DNS BLD2024-0255 LETTER EXPLAINING CC - NO BOILER.From: Nelson, Denise <denise.nelson @edmondswa.gov>
Sent: Wednesday, March 13, 2024 2:40 PM
To: MacKenzie Noyes <mnoyes@accoes.com>
Subject: RE: BLD2024-0255 Kruger Building TI - Response to Corrections Required
Already got the info. Our cross connection reviewer did think it was a boiler, so this email will be
placed in file and he will approve. The permit will be able to issued on Monday.
Denise.
From: MacKenzie Noyes <mnoyes@accoes.com>
Sent: Wednesday, March 13, 2024 2:35 PM
To: Nelson, Denise <denise.nelson @edmondswa.gov>
Subject: Re: BLD2024-0255 Kruger Building TI - Response to Corrections Required
Sounds good, thank you.
MacKenzie Noyes Design Engineer I ACCO Engineered Systems
5300 Denver Ave S Seattle, Washington 198108
www.accoes.com 1206.787.8539 Office 1206.593.0507 Cell
On Wed, Mar 13, 2024 at 2:32 PM Nelson, Denise <denise.nelson(aD_edmondswa.gov>
wrote:
Let me do some digging and get back with you ASAP.
OJ I ��, Denise Nelson CPT I Senior Permit Coordinator I she/her
v
City Hall 1 121 5t" Ave N I Edmonds WA 98020
425.771.0220 Ext 1336
Denise. Nelson@edmondswa.gov
www.edmondswa.gov
The Development Services Permit Center is open M-F 8:00am to 4:30pm for Telephone and
Digital/Remote access. In -Person walk-in service is currently available Mon -Fri 8:30am to
2:00om, closed for lunch 12-1pm; appointments are encouraged. I work remotelv 3-4 days a
week, but on Mondays I am typically in office.
To apply for a permit, check status of a permit or schedule inspections please
visit WWW.MYBUILDINGPERMIT.COM
NOTICE: All emails, and attachments, sent to and from the City of Edmonds are public records
and may be subject to disclosure pursuant to the Public Records Act (RCW 42.56)
From: MacKenzie Noyes <mnoyes@accoes.com>
Sent: Wednesday, March 13, 2024 2:28 PM
To: Kobylk, Jeff <jeff.kobylk@edmondswa.gov>; Carter, Eric <eric.carter@edmondswa.gov>
Cc: Edmonds Development Services Admin <devserv.admin@edmondswa.gov>; Nelson, Denise
<denise.nelson @edmondswa.gov>
Subject: BLD2024-0255 Kruger Building TI - Response to Corrections Required
You don't often get email from mnoyesftaccoes.com. Learn why this is important
Hello,
I received a correction comment stating "boiler needs RPBA installed". However, the
scope of work does not involve any boilers.
The scope involves like -for -like replacements of (2) electric water heaters. I'm assuming
the confusion came from detail P2.01 /1, where a "boiler valve" is called out. We use
boiler valves for electric water heater installs because the built-in connections save us
time in the field.
Please let me know if I need to submit a formal response or if we can resolve this via
email.
All the best,
MacKenzie Noyes I Design Engineer I ACCO Engineered Systems
5300 Denver Ave S I Seattle, Washington 198108
www.accoes.com 1206.787.8539 Office 1206.593.0507 Cell