Building PermitType: COMMERCIAL BLDG Subtype: NEW APT OR CONDO BLDG I Status: ISSUED
Parcel No: 00424400000501 Site Address: 23620 79TH AVE W EDMONDS,WA 98026-9281
Subdivision: 004244, 006030, 004520, 006390, SP 5-2001-11 Lot: 0
Fire Sprinklers: Lot Area: 7178 Zoning: CG
Valuation: $58,046.56 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: HENSON- GARAGE CONV.TO APT M INCL P SEP
WA State Contractor L & I #: mastopc91215
Applied: 2/28/2024
Issued:8/14/2024
Final:
Expiration Date: 8/14/2026
Issued by: NED
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE EMAIL
APPLICANT
JASON SIMONIS
27624 44TH PL S, AUBURN WA
(907)440-9284
JASON@PUGETSOUNDPLANNING.CO
98001
M
CONTACT
PUGET SOUND PLANNING
27624 44TH PL S, AUBURN WA
(907)440-9284
jason@pugetsoundplanning.com
98001
MASTON PROPERTIES &
2020 Maltby Rd Ste 7 Pmb 116,
CONTRACTOR
(425)787-2137
RICK@MASTONPROPERTIES.COM
CONST LLC
BOTHELL WA 98021
OWNER
MARGARET HENSON
7019 14TH AVE NW, SEATTLE
margo@marketappraisalinc.com
WA 98117
FEE
INFORMATION
DESCRIPTION ACCOUNT
AMOUNT
PAID PAID DATE RECEIPT #
AC OR HEAT PUMP - 1.75 BTU OR
001.000.345.83.000.00
$57.00
$57.00
8/14/24
R39327
LESS
ADB REVIEW TYPE 1
001.000.345.83.200.00
$275.00
$275.00
8/14/24
R39327
APPLIANCE VENT
001.000.345.83.000.00
$34.00
$34.00
8/14/24
R39327
BLD - RES VALUE BASED FEE
001.000.345.83.000.00
$813.00
$813.00
8/14/24
R39327
BLD - RES VALUE BASED PLAN
001.000.345.83.000.00
$691.05
$691.05
3/4/24
R35162
REVIEW
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
3/4/24
R35162
PERMIT
ENG - HOURLY REVIEW - 4.1.24
001.000.345.83.400.00
$132.00
$132.00
8/14/24
R39327
FAN CONNECTED TO A SINGLE
001.000.345.83.000.00
$17.00
$17.00
8/14/24
R39327
DUCT
MECHANICAL BASE PERMIT FEE
001.000.322.10.000.00
$57.00
$57.00
8/14/24
R39327
PARK IMPACT - COM ADMIN FEE -
001.000.345.83.000.00
$126.00
$126.00
8/14/24
R39327
4.1.24
PARK IMPACT - MULTI FAMILY
332.100.345.85.000.00
$2,340.16
$2,340.16
8/14/24
R39327
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
8/14/24
R39327
- RES
TRANSPORTATION IMPACT -
001.000.345.83.400.00
$126.00
$126.00
8/14/24
R39327
ADMIN - COM-MF - 4.1.24
Printed: Wednesday, August 14, 2024 1:01:31 PM 1 of 3
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
TRANSPORTATION IMPACT FEE -
112.502.345.86.000.00
$4,092.36
$4,092.36
8/14/24
R39327
CO M
TOTALS: $8,812.07 $8,812.07
Tok MD we Mk
CONDITION TYPE
STATUS
NOTES
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE
SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL IN
FOR
CARBON MONOXIDE SYSTEMS
NEW CONSTRUCTION AND IN EXISTING DWELLINGS WHEN ALTERATIONS, REPAIRS OR
INFORMATION
ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS
ARE ADDED OR CREATED.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
FOR
In addition to the required pressure relief valve an approved listed expansion tank shall
EXPANSION TANK
INFORMATION
be installed on all hot water tanks per UPC 608.
FOR
The engineering division requires 48 hours notice prior to the date of the FINAL
FINAL INSPECTION SCHEDULING
INFORMATION
Inspection.
LOT LINES STAKED
FOR
Lot line stakes must be in place at the time of foundation setback inspection.
NFORMATION
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
MAXIMUM HEIGHT
FOR
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
Installer shall provide the manufacturer installation, operating instructions, and a whole
WHOLE HOUSE FAN
FOR
house ventilation system operation description. A label shall be affixed to the whole
INFORMATION
house timer control that reads "Whole house ventilation, see operating instructions".
Printed: Wednesday, August 14, 2024 1:01:31 PM 2 of 3
•MMERCIAL BLDG Permit
City of Edmonds PERMIT NUM
98020 1 1 .:
. •.
INSPECTIONS•
INSPECTOR
•.
COMPLETED RESULT NOTES
AdINSPECTIONTYPE
A-1 BUILDING PRECON
B-2 SLAB INSULATION
B-3 EXT WALL SHEATHING
B-3 MECH ROUGH IN
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 SHOWER PAN
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
X-2 ENGINEERING FINAL
Printed: Wednesday, August 14, 2024 1:01:31 PM 3 of 3