AVUL" D TO ACCOMMODATE INfZ CIVNG'e RAM>S.AT-GRAD£ INTERSECTIONS AND DPSVEWlYS W THUS SPAC;NG MAY BE REDUCED IN W&AN AREAS TO FIT ROAD'NA7 CONDMONS. CHANNELIZATION DEVICE SPACING fee! MPH TAP2Z TANGENT sm 40 B0 35145 30 1 60 Z5W 20 1 4D I X X 1 X A L Imo' LOP 1 { f I '�� Q 48' ZI— T-�� Vl20-1 V BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPIC I 25 30 35 1 40 1 45 1 50 55 1 60 1 65 70 LENG!H (_C 755 I 2C0 250 I 3C5 360 1 425 435 1 SIC I 045 1 730 TRANSPORTABLE A71ENUATOR ROLL AHEAD DISTANCE = R HOST VETOCLF WEIGHT HOST VEIiICLE WEIGHT 9.5o TO22.o0C Qs. > a.00J .. < 45 MPH 4555 MPH > 55 MPH < 411 WH 4S.% MPH ( > 55 MPH 10P i2T 1TZ 7C 100 I L'P LEGEND * TEMPORARY SIGN LOCATION N TRAFFIC SAFETY DRUM pj�p SEQUENTIAL ARROW SIGN SINGLE -LANE CLOSURE FOR MULTI -LANE ROADWAYS a�S TRANSPORTABLE ATTENUA:OR j PCPAS PORTABLY OiANG1SLE MESSAGE SIGNI NOT TO SCALE PCMS 1 2 RIGHT 7 MR C LAN6 AHEAD z� sEe ao s£c FIELD LOCATE 1 MILE . IN ADVANCE CF LANE CLOSURE StMeNG. \�I X NOTES 1. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS. 2. E)CEND DEVICE TAPER AT LJ3 ACROSS SHOULDER. 3. DEVICES SHALL NOT ENCROACH INTO THE ADJACENT LANE 4, USE TRANSVERSE DEVICES IN CLOSED LANE EVERY LWD(FTi (RECOMMENDED). S. DEVICE SPACING FOR THE DOYIMSTREAM TAPER SHALL BE =(FT), 6. ALL SIGNS ARE BLACK ON ORANGE. FF.E NAM. i n R P. 34+9OnNM>V . Simat lJDnMNDRI w +-��'+ THE A'1501 AN IFEDAW PRDJNO. I I I^"'� CAtE 1nrme /A 7C3 PLOT7© (M IM44H IuSwNEe BY 114" DeparOnent of 7rJlesWashington State "� exrERED Er ortation By ee p TRAFFIC CONTROL PLAN «-� REGIONAL A01K lL.wawY DATE or ENGINEERING DIVISION APPROVED AS NOTED RECEIVED (]$/08/2(]24 Jeff Whatmore _...---------_ __.. ....._................. -. _ ................._....._...._.__......• Jul 16 2024 CITY OF EDMONDS SERVICES DEPARTMENT .... .. DEPARTMENT OLYMPIC VIEW WATER & SEWER DISTRICT EDMONDS BLANKET PERMIT BEQjf*#,v*,^30 NOTIFICATION t,ZOZ 9l, Inf Site Address: 23930 Hwy 99 Scope of Work: Emergency repair of water service. Replace water service. All work will be done in the gravel shoulder. No flaggers will be required. Asphalt or Concrete Cut: No Start date: 7/22/2023 Olympic View Water & Sewer District 8128 228th ST SW Edmonds WA. 98026 Phone Number 425 774 7769 Fax Number 425 670 1856 Contact: Marty Henninger E-mail: marty@ovwater.com Olympic View Water & Sewer District 8128 228th ST SW Edmonds WA. 98026 Phone Number 425 774 7769 Fax Number 425 670 1856 Contact: Billy Ward E-mail: Billyw@ovwater.com . Traffic control shall be in accordance with the MUTCD. • All flaggers shall be trained and certified as required by WAC 296-155-305. • Restoration shall be in accordance with City of Edmonds standards. • All asphalt or concrete cut surfaces shall be patched with City of Edmonds approved materials prior to the end of the day. O:\SHARE\PERMITS RIGHT OF WAYS\Edmonds RECEIVED Jul 16 2024 CITY OF EDMONDS CITY OF EDMONDS MyBuildingPermit.com I� DEVELOPMENT SERVICES DEPARTMENT Right -of -Way Application #1518627 - Water service upgrade Applicant First Name Last Name Company Name Marty Henninger Olympic View Water and Sewer District Number Street Apartment or Suite Number E-mail Address 8128 228th St SW marty@ovwater.com City State Zip Phone Number Extension Edmonds WA 98026 (425) 774-7769 Contractor Company Name Contractor Unknown Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number City Zip Code County Parcel Number Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location 239th & 84th Ave W Property Owner First Name Last Name or Company Name Number Street Apartment or Suite Number City State Zip Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 7/16/2024 Submitted By: Marty Henninger Page 1 of 2 CITY OF EDMONDS M BuildingPermit.com Right -of -Way Application #1518627 - Water service upgrade Project Contact Company Name: Olympic View Water and Sewer District Name: Marty Henninger Email: marty@ovwater.com Address: 8128 228th St SW Phone #: (425) 774-7769 Edmonds WA 98026 Project Type Activity Type Scope of Work Utility Purveyor Utility Work Disturbance of Surface Project Name: Water service upgrade This was a temporary emergency water service repair. We are now going to upgrade the Description of water service to 1" copper. All excavation will be hydro excavated. All work will be done in the Work: gravel shoulder and there will be no need for flagging due to no traffic disturbance. There will be no asphalt cut. Project Details Project Information Job Number 17 Page 2 of 2