Loading...
Building PermitType: RETAINING WALL Subtype: RESIDENTIAL RW I Status: ISSUED Parcel No: 27040700104300 Subdivision: Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 17134 TALBOT RD EDMONDS,WA 98026-5051 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: JOHNSTON-RETAINING WALL Applied: 4/5/2024 Issued:8/20/2024 Final: Expiration Date: 8/20/2026 Issued by: BAC I WA State Contractor L & I #: ADVANFS903DH I CONTACTSad NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT LISA JOHNSTON 17134 TALBOT RD, EDMONDS (623)760-6552 SAMLIJOHN@AOL.COM WA 98026 CONTACT ARON DE LOS ANGELES 250 4TH AVE SOUTH, SUITE 200, (425)778-8500 arond@cgengineering.com EDMONDS WA 98020 CONTRACTOR ADVANCED FNDTN 22102 SPRUCE DRIVE, MONROE (206)852-2450 Howard@foundationsupports.com SUPPORTS LLC WA 98272 7020 164TH ST SW, EDMONDS OWNER LISA A TTEE JOHNSTON WA 98026 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 4/8/24 R36172 PERMIT ENG - INSPECTIONS - 4.1.24 001.000.345.83.400.00 $264.00 $264.00 8/20/24 R39497 RETAINING WALL - RES - PER WALL 001.000.345.83.000.00 $756.00 $756.00 4/8/24 R36172 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 4/8/24 R36172 RES TOTALS: $1,071.50 $1,071.50 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Tuesday, August 20, 2024 3:39:29 PM 1 of 3 RETAINING WALL Permit - City of • • • 98020 1 1 www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION INSPECTIONS FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INFORMATION www.mybuildingpermit.com Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. Special inspections required for: REQUIRED SPECIAL FOR INSPECTIONS INFORMATION 1. Pin Pile installation 2. Epoxy or expansion anchors if used Printed: Tuesday, August 20, 2024 3:39:29 PM 2 of 3 RETAINING WALL Permit - City of • • • 121 98020 1 1 4 www.edmondswa.gov • Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. INSPECTINSPECTOR COMPLETED RESULT NOTES B-1 SETBACKS B-2 FOOTINGS B-2 FOUNDATION WALL B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-5 BLDG SPECIAL SI reports for pin pile installation and epoxy or INSPECTION expansion anchors if used. Provide reports to city inspector. A-1 TESC AND MOBILIZE E-3 STRM CONVEYANCE E-3 STRM FOOTING DRAIN E-9 COMPOST AMEND X-2 ENGINEERING FINAL E-7 SEWER MAIN NOTE TO INSPECTOR: THIS INSPECTION IS TO VERIFY THAT NO PORTION OF THE WALL IS PLACE WITHIN THE SEWER EASEMENT. Printed: Tuesday, August 20, 2024 3:39:29 PM 3 of 3