Loading...
BLD2024-0882+Architectural_or_Building_Floor_Plans+7.8.2024_10.41.03_AM+4361586GENERAL NOTES 1. GENDER NEUTRAL RESTROOMS SCOPE GENERALLY CONSISTS OF REMOVING THE EXISTING MENS AND WOMENS TOILET ROOMS AND CREATING ALL GENDER STUDENT TOILET ROOMS. WORK WILL INCLUDE ELECTRICAL, PLUMBING AND MECHANICAL EFFORT TO REMOVE AND REPLACE WATER CLOSETS AND SINKS IN THE SPACE. THE NEW TOILET ROOMS WILL BE FULLY CODE COMPLIANT. 2. STAFF TOILET ROOM SCOPE GENERALLY CONSISTS OFF DIVIDING A STORAGE ROOM TO ADD A SINGLE USER ALL GENDER STAFF TOILET ROOM. WORK WILL INCLUDE A LIMITED AMOUNT OF ELECTRICAL, PLUMBING AND MECHANICAL EFFORT TO ADD A WATER CLOSET AND SINK TO THE SPACE. THE NEW TOILET ROOM WILL BE FULLY CODE COMPLIANT. 3. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL INDUSTRY STANDARD TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS INDICATED. DO NOT SCALE DRAWINGS. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE FULL SPACE INDICATED WITHOUT ENCROACHMENTS. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR ELEVATION UNLESS OTHERWISE NOTED. ALL HORIZONTAL MEASURMENTS INDICATED AS "CLEAR" ARE FROM FACE OF FINISH TO FACE OF FINISH. 4. THE DRAWINGS HAVE BEEN COORDINATED TO THE EXTENT POSSIBLE WITH AS BUILT CONDITIONS. NOT ALL FIXTURES AND EQUIPMENT SUCH AS LIGHT SWITCHES, SMOKE DETECTORS, OUTLETS, FIRE HORN STROBES, ETC, REQUIRING ADJUSTMENT OR RELOCATION FOR NEW CONSTRUCTION, MAY BE SHOWN ON THE DRAWINGS. ARCHITECT SHALL APPROVE ALL RELOCATIONS OF FIXTURES AND EQUIPMENT WHERE A CONFLICT IN THE FIELD IS NOT INDICATED ON THE DRAWINGS. THESE CHANGES SHALL BE INCLUDED IN THE CONTRACTORS BASE BID. ABBREVIATIONS # POUND OR NUMBER & AND @ AT A/C AIR CONDITIONING A.C.T. ACOUSTIC CEILING TILE A.D. AREA DRAIN ADA AMERICANS with DISABILITIES ACT A.F.F. ABOVE FINISHED FLOOR ALUM. ALUMINUM ANOD. ANODIZED AVG. AVERAGE BBT BIO-BASED TILE BD. BOARD BLDG. BUILDING BOT. BOTTOM BSMT. BASEMENT BYND. BEYOND CFS CLEAR FLOOR SPACE CHNL. CHANNEL C.I.P. CAST IN PLACE C.J. CONTROL JOINT CLG. CEILING CLR. CLEAR(ANCE) C.M.U. CONCRETE MASONRY UNIT COL. COLUMN COMPR. COMPRESSIBLE CONC. CONCRETE CONST. CONSTRUCTION CONT. CONTINUOUS CPT. CARPET C.T. CERAMIC TILE CTYD. COURTYARD DBL. DOUBLE DEMO. DEMOLISH OR DEMOLITION DIA. DIAMETER DIM. DIMENSION DIMS. DIMENSIONS DN. DOWN DR. DOOR DWG. DRAWING EA. EACH EIFS. EXTERIOR INSULATION FINISH SYSTEM E.J. EXPANSION JOINT ELEC. ELECTRICAL ELEV. ELEVATOR OR ELEVATION EPDM. ETHYLENE PROPYLENE DIENE M-CLASS (ROOFING) EQ. EQUAL EXG EXISTING EXT. EXTERIOR F.D. FLOOR DRAIN OR FIRE DEPARTMENT F.E.C. FIRE EXTINGUISHER CABINET FIN. FINISH(ED) FIXT. FIXTURE FLR. FLOOR F.M. FILLED METAL FND. FOUNDATION F.O.C. FACE OF CONCRETE F.O.F. FACE OF FINISH F.O.M. FACE OF MASONRY F.O.S. FACE OF STUDS 3 M M M M E DS UNKNOWN VAULT !E) NNEL 4v o �O (E) TUNNEL �p ❑ (E) RD SDCO B2 AREA DRAIN RIM=401.03400. ,' c� 399.50 IE-398:46 6"( Nffi BLD B2 -IE-9901:11� STCB 99 /M=400.96 4" CO N 1E=J99 01 6 () ❑ \ B 6" WYE E DS 61l 1F�C' SD 1.0% IE=397, , o:: 11 fE1 �N_QOD FEN 4\ L l`w1Uo9%6 ❑ s s ss 5. DO NOT USE SURFACE MOUNTED CONDUIT. NOTIFY ARCHITECT IMMEDIATELY IF THIS CANNOT BE AVOIDED. ARCHITECT SHALL APPROVE ANY SURFACE MOUNTED CONDUIT OR PIPING LOCATIONS PRIOR TO INSTALLATION AND/OR RELOCATION. EXPOSED CONDUIT SHALL BE PAINTED TO MATCH ADJACENT WALL. 6. DIMENSIONS TO EXISTING WALLS ARE TO FACE OF FINISH DIMENSIONS TO NEW CONSTRUCTION WALLS ARE TO FACE OF STUD OR FACE OF CMU. 7. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID AND NOTE ALL CONDITIONS AFFECTING HIS WORK. NO EXTRAS WILL BE ALLOWED FOR COORDINATION OR RELOCATION OF EXISTING CONDITIONS NOT SHOWN ON THE DRAWINGS. BIDS SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS. 8. IT IS THE INTENT THAT ALL THIS WORK SHALL BE COMPLETE IN EVERY RESPECT AND THAT ANY MATERIAL OR WORK NOT SPECIFICALLY MENTIONED OR SHOWN ON THE DRAWINGS, BUT NECESSARY TO FULLY COMPLETE THE WORK SHALL BE FURNISHED BY THIS CONTRACTOR WITHOUT EXTRA CHARGE. SD as (E) ACCESS I E=397.25 IE=399.58 i BLD H ALTERNATE NO.1 D1 AREA DRAIN A RIM=401.02 \ IE=400.00 6"(OUT)N \ P 10LF6"SD@0.0% cn ❑ SD \ E) US \ STYD 925 RIM=400.64 6" SD o 4" PVC N lE=399.99 IE=400.00 SDCO IE=398.62 Tills r 6" SDCO RIM TO GRADE l cn rE •i ~ 7.46 tie in to Existing 4" c� SS - s fE m n City O d o dsUNKN Building Department '�^A 'Z' 6. 1.0 /6 . - El/IUMEL DS . 'Y1 M K ` (IN OW IFE tie in IE= 393.87 KN WN°VA T. > aN o UL 3 - .. 0 �N. YA L �' U T iP - X. .:1' DS E OS •- • + �� t (E) os° Work PLUMBING FOR BATHROOM ADDTN @� •,�,,,. STMH 990 RIM=401.2 B1 AREA DRAIN POTHOLE #3 } o Q, •:, :; :";' (E�.DS '��' � Address 23200 100TH AVE W 4' CONC NW 1E=398.57 RIM=400.87 8" IRON PIPE N-S GRADE=401.17 N a 1, e oD . . . 6 LF 6" EE3 o SD @ 1.0 / P: IE=397.30 6"(IN)S C II VC •---------------------------------------- STCB 1024 PIPE TOP=397.75 IE=397.30 6 (IN)N J ., ` Owner ; SCRIBER LAKE ------- ;- RiM=398.34 POSSIBLE WATER LINE 6" lP OWS N IE=397.30 6"(OUT)W > ° 6" SDCO •� --------------------------------- Approved Date Building Official; _J .. RIM TO GRADE rOP=J96.84 LF I E=399.45 INLET=395.99 03 AREA DRAIN RIM=401.04 400.80 \\ 1E-398.88 399.70 Permit Number; ----------------BLD2024.0882 STCB 1023 R/M=398.19 - 6' lP OWS Al F.P. FIRE PROOF FT. FOOT FTG. FOOTING FUTR. FUTURE GA. GAUGE GALV. GALVANIZED G.B. GRAB BAR G.C. GENERAL CONTRACTOR GFI GROUND FAULT INDICATOR GWB. GYPSUM WALL BOARD H.C. HOLLOW CORE HDCP. HANDICAP(PED) HDR. HEADER H.M. HOLLOW METAL HORZ. HORIZONTAL HR. HOUR HT. HEIGHT HTR. HEATER HVAC HEATING, VENTILATING, AND AIR CONDITIONING I.L.O. IN LIEU OF IN. INCHES INCL. INCLUDE(D)(ING) INFO. INFORMATION INSUL. INSULATION INT. INTERIOR L. LENGTH LB. POUND LAM. LAMINATED LAV. LAVATORY LT. LIGHT MAX. MAXIMUM MH. MANHOLE MIN. MINIMUM MIR. MIRROR MISC. MISCELLANEOUS M.O. MASONRY OPENING MTL. METAL N.I.C. NOT IN CONTRACT NO. NUMBER NOM. NOMINAL N.T.S. NOT TO SCALE O.C. ON CENTER 0.F.C.I. OWNER FINISHED CONTRACTOR INSTALLED O.H. OPPOSITE HAND OPP. OPPOSITE OVHD. OVERHEAD OZ. OUNCE P.C.C. PRE -CAST CONCRETE PLUMB. PLUMBING PLYD. PLYWOOD PNT. PAINT OR PAINTED PROP. PROPERTY P.S.I. POUNDS PER SQUARE INCH P.S.F. POUNDS PER SQUARE FOOT P.T. PRESSURE TREATED PTD. PAPER TOWEL DISPENSER PTN. PARTITION PVC. POLYVINYL CHLORIDE PVMT. PAVEMENT TOP=J96.84 P - /A II LT_ 7n1; nn RAD. RADIUS EXISTING SITE CONDITIONS R.B. RESILIENT BASE C3 RBR. RUBBER RCP REFLECTED CEILING PLAN R.D. ROOF DRAIN REF. REFERENCE/REFINISH REINF. REINFORCE(D)(ING) READ. REQUIRED REV. REVISION RFH. ROOF HATCH 1 . 4W _� 3 R.L. RAIN LEADER RM. ROOM A = R.O. ROUGH OPENING _ SND. SANITARY NAPKIN DISPOSAL t • SIM. SIMILAR S.D. STORM DRAIN SEC. SECTION SHT. SHEET *- �- ;: 'E;- - �•_ SIM. SIMILAR' SQ. FT. SQUARE FOOT T SPEC. SPECIFICATION -� _ - •"� SPK. SPRINKLER OR SPEAKER S.S. STAINLESS STEEL r' STD. STANDARD _ STL. STEEL ' Vic• _ F STRUCT. STRUCTURE OR STRUCTURAL _ L .A. T/D TELEPHONE/DATA > ' ., 39 EXG PARKING SPACES - 3 T&G TONGUE AND GROOVE CCESSIBLE (2 REQUIRED T.B. TOWEL BAR T.D. TOWEL DISPENSER _ TEL. TELEPHONE TLT. TOILET 7_ T.O. TOP OF T.O.C. TOP OF CONCRETE/CURB T.O.S. TOP OF STEELJob- P a ' TSCD. TOILET SEAT COVER DISPENSER At,- TPD. TOILET PAPER DISPENSER TYP. TYPICAL U/S UNDERSIDE - rt UNF. UNFINISHED U.N.O. UNLESS NOTED OTHERWISE V.B. VAPOR BARRIER, VINYL BASE V.C.T. VINYL COMPOSITION TILE �► .� VERT. VERTICAL psi. V.I.F. VERIFY IN FIELD _•'�.` VIN. VINYL LW V.P. VISION PANEL W/ WITH I W/O WITHOUT I W.C. WATER CLOSET/ t i if t� WALL COVERING a _ WD. WOOD �r■rt r r WIN. WINDOW WT WEIGHT W.W.F. WELDED WIRE FABRIC YD. YARD A3 OVERALL SITE PLAN 111= 100 -0 ' PARCEL # 27033600202200: -B4 AREA DRAIN RIM=400.96 400.80 399.70 -IE�39 .939 �{9LIT�AI I 0 POTHOLE #4 4' PVC E-S GRADE=401.30 PIPE TOP=400.1 J FOUND AT 45' ❑x 83LF6"SD@1.0DS 0i 6" WYE IE=398.82 tie to existing 8" storm IE=397.75 ( CS DS �10" vv7t ` 6" SD IE=399.19 IE=398.78 DS existing 4" ��• ; o . ; ': Existing 8" storm 8 IE= 396.25 ' (� DS 6" SDCO RIM TO GRADE IE=399,43 (E) DS 6" WYE IE=399.38 P II-399.3RADE r W .. 0. . Cn SHEET INDEX NUMER NAME G-100 COVER SHEET AND GENERAL INFORMATION A-101 BUILDING OVERALL PLAN AND CODE ANALYSIS A-102 WORKROOM/ TOILET ROOM DEMO AND NEW PLANS A-103 ALL -GENDER TOILET ROOMS DEMOLITION PLAN A-104 ALL GENDER TOILET ROOMS A-200 INTERIOR ELEVATIONS AND DETAILS A-201 INTERIOR ELEVATIONS AND DETAILS A-900 MATERIALS BASIS OF DESIGN MP-001 MECHANICAL & PLUMBING LEGENDS AND NOTES MP-002 MECHANICAL & PLUMBING SCHEDULES MP-100 OVERALL MECHANICAL& PLUMBING PLAN MP-201 ENLARGED MECHANICAL & PLUMBING PLAN MP-202 BLDG H ALL GENDER RESTROOM PLUMBING PLANS MP-203 BLDG H ALL GENDER RESTROOM MECHANICAL MP-301 MECHANICAL & PLUMBING DETAILS MP-501 MECHANICAL SPECIFICATIONS MP-502 PLUMBING SPECIFICATIONS MP-503 PLUMBING SPECIFICATIONS CONT. E-001 ELECTRICAL LEGENDS AND NOTES E-003 SINGLE LINE DIAGRAM & PANEL SCHEDULES E-100 BUILDING H LEVEL ONE OVERALL ELECTRICAL FLOOR PLAN E-201 BUILDING H LEVEL ONE ENLARGED ELECTRICAL FLOOR PLANS E-302 BUILDING H ALL GENDER RESTROOM ELECTRICAL FLOOR E-301 ELECTRICAL DETAILS E-401 ELECTRICAL SPECIFICATIONS F-------------- PROPERTY LINE (ASSUMED FACE OF BUILDING) APPROX LOCATION OF POWER PANELS FOR CIRCUITS ON NEW SPACE - SEE ELECRICAL LOCATION OF WORK WITHIN BUILDING 'H' ACCESSIBLE ROUTE - PUBLIC SIDEWALK THRU - - ' - STAFF WORKROOM DOOR (RED DASHED LINE) RECYCLING/TRASH CONTAINERS r;) � Parcel ID: 27033600202200 x Of - Parcel ID: 27033600202200 �0 Property Address: 23200 100TH AVE W ' City: EDMONDS - Zip Code: 98020 1� ► Taxpayer: EDMONDS SCHOOL DIST 15 Owner, EDMONDS SCHOOL DIST 15 Size (Gross Acres): 39.75 Market Value: $53,137,800 • Tax Code Area: �I LNelghborhoad: 16050 1605000 . NW1/4 SEC36 T27N 831E •• �certv Account Summary, IIIIIIIIII~ •1 find Prnoerty_5L1 5 s PDF Parcel Map TIF Parch Map _ t ,t •E --/- - _ •• - Bulldi•q Photo PROPERTY DESCIPTION: SEC 36 TWP 27 RGE 03RT-50) SE1/4 NW1/4 Parcel l D: 27033600z0 W AUTHORITY HAVING JURISDICTION BUILDING: CITY OF EDMONDS FIRE: CITY OF EDMONDS MECHANICAL: CITY OF EDMONDS ELECTRICAL: CITY OF EDMONDS SITE DATA TAX LOT NUMBER: 270 336 002 02200 LEGAL DESCRIPTION: SEE ATTACHED LOT SIZE: APPROX 40 ACRES BUILDING DATA USE: ALTERNATIVE SCHOOL OCC GROUP: E7: EDUCATIONAL A3: ASSEMBLY TOTAL BUILDING AREA: 148.484 SF 1 RESERVED FOR BUILDING DEPT STAMP 1EOF TEREoITECTAUggIwTON LAURI STRAUSS, AIA, LEED AP BD&C CD CD E 0 CD 0 (N 4J 00 O < 0',J V1 Q CV .5; o o 3 v o o (4 i­- G CN� 0 0 '� J E 0 0 V J O (2) N Of W 0) CIO Q .� =3 }+ W .. (� �z 0 � � 0 ^� W 0 00 U � �w U)(D 0 006 W j 0 E C � W VJ 0 0 0 r cu O � 0 N i M I2 N �0 V ) REVISION SCHEDULE # DESCRIPTION DATE RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 2023-019 DATE 2 MAY 2024 DRAWN LMS REVIEWED IS SHEET NAME COVER SHEET AND GENERAL INFORMATION SHEET NO. G-1 00 OVERALL BUILDING PLAN 3/32" = V-0" 0 CODE ANAYLSIS 1 1/2" = V-0" CODE REQUIREMENTS: 2018 IEBC, 2018 IBC, 2018 IMC, 2018 UPC, AND 2018 WSEC, 2020 NEC, AND ASSOCIATED LOCAL BUILDING CODE AMENDMENTS. ALSO ICC/ANS1117.1-2009, AND EDMONDS CITY CODE AND COMMUNITY DEVELOPMENT CODE SUMMARY: ZONING: RS-8 USE / OCCUPANCY: E- EDUCATIONAL CONSTRUCTION TYPE: V-B (NS) AUTOMATIC SPRINKLER SYSTEM: NO TABLE 506.2 - ALLOWABLE AREA*: 13,775 SF ACTUAL AREA: 24,279 SF TABLE 504.3 - ALLOWABLE HT: 40' ACTUAL HEIGHT: 14' +/- TABLE 504.4 - ALLOWABLE STORIES: 1 STORY ACTUAL STORIES: 1 STORY *ALLOWABLE AREA = TABULAR AREA+ (TAB AREA OF NS FRONTAGE INCREASE) Aa = 9500 + (9500*45%) = 9500 + 4275 = 13,775 S.F. PERIMETER = 962 L.F. TOTAL; 52 LF @15'w; 28' LF @5'w FRONTAGE INCREASE = W W= (882 * 20)/(962-52-28) = (12240)/882 = 20' If = [F/P - .25]W/30: If = [882/962 - 0.25]20/30 = [(.917-.25)*.667=45% PER IEBC - CHAPTER 3 SECTION 305.8.10 - TOILET ROOM COMPLIES WITH CH.11 IBC FOR ACCESSIBILITY CHAPTER 5 PRESCRIPTIVE METHOD SECTIONS 503.2, 503.5 - 503.16; SECTIONS 504, 505, 506 & 507 DO NOT APPLY SECTION 503.1 - ALTERATIONS COMPLY WITH THE IBC. SECTION 503.3 AND 503.4 - ALTERATIONS ARE NOT CHANGING GRAVITY OR LATERAL LOADS, THE EXISTING BUILDING ENVELOPE AND STRUCTURE ARE REMAINING AS IS. CHAPTER 6 PER SECTION 603 - PROJECT IS ALTERATION LEVEL II AND SHALL COMPLY WITH CH. 7 AND 8 OF THE IBC. CHAPTER 7 SECTION 702 - INTERIOR FINISHS COMPLY WITH CH.8 OF THE IBC SECTION 703 - PROJECT MAINTAINS THE EXISTING LEVEL OF FIRE PROTECTION SECTION 704 - PROECT MAINTAINS EXISTING MEANS OF EGRESS SECTION 705 - N/A (NO REROOFING) SECTION 706 - N/A (NO STRUCTURAL CHANGES) SECTION 707- NEW TOILET ROOM COMPLIES WITH IECC CHAPTER 8 SECTION 802 - N/A (PROJET DOES NOT CONTAIN THESE ELEMENTS) SECTION 803 - N/A (PROJECT WORK AREA DOES NOT EXCEED 50% OF THE FLOOR AREA, AND IS NOT LOCATED ON A CORRIDOR OR EXIT. SECTION 803.4.1.1, GROUP E - EXISTING FIRE ALARM SYSTEM TO REMAIN, ADDING TWO SMOKE DETECTORS SECTION 804 - N/A SECTION 805 - N/A (BUILDING IS A SINGLE TENANT AND PROJECT DOES NOT AFFECT OCCUPANCY TYPE OR LOAD) SECTION 806 - N/A/ (PROJECT IS NOT AFFECTING ANY STRUCTURAL ELEMENTS) SECTION 807 - ALL ELECTRICAL WORK COMPLIES WITH NFPA 70 SECTION 808 - VENTILATION AT WORK AREA COMPLIES WITH ASHRAE 62.1 SECTION 809 - N/A (OCCUPANT LOAD IS NOT INCREASING) SECTION 810 - NEW TOILET ROOM COMPLIES WITH IECC PORTABLE FIRE EXTINGUISHERS ARE PROVIDED AND INSTALLED PER SECTION 906 THE TRAVEL DISTANCE FROM ANY POINT IN THE SPACE TO AN EXIT IS LESS THAN 75 FEET. NORTH 10241 REGISTERED �T� LAURA M. STRAUSS STATE OF WASHIN(iTON LAURI STRAUSS, AIA, LEED AP BD&C 0 0 E O O m OU fV 000 0 < � � v J Ln >Q 0, CV o Ln Ln Lu o G CN� 0 0 'N J QJ E 0 0 V J O (2) N Of 00 0) c U �--� }+ W (� z ♦^ Q 0 ^� W oLU 00 r M U >w U)(D 0 cn c 0 06 W j p E co LU W / ) C^1 0 W 0 'r— ICU O � O N i M 42 N U Cn REVISION SCHEDULE # DESCRIPTION DATE RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 2023-019 DATE 2 MAY 2024 DRAWN LMS REVIEWED IS SHEET NAME BUILDING OVERALL PLAN AND CODE ANALYSIS SHEET NO. A-101 Is D5 - EXISTING BOOKCASE TO BE MODIFIED AND REINSTALLED EXISTING CONDITIONS 111 = 1'-01, MODIFY EXISTING CABINET INTO TWO PIECES - DIVIDE AT CENTER VERTICAL - ADD NEW FINISHED END TO ONE SIDE - MOUNT -MOUNT BOTH CABINETS ON (4) 3" DIAM. LOCKABLE CASTERS REMOVE SURFACE MOUNTED CONDUIT AND WIRING - SEE ELECTRICAL REFLECTED CEILING DEMOLITION PLAN 1/2" = 1'-01, WORKROOM DEMOLITION PLAN 1/2" = V-0" REMOVE SURFACE MOUNTED CONDUIT AND WIRING - SEE ELECTRICAL FRONT OF WINDOW DISPLAY TO REMAIN OWNER WILL REMOVE ALL LOOSE FURNITURE AND STORAGE ITEMS PRIOR TO CONSTRUCTION REMOVE PORTION OF EXISTING VCT AND PREP FLOOR FOR NEW CERAMIC TILE INSTALLATION D4 - EXISTING BOOKCASE AND CONDUIT TO BE REMOVED EXISTING WINDOW DISPLAY CABINET TO REMAIN EXISTING STRUCTURAL BRACE TO REMAIN EXISTING MECHANICAL DUCT TO REMAIN EXISING SMOKE DETECTOR TO REMAIN ABOVE NEW CEILING REMOVE (3) EXISTING LIGHT FIXTURES, SALVAGE (2) OR REINSALLATION SHIFT TO FIT WITH NEW WALL LOCATION O I O O ---]L-- ___1 EXISING ROOF BEAM TO REMAIN C1� EXG ROOF BEAM AND STRUCTURE TO REMAIN EXG MECHANICAL DUCT TO REMAIN REMOVE (3) EXG PENDANT LIGHT FIXTURES - SALVAGE (2) FOR REINSTALLATION — FRONT OF WINDOW DISPLAY TO REMAIN D3 - VIEW INTO EXISTING SPACE STAFF TOILET ROOM CEILING PLAN 1/2" = 1'-01, TOILET WORKROOM FLOOR PLAN 1/2" = V-0" EXG MECHANICAL DUCT TO REMAIN SIDE OF WINDOW DISPLAY TO REMA D2 - EXISTING WINDOW DISPLAY CABINET AND PEGBOARD TO REMAIN EXISTING WINDOW DISPLAY CABINET TO REMAIN FIT GYPSUM BOARD CEILING TIGHT AROUND EXISTING STRUCTURAL BRACE NEW LIGHT FIXTURE - CENTER IN ROOM NEW SMOKE DETECTORS - CONNECT TO EXISTING ABOVE NEW CEILING REINSALL (2) PENDANT LIGHT FIXTURES SHIFTED TO FIT WITH NEW WALL LOCATION EXISTING ROOF BEAM TO REMAIN 5/8" GYPUM BOARD ON 18 GA, 4" MS CEILING JOISTS AT 16" O.C. EXISTING MECHANICAL DUCT TO REMAIN ABOVE NEW CEILING IN TOILET ROOM D1 - LOOKING UP TO EXG DUCT FROM SIDE OF WINDOW DISPLAY Hsu C1 - EXTERIOR OF WINDOW DISPLAY CABINET REMOVE SURFACE MOUNTED CONDUIT AND WIRING - SEE ELECTRICAL OWNER WILL REMOVE ALL LOOSE FURNITURE AND STORAGE ITEMS PRIOR TO CONSTRUCTION ' OWNER WILL LOOSE FURN STORAGE ITE CONSTRUCT NORTH 1 n} AS B1 - VIEW TOWARD NEW TOILET ROOM Al - EXISTING VIEW INTO STORAGE ROOM 1EOF ITECT AUgg IwTON LAURI STRAUSS, AIA,LEED AP BD&C CD 0 E 0 CD r o fV F_: 4J O V) � � v J V1 >Q 0, CV j > N 21 0 -0 v Ln Lu o 0 G �N� 0 0 'N J QJ E O O ( / O (3.) N Of 00 V c U +L -j z ♦^ Q O ^� W oLU O0 r M U �w U)(D O (n c 006 (L) O Q E c LU w Cn o O ICU O � O N i M 4. N U Cn REVISION SCHEDULE # DESCRIPTION DATE RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 2023-019 DATE 2 MAY 2024 DRAWN LMS REVIEWED IS SHEET NAME WORKROOM/ TOILET ROOM DEMO AND NEW PLANS SHEET NO. A-1 02 3 2 i 5 1 3 1 VIEW FROM BOYS RESTROOM 4 _ VIEW INSIDE CHASE LOOKING TOWARD DOOR - PIPES TO BE ' REMOVED AND NEW PLUMBING INSTALLED VIEW INSIDE PLUMBI as: NG CHASE VIEW INTO UTILITY ROOM RELOCATE FEC - REMOVE EXISTING PAPER TOWEL DISP FLOORING THIS AREA I XL I VIIJ V L vP I FLOORING THIS AREA VIEW FROM CORRIDOR TO RESTROOM DOORS ^' VIEW INSIDE CHASE {• - DOOR - PIPES TO BE 1 `. REMOVED - PORTION OF WALL TO BE ,.,. REMOVED AND OPENED UP TO CREATE CONNECTION BETWEEN ROOMS. VIEW INTO BOYS RESTROOM n F — U- REMOVE WALL AND DOOR - EXISTING CABINET UNIT, f REMOVE ELECTRICAL J/A-103 HEATER TO BE REMOVED OUTLET THIS WALL AND D/A-103 �� REINSTALL ON NEW WALL SAWCUT AND REMOVE W I REMOVE PORTION OF // PORTION OF TILE BASE WHERE WALL BELOW HEADER / NEW STALL IS CREATED 1 REMOVE AND DISPOSE II 00 OF ALL PLUMBING A/A-103 LO FIXTURES THESE ROOMS �� 1 VIEW INTO PLUMBING CHASE VIEW INSIDE GIRLS RESTROOM --a! REMOVE EXG VAT FLOORING THIS AREA DETACH FIRE ALARM HORN STROBE FROM WALL, - RECONFIGURE CONDUIT AND REMOVE EXISTING REINSTALL ON NEW WALL,'II II ACCESS DOR AND INFILL OPENING IN WALL H/A-103 1i o B/A-103 �l REMOVE PORTION PORTION OF F/A-103 OF CHASE WALL EXISTING CHASE E/A-103 WALLS TO REMAIN REMOVE AND DISPOSE OF ALL PLUMBING FIXTURES THESE ROOMS II DETACH FIRE ALARM HORN I / STROBE FROM WALL, RECONFIGURE CONDUIT AND REINSTALL ON NEW WALL 11 II / II 1 REMOVE PORTION OF I 1 LL. JL�LI WALL BELOW HEADER REMOVE WALL AND DOOR I1 kOVE EXG SAWCUT AND REMOVE REMOVE ELECTRICAL W VATIFFLOORING OUTLET THIS WALL AND PORTIONALOL IS CREATEDF TILE BASE WHERE RELOCATE _ �� REINSTALL ON NEW WALL A/A-103 io FEC THIS AREA __u M �\ EXISTING CABINET UNIT 17 REMOVE EXG FRP FROM �� REMOVE EXISTING HEATER TO BE REMOVED L? THIS 1 WALL, ACE C/A-103 SURFACE STAINLESS GYPSUM BOARD PIPES AND TAINLESS 1 SUBSTRATE AND PREP STEEL COVER �� �� -9 FF 7-1_ _ _ _ _ i FOR PAINTING ----- L0AL0 I r I 0 °°° °°° °°° 8' - 5 114" (EXG) 19' - 5 318" (EXG) _ ALL GENDER TOILET ROOMS DEMO 3/8" = 1'-01, REMOVE EXISTING PAPER TOWEL DISP. DISPOSE OF ALL TOILET PARTITIONS i/• r 4 O O d In/n•//n•/ a.••0Will aa•�`i••p•Qa••a0•i••a•`i•`i•`••p VIEW INTO BOYS RESTROOM PLUMBING FIXTU a 1 VIEW INTO BOYS RESTROOM 1=41 REGISTERED ARCHITECT LAURA M. STR4W STATE OF WASHINwON LAURI STRAUSS, AIA, LEED AP BD&C 0 v 0 u� O O p m v CV 4 ON 7 u J N Q � Ln N N N ° 3 Orq Ln W O : Ln 0 0 �N� 41 E 0 _0 cn o (3.) N Of 00 0) C }+ W (� z ♦^ Q 0 W (3.) O 00 U � �w U)(D 0 006 W j p E CIO LU W V♦ O 0 ICU O � O N i M (3.) N U Cn REVISION SCHEDULE # DESCRIPTION DATE RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 2023-019 DATE 2 MAY 2024 DRAWN Author REVIEWED Checker SHEET NAME ALL -GENDER TOILET ROOMS DEMOLITION PLAN SHEET NO. A-1 0 3 5 4 3 D ROOM FINISH SCHEDULE WALLS RM NUMBER ROOM NAME FLOOR BASE NORTH EAST SOUTH WEST CEILING COMMENTS / NOTES 01 AG-1 EXG RB GB/FRP1 GB/FRP1 GB/FRP1 GB/FRP1 GB/PNT4 02 AG-2 EXG RB GB/FRP1 GB/FRP1 GB/FRP1 GB/FRP1 GB/PNT4 03 AG-3 EXG RB GB/FRP1 GB/FRP1 GB/FRP1 GB/FRP1 GB/PNT4 04 AG-4 EXG RB GB/FRP1 GB/FRP1 GB/FRP1 GB/FRP1 GB/PNT4 05 AGT-5 EXG RB GB/FRP1 GB/FRP1 GB/FRP1 GB/FRP1 GB/PNT4 06 AG-6 EXG RB GB/FRP1 GB/FRP1 GB/FRP1 GB/FRP1 GB/PNT4 07 AG-7 EXG RB GB/FRP1 GB/FRP1 GB/FRP1 GB/FRP1 GB/PNT4 08 AG-8 EXG RB GB/FRP1 GB/FRP1 GB/FRP1 GB/FRP1 GB/PNT4 20 STAFF TLT BBT RB EXG CMU GB/PNT1 GB/PNT2, FRP2 GB/PNT2, FRP2 GB/PNT4 21 STORAGE ROOM EXG RB EXG EXG EXG GB/PNT1 EXG/PNT4 22 WINDOW DISPLAY EXG - EXG EXG EXG EXG EXG 24 ALL GENDER TLT BBT RB EXG EXG/ PNT1 EXG EXG EXG INFILL CONCRETE SLAB WHERE TRENCHING WAS DONE FOR NEW PLUMBING PRIOR TO INSTALLING NEW FLOORING H4 LAVS1 BBT RB EXG/ PNT1 -- GB/FRP1 -- GB/PNT4 H5 CIRCULATION EXG EXG EXG EXG/ PNT1 GB/FRP1 GB/FRP1 GB/PNT4 H6 EXG UTILITY EXG EXG EXG EXG EXG EXG EXG H7 LAVS-2 GB/PNT4 H8 CIRCULATION EXG RB GB/FRP1 EXG/ PNT1 EXG GB/FRP1 GB/PNT4 PATCH AND REPAIR WHERE WALLS ARE C REMOVED AND PAINT COLOR AS SELECTED — NEW D P SIGN TYPE'C' BASED PLANK LAV 1 H4 8' - 5 3/8" 23/47 2'-0" ql 7 2'-0" (El 2'- RECONFIGURE EXG WIRING TO NEW OUTLET THIS WALL RELOCATE FIRE EXTINGUISHER CABINET PROVIDE ELECTRICAL IN FURRED WALL FOR NEW HAND DRYERS TYP EXG UTILITY H6 INFILL PORTION OF FLOOR WHERE CHASE IS REMOVED WITH CT1 TILE TO MATCH EXISTING - APPROX 12 S.F. FIELD VERIFY PROVIDE ELECTRICAL IN FURRED WALL FOR NEW HAND DRYERS TYP RECONFIGURE EXG WIRING TO NEW OUTLET THIS WALL C3 o= r 00 -201 x X o 1 o ' - 215/8" EXG TILE FURR OUT EXG WALL WITH 3 5/8" MS AND 5/8" GYP BD OVER EXISTING CMU WALL, ADD FRP1 FINISH - TYP. ^B5 A-201 60" W x 48" H FRAMED MIRROR MOUNT AT 34" A.F.F. TO BOTTOM OF MIRROR 3' - 7 5/8" +/- FURR OUT EXG WALL WITH 1/2" CEMENT BOARD ADHERED TO EXISTING CMU —\WALL, AND FRP1 I, FINISH - TYP. 60" W x 48" H FRAMED MIRROR MOUNT AT 34" A.F.F. TO BOTTOM OF MIRROR ALL NEW WALLS T BE 3 5/8" MS @16" O.C. WITH 5/8" MR GYP BD AND FRP1 FINISH BOTH SIDE — FURR OUT EXG\ j WALL WITH 3 5/8" MS AND 5/8" GYP U U BD OVER EXISTING CMU '-18" 2' - 8" T /8I WALL, ADD FIR P p \ FINISH - TYP. C2 A-104 U) Bo v / A A L VS- / SIGN TYPE'C' H7 NEW BIO- BASED PLANK EXG TILE i PATCH AND REPAIR WHERE WALLS ARE REMOVED AND PAINT COLOR AS SELECTED A5 ALL GENDER TOILET ROOMS 1/2" = 1'-0" 5 1 D5 GLAZED CMU WALL TO REMAIN - CLEAN CIRCULATION + AND FILL ALL HOLES CV H5 i•� 3'-3" ( '-3" 3'-3" D4 D3 D2 3'-3" ril i � i ire o \I■ I■I ■I o�■� I■I �I o �■ I■i ■I��\■ I■I !% o 3'-3" 3' 3" 3' 2" 3'-2" D9 EXISTING CHASE TO REMAIN GL 6' - 0 1/2" 5'- 11 1/2" + 3' 2 1/2" 5' - 8" B289 � o 8 LO G-6 AG-7 06 4' 07 D6 D7 201 GLAZED CMU WALL TO REMAIN - CLEAN WALL AND FILL ALL HOLES CIRCULATION H8 A3 5'- 7 1/2" AG -8 OS D8 1'-6" D1 4 1'-6" 1 3 DOOR SCHEDULE AG TOILET ROOMS Door Frame Frame Mark Width Height Type Material Finish Frame Type Material Finish Hardware Comments D1 2' - 0" 6' - 8" FLUSH HM PNT2 DOUBLE RABBET HM PNT4 PRIVACY LATCH W OCCUPANCY DEAD BOLT D2 2' - 0" 6' - 8" FLUSH HM PNT2 DOUBLE RABBET HM PNT4 PRIVACY LATCH W OCCUPANCY DEAD BOLT D3 2' - 0" 6' - 8" FLUSH HM PNT2 DOUBLE RABBET HM PNT4 PRIVACY LATCH W OCCUPANCY DEAD BOLT D4 2' - 0" 6' - 8" FLUSH HM PNT2 DOUBLE RABBET HM PNT4 PRIVACY LATCH W OCCUPANCY DEAD BOLT D5 2' - 0" 6' - 8" FLUSH HM PNT2 DOUBLE RABBET HM PNT4 PRIVACY LATCH W OCCUPANCY DEAD BOLT D6 2' - 10" 6' - 8" FLUSH HM PNT2 DOUBLE RABBET HM PNT4 PRIVACY LATCH W OCCUPANCY DEAD BOLT D7 3' - 0" 6' - 8" FLUSH HM PNT2 DOUBLE RABBET HM PNT4 PRIVACY LATCH W OCCUPANCY DEAD BOLT D8 3' - 0" 6' - 8" FLUSH HM PNT2 DOUBLE RABBET HM PNT4 PRIVACY LATCH W OCCUPANCY DEAD BOLT D9 2' - 0" 6' - 8" FLUSH HM PNT2 DOUBLE RABBET HM PNT4 STORE ROOM LOCK WITH LEVER HANDLE OPEN TO STALLS GLAZED CMU B5 -201 / 183 183 18 WALLTO v vvIvT REMAIN - CLEAN WALLvI`v� �I_ �Iv�vv� �I vIvIv� AND FILL ALL �' �` '� �7 _ ; I` HOLES MIRROR WALL 1/2" = V-0" PAINT END WALL WITH EPDXY PAINT B2 �'vi viv' it vI �'vi viv' vI �� v v' i i i i i v OPEN TO STALLS 183 1 183 183 i \ I - < GLAZED CMU WALL TO REMAIN - CLEAN WALL AND FILL ALL HOLES RP1 FINISH' LL WALLS `' -` ` v' -v ` - - I" v' UBBER ASE RB ` " C5 - _ - - - •< - . - - ' X 8''-•0'1' ` • - - - , - '- ; - - _ ,- - ♦ ; - - t _ • - A-201 _ ��- _ _ ; _♦ ,r = - RELOCATE FIRE = = , "7 •0" - ` " _ ` ; ALARM HORN STROBE TO NEW<- +�-' _ , _ _ - 'WALL. - _- -_ - - - - :_- - _ _<� -__ .'._ -- _- - _- _- - -_ __ - __ - , a�=" a • - - _ -• - - �^ - i `t'• Y,l'���-. �5y 4-`, - ����'�-' - _- _''t' e?s/F'f��,.-��,'Y"K` i _ _ ._t `/d♦ FL' V'_+_ FURR OUT EXG .f7. ,•`%�i`�n.�-` WALLS IN TOILET STALLS WITH 1/2" CEMENT BOARD ADHERED TO 'Y - - - EXISTING CMU '" - --'-< - - -{'- `•a ��' = - -- - WALL, AND FRP1 - ,- • _,- -- - - - - - - - - - -- >:� - - - - - FINISH - TYP. - FILL HOLES IN CMU WHERE FIXTURES AND PIPING IS REMOVED - - _• - > a�'`e -`_a - - - :t -_ - -- - i.•a' `_ _ __ _ r-: ;fit. - - - -� - - --:>-'r - - mot:_- X`:F ,iv'.-��,' 3�- - �:_t - -- _ - -•' - - _- - - -_ _-•_,t7`'7;� %_ :� - - ♦. - - -, - - - � - ♦. -♦ - _- - - _ - �� '�T- 3'�a,';-�'S rF' _- 'n%t. -_ - -_ :�- - - - -it;.'' '' - :r �r♦.',-_ - RELOCATE FIRE _ = ALARM HORN STROBE J , TO NEW WALL 0" - - ' _ �" , -♦ _ _ -`_ - ; - - , - " - - _ "- ` - -, _ _ � "" " � �- "� � t , '" PAINT END _ _ ,' " _ � _.. - .� - - - - ♦ - - ♦ _. _ . _ - WALL WITH EPDXY PAINT ALL GENDER TOILET ROOM CEILING PLAN A2 3/8" = V-0" EQUIPMENT SCHEDULE Mark Manuf. Model Description B2892 Bobrick B-2892 Bobrick B-2892 Classic Series Surface Mounted Twin Jumbo -Roll Toilet Tissue Dispenser B3013 Bobrick B-3013 Triml-ineSeries Recessed Seat -Cover Dispenser B3974 Bobrick B-3974 RECESSED ClassicSeries® Convertible Automatic Universal Roll Paper Towel Module B6806 Bobrick B6806-XX Sidewall and Rear Wall Grab Bars SIZE AS INICATED ON DRAWINGS B-2111 Bobrick B-2111 ClassicSeries® Surface -Mounted Soap Dispenser B-7125 Bobrick B-7125 InstaDry Series Surface -Mounted Automatic Hand Dryer M1836 Bobrick B165 1836 18" WIDE BY 36" HIGH MIRROR WITH STAINLESS STEEL CHANNEL FRAME 2448 Bobrick B165 2448 24" W DE BY 48" HIGH MIRROR WITH STAINLESS ST EL CHANNEL FRAME 5/8" GYPUM BOARD ON 18 GA, 4" MS CEILING JOISTS AT 16" O.C. REFERENCE ELECTRICAL FOR LIGHT FIXTURES REFERENCE MECHANICAL FOR FANS, DUFTS,AND TERMINALS 5/8" GYPUM BOARD ON 18 GA, 4" MS CEILING JOISTS AT 16" O.C. REFERENCE MECHANICAL FOR FANS, DUFTS, AND TERMINALS REFERENCE ELECTRICAL FOR LIGHT FIXTURES 5/8" GYPUM BOARD ON 18 GA, 4" MS CEILING JOISTS AT 16" O.C. E T�oITECTAUSSINGTON LAURI STRAUSS, AIA, LEED AP BD&C 0 v 0 E 0 CD O N � 4J � O v J V1 >Q 0� N O Ln LU O G CN� 0 0 J 0 0 V J (D Of CD 00 }+ ^=,3 W U) z♦^ Q 0 ^� W _0O 0 W U 4D > u) V 0 06 W ^1 W 0 O CU � N i M (D .4 U Cn REVISION SCHEDULE # DESCRIPTION DATE RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 2023-019 DATE 2 MAY 2024 DRAWN Author REVIEWED Checker SHEET NAME ALL GENDER TOILET ROOMS SHEET NO. A-1 04 m C B / 5 4 3 2 A3 A5 A-201 A-201 C2 B4 (A-201 B4 C2 A5 �. A-104 EXTEND OUTSIDE��/,1 A-201 A-104 A-201 i WALL AT STALLS TO ROOF DECK ABOVE EXTEND OUTSIDE WALL AT STALLS TO 1 TOP OF WALL �_ / / �� / , / , / , / ROOF DECK ABOVE ; ' /I / ' �` '_ / / �� / / �, BETWEEN STALLS IN E 12" ABOVE CEILINGS - , - LI / ;- ;- ;- I, 12" ABOVE CEILINGS NEW CEILING NEW GYPSUM BOARD CEILING - - NEW GYPSUM BOARD / / / / ; - 4" METAL STUD 18 JOIST - REINSTALL FHS - �I/ ON NEW WALL -; FRP1 FINISH AT WALL -� / -� / -� -�I - - - - - - - - - 'PROVIDE ELECTRICAL IN FURRED WALL FOR NEW HAND DRYERS TYP /� / / - CEILINGON4"METAL / \ - - -STUD 18 GA JOISTS �. REINSTALL FHS ON NEW WALL / �- - I'; - �- I'; - �- / /- , � / I/ � � / / I/ / I / _� / ' �� �/� ��/��� ` 1 /� _`-, �_ ` �� �/� �� �� _� 'I / //- -` 7- BEHIND SINKS NEW GYPSUM BOARD -2111 CEILING ON 4" METAL STUD JOISTS IN EACH STALL - FRP1 FINISH ALL'- = I \ _� \ / -� ` �' -712 -2111 / /I 2� / -211 /= �; /I�/-� ��, �; /I /-� / - - - - - - - FRP1 FINISH AT WALL „,BEHIND SINKS �; /I-�- FRP1 FINISH ALL / -1 3-7125 �` 11 �� -712 - �1/ - / -7 2 - 11 - / -71 / / - - n / - - - - -21/2" `'/ / / -` - ' �'� - ' - �'� ' - ` ; ' /1'/ - ' WALLS IN EACH STALL FRP1 FINISH WALLS BEHIND MIRRORS - - / - " - - / Fi I FINISH WALLS NEW GFCI DUPLEX RECEPTACLE - / ' - /I�/ = �` ` ' / /` �� �I �I - / ��I� - / - - - -� _, 1 � � ;-, � , , � , ` 1 � / � NEW GFCI DUPLEX �� { - . - / I C'q ��-�-� _ / , , � / � , , , � � � , , / I � / �-� I - � 1� / �� -CONNECT TO EXG /I ,- RECEPTACLE - CONNECT �/ ,I ���/ /ICI ���/ /ICI ���/ /I ifl - °0'�,- - 114, / / ' RECONFIGUREDmv TO EXG RECONFIGURED / / / ih�;-� WIRINGWIRING� - / i - -�I INSULATE PIPESINSULATE PIPES ALL SINKS TYP '/ `7 /I/ALLSINKS ;` ;` ;` '�� o o �`'� �1 1'��` 1'�� ,I` / / 1' - 51 /2" C5 RESTROOM ELEVATION 7 1/2" = 1'-0" A55 A-201 A3 A-201 / / If ;7 D5 D4 D3 D2 'I D1 If _11 RESTROOM ELEVATION 5 1/2" = 1'-0" B2 C3 A-201 A-201 EXTEND OUTSIDE WALL AT STALLS TO ROOF DECK ABOVE TOP OF WALL BETWEEN STALLS IS 12" ABOVE CEILINGS NEW GYPSUM BOARD CEILING ON 4" METAL STUD 18 GA JOISTS FRP1 FINISH ALL WALLS IN EACH STALL o� N C3 L FURR OUT WALL BI WITH 3 5/8" MS, 5/8' BOARD,AND FRP1 I EXISTING UTILITY F DOOR TO REMAIN INSULATE PIPES AI RESTROOM ELEVATION 4 B5 C5 A-201 A-201 EXTEND OUTSIDE WALL AT STALLS TO ROOF DECK ABOVE TOP OF WALL BETWEEN STALLS IN 12" ABOVE CEILINGS \- NEW SUSPENDED% GYPSUM BOARD CEILINGNEW GYPSUM BOARD CEILING ON 4" METAL STUD 18 GA JOISTS IN EACH STALL FRP1 FINISH ALL WALLS IN EACH STALL RB TYP - �- PNT3 Cm:) 04 - I�� , �4' 9"� I�� �; - - - / /> / - , �/ / / - - / 18" GB EA SIDE / - - 1 - ' - /� / '48" GB EASIDE /I� ` A5 RESTROOM ELEVATION 2 1/2 = 1 0 C3 r�i ESTROOM ELEVATION 6 /2" = 1'-0" EXTEND OUTSIDE WALL AT STALLS T ROOF DECK ABOVI TOP OF WALL BETWEEN STALLS 12" ABOVE CEILINC NEW GYPSUM BOP CEILING ON 4" MET STUD 18 GA JOIST; FRP1 FINISH ALL WALLS IN EACH ST DOUBLE JUMBO ROLL TOILET PAPE DISPENSERS TYP. PAINT EXG CMU WALL WITH EPDXY PAINT C5 B5 A-201 Al A3 2' - 31/2" '-�='1' 21/2" -T - A3 A� A-201 A-201 L11 / < / / , / 1/ < D8 � D7 � ` D6 I I/v -� /1 -/ RESTROOM ELEVATION 3 1/2" = 1'-0" C3 E12 A-201 A-201 A-201 D EXTEND OUTSIDE WALL AT STALLS TO ROOF DECK ABOVE TOP OF WALL BETWEEN STALLS IS 6" ABOVE CEILINGS — S S NEW GYPSUM BOARD CEILING ON 4" METAL STUD 18 GA JOISTS FRP1 FINISH ALL WALLS IN EACH STALL DOUBLE JUMBO DISPENSERS TYP. PAI$„- WALL T EXG CMU L WITH EPDXY PAINT RD -I % " - -I - O/ /I % " - - 3, _4„ ' ALL R - GB ; - - " --- , ; � 1 / M 'r' - 1 " R A3 ESTROOM 1/2 ;- i_\ 48"GB I, , ao� � � -� -� - ELEVATION 1 2 1' - 51 /2" EXTEND OUTSIDE WALL AT STALLS TO ROOF DECK ABOVE TOP OF WALL BETWEEN STALLS IS 12" ABOVE CEILINGS NEW GYPSUM BOARD CEILING ON 4" METAL STUD 18 GA JOISTS FRP1 FINISH ALL WALLS IN EACH STALL ROOM FINISH NOTES 1. AT ALL LOCATIONS WHERE NEW TOILET ACCESSORIES AND/OR GRAB BARS ARE BEING INSTALLED, CONTRACTOR TO VERIFY BACKING IN WALL IS LOCATED CORRECTLY, AND HAS STRUCTURAL STRENGTH TO WITHSTAND 250 LBS OF FORCE APPLIED AT ANY POINT. PROVIDE NEW BACKING IN WALLS AND PATCH AND REPAIR FINISHES AS REQUIRED. 2. INTERIOR ROOMS ARE TO BE REPAINTED IN THEIR ENTIRETY, INCLUDING THE CEILINGS. COLOR AS SELECTED BY ARCHITECT. 3. PATCH AND REPAIR ALL LOCATIONS - WALLS, CEILINGS, OR FLOORS, WHERE EXISTING EQUIPMENT IS MOVED, RELOCATED, OR REMOVED AND REPLACED. TOUCH UP PAINTS MATCH EXISTING ADJACENT WALL IN SHEEN, COLOR, AND TEXTURE AS APPROVED AND DIRECTED BY THE ARCHITECT. 1 RESERVED FOR BUILDING DEFT STAMP 10241POTECT TERED LAAUSS STATE OF WASHIwTON LAURI STRAUSS, AIA, LEED AP BD&C E O _O ( J O (3.) N c }+ (� �z C/)� o W (3.) W U � � U)(D O 006 W p m E � � W Cn o ^1 W O � O Cu � O N i M 4. N �Un V REVISION SCHEDULE # DESCRIPTION DATE RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 2023-019 DATE 2 MAY 2024 DRAWN Author REVIEWED Checker SHEET NAME INTERIOR ELEVATIONS AND DETAILS SHEET NO. A-201 5 4 3 1 D B F 00 04 m00000 L L E N D F Fi)� E 8 T FP�11� 0 0 M RAISED TACTILE PICTOGRAMS RAISED 3/4" HELVETICA TEXT - CENTER ON PLACARD GRADE II BRAILLE N NOTE: TYPE C 1. U.N.O. - MOUNT SIGN PLACARDS 48" FROM FINISH FLOOR TO BOTTOM OF PLACARD AND 9" MINIMUM / 12" MAXIMUM FROM CENTERLINE TO EDGE OF DOOR FRAME ON LATCH SIDE - TYPICAL. 2. MAINTAIN MINIMUM 3/8" GAP BETWEEN TEXT AND GRAPHICS ON EACH SIGN. 3. SIGN TO BE BLACK BACKGREOUND WITH WHITE LETTERS AND PICTOGRAMS. SIGN LEGEND 6" = 1'-0" NEW 5/8" GYPSUM BOARD CEILING ON 4"'C' STUD 18 GA JOISTS AT 16' O.C. EXISTING WOOD BEAM TO REMAIN EXISTING STEEL BRACE TOREMAIN - FIT GYPSUM BOARD TIGHT AROUND STEEL AT PENETRATION B4 A-200 _1U HANG WALL 3'- 4" 24"x48" CABINETS ON MIRROR 'Z' CLIPS 244 EPDXY BOLTED INTO ;T 18' CMU WALL o G 397 bo ' 48" GB iO ih CO 7*2 FRP2 N RUBBERY) ' BASE `"' (RB) N O r` 100, PIPE INSULATION D1 STAFF TLT 4 A -too EQUIPMENT SCHEDULE Mark Manuf. Model Description B2892 Bobrick B-2892 Bobrick B-2892 Classic Series Surface Mounted Twin Jumbo -Roll Toilet Tissue Dispenser B3013 Bobrick B-3013 TrimLineSeries Recessed Seat -Cover Dispenser B3974 Bobrick B-3974 RECESSED ClassicSeries® Convertible Automatic Universal Roll Paper Towel Module B6806 Bobrick B6806-XX Sidewall and Rear Wall Grab Bars SIZE AS INICATED ON DRAWINGS B-2111 Bobrick B-2111 ClassicSeries® Surface -Mounted Soap Dispenser B-7125 Bobrick B-7125 InstaDry Series Surface -Mounted Automatic Hand Dryer M1836 Bobrick B165 1836 18" WIDE BY 36" HIGH MIRROR WITH STAINLESS STEEL CHANNEL FRAME M2448 Bobrick B165 2448 24" WIDE BY 48" HIGH MIRROR WITH STAINLESS STEEL CHANNEL FRAME i0 TOP EDGE TRIM BY FRP MANUF FRP2 ADHERED TO 5/8" MOISTURE RESISTENT GYPSUM BOARD v FRP2 ADHERED TO 5/8" MOISTURE RESISTENT GYPSUM BOARD BOTT. EDGE TRIM BY FRP MANUF _ 101— RUBBER BASE (RB) BIO-BASED PLANK (BBT) FLOORING NEW WALL AT EXG WALL 3" = 1'-0" W112"STA FF TLT 3 = 1'-0" EXISTING WOOD BEAM TO REMAIN EXG DUCT TO REMAIN NEW 5/8" GYPSUM BOARD CEILING ON 4" 'C' STUD 18GA JOISTS AT 16' O.C. FRP2 RUBBER BASE (RB) DOOR SCHEDULE Frame Frame Frame Mark Width Height Hardware Door Type Material Type Material Finish PNT4 Comments 20a 3'- 0" 7' - 0" PRIVACY LATCH W OCCUPANCY FLUSH SOLID CORE DOUBLE HM STAIN W TRANSPARANT FINISH TO MATCH EXG DEAD BOLT WD RABBET 5/8" TYPE GYPSUMI 18GA x 4" AT 16" O.( PROVIDE MINERAL INSULATI( CAVITES ROOM FINISH NOTES 1. AT ALL LOCATIONS WHERE NEW TOILET ACCESSORIES AND/OR GRAB BARS ARE BEING INSTALLED, CONTRACTOR TO VERIFY BACKING IN WALL IS LOCATED CORRECTLY, AND HAS STRUCTURAL STRENGTH TO WITHSTAND 250 LBS OF FORCE APPLIED AT ANY POINT. PROVIDE NEW BACKING IN WALLS AND PATCH AND REPAIR FINISHES AS REQUIRED. 2. BOTH INTERIOR ROOMS ARE TO BE REPAINTED IN THEIR ENTIRETY, INCLUDING THE CEILINGS. COLOR AS SELECTED BY ARCHITECT. 3. PATCH AND REPAIR ALL LOCATIONS; WALLS, CEILINGS, OR FLOORS, WHERE EXISTING EQUIPMENT IS MOVED, RELOCATED, OR REMOVED AND REPLACED. TOUCH UP PAINT SHALL MATCH EXISTING ADJACENT WALL IN SHEEN, COLOR, AND TEXTURE AS APPROVED AND DIRECTED BY THE ARCHITECT. EXTEND WALL TO BOTT OF ROOF DECK ABOVE EXISTING DUCT TO REMAIN 1/2' GAP ALL AROUND DUCT - FILL WITH BACKER ROD AND SEALANT BOTH SIDES OF WALL 5/8" TYPE 'X' GYPSUM BOARD ON 20 GA 3 5/8" MS AT 16" O.C. - W/UNFACED MINERAL WOOL INSULATION IN STUD CAVITIES @_T THRU NEW WALL STAFF TLT 2 1/2" = 1'-0" EXISTING WOOD BEAM TO REMAIN EXG DUCT TO REMAIN NEW 5/8" GYPSUM BOARD CEILING ON 4" 'C' STUD 18 GA JOISTS AT 16" O.C. HANG WALL CABINETS ON 'Z' CLIPS EPDXY BOLTED INTO CMU WALL RUBBER BASE (RB) 18GAx4 MS JOIS AT16" O. 20 GA 3 MS AT 11 KNEE W. FRP2 AE TO 5/8" P GYPSUM BOTT. E TRIM BY MANUF ROOM ELEVATION 1 /2" = 1'-0" EXISTING WOOD BEAM TO REMAIN EXG DUCT TO REMAIN EXG CMU WALL TO REMAIN - PAINT EXG STEEL BRACE TO REMAIN 2 O W PLATIC LAMINATE _ (PLAM) FACED O z PREFAB CABINETS J U S3S CEDAR PLANKS SANDED WITH TRANSPARENT FINISH (STN) FRP2 RUBBER BASE (RB) D1 BENCH SECTION 21 x30 z WALL CAB W/ (2) ADJ SHELVES FM 42x30 WALL CAB W/ (2) ADJ SHELVES Al STAFF TLT 1 1 /2" = V-0" S3S CEDAR PLANKS SANDED WITH TRANSPARENT FINISH (STN) FACE OF EXG EXTERIOR CMU WALL EXPDXY BOLT TRACKSINTO EXG CONIC SLAB BOX OUT AROUND EXISTING BEAM TO REMAIN BOX OUT AROUND EXISTING DUCT TO REMAIN (2) EXISTING PENDANT LIGHT FIXTURES TO BE RELOCATED TO CENTER OF ROOM EXISTING WINDOW DISPLAY CABINET TO REMAIN MODIFY EXISTING CABINET INTO TWO PIECES - DIVIDE AT CENTER VERTICAL - ADD NEW FINISHED END TO ONE SIDE - MOUNT -BOTH CABINETS ON (4) 3" DIAM. LOCKABLE CASTERS CV W 0 bo -1 cfl EOF �AUSSIN(iTON LAURI STRAUSS, AIA, LEED AP BD&C v 0 E O p m OU N 4J 00 O < d> v J V1 Q N oL E IN Ln Lu o G �N�Q'j 0 0 — N J QJ E O 0 �L_ V J O � N 1..` 00 }+ U) z♦^ Q O ^� W O 0 0 CZ w U (W > U)0 O U) 0 06 W j O �Q W ^1 W O � O ICU � O N i M � N coV REVISION SCHEDULE # DESCRIPTION DATE 1 FLOOR MOUNTED WATER 4/5/2024 CLOS4rml 1_ Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 2023-019 DATE 2 MAY 2024 DRAWN LMS REVIEWED IS SHEET NAME INTERIOR ELEVATIONS AND DETAILS SHEET NO. A-200 5 i C C B FRP1 Rosemary SS5460-G63R MIRROR WITH B-165 STAINLESS STEEL Technical Data CHANNEL FRAME SERIES Desigrer'sl Notes: ,. SPeoa elver sizesavaAabem request 2. Mazkrnur,size„wra avaiMde,fle-a]Z(2a4 z,aacm),„w,imum size, ,T z,T (3az 30an). 3. bu.111-ursortlm,sws are ma,urtacNrM,00w:wlowMm rM MgM Nn,,mmm. FXAkPIE:ANz38' (B, xa,an7 m.m a4B re n,m,al,ae z<-. aB' le, . s,an7 waaieew bane a amMe.nr.rrana. 4. TPape*aPdelsesus ,esN.tx bHM.edbywso.Ixs1cw,wd EzAl4PtE: Isles— (S' z. 6lwn) s. Bohiklr •dmiwss.w anufacMed,oai.owwelle'(33mn). 8. Fns,Aaad space,o lip minor onlowall l,a,gars),p,ovge l'(2Gmd m,nun dearence above apd Pmvde40e PI w. T. 1?(12Tmm)mn,mum clearance vn eacn s,re. Snap Locking Design (Rear View) STANDARD B-165 SERIES MIRRORS MODEL OVERALL SEE NO. W X Is1B51014 is' —) N Btds Is1BS sa10 ,P 4Bwn Ar Bon Sus oO]fi ,8' - sB' boost BIBS NeO N' 6,vn N ]Bon Is,BSNY N'town 8 BIBS NIB 2'6oew qt 171an Is,BSNm -knew) BP 115Ml) "2S" Tab Design (Rear View) -for all other mirrors up to a Width of 36" Flip- 2 F,l ram j 11 Note: Minors reefer than 36" in width will have multiple 9 P lean er brackets whh a typical 8" 06 each e e 9 HP a9 N d®iave Iwo, ae ePPNrbY w PaA,mm a rl. maayaev,ss- a. d#a 4.d a- kwn ar M Mw, „r. d,.adr.,e npe"r„susan daz9n rd M1,arwc. continued... ClassicSeries° SURFACE -MOUNTED B-2111 Technical Data SOAP DISPENSER 4&4�' tom" Finish Fars of Wall S S S Fller-Triil� 98 2g5nvll i I � 1 Wall Plate 11L1 II S gg s Y Wind - II e Push gotten MATERIALS: Conminer-IBA 22 O.8mm stainlesssteel withmtlnfinish.Bo iadmwn one iece seamless . Typehas gauge( ) dY D „nshuccat, Back plate has mounting bracket attached. Furnished with concealed wall plate. Equipped with a clear acrylic ".fill-indkator window and a locked, hinged stainless steel lid foie lop filling. Capacity: 40 0 oz (1.21). ,:Ilve - Black molded plastic push button and spout. Soap head -holding mushroom valve. Stainless steel spring. U-packing -at and duckbill. Antibacterial-soapresisuent plastic cylinder. OPERATION: ( rrosi—sixt-tvalve dispenses commercially marketed all- purpose hand soaps. To prevent corrosion of the tank, use only eliloride-free pH -neutral liquid soaps. Valve is operable with one hand, without tight grasping, pinching, or twisting of the wrist, and with less than 5 Pounds of force ' 2.2 N to comply with accessible des guidelines (including ADAAG in the U.S.A.). W (Z ) PY top lm ( ng ,1'indow Indicates when refill is re uved. The lacked hi lido opens for to filling only with special k provided. Concealed q deed Pe P ng Y Pec key t:,ndaliesislant mounting. g INSTALLATION: se=,:ure wall late la the wdH with three sheel-metal screws furnished b manufacturer at points indicated h an S. Slide P Y W Y ountin bracket of tx)nminer down onto wall late and sen unit with furnished locki - ew. For aster or die wall g P locking— W Y tr,nstruction provide concealed backing to comply with local building codes and secure with sheer -metal screws furnished. For P g PY e nlherwall surfaces provide fiber I s r .ton shields for use with sheer -metal screws furnished or Provide t/8" 3Com e o • P P expansion P Inggle bolts or expansion bolls. Note: Surfacemoin t the dispenser plumb and tree with valve 6" (150mnd to right or left of lavatory center. Provide 4" I IOomm) minimum clearance from the lid to the underside of any horizontal projection. Posh buttons should be located 44" 11120mm) maximum above the finish boor. SPECIFICATION: �arfacemounted son dispenser shall be stainless steel with satin-finish.Corrosion-resistant valve shall dispense P Pe soapen ercialmarketed all-purpose hand so s on -iodine based son and do not use alcohol based sanitisers. To ,event IYsoaps, ps p "rosion of the tan a only chloridefree B-oeutml liquid son .Valve shall be a mbk with one hand and with less than k N y P q Ps Pe pounds of force 2.2 N to comply with accessible des' idelines costal' ADAAC in the U.SA . Container shall be po (2 ) P Y design gu Occluding ) quipped with a clear wrylk refill -indicator window; a locked, hinged stainless steel lid far top fitling; and shall have a capacil) nt 4U8 no (12L). Unit shall have concealed, vandal-resislaw mounting. Surfaee-Mounted Soap Dispenser shall be Model It-2111 of Bobrick Weshrmm Equipment, Ire., Clifton Park, New York; Jackson, Tennessee; Ina Angeles, CNfforaim Bobriek Washroom Equipment Company, Scarborough, Oman,; Hobtick Washroom Equipment Pry. Ltd., Australia; and Bobriek Washroom Equipment Limited, United Kingdom. era d.r,Per.Ivan .m .polra. m p,aenea, r a ew one a ew rxlrvev ow.n.m. OmxtWmdvx WaHor, Egp,ay-Irc. TM muvmclu,er,eavvr ee ne,,,a,e,m mrlmnemelo eme, mew w„auuw nyrwemerwnargmam deroww,s ozoieq Baerrx wazmrcm Equpmen. rc. FINISH MATERIAL SCHEDULE MARK MATERIAL MANUFACTURER STYLE / PRODUCT COLOR SIZE FINISH NOTES BBT BIOBASED TILE ARMSTRONG STRIATIONS BBT DIAMOND 10 ROSEMARY Z3629 12" X 24" FACTORY ECOFLEX BACKING - PLANK HALF LAP INSTALL PATTERN CT1 CERAMIC TILE DAL TILE CERSAMIC MOSAIC TILE MATCH EXISTING MATCH EXG FACTORY MATCH EXG PATTERN, COLOR, SIZE - PROVIDE COVE BASE FRP1 FIBERGLASS REINFORCED PLASTIC MARLITE SymmetrixTM SmartSeam FRP, SUBWAY PATTERN ROSEMARY SS5460-G63R 4'x4' PANEL SIZE: 6" X 3" SIZE TILE CONFIGURATION FACTORY PROVIDE INSIDE/OUTSIDE CORNER, AND TOP AND BOTTOM EDGE TRIM BY SAME MANUF FRP2 FIBERGLASS REINFORCED PLASTIC MARLITE SymmetrixTM SmartSeam FRP, SUBWAY PATTERN 2055 CHIARO - SUBWAY 5' x 3' PANEL SIZE: 24" x 12" SIZE TILE CONFIGURATION FACTORY PLAM PLASTIC LAMINATE CABINET VENEER WILSONART BLACKBIRD 5024 CUSTOM FACTORY PNT1 PAINT SHERWIN WILLIAMS FIELD COLOR SW 7005 - PURE WHITE - EGGSHELL* *SEMI -GLOSS IN ALL -GENDER TOILET ROOMS PNT2 PAINT SHERWIN WILLIAMS ACCENT COLOR SW-6171 CHAT ROOM - EGGSHELL* - PNT3 PAINT SHERWIN WILLIAMS HM DOOR FRAME COLOR SW 6990 CAVIAR - SEMI -GLOSS - PNT4 PAINT SHERWIN WILLIAMS CEILING PAINT SW-7004 SNOWBOUND - FLAT RB RUBBER BASE ROPPE COVE BASE 100 BLACK 4" FACTORY STN WOOD STAIN SHERWIN WILLIAMS TINTABLE WOOD STAIN 250 VOC SMOKEWOOD MW 407 - 1 CLEAR COAT SURFACE -MOUNTED ' J TWIN JUMBO -ROLL B-2892 Technical Data �TOILETTISSUE DISPENSER Mount wlma a^(aaR,an) 4 f��ln Front of Talks Sate 2033 m6' FlnMh Face of Wnall- .me I�-Illy 6& WNmm8"-�t T LookB KW+.. 11B" t SI YP.I ` sonar S Door I s° l o t2-va• Ison " I - 2 ;—i2O_ I I E I S S $ Vlewky sat IaWra slang APcaw Panel camas E Note: flue ,is ICC A117.1- 21X)9 Standard p use h,, Accessibilitym liant. Unit Caro be lecated below ab bar. r„ D e is ,ea 24"minimum to 42"marimvm o rear wit, with ,utle118"minimum above Jtooc Fm MATERIAL: Cabinet - 188 20 gauge I.Omm stainless steel with satinfinish. Equipped with a tumbler lock keyed Else other 8a g • TYPe'�. q DPed Y Bobrkk washroom accessones. Door -188, Type304, 18gauge. (1.2mm) stainless steel with satin -finish. Drawn, one-piece, seamless Construction. Wide viewing slot reveals toilet tissue supply inside cabinet. Dispensing Mechanism - High -impact ABS. confined. RECESSED TOILET -SEAT -COVER B-3013 Technical Data I DISPENSER Specify Finish Required ❑ Stainless Steel, Satin Finish Matte Black Finish, please use model no. B-3013.MBLK L 1 d Rough Wall Opening tl9 pe 9 15-78" 405mm wide 11-7 6" h n ( 290mon ) high 2.3/e:4:ed a m " TOmm minimmu( 7 eP ADA CBC Installation Gultlance .OaI rwAh Pam: To of toilet seat cover Is user enm. Maxbnum nldvnrNe AWRM or co-ob, Perf.' ADA ICG 40"above fl-n. floor AFF) CBC. 40" above f,mzrw4 floor (All) Bobrkk Pla-we Gude forrAccesslbI. omoms Ipwage 9fer to MATERIALS: Cabinet-19- T e-304 bee - e stainless steel. AIL -welded carorowrion. 8. YP vy 9au9 Door -18-8. T 304. 18- au a l.2mm stainless steel with satin finish or matte black. as s Ified. 9/16" 14mm 90' net... YP9 9 ( ) Pec ( ) for maximum rigidity. Secured to h,,,m c a concealed full -ten [ .stainless steel lano pro e. Equipped with a tumbler 9 P 9 lock keyed other Bobrck washroom accessories. Tumbler lock flush with the door -no protrusion. Ye P OPERATION: Dispenses sin le- or half4old r toilet seat covers. To fill dispenser door unlocks with k provided. Capacity: 500 toilet 9 Papa pe key P seat covers. INSTALLATION: Provide framed rough wall opening 15-7 8" wide x 11-T 6" high 405 x 290mm . Minimum recessed tl th required 9 P ng / n 9 ( ) eP eq from finish face ofp wall Is all. Co (dint. Allow clearance for construction features that may Protrude Into rough wall opening from opposite wall. Coordinate with mechanical engineer to avoid pipes, vents, and conduits In wall. Mount cabinet with shims between framingand cabinet at all points indicated b an S than secure unit with four #8 x 1-1 4" Po Y (A .2 x 32mm sheet -metal screws not furnished). SPECIFICATION: Recessed toilet -seat -cover dispenser shall be T e-304 stainless steel with all -welded construction' exposed surfaces YP Po shall have satin finish ne Or matte black a5 specified. staff shrill be 1B 1.2mm 'have 9 6" to m 90o return edges: p gauge( ). n ( ) 9 be secured to cabinet with a concealed full -ten [h stainless steel lano-hln e. Equipped with a tumbler lock keyed Ilk. 9 P 9 r Peed minimum other go rick washroom accessories. Tumbler lock flush with the door - no protrusion. Dispenser shall have a minimum capacity of 500 paper toilet seat covers. Recessed Toilet -Seat -Cover Dispenser shall be Model B-3013 of Bobrick Washroom Equipment, Inc., Clifton Park, New York; Jackson, Tennessee; Los Angeles, California; Bobrick Washroom Equipment Company, Scarborough, Ontario; Bobrick Washroom Equipment Ph, Ltd., Australia; and Bobrick Washroom Equipment Limited, United Kingdom. ClassicSeries • = RECESSED CONVERTIBLE AUTOMATIC UNIVERSAL ROLL B-3974 Technical Data PAPER TOWEL DISPENSER AND WASTE RECEPTACLE (� s��rivsrns�rYa s m IuT I� m I I reAne, I I r.amms sa/Iv I ��I operable cart -= t I awl 4c snd,.wd w A � I2y Y-I: t , � � s n�li:l• islC T�I I: la EMI IssE 61 I `I Y I I use I e I I I I I I sa "a" nusmm rw lzssmm) dManr ue�Tmm) ADA/CBC Installation Guidance Rou Wa110 nin Y n 9 W 9 'Operable Part: Towel dispenser towel outlet 16" 405mm witle p 54-3 4" 1390mm high 9 9 P Maximum mounting height of Operable Part: 4" ADA ICC; 48" maximum above finlshed Door AFF 102mm minimum CBC: 40" maximum above finished floor AFF ad de th P -For more Information re a refer [o Bobrrck Plannin Guide for ArseszlEleaRestmgom yleaseass. 0 MATERIALS: Cabinet-18-8 T e-304 hen a stainless steel. Welded Construction. Ez sad surtace. have san,efli lsh. E ul lack other Bobrick washroom attessories. Flange -18-8. Type-304.22-gauge (0.8mm) stainless steel with satin -finish. Drawn antl bowled. one - piece. -orke , onstruction. Door-18- T -304 20- a e 0.9mm stainless steel with -in-finish. Drawn on amless construction. Secured & YPe 9 u9 ( ) e-Pid like to cabine[with full -le th.stainless steal i no -bin e.E u with lockk keyed like other Bobrkk washroom n9 Pa 9 Equipped! ey Autometh, Roll Towel Dla n - Durable hl h-Ira act ..in materials. Accepts universal standard -core non- .d-tea Pew , 9 P P P rolls u to 8" 200mm wise 8" zosmm diameter. 800 k 244 m I . Dls ne towel par als antl can be se[ p ( ) ( ) ( ) up t per,ses o e parse to transfer to f paper towels at Inree tlifferent lengths. Accommodates up to 3-1/2" (90mm) diameter stub roll with automatic tarsier to full roll. We Receptacle -18-8. Type-304, 22-gauge (0.8mm) stainless steel with wtln finish. Edges hammed for safe handling. Secured to cabinet with a tumbler lock keyed like other Bobrkk washroom ......odes. Capacity: 12-gal. (45.5-L). continued... apdkabm la r—�ona. altw date nl,Ms ranMw Dent sneer sea tznyzz ) DIAMETER STAINLESS STEEL GRAB B-6806 Technical Data BARS WITH SNAP FLANGE SERIES Spe,db' FWah Required: ❑ Saoofimah. slipresis[Am s,rtwe ❑ Peened surface: add su,Bx.99 I, mMet aumber Amg =7 a»a!!llrrrr r� T T rr� TWO COMPAFTMENCHAIR aft, N.N ewe \4 1 corm alJv- r +� 11.11.0-1-TUB ISHOWER COMPARTMENTBAR.zn6 HORIZONTALTINO-WALL BAR for Stall Shower TWOWALL TOILET COMPARTMENT BAR 42 x 54 13-7 .ondwwd... InStaDryTM SURFACE -MOUNTED AUTOMATIC HAND B-7125 Technical Data DRYER Univarwl Voltage: -110V-24OV, 0.8-1.9 AMP, 50/60 Hz. 202-213 watts, cULus Listed and CE marked ♦ 1 i I� ADA CBC Installation Guidance •O erable Part. Sensor at bottom of the dryer P ry r Maximum mounting 9 Pe het height of O nble Part: ADA ICC: 4W maximum above finished floor AFF CBC: 40" maximum above finished floor AFF Bobrck Plann'na Gu de for ACc—bleaRes[mom,, wave 9fer to MATERIAL5: Cover -18-B T e-30a stainless steel 12mm thick with k4 satin-flnlsh vertical grain. Air -Inlet isvandal-resistor[. Cover YP 9 al 'acts no more than 4" 100mm from wall ant Is secured [o mounting base with two recessed socket button head ca project, ( ) 9 P screwsMounti Bew-1.5mm SECC unshed and formed. g P Motor - Brushless 24Vdc with built In thermal P 9 P protection. Ball bearings. Operate, at 40000 RPM. Blower -Backward curvetl radial laded impeller in polycarbonate housing. Eect,,,I, Control- Infrared sensor ,twti,,Ily turns dar r e on when hands are held under alrrouHet o p e and across sensor. Path of Remove hands from path of sensor and d rye, tops. Electronic sensor has automatic hutoff pproximately ring 85 seconds after d ssa ryerturns on If Inanimate object is ro placed across alutle[ opening. Aker Inanimate object is removed. electronicsensor automatically resets Itself and dryer operates normally. continued ... EQUIPMENT SCHEDULE Mark Manuf. Model Description B2892 Bobrick B-2892 Bobrick B-2892 Classic Series Surface Mounted Twin Jumbo -Roll Toilet Tissue Dispenser B3013 Bobrick B-3013 TrimLineSeries Recessed Seat -Cover Dispenser B3974 Bobrick B-3974 RECESSED ClassicSeries® Convertible Automatic Universal Roll Paper Towel Module B6806 Bobrick B6806-XX Sidewall and Rear Wall Grab Bars SIZE AS INICATED ON DRAWINGS B-2111 Bobrick B-2111 ClassicSeries® Surface -Mounted Soap Dispenser B-7125 Bobrick B-7125 InstaDry Series Surface -Mounted Automatic Hand Dryer M1836 Bobrick B165 1836 18" WIDE BY 36" HIGH MIRROR WITH STAINLESS STEEL CHANNEL FRAME M2448 Bobrick B165 2448 24" WIDE BY 48" HIGH MIRROR WITH STAINLESS STEEL CHANNEL FRAME 1EOF ITECT AUSS INI:iTON LAURI STRAUSS, AIA, LEED AP BD&C O CD O C _ n E O CD m (N QJ 00 O In v J Ln >Q 0, CV C ri O GV" a�= �N� 0 'N J QJ E O O L_ st (n O (2) N Of 00 0) C }+ ^, W .. z ♦^ Q O ^� W U � �w U)(D 0 006 W LU W � O O IIIIIIIIII� ICU O N i M N � Its CU REVISION SCHEDULE # DESCRIPTION DATE RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 2023-019 DATE 2 MAY 2024 DRAWN LMS REVIEWED LMS SHEET NAME MATERIALS BASIS OF DESIGN SHEET NO. A-900 5 3 2 li MECHANICAL BASIS OF DESIGN HVAC AND PLUMBING LEGEND PLUMBIN GENERAL NOTES MECHANICAL GENERAL NOTES SYMBOL ABBREVIATIONS DESCRIPTION 1. THE TOTAL INSTALLATION SHALL COMPLY WITH ANY REQUIREMENTS OF THE LEGALLY CONSTITUTED AUTHORITIES 1. THE TOTAL INSTALLATION SHALL COMPLY WITH ANY REQUIREMENTS OF THE LEGALLY CONSTITUTED AUTHORITIES HAVING A. EXHAUST FAN CONTROL METHOD: HAVING JURISDICTION INCLUDING 2018 INTERNATIONAL BUILDING CODE (IBC), 2018 INTERNATIONAL MECHANICAL CODE JURISDICTION INCLUDING 2018 IBC (INTERNATIONAL BUILDING CODE) WITH WASHINGTON STATE AMENDMENTS, 2018 IMC/UPC (IMC), 2018 UNIFORM PLUMBING CODE (UPC) WITH WASHINGTON STATE AMENDMENTS AND THE 2018 WASHINGTON (INTERNATIONAL MECHANICAL CODE AND UNIFORM PLUMBING CODE) AND THE 2018 WASHINGTON STATE ENERGY CODE. 1. VIA ALIGHT SWITCH WITH FIVE-MINUITE DELAY TO TURN OFF. SQ., RECT. OR ROUND DUCT AS NOTED STATE ENERGY CODE. B. EXHAUST TO OUTDOORS (MINIMUM RATES) 2. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE EXISTING EXIST. DUCT OR EQUIP. TO REMAIN 2. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID AND SHALL THOROUGHLY FAMILIARIZE THEMSELVES WITH THE CONDITIONS UNDER WHICH HE WILL BE REQUIRED TO WORK. 1. RESTROOMS: 75 CFM/(WC or U) EXISTING CONDITIONS UNDER WHICH THEY WILL BE REQUIRED TO WORK. INDICATED DIMENSIONS ARE APPROXIMATE 2. RESTROOMS: AIR CHANGE EVERY 5 MINUTES ` _ EXIST. DUCT OR EQUIP. TO BE REMOVED AND ARE GIVEN FOR ESTIMATE PURPOSES ONLY. 3. INDICATED DIMENSIONS ARE APPROXIMATE AND ARE GIVEN FOR ESTIMATE PURPOSES ONLY. BEFORE PROCEEDING WITH THE WORK THIS CONTRACTOR SHALL CAREFULLY CHECK AND VERIFY DIMENSIONS, SIZES, REQUIRED CLEARANCES AND C. DUCTWORK DESIGN CRITERIA (MAXIMUM ALLOWABLE AIR PRESSURE DROPS AND AIR VELOCITIES) TO MEET HIGH .Ll�JU FLEXIBLE DUCT 3. BEFORE PROCEEDING WITH THE WORK THIS CONTRACTOR SHALL CAREFULLY CHECK AND VERIFY DIMENSIONS, SIZES, SHALL ASSUME FULL RESPONSIBILITY FOR THE FITTING OF EQUIPMENT AND MATERIALS HEREIN REQUIRED TO OTHER PARTS EFFICIENCY OPERATION WITH MINIMAL ACOUSTICAL NOISE. DUCT STATIC PRESSURE FRICTION LOSS SHALL NOT EXCEED REQUIRED CLEARANCES AND SHALL ASSUME FULL RESPONSIBILITY FOR THE FITTING OF EQUIPMENT AND MATERIALS OF THE WORK OF OTHER TRADES. DUCT DIMENSIONS SHOWN ON PLANS ARE NET INSIDE CLEAR. 0.2" PER 100 FEET IN MECHANICAL ROOMS AND SHAFTS. LOW PRESSURE SUPPLY AND EXHAUST DUCT STATIC PRESSURE HEREIN REQUIRED TO OTHER PARTS OF THE WORK OF OTHER TRADES. FRICTION LOSS BASED ON A MAXIMUM OF 0.08" PER 100 FEET. LOW PRESSURE RETURN DUCT STATIC PRESSURE FRICTION ' ' CD CEILING DIFFUSER, SUPPLY 4. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT OFFSETS, BENDS, SPECIAL FITTINGS AND LOSS BASED ON A MAXIMUM OF 0.05" PER 100 FEET. MEDIUM PRESSURE DUCTWORK SHALL NOT EXCEED MAXIMUM '. ®' CR CEILING REGISTER, RETURN &EXHAUST 4. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT OFFSETS, BENDS, SPECIAL FITTINGS AND LOCATIONS ARE NOT EXACTLY LOCATED. DUCTWORK DIMENSIONS SHOWN ON THE DRAWINGS ARE NET INSIDE DIMENSIONS. VELOCITY AS LISTED BELOW. LOCATIONS ARE NOT EXACTLY LOCATED. IN THE PREPARATION OF THESE DOCUMENTS, CERTAIN ASSUMPTIONS ARE DO NOT FABRICATE DUCTWORK FROM THESE DRAWINGS. THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR SUPPLYING 1. IN ADDITION EXHAUST DUCT AIR FLOW VELOCITIES, REGARDLESS OF PRESSURE DROP, SHALL NOT EXCEED THE >_> SECTION THROUGH DUCT MADE REGARDING EXISTING CONDITIONS. SOME OF THESE ASSUMPTIONS MAY NOT BE VERIFIABLE WITHOUT SHOP DRAWINGS WHICH REFLECT THE PROPOSED INSTALLATION. THE SHOP DRAWINGS MUST BE APPROVED BY THE EXPENDING ADDITIONAL SUMS OF MONEY OR DESTROYING OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF ENGINEER PRIOR TO ANY SHEET METAL FABRICATION. THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING FOLLOWING CRITERIA: EXISTING BUILDINGS AND/OR EQUIPMENT. THEREFORE, THE ENGINEER SHALL NOT BE HELD RESPONSIBLE FOR ANY ACCURATE AS -BUILT DRAWINGS AT THE COMPLETION OF THE PROJECT AND SUBMITTING THEM TO THE ENGINEER AND A. RUN -OUTS TO ROOF CAPS: 725 FPM DUCT DOWN CHANGES OR ADDITIONAL COSTS INCURRED DUE TO EXISTING CONDITIONS. OWNER. D. ACOUSTICAL: SQUARE TO ROUND TRANSITION 5. ITEMS RELATED TO PLUMBING UTILITIES AND/OR OTHER SERVICE(S); MATERIALS, LABOR, PERMITS, FEES, ETC., SHALL 5. IN THE PREPARATION OF THESE DOCUMENTS, CERTAIN ASSUMPTIONS ARE MADE REGARDING EXISTING CONDITIONS. SOME 1. THE FOLLOWING NOISE NC/RC CRITERIA LEVELS WILL BE DESIGNED AS DEFINED IN THE ASHRAE HVAC APPLICATIONS BE VERIFIED WITH THE RESPECTIVE SERVING UTILITY COMPANY PRIOR TO SUBMISSION OF A BID. THE ACT OF OF THESE ASSUMPTIONS MAY NOT BE VERIFIABLE WITHOUT EXPENDING ADDITIONAL SUMS OF MONEY OR DESTROYING HANDBOOK. THESE LEVELS ADDRESS THE MECHANICAL SYSTEMS ONLY. ACTUAL SOUND PERFORMANCE El DUCT ACCESS DOOR SUBMITTING A BID SHALL CONSTITUTE FULL RESPONSIBILITY OF THE CONTRACTOR TO INSTALL SERVICE(S) IN OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF EXISTING BUILDINGS AND/OR EQUIPMENT. THEREFORE, THE REQUIREMENTS FOR EACH SPACE MUST BE VERIFIED WITH ACOUSTICAL CONSULTANT. COMPLIANCE WITH THE REQUIREMENTS OF THE SERVING UTILITY COMPANY AND THE MECHANICAL ENGINEER. THE ENGINEER SHALL NOT BE HELD RESPONSIBLE FOR ANY CHANGES OR ADDITIONAL COSTS INCURRED DUE TO EXISTING A. RESTROOMS: 40 DUCT WITH TURNING VANES CONTRACTOR SHALL BE RESPONSIBLE FOR CHARGES LEVIED BY THE SERVING UTILITY COMPANY EXCEPTING THE CONDITIONS. FIRST BILLING DEPOSIT. E. SEISMIC: � SFD COMBINATION SMOKE/FIRE DAMPER 6. THE CONTRACTOR SHALL COMPLY WITH CONTRACT DOCUMENTS IN LAYING OUT THEIR WORK AND EQUIPMENT. THEY SHALL 1. ANCHORAGE AND RESTRAINTS ARE A DEFERRED SUBMITTAL BY THE CONTRACTOR AND MUST BE COORDINATED WITH 6. THE CONTRACTOR SHALL COMPLY WITH CONTRACT DOCUMENTS IN LAYING OUT THEIR WORK AND EQUIPMENT. THEY COORDINATE THE WORK OF THIS SECTION WITH THE WORK OF OTHER TRADES AND JOB CONDITIONS. STRUCTURAL ENGINEER AND AUTHORITY HAVING JURISDICTION. 0 MVD MANUAL VOLUME DAMPER SHALL COORDINATE THE WORK OF THIS SECTION WITH THE WORK OF OTHER TRADES AND JOB CONDITIONS. 7. THE INSTALLATION OF ACCESS PANELS OR OTHER INDICATING EQUIPMENT OR SPECIALTIES REQUIRING READING, T'STAT THERMOSTAT 7. THE INSTALLATION OF ACCESS PANELS OR OTHER INDICATING EQUIPMENT OR SPECIALTIES REQUIRING READING, ADJUSTMENT, INSPECTION, REPAIRS, REMOVAL OR REPLACEMENT SHALL BE CONVENIENTLY LOCATED WITH REFERENCE TO ADJUSTMENT, INSPECTION, REPAIRS, REMOVAL OR REPLACEMENT SHALL BE CONVENIENTLY LOCATED WITH THE FINISHED BUILDING. P.O.0 POINT OF CONNECTION REFERENCE TO THE FINISHED BUILDING. 8. WHERE MATERIAL IS SHOWN ON THE DRAWINGS BUT NOT SPECIFIED, IT SHALL BE OF THE SAME TYPE AND QUALITY AS 8. EQUIPMENT AND FIXTURES INSTALLED UNDER THIS CONTRACT SHALL BE HUNG OR ANCHORED IN ACCORDANCE WITH EXISTING MATERIAL. P.O.D. POINT OF DEMOLITION 2018 (IBC) AND 2018 UPC. �n 9. WHERE NOT SPECIFICALLY INDICATED OTHERWISE, DUCTWORK AND EQUIPMENT SHALL BE SUPPORTED PER THE SMACNA MOTORIZED DAMPER 9. THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO CONSTRUCT THE PROJECT IN ACCORDANCE WITH 2O18 GUIDELINES FOR SEISMIC RESTRAINT AND CURRENT APPLICABLE UNIFORM MECHANICAL CODE. No. WASHINGTON STATE ENERGY CODE. EDETAIL SHEET No. DETAIL REFERENCE 10. MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE FLAME SPREAD INDEX NOT 10. WHERE MATERIAL IS SHOWN ON THE DRAWINGS BUT NOT SPECIFIED, IT SHALL BE OF THE SAME TYPE AND QUALITY AS GREATER THAN 25 AND A SMOKE DEVELOPED INDEX NOT GREATER THAN 50 (2018 IMC SECTION 602.2). A SECTION REFERENCE EXISTING MATERIAL. 11. THERMOSTATS SHALL BE 7-DAY PROGRAMMABLE AND SHALL COMPLY WITH THE 2018 WASHINGTON STATE ENERGY CODE. STACK/RISER PLUMBING STACK OR RISER REFERENCE 11. TEST SYSTEM(S) IN ACCORDANCE WITH REQUIREMENTS OF THE GOVERNING AUTHORITIES. ANCHORAGE AND BRACING NOTES ID. No. 12. CLEANOUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE AND LOCATED AS PER CODE REQUIREMENTS THE EQUIPMENT CONTRACTOR SHALL COORDINATE CLEANOUT LOCATIONS WITH EQUIPMENT CABINETS, ETC. AND THE ARCHITECT EQUIPMENT REFERENCE PRIOR TO ANY INSTALLATION. ID. No. OS LIGHT SWITCH TO TURN/OFF EXHAUST FAN 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND REPAIRING PAVED AREAS WHICH ARE EXCAVATED 1, PIPES, DUCTS AND CONDUITS SHALL BE SUPPORTED AND BRACED PER THE 2008 SMACNA "GUIDELINES FOR - CW COLD WATER AND/OR DAMAGED BY THEIR OPERATIONS. IN ADDITION, THE CONTRACTOR SHALL RESTORE TO ORIGINAL CONDITION SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING SYSTEMS", THE "SUPERSTRUT SEISMIC PLANTED AREAS DAMAGED BY THEIR OPERATIONS. RESTRAINT SYSTEM" FOR PIPES AND CONDUITS ONLY. CA CA COMPRESSED AIR - - HOT WATER 14. CONNECTIONS TO EXISTING SERVICES SHALL BE MADE SUCH THAT INTERRUPTION TIME WILL BE AS SHORT AS HW POSSIBLE. THE CONTRACTOR SHALL GIVE THE OWNERS REPRESENTATIVE A MINIMUM OF 72 HOURS NOTICE OF SUCH Sheet List Table - - - HWR HOT WATER RETURN INTERRUPTIONS AND THE ACTUAL SHUT -DOWN TIME SHALL BE AT A TIME DESIGNATED BY THE OWNERS S or W SOIL or WASTE ABOVE GRADE (or FLOOR) REPRESENTATIVE. Sheet Number Sheet Title S or W PIPE BELOW GRADE (or FLOOR) 15. POTABLE WATER SYSTEMS SHALL BE DISINFECTED AND FLUSHED PRIOR TO USE BY WATER -CHLORINATION SOLUTION MP-001 MECHANICAL & PLUMBING LEGENDS AND NOTES --- --- --- --- V PLUMBING VENT AND HAVE BACTERIOLOGICAL EXAMINATION MADE BY AN APPROVED AGENCY PER 2018 UPC 609.9 AND AS PRESCRIBED IN AWWA C651. METHODS OF CLEANING/ DISINFECTING FOR NEW OR REPAIR PIPING AS DESCRIBED IN C651 OR NFPA 24. MP-002 MECHANICAL & PLUMBING SCHEDULES COND COND CONDENSATE DRAIN MP-100 BLDG H OVERALL M&P WORK PLAN 16. PLUMBING PIPE, FITTINGS AND FIXTURES USED TO CONVEY OR DISPENSE WATER FOR HUMAN CONSUMPTION SHALL BE G G GAS LOW PRESSURE LEAD-FREE PER 2018 UPC 604.2. MP-201 BLDG H WORKROOM BATHROOM M&P PLAN MPG MPG GAS MEDIUM PRESSURE 17. ANY SUBSTITUTION MADE BY THE CONTRACTOR THAT IS DIFFERENT FROM WHAT IS SPECIFIED ON THE DRAWINGS MP-202 BLDG H ALL GENDER RESTROOM PLUMBING PLANS CS CIRCUIT SETTER NEEDS TO BE APPROVED BY ENGINEER OF RECORD AND OWNER PRIOR TO BID AND SHALL BE CLEARLY INDICATED ON MP-203 BLDG H ALL GENDER RESTROOM MECHANICAL PLANS SOV SHUT OFF VALVE THE SUBMITTAL AS TO THAT IS BEING SUBSTITUTED. MP-301 MECHANICAL & PLUMBING DETAILS CV SWING CHECK VALVE 18. SHUT-OFF VALVES SHALL BE PROVIDED IN MAIN BRANCHES, RUNS TO RISERS AND WHERE INDICATED ON DRAWINGS. MP-501 MECHANICAL SPECIFICATIONS PRV PRESSURE REDUCING VALVE 19. NEW NON-RESIDENTIAL WATER CLOSETS SHALL COMPLY WITH 2O18 UPC 411.2 AND SHALL NOT EXCEED 1.6 GALLONS MP-502 PLUMBING SPECIFICATIONS PTR PRESSURE -TEMPERATURE RELIEF VALVE PER FLUSH. MP-503 PLUMBING SPECIFICATIONS CONT. RPBFP REDUCED PRESSURE BACKFLOW PREVENTER 20. NEW NON-RESIDENTIAL LAVATORY FAUCETS SHALL COMPLY WITH 2O18 UPC 407.2.1 AND SHALL NOT EXCEED 0.5 GC GAS COCK (or GAS STOP) GALLONS PER MINUTE FOR PUBLIC LAVATORY AT 60 PSI. 0) DN PIPE DOWN 21. FIXTURES, EQUIPMENT, PIPING, FITTINGS, AND MATERIALS SHALL BE LISTED. �O UP PIPE UP Q PIPE RISER (UP AND DOWN) 22. PLUMBING FIXTURES SHALL MEET THE FLOW REQUIREMENTS SPECIFIED IN THE 2018 UPC. FLOOR CLEANOUT 23. PUBLIC LAVATORIES SHALL HAVE CONTROLS TO LIMIT THE WATER TEMPERATURE TO 1207. FCO WCO WALL CLEANOUT YARD CLEANOUT CLEANOUT TO GRADE APPLICABLE CODES C.O.T.G. or CAP ON END OF PIPE HB HOSE BIBB WITH VACUUM BREAKER 1. BUILDING CODE: 2018 INTERNATIONAL BUILDING CODE WITH WASHINGTON STATE AMENDMENTS WHA OR TP WATER HAMMER ARRESTOR OR TRAP PRIMER 2. PLUMBING CODE: 2018 UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS - - - -DX - - - - DX REFRIGERANT LINES ABV. ABOVE 3. MECHANICAL CODE: 2018 INTERNATIONAL MECHANICAL CODE WITH WASHINGTON STATE AMENDMENTS BEL. BELOW 4. ELECTRICAL CODE: 2020 NATIONAL ELECTRICAL CODE (NFPA 70 - 2020) INC. ANNEX A, B, AND C CLG. CEILING 5. FIRE/LIFE SAFETY: 2018 INTERNATIONAL FIRE CODE WITH WASHINGTON STATE AMENDMENTS CONN CONNECTION CONT CONTINUATION 6. ADA AND ACCESSABILITY GUIDELINES - 2010 ADA STANDARDS FLR. FLOOR 7. ENERGY: 2018 WASHINGTON STATE ENERGY CODE FU PLUMBING FIXTURE UNIT GR GRADE H.C. HANDICAPPED IE INVERT ELEVATION NC NO NORMALLY CLOSED NORMALLY OPEN M JO� 110 James St., Suite 106 ���` WA Edmonds, Phone: 0 42 458.9700 o Fax: 909.890.3770 TYP. TYPICAL z Email: cadd@designwesteng.com V.T.R. VENT THROUGH ROOF W/ WITH �60� 6776 DESIGN WEST ENGINEERING CFM CUBIC FEET OF AIR PER MINUTE I s �sSIOST MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS CFMS CFM SUPPLY CFMR CFM RETURN CFME CFM EXHAUST (N) NEW (E) OR EXIST. EXISTING 30x10 INDICATES SQUARE DUCT (INCHES) 10"0 INDICATES ROUND DUCT (INCHES) RESERVED FOR BUILDING DEPT STAMP C) 0 0 CD M E O CV rn In Q In Q fV j N M p_1 Ln C� c: C C N Lnwd � 0 o NF- U 0 o cN� 0 0 v 0 N �Of LL C) 00 co L },7 }+ W 0 � � 0 0 O 0 }+ co 0 c 06 W ��0 VJ O 0 � + V J 0 Qco Q c-_ W 0 O L 0 0 Cn 0 N M N REVISION SCHEDULE # DESCRIPTION DATE Di FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN KN REVIEWED SJ SHEET NAME MECHANICAL & PLUMBING LEGENDS AND NOTES SHEET NO. MP-001 22-268 HOT WATER BRANCH LENGTH SCHEDULE PIPE VOLUME AND MAXIMUM LENGTH IS BASED ON 2018 WASHINGTON STATE ENERGY CODE TABLE C404.3.1 PIPING VOLUME AND MAXIMUM PIPING LENGTH NOMINAL PIPE SIZE VOLUME (LIQUID OUNCES PER FT.) MAXIMUM PIPING LENGTH (FT.) PUBLIC LAVATORY FAUCETS OTHER FIXTURES AND APPLIANCES 1/2" 1.5 2 43 3/4" 3 0.5 21 ill 5 0.5 13 1-1/4" 8 0.5 8 1-1/2" 11 0.5 6 2" & LARGER 1 18 0.5 4 FIXTURE SCHEDULE - ALL GENDER RR CONNECTION SIZE: SYMBOL SPECIFICATION WASTE I TRAP I VENT I CW I HW I ELEC. WATER CLOSET: KOHLER "KINGSTON" #K-4325, ADA COMPLIANT, WALL MOUNTED, FLUSH VALVE, ELONGATED BOWL, WHITE VITREOUS CHINA. FLUSHOMETER VALVE: WC SLOAN CODE #3250289, G2 EXPOSED SENSOR FLUSHOMETER 3" INT. 2" 1" BATT. 1 #G2 8111-1.28, POLISHED CHROME FINISH, SINGLE FLUSH, BATTERY OPERATED, (1.28 GPF). TOILET SEAT: BEMIS PLASTIC SEAT MODEL 1955CT, ELONGATED, OPEN FRONT, STAIN & CHEMICAL RESISTANT. WATER CLOSET: KOHLER "KINGSTON" #K-4325, WALL MOUNTED, FLUSH VALVE, ELONGATED BOWL, WHITE VITREOUS CHINA. FLUSHOMETER VALVE: SLOAN CODE WC #3250289, G2 EXPOSED SENSOR FLUSHOMETER 3" INT. 2" 1" BATT. 2 #G2 8111-1.28, POLISHED CHROME FINISH, SINGLE FLUSH, BATTERY OPERATED, (1.28 GPF). TOILET SEAT: BEMIS PLASTIC SEAT MODEL 1955CT, ELONGATED, OPEN FRONT, STAIN & CHEMICAL RESISTANT. LAVATORY: KOHLER "HUDSON" #K-2812 WALL MOUNTED BATHROOM SINK, ONE FAUCET HOLE. FAUCET: SLOAN FAUCETS MODEL #EBF-85 DECK MOUNTED, SINGLE HOLE, HYTRONIC GOOSENECK, 6-VOLT LITHIUM CRP2 BATTERY INCLUDED, DUAL BEAM INFRARED SENSOR OPERATED, 0.50 L GPM, VANDAL PROOF NON -AERATING SPRAY OUTLET. 2" 1-1/2" 1-1/2" 1/2" 1/2" BATT. 1 COMPLETE WITH BRASSCRAFT KT SERIES 1/4 TURN ANGLE STOPS. THERMOSTATIC MIXER LOCATED BELOW SET @ 105° F. TAILPIECE AND HOT WATER LINES SHALL BE INSULATED OR COVERED PER CBC 11 B-606.5. ON ADA COMPLIANT PROVIDE TRUEBRO LAV GUARD PER ADA CODE 4.19.4. LEAD FREE. ADA COMPLIANT. WATER HAMMER ARRESTOR: JAY R. SMITH, #5005 "HYDROTROL" STAINLESS STEEL SHOCK ABSORBER (SEE WHA PLANS FOR SIZE), INSTALLED ON ALL QUICK CLOSING VALVES - - 3/4" " 1 AND ALL VALVES WHICH CLOSE WITH THE FLOW OF FLUID, OR ON HEADERS SERVING MORE THAN ONE FIXTURE. PROVIDED WITH A 12"X 12" ACCESS PANEL. TP TRAP PRIMER: PRECISION PLUMBING PRODUCTS, P2-500, WITH 1 DISTRIBUTION UNITS FOR MULTPLE DRAIN INSTALLATION. 1/2" FLOOR DRAIN: JAY R. SMITH, 2005Y-02-A05-NB, FLOOR OR SHOWER DRAIN, 2" PIPE SIZE, WITH 7.0 SQ IN FREE INLET FD AREA, WITH DUCO CAST IRON BODY WITH ANCHOR FLANGE, 2" 2" 1-1/2" - - 1 WITH 5" ROUND TOP ADJUSTABLE NICKEL BRONZE STRAINER, WITH MEMBRANE CLAMP AND WEEP HOLES. SIZE 1/2" 3/4" 1" 1-1/4" 1-1/2" 2" 2-1/2" 3" 4" PLUMBING SIZING FORM -ALL GENDER RR PIPE SIZE IS BASED ON CHART A 105.1(1) @ 3.0 P.S.I. / 100 FT. FIXTURE UNITS ARE BASED ON TABLE A 103.1(2) FROM APPENDIX A PIPE SIZE SCHEDULE FIXTURE UNITS FIXTURE UNITS F. TANK F. VALVE GPM VELOCITY 1 0 1.8 3.0 5 0 4.8 3.5 13 0 10 4.0 24 0 17 4.5 47 10 27 5.0 158 64 56 6.0 380 250 100 7.5 850 800 160 8.0 1750 1750 230 8.0 NUMBER FIXTURE UNIT TOTAL 8 WC 5 40 7 L 1 7 - EXIST - 3 TOTAL FIXTURE UNITS 50 TOTAL G.P.M. 50 VELOCITY FOR COLD WATER PIPING LESS THAN 8 FT. PER SECOND VELOCITY FOR HOT WATER PIPING LESS THAN 5 FT. PER SECOND MAXIMUM SIZE FOR HOT WATER PIPING SHALL BE 1-1/2" FIXTURE SCHEDULE - STAFF TLT CONNECTION SIZE: SYMBOL SPECIFICATION AWASTE TRAP I VENT I CW I HW I ELEC. WATER CLOSET: KOHLER "ELMBROOK" #K-45983, ADA COMPLIANT, TWO-PIECE, FLOOR-MOUNTE ELONGATED, WC TANK TYPE TOILET (1.28 GPF), WHITE VITREOUS CHINA. 3" INT. 2" 1/2" - 1 TOILET SEAT: BEMIS PLASTIC SEAT MODEL 1955CT, ELONGATED, OPEN FRONT, STAIN & CHEMICAL RESISTANT. LAVATORY: KOHLER "HUDSON" #K-2812 WALL MOUNTED BATHROOM SINK, ONE FAUCET HOLE. FAUCET: SLOAN FAUCETS MODEL #EBF-85 DECK MOUNTED, SINGLE HOLE, HYTRONIC GOOSENECK, 6-VOLT LITHIUM CRP2 BATTERY INCLUDED, DUAL BEAM INFRARED SENSOR OPERATED, 0.50 L GPM, VANDAL PROOF NON -AERATING SPRAY OUTLET. COMPLETE WITH BRASSCRAFT KT SERIES 1/4 TURN ANGLE 2" 1-1/2" 1-1/2" 1/2" 1/2" BATT. 1 STOPS. THERMOSTATIC MIXER LOCATED BELOW SET @ 105° F. TAILPIECE AND HOT WATER LINES SHALL BE INSULATED OR COVERED PER CBC 11 B-606.5. ON ADA COMPLIANT PROVIDE TRUEBRO LAV GUARD PER ADA CODE 4.19.4. LEAD FREE. ADA COMPLIANT. WATER HAMMER ARRESTOR: JAY R. SMITH, #5005 "HYDROTROL" STAINLESS STEEL SHOCK ABSORBER (SEE WHA PLANS FOR SIZE), INSTALLED ON ALL QUICK CLOSING VALVES AND ALL VALVES WHICH CLOSE WITH THE FLOW OF FLUID, OR 3/4" 1 ON HEADERS SERVING MORE THAN ONE FIXTURE. PROVIDED WITH A 12"X 12" ACCESS PANEL. FD TRAP PRIMER: PRECISION PLUMBING PRODUCTS, P2-500, 1 ) � DISTRIBUTION UNITS FOR MULTPLE DRAIN INSTALLATION. 2" 1 2" 1 1-1/2" 1" I" I" CEILING MOUNTED FAN SCHEDULE AREA FAN SYSTEM ELECTRICAL OPR.WT WITH REMARKS TAG MFR. & MODEL NO. SERVED SONES ACCESSORIES (SEE EQUIPMENT NOTES DETAIL CFM ESP RPM WATTS V-PH-HZ AMPS (LBS) BELOW) EF GREENHECK SP-A125 NEW STAFF TLT 100 0.25 1100 20.4 0.6 120-1-60 0.19 17 O O MP-301 EQUIPMENT NOTES: 1D PROVIDE ROOF CAP WITH BUILT-IN DAMPER 2O MESH FILTER LOCATED ON TOP OF THE GRILLE IS HIGHLY RECOMMENDED FOR EXCESS DIRT TO ACCUMULATE ON WHEELS AND MOTORS. ROOF MOUNTED EXHAUST FAN SCHEDULE TAG MFR. & MODEL NO. AREA SERVED FAN SYSTEM SONES ELECTRICAL OPR.WT WITH ACCESSORIES (LBS) REMARKS (SEE EQUIPMENT NOTES BELOW) DETAIL CFM ESP RPM HP V-PH-HZ AMPS H-10 GREENHECK GB-100-A ALL GENDER RR 1187 0.5 1660 1/6 5.5 120-1-60 1.0 61 1O 0 O3 0 M EQUIPMENT NOTES: 0 REPLACEMENT FOR (E) ROOF MOUNTED EXHAUST FAN (EF-H-10) 2O PROVIDED WITH CURB COVER & DAMPER 3O BELT DRIVEN O4 TOTALLY ENCLOSED, NON -VENTILATED (TENV) ENCLOSURE ELECTRIC DUCT HEATER SCHEDULE AREA DUCT DIMENSIONS (INSIDE) ELECTRICAL HEATING REMARKS TAG MFR. & MODEL NO. SERVED CFM CONTROL (SEE EQUIPMENT NOTES BELOW) DETAIL W (WIDTH) H (HEIGHT) KW VOLTAGE PHASE EF GREENHECK SP-A125 NEW STAFF TLT 100 10 10 6 208 1 SCR 1O O2 M P-3 01 EQUIPMENT NOTES: 1O PROVIDE DUCT HEATER WITH FACTORY 24 VOLT FAN RELAY INTERLOCK. CONTROL CONTRACTOR SHALL MOUNT AND WIRE THE FACTORY FAN RELAY INTERLOCK. SIZE 1/2" 3/4" 1" 1-1/4" 1-1/2" 2" 2-1/2" 3" 4" PLUMBING SIZING FORM - STAFF TLT PIPE SIZE IS BASED ON CHART A 105.1(1) @ 3.0 P.S.I. / 100 FT. FIXTURE UNITS ARE BASED ON TABLE A 103.1(2) FROM APPENDIX A PIPE SIZE SCHEDULE FIXTURE UNITS FIXTURE UNITS F. TANK F. VALVE GPM VELOCITY 1 0 1.8 3.0 5 0 4.8 3.5 13 0 10 4.0 24 0 17 4.5 47 10 27 5.0 158 64 56 6.0 380 250 100 7.5 850 800 160 8.0 1750 1750 230 8.0 NUMBER FIXTURE U. UlI -,_3-L1TALAA 1 WC 2.5 2.5 1 L - EXIST TOTAL FIXTURE UNITS [r7y TOTAL G.P.M. VELOCITY FOR COLD WATER PIPING LESS THAN 8 FT. PER SECOND VELOCITY FOR HOT WATER PIPING LESS THAN 5 FT. PER SECOND MAXIMUM SIZE FOR HOT WATER PIPING SHALL BE 1-1/2" PIPE MATERIAL SCHEDULE PAP PRESSURE SHUT-OFF PIPE MATERIAL TYPE OF SERVICE FITTINGS RATINGS PSI VALVE & WEIGHT JOINTS MATERIAL - SWP COLD WATER ABV. CAST BRONZE/ BALL GROUND COPPER L TUBE SOLDERED WROUGHT COPPER 125 GATE CHECK COLD WATER BELOW SCHEDULE 80 PVC SOLVENT - WELD PVC 125 GATE GROUND BEYOND 5-0" HOT WATER ABV. COPPER L TUBE SOLDERED CAST BRONZE/ 125 BALL GROUND WROUGHT COPPER CHECK VENT NO -HUB CAST IRON NO -HUB N/A N/A N/A WASTE, SOIL & ROOF SCH 40 PVC DWV SOLVENT - DRAINS BELOW SCHEDULE 40 ABS WELD ABS N/A N/A GRADE PIPE INSULATION SCHEDULE FLUID CONDUCTIVITY INSULATION PIPE SIZE (IN. DIA.) < 1 1 to < 1.5 1.5 to < 4 4 to < 8 8 and larger TEMPERATURE RANGE RANGE (IN BTU-IN/HR MEAN RATING TEMPERATURE (7) PER SQFT/°F) ff) REQUIRED INSULATION THICKNESS (IN.) DOMESTIC HOT WATER SYSTEM INCHES 1.0 1.5 2.0 2.0 2.0 105' -140' 0.22 - 0.28 100, R-VALUE R-7.7 R-12.5 R-11 R-9 R-8 DOMESTIC COLD WATER SYSTEM 40' - 60' 0.21 - 0.27 75' INCHES NONRES 0.5 RES 0.75 NONRES 0.5 RES 0.75 1.0 1.0 1.0 R-VALUE NONRES RES NONRES RES R-7 R-6 R-5 R-3 R-6 R-3 R-5 NOTE: WHERE INSULATED PIPING IS EXPOSED OUTDOORS, IT SHALL BE COVERED. COVER OUTDOOR EXPOSED INSULATED PIPING WITH 0.016 INCH THICK CORRUGATED ALUMINUM JACKET. PROVIDE VALVE STEM EXTENSIONS SUCH THAT INSULATION IS NOT DAMAGED WHEN VALVE IS CYCLED AIR DISTRIBUTION SCHEDULE SYMBOL DESCRIPTION MANUFACTURER & FINISH LOCATION ACCESSORIES MODEL NO. EG EXHAUST GRILLE TIIEL #26 WHITE ALL GRERNDER M PAR 0 NO OPPOSED BLADE DAMPERS SHALL BE USED. 0 C) 0 E 0 C:, M O CV 00 rn In Q � �� In Q m fV j N p1 M c: C E LA Lnwd 0 o NF-�i 0 o cN� 0 0 'N J a1 0 LL C) 00 L },7 U O 0 O E 4-0 co 0 06 W �� VJ O U -+-+ VJ ^, W O Qco Q c-_ CD O L 0 O Cn O N M N REVISION SCHEDULE # DESCRIPTION DATE Di FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN KIN REVIEWED SJ SHEET NAME MECHANICAL & PLUMBING SCHEDULES SHEET NO. MP-002 22-268 NORTH M - JD 110 James St., Suite 106 31 OF WA Edmonds, Edmonds, WA 98020 �� Phone:425.458.9700 �0 Fax: 909.890.3770 Z Email: cadd@designwesteng.com .." 6) — 166776 ���' ISTEg��w� DESIGN WEST ENGINEERING �SSIONAL�� MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS C) O n E O O O rn V 41 o J t! 1 Q rn N l/1 N ZS Vl n I V) N S_ O Ln w o � 0 0 f-l�--6 0 0 c:N� 41 O CN ry O 00 co a-) L- Q ♦--� cn OW.0 E 0 co -0 U 06 > W O O � Q E co 0 W O CD O U O C/) O N co N REVISION SCHEDULE # DESCRIPTION DATE Q FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN KN REVIEWED Si SHEET NAME BLDG H OVERALL M&P WORK PLAN LEVEL 1 OVERALL MECHANICAL & PLUMBING SITE PLAN SCALE: 3/32" =1'.0" I 1 RESERVED FOR BUILDING DEPT STAMP SHEET NO. MP-100 22-268 GENERAL NOTES 1. FOR LINE TYPES, SYMBOLS & ABBREVIATIONS SEE LEGEND ON MP-001. 2. FOR CONNECTION TO STRUCTURE & PIPE SUPPORT SEE DETAILS 1 & 2 ON SHEET MP301. 3. SEE FIXTURE SCHEDULE ON MP-001 FOR ADA & STANDARD RIM HEIGHTS FOR WC-1. 4. CONTRACTOR SHALL PATCH FLOORS, WALLS & CEILINGS TO MATCH NEW CONSTRUCTION PER ARCHITECTS SPECIFICATIONS. 5. COORDINATE REQUIRED SLAB CUTS FOR NEW PLUMBING LINES WITH ARCHITECT PRIOR TO CONSTRUCTION. 6. EXISTING PIPING SIZES AND LOCATIONS IS PER RECORD DRAWINGS, PRIOR TO CONSTRUCTION CONTRACTOR SHALL FIELD VERIFY FOR EXACT SIZE, LOCATION & INVERT ELEVATION OF EXISTING WASTE LINE & COORDINATE WITH PLUMBING ENGINEER FOR ANY CHANGES NEEDED. 7. FOR WATER HAMMER ARRESTOR, SEE DETAIL _ 3 P-30 O 8. FOR SINK CONNECTION, SEE DETAIL e P-30 (E ALL GENDER TILT (E)3/4"CW 9. FOR CLEANOUT,SEE DETAIL e 24 P-30 2 (E) 2" V 10. FOR TRAP PRIMER CONNECTION, SEE DETAIL -, 6 E 3/4" HW O 11. FOR EXHAUST FAN SUPPORT, SEE DETAIL e7 P-30 (E)1 1/2" V -I- J 12. FOR EXHAUST FAN ROOF CAP, SEE DETAIL P830 8 I 3 ----+-------� DEMOLITION NOTES ?� (E)2"W r _� 1/2" CW I �(E) 1/2" TP 9 (E) I �JO- - - - - J O (E) WATER CLOSET AND ASSOCIATED PIPING TO REMAIN. O1 � I 0 O (E) LAVATORY AND ASSOCIATED PIPING TO REMAIN. 5 O (E) FLOOR DRAIN AND ASSOCIATED PIPING TO REMAIN. I O4 (E) INSTANTANEOUS ELECTRIC WATER HEATER AND ASSOCIATED PIPING TO REMAIN. (E) TRAP PRIMER - - - - - - O (E) TRAP PRIMER TO REMAIN J O (E) EXHAUST FAN TO REMAIN. O (E) 1/2" CW (E) 2" V 7O REMOVE (E) 1/2" CW AND REPLACE WITH (N) 1-1/2" CW AND RECONNECT TO (E) COLD WATER MAIN AND (E)1/2" TO (E) WATER CLOSET. (E) 1/2" CW (E) 3" W 8O REMOVE (E)1/2" CW AND REPLACE WITH (N) 3/4" CW AND RECONNECT TO (E) 3/4" CW. NORTH O SAW CUT FLOOR SLAB REQUIRED TO INSTALL NEW FIXTURE AND / OR PIPING TO CONNECT EXISTING. LEVEL 1 WORKROOMIBATH ROOM MECHANICAL & PLUMBING DEMOLITION PLAN SCALE: 1/2"=1'-0" 1 CONSTRUCTION NOTES O2" W DN. O2 1/2" TP DN. O3 CONNECT (N) 3" W TO (E) WASTE. BENCH WITH O4 SAW CUT SLAB REQUIRED TO INSTALL NEW FIXTURE AND PIPING TO CONNECT TO EXISTING CABINETS ABOVE O5 (N) EXHAUST FAN TO CONTROL VIA LIGHT SWITCH WITH FIVE-MINUTE DELAY TO TURN OFF. O6 RETROFIT (E) EXHAUST FAN TO CONTROL VIA LIGHT SWITCH WITH FIVE-MINUTE DELAY TO TURN OFF. O7 8x6 EXHAUST DISCHARGE OPENING SIDE. ------ - - - - -- (E) WINDOW DISPLAY OS 80 EXHAUST DUCT UP TO ROOF. PROVIDE CAP WITH BUILT-IN DAMPER AND BIRDSCREEN AT TERMINATION. 1/2" CW 22 WCO L 1 (E) LL GENDER TILT (N) STAFF TILT �� 211 W �0 V I I I (E) 3/4" HW 1/2" HW �(E) 2" V J I I I I I I I (E) 1-1/2" V (E) 1-1/2" V 8 1-1/2" V 4 r - - -\® / I 2�� WAFD L1------207 1/2" T I E 2 W - I EF (E) STORAGE ROOM 5ccn (E) 1/2" TP - d 3 - - -- 1 21 - - / 3/4" CW /WC 6 � I I I 1/2" TP 5 I I 1 WHA WCO I I I I I JWA 1 1 F M' JD 110 James St., Suite 106 Edmonds, WA 98020 Phone: 425.458.9700 Fax: 909.890.3770 - - Z Email: cadd@designwesteng.com _-=j DESIGN WEST ENGINEERING �GISTI;g (E) 2" V 3" W 2" V 1 �'� ��s�' sSIONAL MECHANICAL •ELECTRICAL •ENERGY CONSULTANTS (E) 1/2" CW 1-1/4" CW 4 3/4" CW (E) 3" W CONNECT TO NEAREST NORTH (E) 3/4" CW IN STAFF 1 LOUNGE WO KROOM LEVEL 1 WORKROOM/BATHROOM MECHANICAL & PLUMBING REMODEL PLAN SCALE: 1/2"=1'-01, 2 RESERVED FOR BUILDING DEPT STAMP C) 0 Ln O p m 0 CV In Q fV j N M p_1 � o -0" 3 Lnwd � 0 0 o N��i 0 0 cN� 2)Q'- 0 0 N v O f N N Of O 00 co },7 L }+ L (/) o 0 W.0 o4-0 0(Dco-0 0 06 W O V ! 0 �A cI 0 Qco Q c—_ J W 0 O (1) L 0 0 Cn 0 N M N F_ REVISION SCHEDULE # DESCRIPTION DATE Q FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN KIN REVIEWED Si SHEET NAME BLDG H WORKROOM BATHROOM M&P PLAN SHEET NO. MP-201 22-268 GENERAL NOTES 1. FOR LINE TYPES, SYMBOLS & ABBREVIATIONS SEE LEGEND ON MP-001. 2. FOR CONNECTION TO STRUCTURE & PIPE SUPPORT SEE DETAILS 1 & 2 ON SHEET MP301. 3. SEE FIXTURE SCHEDULE ON MP-001 FOR ADA & STANDARD RIM HEIGHTS FOR WC-1. 4. CONTRACTOR SHALL PATCH FLOORS, WALLS & CEILINGS TO MATCH NEW CONSTRUCTION PER ARCHITECTS SPECIFICATIONS. I I 5. COORDINATE REQUIRED SLAB CUTS FOR NEW PLUMBING LINES WITH ARCHITECT PRIOR TO CONSTRUCTION. 1 1 6. EXISTING PIPING SIZES AND LOCATIONS IS PER RECORD DRAWINGS, PRIOR TO CONSTRUCTION CONTRACTOR SHALL FIELD VERIFY FOR EXACT 8 16 I I SIZE, LOCATION & INVERT ELEVATION OF EXISTING WASTE LINE & COORDINATE WITH PLUMBING ENGINEER FOR ANY CHANGES NEEDED. 1 1 1 15 1 (E) FD i �r 1 1 II 14 ii 14 ii 14 7. FOR WATER HAMMER ARRESTOR, SEE DETAIL e P-30 4 8. FOR SINK CONNECTION, SEE DETAIL P 30 14 1 1 1 O (E)ID'111 14 O O O II II II II II iiiiii (E) VTR 9. FOR CLEANOUT, SEE DETAIL 5 P-30 10. FOR TRAP PRIMER CONNECTION, SEE DETAIL (E) WATER7HEATER — -- ------ ------ — -- (E) FCO � �E --- -- — --- — ------ — Og (E)UTILITY I SINK c 0 4 4 5 O O O 11 5 5 O O DEMOLITION NOTES 1 10 (E) W 13 P �� II 10 (E) W ii I O I I O Il II 1 14 1 REMOVE (E) WATER CLOSET AND CAP (E) WASTE BELOW (E) FLOOR AND PATCH TO MATCH O (E) FLOOR. J 15 I (E) HW 1 (E) CW I 11 ! �I jj (E) FD I i 11 L --------— 8 i I i i 16 O REMOVE (E) LAVATORY AND CAP (E) WASTE IN WALL AND PATCH TO MATCH (E) WALL. O REMOVE (E) LAVATORY, (E) HOT AND COLD PIPING AND CAP (E) WASTE BELOW (E) FLOOR AND I I PATCH TO MATCH (E) FLOOR. I 1 O O O O4 REMOVE (E) URINAL, CAP (E) WASTE BELOW (E) FLOOR AND PATCH TO MATCH WITH (E) FLOOR, AND (E) COLD WATER PIPING. I �. . . . . . . . . O REMOVE (E) URINAL, CAP (E) WASTE IN WALL AND PATCH TO MATCH WITH (E) WALL, AND (E) COLD WATER PIPING. (E) W <8> O (E) UTILITY SINK TO REMAIN. O7 (E) FLOOR CLEANOUT TO REMAIN. OREMOVE (E) FLOOR DRAIN, EXTEND (E) WASTE FOR (N) FLOOR DRAIN AND PATCH TO MATCH (E) FLOOR. NORTH O (E) WATER HEATER TO REMAIN. 10 (E) WASTE TO REMAIN. 11 REMOVE (E) COLD WATER MAIN PIPING AND CAP UP TO UTILITY SINK CONNECTION. ALL GENDER RESTROOM PLUMBING DEMOLITION PLAN SCALE: 1 /4" = 1._0„ 1<8> REMOVE (E) HOT WATER PIPING AND CAP UP TO UTILITY SINK CONNECTION. 13 REMOVE (E) VENT AND CAP. 14 SAW CUT FLOOR SLAB REQUIRED TO CAP (E) WASTE BELOW SLAB. 15 SAW CUT FLOOR REQUIRED TO CONNECT (N) 2" W TO (E) WASTE MAIN. 16 SAW CUT (E) FLOOR REQUIRED FOR (N) FLOOR DRAIN. I I CONSTRUCTION NOTES I 1 1/2" TP FD 1 FD 1 O (N) T' W DN. L L L 1 1 1 L 4 1 r L L L L 1 1 1 1 2 �:ir O2 CONNECT (N) 2" V TO NEAREST (E) VENT MAIN. 5 I I o 0 0 1/2" CW (TYP 4) 0 1/2" HW (TYP 4) WC WC 2 i'' 2 \ WC WC 2 2 WC 2 1 WCO (TYP) o o o — WC WC 2" W i' 2 2 WC WC 2 2 O3 SAW CUT SLAB REQUIRED TO INSTALL NEW FIXTURE AND PIPING TO CONNECT TO EXISTING. (N) 1/2" TP DN. O4 3/4" CW I I � lO WC o 2 i O SET CIRCUIT SETTER AT 0.5 GPM. (E) 2" W JO - — I 2" V 2w I (E) WATER I 2" W I CAPPED — WHA i HEATER 2"W I � (E) FD BELOW SLAB, TYP - 3/4" HW 2 CW WATER Ilk, I ® ® 0 ® ® 1 O i I I 1 1 1 1 (E) HEATER I 2„ CW _/ TP 1 2" CW 1 1/4' CW (TYP 8) 1-1/2" CW (E) FCO ———`--------- —------- ----- (E) FCO I I 3/4" HW 3l4" CW CAPPED ® — 2" V 3/4" HW I C (E) W j i CAPPED -I (IN -WALL, TYP) 11 I1 (E) 2" W I I 3/4" HW 3/4" CW t.'ITc eWC WC I WC 1 I 2„ W 3 I 2" W WC WC 2 1 WC E HW ( ) 2 1 1 0 I (E) CW o II I I i O1 II 2„ W � 1/2" HW 1/2" CW I I L L 1/2" CW L 1/2" HW 4 FD TP 1-1/2" V LL WCO (TYP) 1 1 G FD O1l2" e I ' 1/2° HW 1 /2° CW CAPPED 1 1/2" V � I � � I I M � JD 110 James St., Suite 106 wAS Phone: 42 458.90700 � �F kl CAPPED O Fax: 909.890.3770 Z Email: cadd@designwesteng.com (IN -WALL, TYP) �60 6776 DESIGN WEST ENGINEERING STI;g �� MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS SIDNAL NORTH NORTH ALL GENDER RESTROOM DOM WATER PLUMBING REMODEL PLAN SCALE: 1/4" = V-1)" 3 ALL GENDER RESTROOM W & V PLUMBING REMODEL PLAN SCALE: 1/4" = V-0" 121 RESERVED FOR BUILDING DEPT STAMP C) 0 0 M O N rn -1 00 � rn 1j < Q In Q N � j N 0) Ln cM -tea rl M C fV tl--0" 3 Ln w d � 0 o NF-�i 0 0 cN� 0 0 a1 O O N /C) W co }, 7W }'^� =! V J 0 0 W.0 o4-0 co 0 � W O V ♦ -4-0 V ! Of ♦ ^ W 0 Q E J W 0 o L V 0 Cn 0 N M N REVISION SCHEDULE # DESCRIPTION DATE Di FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN KIN REVIEWED SJ SHEET NAME BLDG H ALL GENDER RESTROOM PLUMBING PLANS SHEET NO. M P-202 22-268 a GENERAL NOTES 1. FOR LINE TYPES, SYMBOLS & ABBREVIATIONS SEE LEGEND ON MP-001. 2. FOR DUCT SUPPORT, SEE DETAIL e P-30 O i I (E) 16x16 EXHAUST DUCT O UP TO (E) EXHAUST FAN (EF-H-10) (E) CUH I I I I I I I I I r r II I�r r II II I II II II II II II II II II II II II II II II II II II II II (E) 8x8 EG II II II II 150 CFM 0 0 0 (E) 18x12 EG 500 CFM II II II I II Ll EXHAUST 11 DEMOLITION NOTES (E) II DUCT MAIN O II II II jl I�jl II II II O FIELD VERIFY ELEVATION ON (E) EXHAUST DUCT AND (E) GRILLE, REMOVE AND RELOCATE TO NEW DROPPED CEILING IF NECESSARY. I I I L - - - - JL O (E) 16x16 EXHAUST DUCT TO REMAIN. REMOVE AND REPLACE (E) EXHAUST FAN (EF-H-10). I I E CUH ( ) O (E) EXHAUST DUCT MAIN TO REMAIN. O O4 REMOVE (E) EXHAUST DUCT AND (E)18x12 EXHAUST GRILLE AND CAP. OREMTECTURABINET UNIT HEATER. PATCH ANY OPENINGS. COORDINATE FINISH WITH ARCHNORTH ALL GENDER RESTROOM MECHANICAL DEMOLITION PLAN SCALE: 1/4"=V-0" CONSTRUCTION NOTES (E) 16x16 EXHAUST DUCT UP TO (N) EXHAUST FAN (EF-H-10) 12x12 EG 12x12 EG 100 CFM 100 CFM 60 -60 (E) 8x8 EG 60 150 CFM T-zCAPPED I 60 ---- - - (E) EXHAUST DUCT MAIN 12x12 EG I I li 16x16 EG 16x16 EG 100 CFM II 200 CFM 200 CFM 000 000 000 II II M' JO 110 James St., Suite 106 WASds, WA 9820 �0 PhoeEdmon 42458.90700 rce";v 0 Fax:909.890.3770 Z Email: cadd@designwesteng.com �606 76� ISTI;g�'DESIGN WEST ENGINEERING �sSIOIST MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS /000 NORTH ALL GENDER RESTROOM MECHANICAL REMODEL PLAN I SCALE: 1/4"-1'-01, 121 RESERVED FOR BUILDING DEPT STAMP C) O �n O O m E CV 00 M Ln a,Q < In Q fV j N V1 ^ M p1 Ln o rn E ,j. 3 Lnwd � 0 o NF— d�L U 0 0 cN� 0 0 v O Of (N O 00 co M }+ (/) O O W.0 o4-0 ��co-0 v 06O W to co 4� 0 }, C� O Q Q E co 0 J W O O L �..� O Cn O N M N REVISION SCHEDULE # DESCRIPTION DATE Q FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN KIN REVIEWED SJ SHEET NAME BLDG H ALL GENDER RESTROOM MECHANICAL PLANS SHEET NO. MP-203 22-268 FLOOR DRAIN TRAP PRIMER DISTRIBUTION CHART MAX. WATER NO.OF DISTRIBUTION DEL. ON 15 USE STAND DISTRIBUTION DRAINS UNIT MODEL SEC. PRESS. PIPE STYLE UNIT IS DROP. 1 N/A 2 OZ. STRAIGHT NOT REQUIRED 2 DU-2 2 OZ. STRAIGHT 2 OPENING 3 DU-3 5 OZ. STRAIGHT 3 OPENING 4 DU-4 5 OZ. STRAIGHT 4 OPENING FOR CONNECTION TO STRUCTURE - REFER TO 2008 SMACNA SEISMIC RESTRAINT MANUAL 3" 24 GA. STRAP 1"0116 GA. BENT CLIP WITHIN 2' OF SECURED TO CD/CR W/#10 SMS REGISTER TYP.(2) EACH CD/CR AT DIAG. CONNECTION (DUCT TAPE W/PANDUIT STRAP PULL OVER \� INSULATION AND PANDUIT STRAP.)-� 12 GA. WIRE CEILING - REFER TO ARCHITECTURAL REFLECTIVE CEILING PLAN NOTE: SEAL ALL JOINTS & CONNECTIONS AIR TIGHT W/ APPROVED SEALANT. U 2 w z z > i LONG RADIUS TURN - NO KINKS 1/2" CW (TYP) BALL VALVE REFER TO PLANS FOR SIZE AND LOCATION DISTRIBUTION UNIT WHERE REQUIRED TP 1 CEILING DIFFUSER OR REGISTER REFER TO SPECS. I FOR MFR.# AND MODEL # a DUCT SUPPORT 19 - 110 FL TO FLOOR SINK OR FLOOR DRAIN TRAP 1/2" CW SUPPLY BALL VALVE -TRAP PRIMER TP 1 ACCESS PANEL NOTE: ACCESS PANEL SHALL NOT BE INSTALLED BEHIND GRAB BARS. TRAP PRIMER CONNECTION A NOTE: Install hanging support rods using the following vibration isolator centerline dimensions shown in table below. Isolator Centerline Dimensions Unit Size A B 1350-13200 41/ 114) 15 /8 397 A50-Al90 5'/ (140) 15 (381) A200-A390 63/, (171) 153/4(400) A410, A510, A710, A780 9'A (235) 19Y, (502) A700 5Y2 (140) 253/a (645) A900-A1050, A1410-A1550 9'/, 235 25/2 648 A1750, A2150 9 A (235) 363/, (933) A3600 9A (235) 471/4 (1200) All dimensions shown in Inches (millimeters). USE FOR EXHAUST FAN UNIT SIZE A125 EXHAUST FAN SUPPORT 0 ROOF CEMENT I (Seal shingles to roof cap on sides and top) NAILS (Seal all nail heads with roof cement) Figure 3 Damper Rod Housing (Painted) Housing (Aluminum) Damper Flap 98005581 Bird Screen / Long Sealant f Screw (Black) Short Sealant / Screw (Silver) Strip Damper Plate (Painted) Damper Plate (Aluminum) EXHAUST FAN ROOF CAP rA e WATER HAMMER ARRESTOR PIPE SIZING AND SELECTION TABLE PIPE SIZE FIXTURE UNITS CROSS REF. PDI 1/2" 1-11 A 3/4" 12-32 B 1" 33-60 C 11/4" 61-113 D 1112" 114-154 E 2" 155-330 F fCCr CfC I V rL/11VJ FOR SIZE & LOCATION FOR CONNECTION TO THREADED HANGAR ROD. FOR STRUCTURE - REFER TO SIZE AND SPACING SEE 5 2008 SMACNA SEISMIC RESTRAINT MANUAL STIFFENER SHALL BE SPOT WELDED/ ADD VERTICAL ANGLE STIFFENER IF LENGTH IS GREATER THAN MAX. LENGTH SHOWN ON PIPE SUPPORT SCHEDULE. VALVE I BUT & WASHER TOP & BOTTOM TRANSVERSE ANGLE BRACE. ALTERNATE SIDES EVERY BRACE. TAINLESS STEEL "B LINE" 63690 CCESS PANEL ADJUSTABLE "J" HANGER. PIPING. SEE PLANS FOR SIZE AND LOCATION. i`a � INSULATION WHERE 'B-LINE" B3162 APPLIES - SEE PIPE SADDLE SPECIFICATIONS NOTE: ACCESS PANEL SHALL NOT BE INSTALLED BEHIND GRAB BARS. WATER HAMMER ARRESTOR 1-112 VENT---' COVE FINISH SINK CONNECTION 3 CI NOTE: 1. DETAIL APPLIES TO PIPES 2" I.D. AND SMALLER. 2. REFER TO PIPE SUPPORT SCHEDULE FOR ADDITIONAL INFORMATION. PIPE SUPPORT 11 MAXIMUM SPAN MAX ROD Q Q PIPE SIZE BETWEEN SUPPORT HANGER ROD MAX ROD LENGTH, LONGITUDINAL VERTICAL TRANSVERSE BOLT IN INCHES HANGERS O.C. DIAMETER SIZE LENGTH, NO STIFFENER WITH ANGLE BRACE HANGER ANGLE (STIFFNER) ANGLE BRACE SIZE HORIZ. VERT. STIFFENER COPPER TUBE & PIPE 1 6 -0" 10'-0" 3/8" 16" 37" 1-1/2 x 1-1/2 x 18 ga @ 1 x 1 x 18ga 1-1/2 x 1-1/2 x 18 ga @ 3/8" 80'-0" O.C. 40'-0" O.C. 1 thru 1-2 6' 0" 10' 0" 3/8" 16" 37" 1-1/2 x 1-1/2 x 18 ga @ 1 x 1 x 18ga 1-1/2 x 1-1/2 x 18 ga @ 3/8" 80'-0" O.C. 40'-0" O.C. 2 10'-0" 10'-0" 3/8" 16" 37" 1-1/2 x 1-1/2 x 18 ga @ 1 x 1 x 18ga 2-1/2 x 2-1/2 x 16 ga @ 3/8" 80'-0" O.C. 40'-0" O.C. STEEL PIPE FOR GAS 1 6'-0" 6'-0" 3/8" 16" 37" 1-1/2 x 1-1/2 x 18 ga @ 1 x 1 x 18ga 1-1/2 x 1-1/2 x 18 ga @ 3/8" 80'-0" O.C. 40'-0" O.C. 1 T-0" 8'-0" 3/8" 16" 37" 1-1/2 x 1-1/2 x 18 ga @ 1 x 1 x 18ga 1-1/2 x 1-1/2 x 18 ga @ 3/8" 80'-0" O.C. 40'-0" O.C. 1=a thru 2 10' 0" 10' 0" 3l8" 16" 37" 2-1/2 x 2-1/2 x 16 ga @ 1 x 1 x 18ga 2-1/2 x 2-1/2 x 16 ga @ 3l8" 80'-0" O.C. 40'-0" O.C. SCHEDULE 40 PVC & ABS DWV 2a & 4'-0" 10'-0" 3/8" 16" 37" 1-1/2 x 1-1/2 x 18 ga @ 1 x 1 x 18ga 1-1/2 x 1-1/2 x 18 ga @ 3/8 80'-0" O.C. 40'-0" O.C. 1 thru 2 4'-0" 10'-0" 3/8" 16" 37" 1-1/2 x 1-1/2 x 18 ga @ 1 x 1 x 18ga 1-1/2 x 1-1/2 x 18 ga @ 3/8" 80'-0" O.C. 40'-0" O.C. CAST IRON HUBLESS (NO HUB) 1& 2 O 15'-0" 3l8" 16" 37" 1-1/2 x 1-1/2 x 18 ga @ 1 x 1 x 18ga 1-1/2 x 1-1/2 x 18 ga @ 3/8" 80'-0" O.C. 40'-0" O.C. 3 thru 6 OA REFER TO SMACNA GUIDELINES IN SCHEDULE BELOW OA SUPPORT EVERY JOINT. SUPPORT SHALL BE WITHIN 18 INCHES OF JOINT ON BOTH SIDES. (SUPPORT ALSO REQUIRED AT EACH HORIZONTAL JOINT CONNECTION.) ALL PIPING 2-1/2" AND LARGER PER THE FOLLOWING SMACNA GUIDELINES 2-1/2 10'-0" 10'-0" 1/2" 18" 37" 2-1/2 x 2-1/2 x 16 ga @ 2 x 2 x 16ga 2-1/2 x 2-1/2 x 16 ga @ 3/8" 80'-0" O.C. 40'-0" O.C. 3 10'-0" 10'-01, 1/2" 18" 37" 2-1/2 x 2-1/2 x 16 ga @ 2 x 2 x 16ga 2-1/2 x 2-1/2 x 16 ga @ 3/8" 80'-0" O.C. 40'-0" O.C. 4 10'-0" 10'-01, 3/8" 181, 37" 2-1/2 x 2-1/2 x 16 ga @ 2 x 2 x 16ga 2-1/2 x 2-1/2 x 16 ga @ 1/2" 80'-0" O.C. 40'-0" O.C. 5 10'-0" 10'-0" 5/8" 24" 48" 2-1/2 x 2-1/2 x 16 ga @ 2 x 2 x 16ga 2-1/2 x 2-1/2 x 16 ga @ 1/2" 80'-0" O.C. 40'-0" O.C. 6 10'-0" 10'-0" 5/8" 24" 48" 2-1/2 x 2-1/2 x 16 ga @ 2 x 2 x 16ga 2-1/2 x 2-1/2 x 16 ga @ 1/2" 40'-0" O.C. 40'-0" O.C. NOTES: VERTICAL ANGLE ONLY REQUIRED WHEN ROD MAXIMUM LENGTH IS EXCEEDED. Q BRACING MAY BE OMITTED WHERE TOP OF PIPE IS 12" OR LESS FROM BOTTOM OF HANGER SUPPORT CONNECTED TO STRUCTURE O3 ALLOW FOR EXPANSION EVERY 30'-0". PIPE SUPPORT SCHEDULE 12 M • JO 110 James St., Suite 106 WAS`j7l��O Edmo20 Phone: ds, WA 0 (D 42 458.9700 0 Fax:909.890.3770 Z Email: cadd@designwesteng.com 776 sT1;'A4� DESIGN WEST ENGINEERING �sSIONAL(� MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS C L EAN O U T 151 I RESERVED FOR BUILDING DEPT STAMP C) 0 0 � M E O CV 00 rn N .4- = rn li Q N Q fV 3 C& j N M o `° 3 Lnwd0 � 0 o r-4 U OL0 o cN� 0)Q'— 0 0 v 0 N M� W U (3) =! 0 0 O 060 W ��y^^ VJ a) �+ V ) 0 (3) Q C__ J W 0 O (D L V 0 U) 0 N M N REVISION SCHEDULE # DESCRIPTION DATE 0, FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN KN REVIEWED Si SHEET NAME MECHANICAL & PLUMBING DETAILS SHEET NO. MP-301 22-268 MECHANICAL SPECIFICATIONS PART 1 GENERAL 12. FLEXIBLE DUCTWORK SHALL BE "GLASSFLEX" AVC-180 OR EQUAL, UL-181 CLASS I AIR DUCT, MATERIAL TESTED AND AS GOOD AND EFFICIENT. THE CONTRACTOR SHALL PREPARE HIS BID ON THE BASIS OF THE PARTICULAR PROVIDING COMPLETE, OPERATIONAL, AND ACCEPTABLE SYSTEM. LABELED WITH A FLAME AND SMOKE RARING OF 25/50 OR LOWER. THE DUCT SHALL HAVE A R-4.5 FIBERGLASS INSULATION EQUIPMENT AND MATERIALS SPECIFIED FOR THE PURPOSE OF DETERMINING THE LOW BID. THE AWARDING OF THE 1.01 SCOPE AND A 0.17 PERM VAPOR BARRIER. MAXIMUM LENGTH SHALL NOT EXCEED FIVE FEET (60"). SUBMIT SHOP DRAWINGS FOR CONTRACT SHALL CONSTITUTE A CONTRACTUAL OBLIGATION TO FURNISH THE SPECIFIED EQUIPMENT AND 3.05 COMPLETION APPROVAL MATERIALS. A. WORK OF THIS SECTION INCLUDES EVERYTHING NECESSARY AND INCIDENTAL TO COMPLETING HEATING, VENTILATING, AND AIR 13. THE CONTRACTOR SHALL VERIFY ALL CLEARANCES ON JOB PRIOR TO FABRICATING DUCTWORK. PROVIDE TRANSITIONS e) AFTER THE EXECUTION OF THE CONTRACT, SHOULD THE CONTRACTOR DESIRE TO SUBSTITUTE EQUIPMENT OTHER A. WHEN THE INSTALLATION IS COMPLETE AND ADJUSTMENTS SPECIFIED HEREIN ARE MADE, THE SYSTEM SHALL BE OPERATED FOR CONDITIONING WORK; EXCEPT AS HEREIN SPECIFICALLY EXCLUDED. AND OFFSETS AS REQUIRED TO INSTALL THE WORK AND COORDINATE ALL CLEARANCES WITH OTHER TRADES. THAN THAT SPECIFIED IN THE CONTRACT DOCUMENTS, SUCH SUBSTITUTION WILL BE CONSIDERED FOR ONE A PERIOD OF ONE WEEK, DURING WHICH TIME IT SHALL BE DEMONSTRATED TO THE MECHANICAL ENGINEER AS BEING 14. PROVIDE "DURO DYNE" MODEL TH-1 INSTRUMENT PORT IN EACH SUPPLY AND RETURN TRUNK FOR EACH SPECIFIED REASON ONLY: THE EQUIPMENT PROPOSED FOR SUBSTITUTION IS SUPERIOR IN CONSTRUCTION AND EFFICIENCY TO COMPLETED AND OPERATING IN CONFORMANCE WITH THESE SPECIFICATIONS. 1.02 GENERAL REQUIREMENTS SYSTEM. SUBMIT SHOP DRAWINGS FOR APPROVAL. THAT SPECIFIED HEREIN. IN THE EVENT THE CONTRACTOR OBTAINS THE ENGINEER'S APPROVAL OF EQUIPMENT OTHER THAN THAT HEREIN B. RECORD AS -BUILT DRAWINGS SHOWING LOCATIONS AND SIZE OF ALL PIPE AND DUCTS AS INSTALLED SHALL BE KEPT UP-TO-DATE A. ALL CORE DRILLING, CUTTING, AND PATCHING FOR THE INSTALLATION OF WORK UNDER THIS SECTION SHALL BE PERFORMED 2.03 CEILING DIFFUSERS AND REGISTERS DESCRIBED; HE SHALL, AT HIS OWN EXPENSE, MAKE ANY CHANGES IN THE STRUCTURES, BUILDINGS, OR PIPING AND AVAILABLE FOR INSPECTION AT ALL TIMES DURING CONSTRUCTION. THESE SHALL BE SIGNED BY THE GENERAL UNDER THIS SECTION OF THE SPECIFICATIONS. NO HOLES WILL BE ALLOWED IN ANY STRUCTURAL MEMBERS WITHOUT THE NECESSARY TO ACCOMMODATE THE EQUIPMENT AND SHALL FURNISH RECORD DRAWINGS TO THE ENGINEER. CONTRACTOR AND HEATING, VENTILATING, AND AIR CONDITIONING CONTRACTOR TO CERTIFY THEIR ACCURACY AND SHALL BE WRITTEN APPROVAL THE ARCHITECT. A. PERFORMANCE: g) IT WILL BE ASSUMED THAT THE COST TO THE CONTRACTOR OF THE EQUIPMENT PROPOSED TO BE SUBSTITUTED IS SUBMITTED TO THE OWNER PRIOR TO FINAL ACCEPTANCE OF THE WORK. LESS THAN THAT OF THE EQUIPMENT SPECIFIED IN THE CONTRACT DOCUMENTS; AND, IF THE SUBSTITUTION IS B. GUARANTEE: FURNISH A WRITTEN GUARANTEE FORM AS STIPULATED IN SECTION "GENERAL CONDITIONS," FOR A PERIOD OF ONE 1. DEVICES SHALL PROVIDE THE REQUIRED AIR THROW AND SPREAD WITH NO APPARENT DRAFTS OR EXCESSIVE AIR APPROVED, THE CONTRACT PRICE SHALL BE REDUCED BY AN AMOUNT EQUAL TO THE SAVINGS. (1) YEAR FROM DATE OF ACCEPTANCE OF WORK BY THE OWNER. MOVEMENT WITHIN THE VENTILATED OR AIR CONDITIONED AREA. END OF SECTION 2. ALL AIR DISTRIBUTION ACCESSORIES REQUIRED TO AFFECT THESE CONDITIONS SHALL BE PROVIDED AND INSTALLED BY B. AIR SYSTEMS TEST AND BALANCE C. MATERIALS: THIS CONTRACTOR. 3. DIFFUSERS, GRILLES AND REGISTERS CAUSING EXCESSIVE AIR MOVEMENT, DRAFTS OR OBJECTIONABLE NOISE SHALL BE 1. THE MECHANICAL CONTRACTOR WILL CONTRACT WITH AN INDEPENDENT TESTING, ADJUSTING, & BALANCING (TAB) 1. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND IN PERFECT CONDITION WHEN INSTALLED, OF THE BEST GRADE AND REPLACED AT NO COST TO THE OWNER. AGENCY TO TEST, ADJUST, & BALANCE THE HVAC SYSTEMS. OF THE SAME MANUFACTURER THROUGHOUT FOR EACH CLASS OR GROUP OF EQUIPMENT. MATERIALS NOT IDENTIFIED BY 2. THE WORK INCLUDED IN THIS SECTION CONSISTS OF FURNISHING LABOR, INSTRUMENTS, & TOOLS REQUIRED IN TESTING, NAME OR MANUFACTURER SHALL BE COMPARABLE TO THAT SPECIFIED AND AS APPROVED BY THE ARCHITECT. MAINTAIN B. CEILING DIFFUSERS: ADJUSTING & BALANCING THE HVAC SYSTEMS, AS DESCRIBED IN THESE SPECIFICATIONS OR SHOWN ON ACCOMPANYING ADEQUATE JOB PROTECTION FOR ALL MATERIALS, EQUIPMENT AND WORK OF OTHER TRADES. STORE ALL PIPE AT LEAST DRAWINGS. SERVICES SHALL INCLUDE CHECKING EQUIPMENT PERFORMANCE, TAKING THE SPECIFIED MEASUREMENTS, & FOUR INCHES (4") ABOVE GRADE TO AVOID CONTACT WITH WATER AND DIRT. 1. DIFFUSERS SHALL BE MODULAR, REMOVABLE CORE TYPE, WITH ADJUSTABLE VOLUME CONTROL DAMPERS. RECORDING AND REPORTING THE RESULTS. 2. UNLESS OTHERWISE DIRECTED BY THE MECHANICAL ENGINEER IN WRITING, OR SPECIFIED OR INDICATED, ALL MATERIALS, 2. FURNISH DIFFUSERS IN A FACTORY APPLIED, BAKED ENAMEL FINISH. COLOR AS SELECTED BY THE ARCHITECT. 3. THE ITEM REQUIRING TESTING, ADJUSTING, & BALANCING INCLUDE THE FOLLOWING: AND EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS. 3. DIFFUSERS SHALL BE AS MANUFACTURED BY "KRUEGER" SERIES 51240 MODULAR ADJUSTABLE AIR DIFFUSERS, ALUMINUM 3. MECHANICAL EQUIPMENT SHALL BEAR THE MANUFACTURER'S LABEL NAMEPLATE SHOWING ALL PERFORMANCE CONSTRUCTION, OR EQUAL IN "NAILOR." OR METAL-AIRE AIR SYSTEMS: CHARACTERISTICS. ALL VALVES, PIPE FITTINGS, ETC., SHALL BEAR THE MANUFACTURER'S TRADEMARK OR IDENTIFYING 4. VERIFY FRAME TYPES PRIOR TO ORDERING. SUBMIT SHOP DRAWINGS, INCLUDING COLOR SAMPLES, FOR APPROVAL. EXHAUST FANS MARKINGS. 5. PROVIDE IN THE NECK AT EACH DIFFUSER AT DUCT TAKEOFF FROM MAIN DUCT, AN ADJUSTABLE TYPE AIR EXTRACTOR AND 4. ALL MATERIALS OF SIMILAR FUNCTION OR SERVICE SHALL BE OF ONE MANUFACTURER. VOLUME CONTROLLER. SUBMIT SHOP DRAWINGS FOR APPROVAL. 6. WHERE AIR DISTRIBUTION DEVICES ARE INSTALLED IN LAY -IN CEILINGS, TWENTY FOUR BY TWENTY FOUR (24" X 24") FILLER 4. ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AABC NATIONAL STANDARDS. IF THESE CONTRACT D. APPROVAL OF MATERIALS: PANEL SHALL BE PROVIDED. FOR CEILING DIFFUSERS LARGER THAN 24" X 24" (I.E. 30" X 22"), PROVIDE PROPERLY SIZED DOCUMENTS SET FORTH MORE STRINGENT REQUIREMENTS THAN THE AABC NATIONAL STANDARDS, THESE CONTRACT FILLER PANEL. DOCUMENTS SHALL PREVAIL. 1. WITHIN THIRTY (30) DAYS AFTER AWARD OF THE CONTRACT, SUBMIT TO THE ARCHITECT, DIGITAL COPIES OF A COMPLETE 5. AABC: THE ASSOCIATED AIR BALANCE COUNCIL IS A NON-PROFIT ASSOCIATION OF INDEPENDENT, CERTIFIED AGENCIES C. SIDEWALL DIFFUSERS: SPECIALIZING IN TESTING, ADJUSTING, & BALANCING HVAC SYSTEMS. THE AABC NATIONAL STANDARDS (LATEST EDITION), LIST OF MATERIAL AND EQUIPMENT PROPOSED FOR THE JOB INCLUDING RATING AND CAPACITY DATA, SIZES, GRADE, PROVIDES STANDARDS & OPERATIONAL CRITERIA FOR HVAC SYSTEMS. ELECTRICAL DATA, PART OR CATALOG NUMBER, MANUFACTURER'S NAME, PICTURES, CATALOG CUTS, ETC. 1. DIFFUSERS SHALL BE EXTRUDED ALUMINUM LINEAR BAR GRILLES WITH SIZES AS SHOWN ON PLANS. 6. WORK UNDER THIS SECTION SHALL INCLUDE COMPLETE AND TOTAL BALANCING OF ALL EQUIPMENT AIR SYSTEMS. 2. SUBMIT WITH THE ABOVE LIST, DIGITAL COPIES OF COMPLETE SHOP DRAWINGS FOR ALL FABRICATED EQUIPMENT AND 2. DEFLECTION BARS SHALL BE 15 IN A PERMANENTLY FIXED POSITION. 7. THIS CONTRACTOR SHALL PROCURE THE SERVICES OF AN INDEPENDENT AIR BALANCE AND TESTING AGENCY, APPROVED DIGITAL COPIES OF COMPLETE CONTROL DIAGRAMS WITH DESCRIPTIONS AND DETAILS. 3. BORDERS SHALL BE 1" WIDE. BY THE ENGINEER, WHICH SPECIALIZES IN THE BALANCING AND TESTING OF HEATING, VENTILATING, AND AIR 3. SAFETY COMPLIANCE: ALL MATERIALS, EQUIPMENT AND INSTALLATION SHALL COMPLY WITH THE REQUIREMENTS OF 4. GRILLE AND REGISTER SECTIONS SHALL BE FURNISHED IN ONE PIECE UP TO 6 FEET IN LENGTH. CONDITIONING SYSTEMS. THE INDEPENDENT AGENCY SHALL BE CERTIFIED AND IN GOOD STANDING WITH THE AABC. ALL "OCCUPATIONAL SAFETY AND HEALTH ACT" (OSHA) STANDARDS. 5. BAR GRILLE BORDERS SHALL BE MECHANICALLY FASTENED TO PROVIDE A NEAT HAIRLINE CORNERS. WORK OF THIS AGENCY SHALL BE DONE UNDER THE SUPERVISION OF A QUALIFIED HEATING AND VENTILATING ENGINEER 6. FURNISH ALL GRILLES WITH OPPOSED BLADE DAMPERS. EMPLOYED BY THEM. ALL INSTRUMENTS USED BY THIS AGENCY SHALL BE ACCURATELY CALIBRATED AND MAINTAINED IN E. VERIFICATION OF DIMENSIONS: 7. GRILLES SHALL HAVE A NATURAL ANODIZED FINISH, AND SHALL BE AS MANUFACTURED BY KRUEGER OR APPROVED EQUAL GOOD WORKING ORDER. SHOULD THE CONTRACTOR REFUSE OF NEGLECT TO MAKE TESTS NECESSARY TO SATISFY IN "NAILOR" OR "METAL-AIRE". ARCHITECTS THAT REQUIREMENTS OF SPECIFICATIONS AND DRAWING ARE MET, SUCH TESTS MAY BE MADE BY AN 1. ALL INDICATED DIMENSIONS ARE APPROXIMATE AND ARE GIVEN FOR ESTIMATING PURPOSES ONLY. BEFORE PROCEEDING INDEPENDENT TESTING COMPANY WITH THE CONTRACTOR CHARGED FOR ALL EXPENSES. WITH THE WORK, THIS CONTRACTOR SHALL CAREFULLY CHECK AND VERIFY ALL DIMENSIONS, SIZES, REQUIRED D. RETURN/EXHAUST REGISTERS: 8. AIR BALANCE AND TESTING SHALL NOT BEGIN UNTIL SYSTEM HAS BEEN COMPLETED AND IS IN FULL WORKING ORDER. THE CLEARANCES AND SHALL ASSUME FULL RESPONSIBILITY FOR THE FITTING OF ALL EQUIPMENT AND MATERIALS HEREIN CONTRACTOR SHALL PUT ALL HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS AND EQUIPMENT INTO FULL REQUIRED TO OTHER PARTS OF THE WORK AND THE WORK OF OTHER TRADES. 1. REGISTERS SHALL BE ALUMINUM CONSTRUCTION WITH KEY OPERATED, OPPOSED BLADE, VOLUME DAMPERS. OPERATION AND SHALL CONTINUE THE OPERATION OF SAME DURING EACH WORKING DAY OF TESTING AND BALANCING. 2. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT ALL OFFSETS, BENDS, SPECIAL FITTINGS AND 2. FURNISH ALL REGISTERS WITH A FACTORY APPLIED, BAKED ENAMEL FINISH. COLOR AS SELECTED BY THE ARCHITECT. 9. THE SPECIFIED SYSTEMS SHALL BE REVIEWED AND INSPECTED FOR CONFORMANCE TO DESIGN DOCUMENTS. TESTING, LOCATIONS ARE NOT EXACTLY LOCATED. 3. REGISTERS SHALL BE AS MANUFACTURED BY "KRUEGER" MODEL S585, OR EQUAL IN "METAL AIRE" OR "NAILOR" ADJUSTING & BALANCING ON EACH IDENTIFIED SYSTEM SHALL BE PERFORMED. THE ACCURACY OF MEASUREMENTS SHALL 4. VERIFY FRAME TYPES PRIOR TO ORDERING. SUBMIT SHOP DRAWINGS, INCLUDING COLOR SAMPLES, FOR APPROVAL. BE IN ACCORDANCE WITH AABC NATIONAL STANDARDS. ADJUSTMENT TOLERANCES SHALL BE + OR - 10% UNLESS F. THIS CONTRACTOR SHALL COMPLY WITH ALL CONTRACT DOCUMENTS IN LAYING OUT HIS WORK AND EQUIPMENT. HE SHALL 5. WHERE REGISTERS ARE INSTALLED IN LAY -IN CEILINGS, TWENTY FOUR BY TWENTY FOUR (24" X 24") FILLER PANEL SHALL BE OTHERWISE STATED. COORDINATE THE WORK OF THIS SECTION WITH THE WORK OF OTHER TRADES AND ALL JOB CONDITIONS. PROVIDED. FOR RETURN/EXHAUST REGISTERS LARGER THAN 24" X 24" (I.E. 30" X 22"), PROVIDE PROPERLY SIZED FILLER 10. EQUIPMENT SETTINGS, INCLUDING MANUAL DAMPER QUADRANT POSITIONS, MANUAL VALVE INDICATORS, FAN SPEED PANEL. CONTROL LEVERS, & SIMILAR CONTROLS & DEVICES SHALL BE MARKED TO SHOW FINAL SETTINGS. 1. THE INSTALLATION OF VALVES, THERMOMETERS, GAUGES, DAMPERS, DUCT ACCESS DOORS OR OTHER INDICATING 11. ALL INFORMATION NECESSARY TO COMPLETE A PROPER TAB PROJECT & REPORT SHALL BE PER AABC STANDARDS UNLESS EQUIPMENT OR SPECIALTIES REQUIRING READING, ADJUSTMENT, INSPECTION, REPAIRS, REMOVAL OR REPLACEMENT 2.04 CEILING MOUNTED EXHAUST FANS OTHERWISE NOTED. THE DESCRIPTIONS FOR WORK REQUIRED, AS LISTED IN THIS SECTION, ARE A GUIDE TO THE MINIMUM SHALL BE CONVENIENTLY AND ACCESSIBLY LOCATED WITH REFERENCE TO THE FINISHED BUILDING. INFORMATION NEEDED. 2. WHERE WALL AND CEILING ACCESS DOORS ARE REQUIRED FOR ACCESS TO MECHANICAL EQUIPMENT, DOORS SHALL BE A. GENERAL 12. THE TAB AGENCY SHALL VERIFY THAT ALL THE DUCTWORK, DAMPERS, GRILLES, REGISTERS, & DIFFUSERS HAVE BEEN FURNISHED AND INSTALLED UNDER OTHER SECTIONS. COORDINATE THIS REQUIREMENT WITH APPROPRIATE SECTION OF INSTALLED PER DESIGN & SET IN THE FULL OPEN POSITION. THE TAB AGENCY SHALL PERFORM THE FOLLOWING TAB SPECIFICATIONS. 1. FAN SHALL BE DIRECT DRIVEN, CEILING MOUNTED, WITH CENTRIFUGAL BLOWER. PROCEDURES IN ACCORDANCE WITH THE AABC NATIONAL STANDARDS: G. ROUGH -IN: ROUGH -IN AND FINAL CONNECTIONS SHALL BE PROVIDED FOR EQUIPMENT FURNISHED UNDER OTHER SECTIONS AND 2. SEE EQUIPMENT SCHEDULE FOR CAPACITIES AND DUTY OF EACH EXHAUST FAN TO BE PROVIDED AND PLANS FOR LAYOUT FOR EXHAUST FANS: BY THE OWNER IN ACCORDANCE WITH ROUGH -IN DRAWINGS FURNISHED BY OTHERS. FUTURE EQUIPMENT, AS NOTED ON THE DETAILS. 3. FANS SHALL BE U.L. LISTED AND ALL ELECTRICAL COMPONENTS SHALL CARRY THE LISTING AND COMPLY WITH THE STATE DRAWINGS, SHALL BE PROVIDED WITH ALL REQUIRED ROUGH -IN UTILITIES. OF WASHINGTON STATE ELECTRICAL CODE. a) FAN SPEEDS - TEST & ADJUST FAN RPM TO ACHIEVE MAXIMUM OR DESIGN CFM. H. MACHINERY GUARDS: ALL MOVING PARTS OF MACHINERY, SUCH AS SHAFT COUPLINGS, BELT DRIVES, ETC., SHALL BE 4. FANS SHALL BE AS MANUFACTURED BY "COOK," OR APPROVED EQUAL IN "GREENHECK" OR "PENN.-, b) CURRENT & VOLTAGE - TEST & RECORD MOTOR VOLTAGE & AMPERAGE, & COMPARE DATA WITH THE NAMEPLATE LIMITS TO ENSURE MOTOR IS NOT IN OR ABOVE THE SERVICE FACTOR. ADEQUATELY COVERED WITH REMOVABLE METAL GUARDS TO PROTECT PERSONNEL FROM POSSIBLE INJURY. GUARDS SHALL BE B. QUALITY ASSURANCE C) PITOT-TUBE TRAVERSE - PERFORM A PITOT-TUBE TRAVERSE OF MAIN EXHAUST DUCTS TO OBTAIN TOTAL CFM. FURNISHED BY THE EQUIPMENT MANUFACTURER AND SHALL COMPLY WITH APPLICABLE REQUIREMENTS OF APPLICABLE STATE d) STATIC PRESSURE - TEST & RECORD SYSTEM STATIC PROFILE OF EACH EXHAUST FAN. AGENCIES AND OSHA. 1. EXHAUST FANS SHALL BE DESIGN CERTIFIED BY AMCA. PART 2 PRODUCTS 2. ALL FANS SHALL BE STATICALLY AND DYNAMICALLY BALANCED. C. CONSTRUCTION 2.01 SUPPORTS, HANGERS, FLASHING, AND SEISMIC RESTRAINT 1. THE DRIVE FRAME, BEARING, AND MOTOR PLATES SHALL BE CONSTRUCTED OF MILD GAUGE STEEL. A. PIPE SUPPORT: D. MOTORS 1. ALL PIPING SHALL BE SUPPORTED IN SUCH A MANNER THAT IT IS SECURELY ATTACHED TO THE STRUCTURE OF THE BUILDING. ATTACHMENT IS TO BE CAPABLE OF SUPPORTING THE TRIBUTARY WEIGHT OF PIPE AND CONTENTS IN ANY 1. MOTORS SHALL BE HEAVY DUTY, 1750 RPM, OPEN DRIP -PROOF, HORSEPOWER AND VOLTAGE AS INDICATED ON EQUIPMENT 3.02 EQUIPMENT DIRECTION. MAXIMUM SPACING OF SUPPORT AND BRACES SHALL BE AS DETAILED ON DRAWINGS. SCHEDULE. 2. SUPPORT HORIZONTAL OVERHEAD PIPING WITH CLEVIS HANGERS. UPPER END OF HANGER ROD SHALL BE SUPPORTED 2. MOTORS SHALL BE EQUIPPED WITH PERMANENTLY LUBRICATED, SEALED BALL BEARINGS. A. REGULATION, OPERATION AND INSTRUCTION FROM A CODE APPROVED ATTACHMENT. SEE DRAWINGS FOR PIPE SUPPORT DETAILS. SUBMIT SHOP DRAWINGS OF ALL PIPING SUPPORTS FOR APPROVAL. E. FACTORY ACCESSORIES 1. LUBRICATE ALL BEARINGS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS. 2. CHECK OPERATION OF ALL PUMPS, FANS, MOTORS, ETC. B. FLASHING: PIPES THROUGH ROOF SHALL BE FLASHED WITH "SEMCO" NO. 1110-7 STEEL REINFORCED BOOT TYPE, SIX (6) POUND 1. FANS SHALL BE COMPLETE WITH THE FOLLOWING FACTORY ACCESSORIES: 3. THE SERVICES OF A QUALIFIED TECHNICIAN SHALL BE MADE AVAILABLE FOR A CONTINUOS PERIOD OF NOT LESS THAN SEAMLESS LEAD FLASHING WITH SUITABLE COUNTERFLASHING SLEEVE, OR AS APPROVED BY THE ARCHITECT. SUBMIT SHOP SEVENTY TWO (72) HOURS DURING BUSINESS HOURS, AT A TIME CONVENIENT TO THE OWNER TO PLACE THE ENTIRE DRAWINGS FOR APPROVAL. 1J GRAVITY BACKDRAFT DAMPER SYSTEM INTO OPERATION, SUPERVISE ITS OPERATION, MAKE ALL TESTS AND ADJUSTMENTS, CORRECT ANY AND ALL g) BIRD SCREENS DEFECTS AND DEFICIENCIES AND THOROUGHLY INSTRUCT THE OWNER'S OPERATORS IN THE PROPER OPERATION AND C. SEISMIC RESTRAINT: ALL PIPING, EQUIPMENT, AND DUCTWORK SHALL BE SUITABLY RESTRAINED AND ANCHORED IN BOTH MAINTENANCE OF THE ENTIRE SYSTEM. FURNISH COMPLETE TEST REPORTS INCLUDING ALL MOTOR CURRENT'S, STATIC HORIZONTAL AND VERTICAL DIRECTIONS TO WITHSTAND SEISMIC FORCES AS REQUIRED BY THE STATE OF WASHINGTON STATE 2.05 ROOFTOP CENTRIFUGAL EXHAUST FANS PRESSURES, TEMPERATURES, FAN SPEEDS, AND CFM TO THE ARCHITECT FOR REVIEW BY THE MECHANICAL ENGINEER. AND SMACNA. SEE DRAWINGS FOR DETAILS. 4. FURNISH ANY ADDITIONAL OPERATION, LABOR, AND MATERIAL THAT MAY BE REQUIRED DURING GUARANTEE PERIOD. A. GENERAL: EXHAUST FANS SHALL BE CENTRIFUGAL BELT DRIVEN TYPE AS MANUFACTURED BY "LOREN COOK COMPANY" OR 5. THE CONTRACTOR SHALL, DURING THE GUARANTEE PERIOD, AND AS DIRECTED BY THE OWNER, MAKE ANY ADDITIONAL 2.02 SHEET METAL APPROVED EQUAL IN "PENN VENTILATOR" OR "GREENHECK". TESTS, ADJUSTMENTS, ETC., THAT MAY BE REQUIRED AND CORRECT ANY DEFICIENCIES ARISING FROM THE OPERATION OF THE SYSTEM. A. LAYOUT: DRAWINGS ARE IN PART DIAGRAMMATIC AND ARE INTENDED TO CONVEY THE SCOPE OF WORK AND INDICATE THE B. CONSTRUCTION: GENERAL ARRANGEMENT OF EQUIPMENT, DUCTS AND PIPING. MECHANICAL TRADES SHALL FOLLOW THESE DRAWINGS IN LAYING 3.03 OPERATING AND MAINTENANCE DATA OUT THEIR WORK, CONSULT GENERAL CONSTRUCTION DRAWINGS TO FAMILIARIZE THEMSELVES WITH ALL CONDITIONS 1. FAN HOUSING AND SHROUD SHALL BE CONSTRUCTED OF MINIMUM 16 GAUGE MARINE ALLOY ALUMINUM WITH A RIGID AFFECTING THEIR WORK AND SHALL VERIFY SPACES IN WHICH THEIR WORK WILL BE INSTALLED. WHERE JOB CONDITIONS INTERNAL SUPPORT SYSTEM. A. DATA: SUBMIT TO THE ARCHITECT FOR APPROVAL, PRIOR TO ACCEPTANCE OF THE INSTALLATION, COMPLETE AND AT ONE TIME. REQUIRE CHANGES IN INDICATED LOCATIONS AND ARRANGEMENT, MAKE SUCH CHANGES AT NO ADDITIONAL COST TO OWNER. 2. FAN WHEEL SHALL BE CENTRIFUGAL, BACKWARD INCLINED. PARTIAL OR SEPARATE DATA WILL NOT BE ACCEPTED. DATA SHALL CONSIST OF THE FOLLOWING-- B. DESCRIPTION: INCLUDES SHEET METAL PLENUMS, DUCTWORK, MANUALLY OPERATED DAMPERS AND EQUIPMENT CONNECTIONS. 3. FAN WHEEL SHALL BE CONSTRUCTED OF ALUMINUM AND SHALL INCLUDE A WHEEL CONE MATCHED TO THE INLET CONE. 4. WHEELS SHALL BE STATICALLY AND DYNAMICALLY BALANCED IN ACCORDANCE WITH AMCA STANDARD 204-96. 1. MANUFACTURER'S LITERATURE: DIGITAL COPIES OF MANUFACTURER'S INSTRUCTIONS FOR OPERATION AND MAINTENANCE 5. FAN SHROUD SHALL HAVE A ROLLED BEAD FOR ADDED STRENGTH. OF ALL EQUIPMENT, VALVES, AND CONTROLS; INCLUDING REPLACEMENT PARTS LISTS. C. MATERIAL: ALL SHEET METAL SHALL BE FABRICATED OF GALVANIZED STEEL. 6. DRIVE FRAME ASSEMBLY SHALL BE CONSTRUCTED OF HEAVY GAUGE STEEL AND MOUNTED ON VIBRATION ISOLATORS. 2. WRITTEN INSTRUCTION: TYPEWRITTEN INSTRUCTION FOR OPERATION AND MAINTENANCE OF THE SYSTEM COMPOSED OF OPERATION INSTRUCTIONS AND MAINTENANCE INSTRUCTION. DIGITAL COPIES SUBMITTED TO THE ARCHITECT FOR D. LOW PRESSURE DUCT CONSTRUCTION: GAUGES, TRANSVERSE JOINTS, SPACING OF JOINTS AND INTERMEDIATE BRACING SHALL C. MOTORS: APPROVAL. BE AS TABULATED BELOW, IN WHICH TRANSVERSE JOINTS ARE SHOWN SS FOR S-STOP, DS FOR DRIVE SLIP, PS FOR POCKET SLIP, AND BS FOR BAR SLIP. PS AND BS LAPPED AND RIVETED AT CORNERS. INTERMEDIATE BRACING WHERE SHOWN MAY BE OMITTED 1. MOTORS SHALL BE HEAVY DUTY PERMANENTLY LUBRICATED SEALED BALL BEARING TYPE, CAREFULLY MATCHED TO THE a) OPERATING INSTRUCTIONS SHALL CONTAIN A BRIEF DESCRIPTION OF THE SYSTEM. ADJUSTMENTS REQUIRING THE IF DUCT SECTIONS OF FOUR FEET (4'0") OR LESS ARE USED. MAXIMUM SPACING OF BRACING - FOUR FEET (4'0") TECHNICAL KNOWLEDGE OF THE SERVICE AGENCY PERSONNEL SHALL NOT BE INCLUDED IN THE OPERATING FAN LOAD, AND FURNISHED AT THE SPECIFIED VOLTAGE, PHASE AND ENCLOSURE. INSTRUCTIONS. 1. SCHEDULE: 2. MOTORS SHALL BE READILY ACCESSIBLE FOR MAINTENANCE. b) MAINTENANCE INSTRUCTIONS SHALL LIST EACH ITEM (I.E. CONTROLS AND MECHANICAL EQUIPMENT) REQUIRING 3. A DISCONNECT SWITCH SHALL BE FACTORY INSTALLED AND WIRED FROM THE FAN MOTOR TO A JUNCTION BOX INSTALLED INSPECTION, LUBRICATION, OR SERVICE AND DESCRIBE THE PERFORMANCE OF SUCH MAINTENANCE. SHAPE SIZE (IN.) GAUGE TRANSVERSE JOINT BRACING WITHIN THE MOTOR COMPARTMENT. RECT UP TO 12 26 DS,SS NONE 3. VERBAL INSTRUCTIONS: OPERATING PERSONNEL SHALL BE INSTRUCTED IN THE OPERATION OF THE SYSTEMS IN RECT 13 TO 18 24 DS,SS NONE D. CERTIFICATION: ACCORDANCE WITH TYPEWRITTEN INSTRUCTIONS. NO OTHER VERBAL INSTRUCTIONS SHALL BE GIVEN. RECT 19 TO 30 24 DS,SS NONE 1. ALL FANS SHALL BEAR THE AMCA CERTIFIED RATINGS SEAL FOR SOUND AND AIR PERFORMANCE. 3.04 SPECIAL REQUIREMENTS RECT 31 TO 42 22 1" PS, OR BS LXLXL-L/8 2. FAN SHALL BE LISTED BY UNDERWRITERS LABORATORIES (UL 705) RECT 43 TO 54 22 1 1/2" STANDING SEAM 1.5 X 1.5 3. EACH FAN SHALL BEAR A PERMANENTLY AFFIXED MANUFACTURER'S NAMEPLATE CONTAINING THE MODEL NUMBER AND A. THE MANUFACTURER AND/OR SUPPLIER OF ALL EQUIPMENT SHALL CERTIFY IN WRITING TO THE OWNER THAT THIS EQUIPMENT ROUND UP TO 9 24 2" SLIP NONE INDIVIDUAL SERIAL NUMBER FOR FUTURE IDENTIFICATION. COMPLIES WITH THESE SPECIFICATIONS. ROUND 9 TO 14 24 4" SLIP NONE ROUND 14 TO 23 22 4" SLIP NONE 2.06 EQUIPMENT IDENTIFICATION B. ALL NEW EQUIPMENT SHALL BE ANCHORED AS REQUIRED AND/OR AS DETAILED ON DRAWINGS. 2. ALTERNATE TRANSVERSE JOINT: FOR RECTANGULAR DUCT SIZES NINETEEN INCHES (19") AND ABOVE, IN LIEU OF THE "DUCTMATE" A. EQUIPMENT C. WRITTEN CERTIFICATIONS, IN A FORM APPROVED BY THE MECHANICAL ENGINEER SHALL BE PROVIDED BY THE EQUIPMENT JOINT CONSTRUCTION SPECIFIED IN SCHEDULE 1 ABOVE, AN ALTERNATE JOINT CONSTRUCTION IN SHALL BE MANUFACTURER OR HIS AUTHORIZED REPRESENTATIVE: ACCEPTABLE. SUBMIT SHOP DRAWINGS FOR APPROVAL. 1. STENCILED IDENTIFICATION FOR EACH PIECE OF EQUIPMENT INSTALLED. 3. STIFFENING: PANELS TWENTY INCHES (20") AND LARGER SHALL BE CROSS BROKEN UNLESS STANDING SEAMS ARE USED 2. EQUIPMENT IDENTIFICATION TAG TO MATCH PLAN NUMBERS. 1. THAT THE EQUIPMENT AND ITS INSTALLATION WAS INSPECTED ON THE JOB BY THE MANUFACTURER AND THAT THE AND ARE SPACED CLOSER THAN THIRTY SIX INCHES (36"). 3. SUBMIT EQUIPMENT STENCILING FOR APPROVAL BY MECHANICAL ENGINEER, PRIOR TO INSTALLATION. EQUIPMENT IS IN FIRST-CLASS CONDITION THROUGHOUT, WAS INSTALLED IN ACCORDANCE WITH MANUFACTURER'S 4. CHANGES IN DIRECTION AND SIZE: DUCTURNS USED WHERE INDICATED. IN DUCTS TWENTY INCHES (20") WIDE OR LESS, REQUIREMENTS AND RECOMMENDATIONS, AND THAT THE INSTALLATION IS APPROVED BY THE MANUFACTURER. USE BARBER-COLEMAN DUCTURNS OR AS APPROVED. TRANSITIONS WITH LENGTHS NOT SHORTER THAN THOSE SHOWN; 3.01 SUBMITTALS AND TESTS 2. THAT THE EQUIPMENT IS OPERATING IN A SAFE AND SATISFACTORY MANNER AND IS DELIVERING CAPACITIES AND MINIMUM LENGTH OF THREE FEET (3'0") WHERE NOT INDICATED. ROUND ELBOWS SHALL BE OF 4-PIECE CONSTRUCTION. SAME GAUGE AS ADJACENT DUCT. ROUND "WYE" FITTINGS TO HAVE 45 DEGREE SIDE TAKE -OFF TAPPED INTO REDUCING A. REQUIREMENTS AND SUBMITTALS PERFORMANCE HEREINBEFORE SPECIFIED AND/OR INDICATED ON THE DRAWINGS. M • J O 110 James St., Suite 106 WA s Edmonds, WA 98020 TRANSITION. SEAL ALL JOINTS AS SPECIFIED BELOW. D. THE FOLLOWING SHALL BE CERTIFIED AS DESCRIBED ABOVE: AIR CONDITIONING SYSTEMS, EVAPORATIVE COOLERS, SUSPENDED �l� �O 5. JOINTS: AIRTIGHT FOR THE PURPOSE INTENDED. SEAL ALL JOINTS WITH HIGH PRESSURE, FLEXIBLE DUCT SEALANT WITH ti� w Phone: 425.458.9700 (D PRESSURE TESTS TO 10" OF WATER COLUMN. SEALANT SHALL BE AS MANUFACTURED BY "GLENKOTE" OR APPROVED 1. CONFORMATION TO REQUIREMENTS OF INTERNATIONAL MECHANICAL CODE 2018EDITION, LOCAL AND/OR STATE CODES GAS HEATERS, AND EXHAUST FANS. Fax: 909.890.3770 EQUAL. ALTERNATELY, DUCTWORK MAY BE SEALED WITH 6 OZ CANVAS STRIPS AND ARABOL. PITTSBURGH LOCK OR AND/OR ORDINANCES, INCLUDING THE UNIFORM CITY AND COUNTY BUILDING CODES, STATE COUNTY AND CITY HEALTH z Email: cadd@designwesteng.com DOUBLE SEAMS EXCEPTED. ARABOL SHALL BE USED FULL STRENGTH WITH NO DILUTION. DUCT TAPE SHALL NOT BE USED. DEPARTMENT ORDINANCES, STATE OF WASHINGTON STATE INDUSTRIAL ACCIDENT COMMISSION SAFETY ORDERS. E. DAMAGE BY LEAKS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO EQUIPMENT AND PREMISES CAUSED BY 6. SUPPORTS: DUCTS SECURED AGAINST DISPLACEMENT AND VIBRATION. ANCHOR TO STRUCTURAL PARTS OF BUILDING AT 2. APPLY AND PAY FOR ALL PERMITS, FEES, INSPECTIONS, EXAMINATIONS AND TESTS REQUIRED BY ANY LEGALLY LEAKS OR BREAKS IN PIPING OR EQUIPMENT FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF FINAL ACCEPTANCE. INTERVALS NOT GREATER THAN TEN FEET (10'0") AND SUSPEND WITH HANGER STRAPS. ALL SUPPORTS SHALL BE PER CONSTITUTED AUTHORITIES. d7P 6776 9 DESIGN WEST ENGINEERING 0�'� SMACNA STANDARDS. SUBMIT SHOP DRAWINGS FOR APPROVAL. 3. CONTRACTOR SHALL CLEARLY NOTE ON SUBMITTALS ANY CHANGES OR DEVIATIONS FROM THAT WHICH IS SPECIFIED SO F. UNLESS OTHERWISE DIRECTED, AND/OR SPECIFIED, AND/OR INDICATED; ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN �GISTEg�' 7. MANUAL DAMPERS: INSTALL WHERE SHOWN; MANUALLY OPERATED, OPPOSED BLADE DAMPERS WITH INTERLOCKING THAT THE ENGINEER MAY READILY IDENTIFY ANY PROPOSED SUBSTITUTIONS. ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS. SS.IDNAL� MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS EDGES, FABRICATED OF 18 GAUGE STEEL AND EQUIPPED WITH LOCKING QUADRANTS AND END BEARINGS. DURO DYNE 4. SUBMISSION OF SIX (6) BROCHURES CONTAINING CERTIFIED MANUFACTURER'S DRAWINGS AND CUTS OF ALL EQUIPMENT SRH-228 DAMPER REGULATORS SHALL BE INSTALLED ON DAMPERS IN LINED DUCT; SRST-L ON WRAPPED DUCT, WITH AND SPECIALTIES WITHIN THIRTY (30) DAYS AFTER CONTRACT IS SIGNED. PARTIAL OR INCOMPLETE SUBMITTALS WILL BE G. MECHANICAL EQUIPMENT SHALL BEAR THE MANUFACTURER'S LABEL OR NAMEPLATE SHOWING PERFORMANCE PROPER OFFSET FOR DUCT INSULATION. EACH DAMPER REGULATOR ROD, DURO DYNE MODEL "SB." SUBMIT SHOP REJECTED AND WILL BE RETURNED TO CONTRACTOR FOR RE -SUBMITTAL. CHARACTERISTICS. IDENTIFYING SIZE OR MODEL NUMBER SHALL BE GIVEN ONLY WHEN NOT PRACTICABLE OR CUSTOMARY TO DRAWINGS FOR APPROVAL. SHOW OTHERWISE. ALL VALVES, PIPE, AND FITTINGS SHALL BEAR THE MANUFACTURER'S TRADEMARK OR IDENTIFYING MARKINGS. 8. ALL ROUND "WYE" FITTINGS SHALL INCLUDE A MANUAL VOLUME DAMPER WITH LOCKING QUADRANT. DAMPERS SHALL BE a) SUBMITTALS SHALL BE IN A NEAT RING BINDER FORM AND SHALL CONTAIN A COMPLETE LIST, IN INDEX FORM, OF "DURO DYNE" JDS SERIES OR EQUAL. SUBMIT SHOP DRAWINGS FOR APPROVAL. THE MANUFACTURER'S NAMES, CUTS OF EQUIPMENT, PERFORMANCE DATA, CATALOG NUMBERS AND TRADE NAMES; H. ALL MATERIALS OF SIMILAR CLASS OR SERVICE SHALL BE OF ONE MANUFACTURER. 9. TURNING VANES SHALL BE DOUBLE WALL TYPE. NO EXCEPTIONS. AS REQUIRED; TO PROPERLY IDENTIFY THE MATERIALS AND EQUIPMENT TO BE FURNISHED UNDER THESE 10. TURNING VANES IN DUCTS TWENTY INCHES (20") WIDE AND LARGER SHALL BE DOUBLE WALL WITH PERFORATE INNER FACE SPECIFICATIONS. I. DUCT LAYOUT AS SHOWN ON THE DRAWINGS IS SUBJECT TO MODIFICATIONS, BY CONTRACTOR, WITHOUT EXTRA COST AS AND PACKED WITH FIBERGLASS. USE "SONOTURN" OR EQUAL. SUBMIT SHOP DRAWINGS FOR APPROVAL. b) DATA SUBMITTED FOR EACH ITEM SHALL BE PROPERLY IDENTIFIED BY REFERENCE TO ITEM NUMBER OF REQUIRED TO CLEAR OTHER ITEMS OF CONSTRUCTION. THIS CONTRACTOR SHALL COORDINATE THE WORK OF THIS SECTION 11. REGISTER BOXES: SHEER METAL REGISTER BOXES SHALL BE PROVIDED FOR ALL CEILING DIFFUSERS AND REGISTERS PARAGRAPHS IN THE SPECIFICATIONS AND MECHANICAL DRAWINGS' EQUIPMENT SCHEDULE DESIGNATION. WITH THAT OF OTHER SECTIONS AS TO AVOID INTERFERENCES BY OTHER CRAFTS INVOLVED. WITH ROUND DUCT CONNECTIONS. REGISTER BOXES SHALL BE LINED WITH ONE INCH (1") DUCT LINER AND BE COMPLETE c) ANY DEVIATION FROM ITEM AS SPECIFIED SHALL BE CLEARLY INDICATED ON THE SUBMITTAL AND NOTED AS SUCH. WITH ROUND STARTER COLLAR, SIZE AS INDICATED ON DRAWINGS. SUBMIT SHOP DRAWING FOR APPROVAL. d) THESE SPECIFICATIONS AND ACCOMPANYING DRAWINGS SPECIFY AND ILLUSTRATE EQUIPMENT AND MATERIALS J. CONTRACTOR SHALL VISIT SITE PRIOR TO BIDDING AND FULLY ACQUAINT HIMSELF WITH ALL CONDITIONS AFFECTING DEEMED MOST SUITABLE FOR THE SERVICE ANTICIPATED. THIS IS NOT TO PRECLUDE OTHER PRODUCTS EQUALLY INSTALLATION OF THE PROPOSED SYSTEM. FAILURE TO. DO SO SHALL NOT RELIEVE CONTRACTOR OF RESPONSIBILITY OF RESERVED FOR BUILDING DEPT STAMP C) 0 0 CD M E O CV C) CD00 In rn a,Q In Q fV j N vi ^ r, p1 in o `° 3 Lnwd � 0 o NF- j OL0 0 o cNc: 0)Q'- 0 0 N a1 0 Of N MO co TW VJ L -0 ^ L Z �+ W U 0 0 W.0 E 4-0 co � W �0^ O W 0 V�+ J 0 Q Q E co c-_ C:)W 0 L 0 O Cn O N M N REVISION SCHEDULE # DESCRIPTION DATE Di FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN KN REVIEWED Si SHEET NAME MECHANICAL SPECIFICATIONS SHEET NO. MP-501 22-268 PLUMBING SPECIFICATIONS PART 1 GENERAL materials listed under each group: 3. Everyone hundred feet (100') horizontal run. 9. Valve Material: Bronze for sizes two inches (2") and smaller. 1.01 SCOPE 1. Copper Tubing and Fittings G. Extend cleanouts to accessible surface. Do not place cleanouts in carpeted floors. In such locations, use wall -type cleanouts. 10. Valve ends: Screwed for all sizes two inches (2") and smaller, except copper tube. A. Work of this section includes everything necessary and incidental to completing plumbing work, except as herein specifically excluded. H. Each fixture and appliance discharging water into sanitary sewer or building sewer lines shall have a seal trap in connection with a complete venting a. Muller Brass b. Chase 11. Valve ends for copper tubes, Type K and L: Solder joint type. 1.02 GENERAL REQUIREMENTS system so gasses pass freely to atmosphere with no pressure for siphon condition on water seal. c. Revere d. Cerro 12. Flange valves shall have flange drilling to suit joining pipe flanges. A. All core drilling, cutting, and patching for the installation of work under this section shall be performed under this section of the specifications. No holes will I. Vent entire system to atmosphere. Discharge fourteen inches (14") above roof. Join lines together in fewest practical number before projecting above roof (see plans for locations) . Offset vent lines so they will not pierce roof near an edge or valley. 2. Cast Iron Pipe 13. Gate valves shall have solid tapered wedge, except where otherwise specified. be allowed in any structural members without the written approval of the Architect. B. Guarantee: Furnish a written guarantee form as stipulated in section "General Conditions," for a period of one (1) year from date of acceptance of work by J. Use torque wrench to obtain proper tension in cinch bands when using hubless cast iron pipe. Butt ends of pipe against centering flange or coupling. a. Alhambra 14. Globe type valves shall have renewable composition discs recommended by manufacturer for intended service, or renewable bevel seat and metal the owner. b. Anaheim Foundry disc where so specified. K. Grade all soil and waste lines at one quarter inch (1/4") fall per foot, indirection of flow; unless otherwise noted on plans (see plans for other locations) c. U.S. Pipe and Foundry 1. Materials: d. Universal Cast Iron Manufacturing 15. Check valves shall be horizontal swing type with bronze seat and composition or bronze disc as approved; body of same material, pressure rating, 2.04 SOIL, WASTE, AND VENT PIPING SYSTEMS (ABS) screwed or flanged, finish as adjoining globe or gate valve. Check valves in pump discharge lines shall be of the spring loaded non -slam type as a. All material and equipment shall be new and in perfect condition when installed, of the best grade and of the same manufacturer A. Mains, risers branches and connections of sizes and arrangement as indicated on drawings. 2.13 PIPE JOINTS manufactured by "Mission" Duo Check Series 150-S-M-F. throughout for each class or group of equipment. Materials not identified by name or manufacturer shall be comparable to that specified job A. Unless otherwise specified, join pipe as follows: C. Submit complete shop drawings and catalog cuts of all valve types to be used, for review and approval by Mechanical Engineer, prior to installation. No arid as approved b the Architect. Maintain adequate protection for all materials, equipment and work of other trades. Store all pipe at PP Y q 1 PP P B. ABS soil pipe and fittings shall comply with ASTM D2661-85a or ASTM F628-85. Exceptions. least four inches (4") above grade to avoid contact with water and dirt. 1. All steel pipe two inches (2") and smaller shall have screwed joints. b. Unless otherwise directed by the Mechanical Engineer In writing, or specified or indicated, all materials, fixtures and equipment shall be installed in accordance with manufacturers recommendations and instructions. 1. Piping shall be black in color and have a pipe wall thickness the same as that of Schedule 40 (IPS) standard steel pipe. 2.18 VALVE CATALOG NUMBER DESIGNATIONS c. Plumbing equipment shall bear the manufacturer's label nameplate showing all performance characteristics. All valves, pipe fittings, etc., shall bear the manufacturer's trademark or identifying markings. 2, Pipe shall be marked on two sides, 180 degrees apart or spirally, in letters not less than 3/16" high in a contrasting color, and shall contain the 2. All steel pipe two and one half inches (21/2") and larger shall have welded joints. joints A. Valve design, material of components, workmanship, other features: Equal to "Stockham Valve Company" catalog numbers unless otherwise noted for g Y 9 ( ) d. All materials of similar function or service shall be of one manufacturer. followingInformation: 3. All copper pipe shall have soldered made with 95-5 tin/antimony solder. PP P P 1 Y various types of valves listed. 2. Approval of Materials: a. Mfgr's name or trademark 4. Galvanized vent pipe shall be screwed "Durham" tarred drainage fittings. B. Gate Valves b. ASTM designation a. Within thirty (30) days after award of the contract, submit to the Architect, digital copies of a complete list of material and equipment c. Nominal pipe size tl. Symbol ABS-DWV or COEX ABS FOAMED CORE DWV 5. All joints In underground and under -floor distribution piping shall be welded, regardless of size. 1. Screwed, bronze, union bonnet, rising stem, 150 PSI SWP; NO. B-120. Proposed for the job including rating and capacity data, sizes, grade, electrical data, part or catalog number, manufacturer's name, pictures, e. Mfgr's code 6. All ABS piping shall have solvent welded joints. 2. Screwed, ibbm, non -rising stem, 125 PSI SWP; NO. G608. catalog cuts, etc. f. IAPMO certification b. Submit with the above list digital copies of complete shop drawings for all fabricated equipment and digital copies of complete wiring B. Welding Exceptions: In locations such as risers in shafts or mains in crowded corridors, where welding may be difficult; permission may be given by job 3. Flanged, ibbm, non -rising stem, 125 PSI SWP; NO. G461. diagrams with descriptions and details. C. Above grade piping and vent line shall also be ABS piping. inspector or Mechanical Engineer to use screwed joints up to four inch (4") size. c. Safety Compliance: All materials, equipment and installation shall comply with the requirements of "Occupational Safety and Health Act" (OSHA) Standards. D. Exposed vents thru roof shall be protected by water base synthetic latex paints. C. Welding Process, Procedure: 4. Flanged, ibbm, OS & Y, 125 PSI SWP; NO. G-623. C. Verification of Dimensions: E. Cleanouts shall be provided as previously specified and in the following locations: P P Y P 9 1. Where welding Is required b work of this section, such work shall only be performed b welders qualified and certified b a recognized, approved 9� q Y Y P Y q Y 9 PP C. Ball Valves 1. All indicated dimensions are approximate and are given for estimating purposes only. Before proceeding with the work, this contractor shall 1. Near bottom of each stack and riser. agency. Such certification shall bear a date not more than six (6) months prior to date of starting work under this section and shall be submitted and approved by the job inspector and Mechanical Engineer prior to starting work. 1. Screwed two inches 2" and smaller, cast bronze body, p ( ) y, 40 PSI WOG, "Apollo 3" Series 82. carefully check and verify all dimensions, sizes, required clearances and shall assume full responsibility for the fitting of all equipment and materials herein required to other parts of the work and to the work of other trades. 2. At every 135 degree change of direction for horizontal line. 2. Pipe welding shall comply with the latest revision of applicable code, ASA Code for Pressure Piping and State requirements. Before welding Is 2• Valves shall include reinforced Teflon packing ring, thrust seal, body seals and seats. 2. The drawings are essentially diagrammatic to the extent that all offsets, bends, special fittings and locations are not exactly located. 3. Everyone hundred feet (100') horizontal run. performed, contractor shall submit to the Mechanical Engineer evidence of compliance of welding and operator's qualification according to provisions of governing codes. Standard Procedure Specifications and operators qualified by National Certified Pipe Welding Bureau shall be 3. Balls shall be chromium plated bronze; with full size ports. P 3. This contractor shall comply with all contract documents in laying out his work and equipment. He shall coordinate the work of this section with the F. Extend cleanouts to accessible surface. Do not place cleanouts in carpeted floors. In such locations, use wall -type cleanouts. considered as conforming to requirements of these specifications. 4. , packing ad Quarter turn on -off, � P 9 gland and internally Inserted stem. work of other trades and all job conditions. 3. Use only welding type fittings and welding neck flanges. The following exceptions may be used, only as approved by the Mechanical Engineer: 5. 21/2"and larger: "Powell" 150 PSI; flanged ball valve Fig. 4226T with 316 stainless steel (SS) body and 316 55 ball and stem with Teflon seat. 4. The installation of valves, thermometers, gauges, cleanouts, water hammer arrestor access doors or other indicating equipment or specialties G. Each fixture and appliance discharging water into sanitary sewer or building sewer lines shall have a seal trap in connection with a complete venting system so gasses pass freely to atmosphere with no pressure for siphon condition on water seal. a. Join "small" branches into mains with intersection weld, instead of using welding type tee. "Small" shall mean that the branch is one size requiring reading, adjustment, inspection, repairs, removal or replacement shall be conveniently and accessibly located with reference to the less than half the size of the main which it intersects as: 1 1/4" branch into 3" main; 1 1/2" branch Into 4" main; 2" branch into 6" main; 4" D. Globe and Angle Valves finished building. H. Vent entire system to atmosphere. Discharge fourteen inches (14") above roof. Join lines together in fewest practical number before projecting above roof branch into 10" main. 1. Screwed, bronze, composition, 150 PSI SWP; B-22 globe, No. 17 angle. 5. Where wall and ceiling access doors are required for access to plumbing equipment, doors shall be furnished and installed under other sections. (see plans for locations) .Offset vent lines so they will not pierce roof near an edge or valley. b. Use only "Weldolet" of "Threadolet" type of welding fittings for intersection welding of branches to mains. Coordinate this requirement with appropriate section of specifications. I. Use torque wrench to obtain proper tension in cinch bands when using hubless cast iron pipe. Butt ends of pipe against centering flange or coupling. 2. Screwed, bronze, bevel seat and metal disc1 200P51 SWP; B 37 globe, No. 701 angle. 4. Do not make direct welded connections to valves, expansion joints, strainers, apparatus, other equipment; which are intended to be removable. D. Rough -In: Rough -in and final connections shall be provided for equipment furnished under other sections and by the owner in accordance with rough -in J. Grade all soil and waste lines atone quarter inch (1/4") fall per foot, indirection of flow; unless otherwise noted on plans (see plans for other locations) 2.19 MANUFACTURER OF VALVES drawings furnished b others. Future equipment, as noted on the drawings, shall be provided with all required rough -in utilities. 9 Y9 P q 9 5. Brass piping shall have screwed joints for sizes two inches (2"); flanged for two and one half inches (2112")and larger. 2.05 UNIONS A. Valves: "Stockham," "Crane," "Nibco" or "Apollo." E. Before submitting his bid for the work under this division the contractor shall carefully study all drawings and shall make a careful examination of the D. Brazing Option: Brazing of threadless brass pipe to bronze fittings with pre -inserted rings, will be acceptable in place of screwed joints. premises. He shall determine in advance, the methods of installing and connecting the equipment, the means to be provided for getting the equipment into A. Provide unions, screwed or flanged, where indicated and In the following locations: B. All valves shall be the product of manufacturer. place and shall make himself thoroughly familiar with all the requirements of the contract. After award of the contract, no subsequent allowances will be 1. For brazing joints on threadless brass pipe and copper "B" tube, copper tube type "K" and "L," use brazing alloy„ 80% copper, 15% silver, 5% made to the contractor due to the failure to comply with the above requirements or any other conditions affecting the installation and completion of the 1. In by-passes around equipment. phosphorous, which will flow freely at 1300 F; Handy and Harmon "Sil-Fos," or approved equal; use flux and brazing method recommended by C. All valves shall bear name or trademark of manufacturer, working pressure, and direction of flow cast or stamped on valve body. work. 2. In connection to traps, heaters, tanks, pumps and other equipment requiring disconnection for repairs or replacement. Locate between shutoff and manufacturer of brazing alloy. equipment. 2.20 PIPE ISOLATION F. An minor changes in work which have not been installed shall be made b this contractor without additional compensation except changes which Y 9 Y P P 9 3. Where access panels for unions and valves in walls partitions and ceilings are required. Coordinate this requirement with the General Contractor. P P g q q 2. Copper tube type "K" and "L" shall have soldered or sweated joints with solder -joint type or copper fittin s. Flared joints with flare type bronze PP YP 1 1 YP9 1 YP increase or decrease the size of the materials specified or indicated on the drawings. This contractor shall submit an estimate of the cost, or credit for, fittings may be used where approved for specific service. Solder shall be 95-5 or equal. A. Hangers shall be separated from pipe by means of steel encased hair felt padded isolation. such changes he does not consider of a minor nature and shall proceed only upon the written authorization of the Engineer. g P Y P g B. For two Inches (2") and smaller pipe, use screwed unions; for two and one half Inches (21/2") and larger use flanged. 3. Do not make brazed or soldered connections to valves expansion joints strainers apparatus, other units which are intended to be removable. P 1 PP B. Isolator shall be as manufactured b "Lemco-Trisolators" or "Potter Roemer RP Isolators." Submit shop drawings for approval. Y P 9 PP G. Machinery Guards: All moving parts of machinery, such as shaft couplings, belt drives, etc., shall be adequately covered with removable metal guards to C. For steel pipe, use malleable iron unions, 150 PSI SWP for standard pipe and 250 PSI SWP for extra strong pipe, with bronze -to -iron ground joints by protect personnel from possible injury. Guards shall be furnished b the equipment manufacturer and shall comply with applicable requirements of P P P 1 ry• YP Y pp q Grinnell Company, or approved equal; or cast iron flanged unions gasket type by Grinnell Company, Fig 487, or approved equal. E. Screwed Joints: 2.21 PIPING IDENTIFICATION applicable state agencies and OSHA. PART 2 PRODUCTS D. For threaded brass pipe use flanged bronze unions with steel bolts and gasket for 150 PSI SWP, Walworth Company No. 3480, or approved equal; or 1. For screwed joints use red or white lead and oil or approvedpipe-joint com ound; apply only on male threads. 1 PP P PPY Y A. Each individual pipe line concealed or exposed shall be labeled for quick and easy identification as to direction of flow and content of materials carried in p p p q y bronze ground joint unions with octagon ends for 200 PSI SWP, Walworth Company No. 3477, or approved equal. the pipes by method of stenciling. 2. Brass pipe shall have screwed joints, for sizes two inches (2")and under; flanged two and one half (21/2")and over. 2.01 PIPING INSTALLATION 2.06 CONCEAL PIPING: B. Labels shall be installed at each valve, special fittings and at all branch take -offs and twenty feet (20'-0") apart on long runs. 3. Cut pipe, nipples evenly, cut threads clean, remove burrs, ream ends to full inside bore. Cut brass pipe with hack saw rather than with pipe cutter. A. Arranged as shown on the drawings and as required for a complete system. 9 9 q P Y A. Where indicated or specified, conceal piping in building construction. Install such piping in time so as not to delay work of other trades and to allow ample C. Samples of all stenciling for flow and content shall be submitted for approval prior to installation. time for tests and approval; do not cover before test approval is obtained from the Engineer. 4. Do not use Stulson Wrench for making brass pipe joints tight; such pipe, bearing wrench marks, will not be acceptable and shall be replaced at B. Run straight and true to line and as direct as possible. 9 P Contractor's own expense. LETTERS C. Risers shall be plumb. Form right angles on parallel lines with building wall. P 9 9 P 9 B. Run up branches passing through floor or roof into partition; offset above floor close to equipment unit; expose only as much as necessary for final connection. F. Joints of Dissimilar Metals: Provide with "EPCO" dielectric valves isolation couplings of same size as pipe. Domestic Hot Water Supply HW Domestic Cold Water Supply CW D. Kee pipes close to walls and partitions, off -set only where necessary to follow walls, or as directed. p P P P Y ry C. Where furred spaces are indicated, keep pipes as close to structural members as possible so as to require minimum furring. In case of furred beams, G. Pipe Preparation: Soil S Waste W E. Locate groups of pipes parallel to each other. Pipe spacing shall permit application of full insulation and access for servicing valves. obtain approval, from Architect of resulting headroom clearance before installing pipes. PP 9 g P P 1. Pipe shall be carefully cleaned before installation. The ends of threaded pipe shall be reamed out full-size with a long taper reamer so as to be Vent V F. All piping shall be isolated from otherpiping,an art of the building, framing, conduit etc. with one inch 1" strips of hair, felt or pipe isolators. P P 9 Y P 9, g° ( ) P P P D. Access panels: Install where shown and over all concealed valves, cleanouts, isolation unions and any concealed equipment which may require access partially bell -mouthed and perfectly smooth. P Y P Y D. Prior to stenciling, all fuel gas piping shall be provided with one coat of primer paint and one coat of yellow paint. Primer arid paint types as selected by the for operation, maintenance and repair. Panel shall be sized for proper service and be not less than twelve Inches by twelve inches (12" x 12"), furnished Architect. and installed by this contractor. 2. All threads on black steel pipe shall be cut with new clean dies, full thickness of the die and so that no more than two (2) threads are left exposed G. Risers shall not have couplings in runs from one floor outlet to next. on the pipe when the joint is made up in the fitting or valve. 2.22 PLUMBING FIXTURES H. All piping shall be concealed in walls or above ceilings unless otherwise noted. P P 9 9 2.07 PIPES PIERCING WATERPROOFING: 3. Copper, brass pipe and chromed, polished or painted. connections from fixtures shall show no tool marks. Install with approved wrenches. A. All plumbing fixtures shall be as specified on the drawings with connection sizes as indicated on the fixture schedule and/or in the specifications and must I. Street elbows, bushings, and Ion screw fittings not be allowed for on -site buildings. 9 9 9 9 A. For pipes passing through waterproofed floor or roof, provide sleeves and flashing to maintaining watertight condition. Submit details for approval. P P P 9 9 P ' P 9 9 9 PP 4. Thread lubricant shall be used for all threaded joint make-up and shall be applied to the make thread only. Lubrication shall include threaded be furnished and installed in accordance with manufacturer's specifications by this contractor. J. Cleanouts 2.08 CHECK FOR INTERFERENCES WITH OTHER TRADES cleanout plugs. B. Plumbing Fixtures: Accessible plumbing fixtures shall comply with all of the requirements of IMC Section 11 B-6. Heights and location of all fixtures shall be according to IMC 11 B-6. Fixture controls shall comply with IMC Section 116-3. 1. Floor cleanouts, as specified (see plans for size), shall be " -hub and installed into pipe where shown on plans. Floor cleanouts shall be "WYE A. Before installing piping, check architectural, structural, plumbing, electrical and fire protection drawings. Make accurate layout of all piping, including installed elevations. Submit copies of final layout to other trades for coordination with their work so that grouped pipes, conduit, and ducts will not interfere P Y 9 P P P H. Press System: C. Accessible sinks and lavatories shall have Truebro "Law uard" or "Layshield insulations stem for water and waste piping under the sink. Foam wrap and g Y p P g P accessible in all cases and shall be brought to surface on bran branches. with each other, or with full swing doors and will leave minimum headroom as indicated. 9 1. NIBCO® mechanical press copper fittings for use in plumbing or mechanical applications. Available sizes range through 4" in diameter. p PP 9 P 9 pp 9 9 tape will not be acceptable. Product is designed to join ASTM 688 (Types K, L, M) hard drawn copper tube (112" through 4") as well as soft copper tube (112", 3/4" and 1"). 2. Wall cleanouts, as specified (see plans for size), shall be taper thread plugs and installed into pipe where shown on plans. Wall cleanouts shall be B. Coordination of the mechanical piping Is the responsibility of this section. Fittings are approved for installations in both above and below ground applications. Per code, local inspector approval must be obtained prior to D. Interior exposed pipe, valves, and fixture trim shall be chrome plated. accessible in all cases. installation below ground. C. Protect open pipe ends. Keep piping free from scale and dirt. Protect open ends whenever work is suspended during construction to prevent foreign E. The complete installation of each fixture shall include trap and accessories with accessible stop or control valve in each hot and cold water branch supply 3. All cleanouts shall be provided with removable floor or wall plate as hereinbefore specified. bodies enteringand lodging there; use temporary plugs, burlap, or other approved material for protection. 9 9 P ry P 9 P PP P 2. Standards and codes: UPC, UMC, ASME B16.51 performance, International residential code, international mechanical code, international plumbing line. Fixture floor connections shall be made with approved brand of cast Iron floor flange, soldered or caulked secure) to waste pipe. Make joint between PP 9 Y P P 1 code. fixture and floor flange tight with approved fixture setting compound or gaskets. 4. Cleanouts to grade shall be provided with either a traffic rated brass cap or concrete yard box. 2.09 SUPPORTS, HANGERS, FLASHING, AND SEISMIC RESTRAINT 3. Listings and certifications: NSF/ANSI 61, NSF/ANSI 372, ASME B16.51, IAPMO PS-117. F. Polish chrome finish at completion of project. K. Install stops on all hot and cold water fixture supplies, unless integral stops are specified. Supply trim shall have all metal -to -metal connections. A. Pipe Support 4. Operating Parameters: G. Install fixtures and fittings as per local codes and manufacturer's instructions. L. Protect open pipe ends. Keep piping free from scale and dirt; protect open ends whenever work is suspended during construction to prevent foreign 1. All piping shall be supported in such a manner that it is securely attached to the structure of the building. Attachment is to be capable of supporting a. Operating pressure: 200 PSI maximum bodies entering and lodging there; use temporary plugs1 or other approved material for protection. the tributary weight of pipe and contents in any direction. Maximum spacing of support and braces shall be as detailed on drawings. b. Water test pressure: 50 PSI maximum H. Do not use flexible water piping. 2. Support horizontal overhead piping with clevis hangers. Upper end of hanger rod shall be supported from a code approved attachment. See c. Operating temperature: -20F through 25OF M. Bending or mitering of pipe to constitute fittings shall not be permitted. drawings for pipe support details. Submit shop drawings of all piping supports for approval. I. Caulking: Fixtures shall be bedded and caulked along joint at walls, counter tops and other intersecting surfaces with "Polysenseal" distributed by 3. Piping shall be attached to top chord members only of prefabricated roof or floor trusses. Where plywood web trusses occur, pipe support may be 2.14 PIPE FLANGES "Gladding-McBean" or approved equal. 2.02 DOMESTIC HOT AND COLD WATER PIPING SYSTEM secured to additional web stiffeners as shown on plans. A. Flanges of same weight as fittings in same service category; drilled for 150 PSI service. J. Backing for all fixtures indicated on wall shall be one quarter inch by six inches (1/4" x 6") steel) plate; recessed flush with stud face and extending to next A. Mains, risers, branches, connections of sizes and arrangement as indicated on drawings. B. Flashing: Pipes through roof shall be flashed with "Semco" No. 1110-7 steel reinforced boot type, six (6) pound seamless lead flashing with suitable stud beyond fixture on each side. Secure plate top and bottom at each stud and weld three eighths inch (3/8") steel stud bolts to each stud. See fixture counter -flashing sleeve, or as approved by the Architect. Submit shop drawings for approval. B. Screwed flanges shall be cast iron. schedule for type of support required. For wood stud installation, secure backing plate to each stud with three eighths inch by two inch (3/8" x 2") long lag B. Shut-off valves shall be provided in main branches, runs to risers and where indicated on drawings. bolts. Minimum two (2) per stud. C. Seismic Restraint: All piping and equipment shall be suitably restrained and anchored in both horizontal and vertical directions to withstand seismic forces C. Welded flanges shall be steel welding neck type. C. Piping below grade shall be dipped and wrapped with "Hunt's Process" No. HP#6-F. All field joints and fittings shall be double wrapped with "Scotch Wrap" as required by the State of WASHINGTON STATE. See drawings for details. No. 50. In lieu of wrapping, "X-Tru-Coat" steel pipe shall be considered an approved equal. 2.15 GASKETS 2.10 PIPES OVER ELECTRICAL EQUIPMENT D. Joints under concrete slabs, if allowed by local codes, shall be brazed. A. Gaskets for pipe flanges shall be ring type, one sixteenth inch (1/16") thick, of compressed fiber and special compound, suitable for service intended. A. Where pipe joints or valves in cold and hot water lines occur within two feet (2'0") in horizontal direction from electrical panels, or equipment, provide a drip 2.03 SOIL, WASTE, AND VENT PIPING SYSTEMS (CAST IRON PIPING) pan of size which will afford protection. Submit pan size and construction for approval. B. Factory cut for 125 lb. flange size, "Durable Mfg. Co.," Durable Series. A. Mains, risers, branches and connections of sizes and arrangement as indicated on drawings. B. Pans shall be 18 GA. GI sheet, edges turned up two and one half inches (2 1/2") all sides, reinforced with galvanized angles or by rolling edge over one C. Garlock 122. "Garlock Packing Co.," for hot and cold water. quarter of an inch (1/4") diameter galvanized wire. B. All waste, vent sewer and storm lines shall be cast iron soil pipe and fittings and shall conform to ASTM A-888 or ASTM A-74 and the requirements of D. Rubber gaskets for cast iron pipe shall meet the requirements of ASTM A 74-80. CISPI Standard 301 for all pipe and fittings. Pipe and fitting shall be marked with the collective trademark of the Cast Iron Soil Pipe Institute or receive prior approval of the engineer. Refer to section 3.01 for submittal requirements. C. Provide drain with three quarters of an inch (3/4") galvanized flange and galvanized pipe drain to nearest floor sink. 2.16 PIPE SLEEVES, ESCUTCHEONS, COVERS JD 110 James St., Suite 106 C. Cast iron soil and fittings below shall be service weight no hub type. D. Support with galvanized bars or angles, brace to prevent sagging or swaying, as detailed for ductwork. ��1''oF WAshl� Edmonds, WA 98020 pipe grade A. Furnish and set sleeves to accommodate pipes passing through foundations, walls, floors, partitions, roof; provide escutcheons at exposed finished ti O Phone: 425.458.9700 �o 1. Shall be no weight no 2.11 ASTM DESIGNATIONS FOR PIPE AND FITTING MATERIALS surfaces pierced by pipes. �� Fax: 909.890.3770 -hub service using -hub coupling assembly, all stainless steel (#304) coupling. z Email: cads@designwesteng.com A. Pipe, as specified in schedule, shall conform to requirements covered by following ASTM designations: B. Any pipe passing through a wall of a vertical shaft or through a wall of an occupancy separating or floor shall pass through a 16 GA G. I. sleeve. After pipe _ a. One and one half (1 1/2"), two inch (2"), three inch (3"), four inch (4"), diameter coupling shall consist of a three inch (3') wide corrugated has been installed through sleeve, remaining space shall be packed tightly with an inert packing and secured on each side of wall with a 16 GA escutcheon 304 stainless steel shield in conjunction with four (4) stainless steel clamps mounted in series, secured in place by means of a fixed and "floating" eyelet to allow clamp travel during tightening. 1. Copper Tube "B": B-75. 2. Copper Tube "K" "L-: B-88. around pipe. Submit shop drawings for approval. A 6776 o��GISTEg�DESIGN WEST ENGINEERING "), and b five inch inchinchshallconsist inl a cd(1 a four inchmeans and 304 stainless (stainless inch c 3. Cast Iron Waste: A-74 or A-888. 2.17 VALVE TYPES �SSIOIST MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS nor clamps men con conjunction with edof of a fixed in eyelet to allow 1 () P P Y 9 Y 4. Schedule 80 PVC clamp travel during tightening. 5. ABS Waste: D2661-85a A. General: For valve location and installation, refer to "Valves" under "Piping Installation" herein and the drawings. c. All HUSKY Series 4000 couplings, or approved equal, shall be installed using a factory preset torque wrench, set to 80 inch -pounds. B. Fittings, as specified in schedule for various services, shall conform to requirements covered by the following ASTM designations: B. Valve Requirements: Unless otherwise indicated or specified for particular system or individual equipment, following requirements shall apply-- D. Above grade piping and vent line shall be service weight cast iron with no -hub joints. 1. Malleable Iron: A-197. 5. Valves, General: Designed for packing under pressure with valve open or closed. E. Vent piping may be schedule 40 galvanized steel in lieu of item 2.03, C. 2. Bronze, Solder Joint: B-88. F. Cleanouts shall be provided as previously specified and in the following locations: 3. Wrought Copper, Solder Joint: ANSI B16.22, B16.18. 4. ABS: D2661-85a & D3311-82 6. Valves used for throttling of controlling flow: Globe type as indicated; for shut off use butterfly or ball type as indicated. 1. Near bottom of each stack and riser. 2.12 MANUFACTURERS OF PIPE AND FITTINGS 7. Ball valves on all cold water and hot water piping unless otherwise noted. 2. At eve 135 degree change of direction for horizontal line. every 9 9 A. All pipe and fittings shall be "U.S." manufactured. Pipe manufacturer shall be submitted for approval. The following manufacturers shall be acceptable for 8. Valves shall have rating of not less than 125 PSI SWP or as indicated in service schedule. RESERVED FOR BUILDING DEPT STAMP v 0 O O m Ov C:) 0 V) 00 7 ON j J Ln Q rn r14 Ln N 0) V r^ s= -0 0 Ln w o 0 0 o N I- 0 0 �N� O O 41 C) CN I..L MO Co TW V ) L W U z = O O O E 0 W > W V) W O E c w �+ C) ^ ,� W O L C) O W O N co N REVISION SCHEDULE # DESCRIPTION DATE Q FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN KN REVIEWED Si SHEET NAME PLUMBING SPECIFICATIONS SHEET NO. MP-502 22-268 PLUMBING SPECIFICATIONS 2.23 WATER HAMMER ARRESTORS h. It will be assumed that the cost to the contractor of the equipment proposed to be substituted is less than that of the equipment specified in the contract documents; and, if the substitution is approved, the contract price shall be reduced by an amount equal to the savings. A. Piston operated, type K copper barrel, with brass threaded adaptor B. Domestic Water Systems Testing 1. The piston shall provide a permanent mechanical barrier between fluid and pre -load air change. 1. Test each section of the piping system and subject it to a test pressure of 150 psig of water for a duration of 4 hours. 2. The piston shall be equipped with two (2) 0-rings, "Parker Specifications" N741-75, temperature rated 40 OF to 450 OF. Seal lubricant shall be "Dow Corning" Silicone Compound #111 FDA listed as safe for use in potable water systems. a. All tests shall be performed in the presence of the administrative authority for the project. B. Shall be designed to operate under domestic and commercial line pressures and equal to the pipe diameter at the point of installation. 2. Potable water systems shall be disinfected and flushed prior to use by water -chlorination solution and have bacteriological examination made by an approved agency per 2018 UPC sec. 609.9 and as prescribed in awwa c651. methods of cleaning/ disinfecting for new or repair piping as C. The installation shall be made in the vertical or horizontal positions from the source of lock. Shall be installed in the following locations: described in c651 or nfpa 24. 1. All quick closing valves. C. Soil and Waste Systems Testing 2. All valves that close with the flow of fluid. 1. Test each section of the piping system and subject it to a test pressure of 4 psig of compressed air (or 10 ft/hd) for a duration of 15 minutes. D. Normal arrestor operating pressure shall be 35 to 250 Psig; with a maximum surge or spike pressure not to exceed 1500 Psig. a. All tests shall be performed in the presence of the administrative authority for the project. E. Arrestor shall be fully guaranteed in writing by manufacturer for the entire life of the system. D. Dental Gas Testing F. Shall be as manufactured by "Precision Plumbing Products, Inc.," SC Series. Submit shop drawings for approval by the Mechanical Engineer. 1. Initial test shall consist of blow down and leakage tests as required by NFPA 99. 2.24 CLEANOUTS a. After installation of the rough -in portion of the piping system, but before closing of walls, each section of the piping system shall be subjected to a test pressure of one and one-half times the maximum working pressure, but not less than 150 psig, with oil -free dry air or A. Floor: "J.R.Smith" 4023 or 4043 or "turn" 1400-2 or 1440-3 or "Josam" 55000-1-CFC-22-Z or "Josam" 55000-1-SQ-22-Z; with polished nickel bronze nitrogen. Maintain the test pressure until each joint has been examined for leakage by means of an approved leak detection material. non-skid adjustable round or square top. Use carpet clamping type top with carpet marker in carpeted areas. b. After completion of the above test and all leaks have been repaired, the piping system shall be pressure tested at 20 percent above the B. Dry Wall: "J.R.Smith" 4670 or approved equal by "Zurn" or "Josam;" prime coated steel, face or wall type. normal operating pressure and held for a 24 hour period. Leaks shall be coated, repaired and the system until it holds the test pressure for C. All other walls: "J.R.Smith" 4470 or approved equal by"Josam" 58540 or "Zurn" 1470 series with chrome plated cover and screws. Provide "J.R. Smith" the 24 hour period. 4710 or approved equal where wall thickness is inadequate to conceal cleanout. 2. Final tests, purging and analysis shall be performed b an independent medical ass stem testing organization. Final tests shall include: P 9 9 Y P Y P 9 Y 9 9 D. Submit shop drawings and/or catalog cuts for each type for Mechanical Engineer's approval, prior to installation. a. Perform cross connection, alarms stem, color labeling, leakage, supply and valve testing as required b NFPA 99. The plumbing Y 9 9 PPY 9 q Y P 9 2.25 THERMOMETERS contractor shall obtain and present to the Owner a notarized letter of pipeline certification from the equipment manufacturer. This shall confirm that the system is free of crossed connections, that all components perform to the mfr's specifications, and that the system is A. Mercury -filled lens tube type with separable socket. Adjustable, six inch (6") scale shall be 40 deg. F to 240 deg. F range for hot water system with 2 deg. F properly balanced. increments. b. After purging the system, test each terminal outlet using a 0.45 micron filter for evidence of solid particulate contamination. The allowable B. Case, polished, nickel plated or enameled, straight style or angle style case, as required for ease in reading. limit shall be 2 milligrams per cubic meter. C. Installed where shown, and adjacent to each liquid immersion thermostat. Locate accessible and for ease in reading, position thermometers located more c. Test each positive pressure terminal outlet for dewpoint to verify absence of moisture. Dewpoint shall not exceed the dewpoint of the than 6 feet (6) above floor. source nitrogen test gas by more than 2 deg. C. D. Thermometers shall be manufactured by "Palmer" 6016, 6017, 1021; or approved equal in "Taylor," or "Scientific." d. Test all terminal outlets and test the gas source for contaminant levels. E. Submit shop drawings and/or catalog cuts for each type for Mechanical Engineer's approval, prior to installation. 1) Total hydrocarbons such as methane shall not exceed 1 ppm. 2.26 PIPE INSULATION 2) Halogenated hydrocarbons shall not exceed 2 ppm. A. General 3) Carbon monoxide shall not exceed 2 ppm. 1. Furnish and install thermal insulation on clean dry surfaces; after testing, inspection, and approval in strict accordance with these specifications, e. After the final purging of the test gas and introduction of the applicable gas, analyze each positive pressure outlet to confirm delivery of the contract documents and manufacturer' 5 recommendations. proper gas at the proper pressure. 2. All insulation and accessory material shall meet the requirements of flame spread not to exceed 25 and smoke developed not to exceed 50, as 3.02 EQUIPMENT tested by "Procedure ANSI/ASTM-E-84, NFPA 225 or UL 723. 3. Insulation shall be as manufacture by "Manville" or as approved by the Mechanical Engineer, prior to installation. A. Regulation, Operation and Instruction 4. Installation: By skilled appliers directly in the employ of firms with a minimum of five (5) years successful installation experience, specializing in this 1. Lubricate all bearings in accordance with manufacturer's recommendations and instructions. type of work. 2. Check operation of all pumps, fixtures, motors, etc. 5. Pipe Hangers shall be installed outside the insulation. This contractor shall insert a section of cellular glass insulation at the support of a length not 3. Furnish any additional operation, labor, and material that may be required during guarantee period. less than twice pipe diameter. B. Medium Temperature Pipe Insulation 4. The contractor shall, during the guarantee period, and as directed by the owner, make any additional tests, adjustments, etc., that may be required and correct any deficiencies arising from the operation of the system. 1. All piping with hot surfaces shall be insulated. These shall include, but not be limited to the following: 3.03 OPERATING AND MAINTENANCE DATA a. Domestic hot water supply piping. A. Data: Submit to the Architect for approval, prior to acceptance of the installation, complete and at one time. Partial or separate data will not be accepted. Data shall consist of the following- b. Domestic hot water return piping. 1. Manufacturer's Literature: Electronic PDF of manufacturer's instructions for operation and maintenance of all equipment, valves, and controls; 2. Insulation shall be one inch (1") thick for piping 1 1/2" and smaller, and one and one half (1 I/2").thick for piping 2" and larger; with a K factor of 0.23 including replacement parts lists. at 75 -F, high density, white draft bonded to aluminum foil reinforced with fiberglass yarn, "Manville" Micro-Lok with AP jacket or approved equal in C.S.G., or P.P.G. 2. Written Instruction: Typewritten instruction for operation and maintenance of the system composed of Operation Instructions and Maintenance Instruction. Electronic PDF submitted to the Architect for approval. 3. Insulation shall be applied over clean, dry pipe after piping has been tested. Insulation shall be butted together and longitudinal joint closed with white vapor barrier adhesive. Butt strips shall be applied over the circumferential joint and secured with three inch (3") wide self-sealing butt joint 3. Operating instructions shall contain a brief description of the system. Adjustments requiring the technical knowledge of the service agency strips. personnel shall not be included in the operating instructions. 4. Insulate all fittings, flanges, valves and appurtenances with pre -molded one-piece PVC molded fitting covers with factory matched precut insulation 4. Maintenance instructions shall list each item (i.e. plumbing fixtures and equipment) requiring inspection, lubrication, or service and describe the insert, "Manville Zeston" or approved equal. performance of such maintenance. C. Weatherproofing 5. Verbal Instructions: Operating personnel shall be instructed in the operation of the systems in accordance with typewritten instructions. No other verbal instructions shall be given. 1. General: Where insulated piping is exposed outdoors, it shall be covered. This includes all cold water piping exposed to outdoors. 3.04 SPECIAL REQUIREMENTS 2. Cover outdoor exposed insulated piping with 0.016 inch thick corrugated aluminum jacket. A. The manufacturer and/or supplier of all equipment shall certify in writing to the owner that this equipment complies with these specifications. 3. Aluminum jacket shall be secured with aluminum draw bands eighteen inches (18") on center, with longitudinal seam overlapped and positioned to shed water. At circumferential joint, place sealant around one end and overlap adjacent piece two inches (2") and secure with one half inch (1/2") B. All new equipment shall be anchored as required and/or as detailed on drawings. aluminum hand. C. Written Certifications, in a form approved by the Mechanical Engineer, shall be provided by the equipment manufacturer or his authorized representative: 4. Elbows, all valves, flanges, fittings, etc., shall be covered with "GASCO" or equal covers with circumferential joints described above 1. That the equipment and its installation was inspected on the job by the manufacturer and that the equipment is in first-class condition throughout, 2.27 EQUIPMENT IDENTIFICATION was installed in accordance with manufacturer's requirements and recommendations, and that the installation is approved by the manufacturer. A. Control Valves 2. That the equipment is operating in a safe and satisfactory manner and is delivering capacities and performance hereinbefore specified and/or indicated on the drawings. 1. Numbered brass disc attached to each valve for identification. 3. The following shall be certified as described above: All plumbing fixtures and domestic hot water heaters. 2. Valve tag shall be stamped to identify type of service and sequence number (i.e.: HW-I). Submit sample valve tag for approval prior to installation. D. Damage by Leaks: The contractor shall be responsible for all damage to equipment and premises caused by leaks or breaks in piping or equipment for a 3. Valve directory to be provided with operations and maintenance submittals. period of one (1) year after date of final acceptance. PART 3 - EXECUTION E. Unless otherwise directed, and/or specified, and/or indicated; all materials and equipment shall be installed in accordance with the manufacturer's recommendations and instructions. 3.01 SUBMITTALS AND TESTS F. Plumbing equipment shall bear the manufacturer's label or nameplate showing performance characteristics. Identifying size or model number shall be A. Requirements and Submittals given only when not practicable or customary to show otherwise. All valves, pipe, fixtures and fittings shall bear the manufacturer's trademark or identifying markings. 1. Conformation to requirements of Uniform Plumbing Code 2018 Edition, local and/or State codes and/or Ordinances, including the Uniform City and County Building Codes, State County and City Health Department Ordinances, State of WASHINGTON STATE Industrial Accident Commission G. All materials of similar class or service shall be of one manufacturer. Safety Orders. . Plumbing piping layouts as shown on the drawings are subject to modifications, by contractor, without extra cost as required to clear other 2. Apply and pay for all permits, fees, inspections, examinations and tests required by any legally constituted authorities. items of construction. This contractor shall coordinate the work of this section with that of other sections as to avoid interferences by other crafts involved. 3. Contractor shall clearly note on submittals any changes or deviations from that which is specified so that the engineer may readily identify any proposed substitutions. H. Contractor shall visit site prior to bidding and fully acquaint himself with all conditions affecting installation of the proposed system. Failure to do so shall not relieve contractor of responsibility of providing complete, operational, and acceptable system. 4. Submission of Electronic PDF containing certified manufacturer's drawings and cuts of all equipment and specialties within thirty (30) days after Contract is signed. Partial or incomplete submittals will be rejected and will be returned to Contractor for re -submittal. 3.05 COMPLETION a. Submittals shall be in a single Electronic PDF and shall contain a complete list, in index form, of the manufacturer's names, cuts of equipment, performance data, catalog numbers and trade names; as required; to properly identify the materials and equipment to be furnished these A. When the installation is complete and adjustments specified herein are made, the system shall be operated for a period of one week, during which time it shall be demonstrated to the Mechanical Engineer as being completed and operating in conformance with these specifications. M' JO 110 James St., Suite 106 WA Edmonds, Edmonds, WA 98020 under specifications. B. Record drawings locations fixtures, installed be kept for l�O as -built showing and size of all plumbing piping, and equipment as shall up-to-date and available �ti� w Phone: 425.458.9700 (D b. Data submitted for each item shall be properly identified by reference to item number of paragraphs in the specifications and mechanical inspection at all times during construction. These shall be signed by the General Contractor and Plumbing Contractor to certify their accuracy and shall be � Fax: 909.890.3770 drawings' equipment schedule designation. submitted to the owner prior to final acceptance of the work. z Email: cadd@designwesteng.com c. Any deviation from item as specified shall be clearly indicated on the submittal and noted as such. END OF SECTION �6�o� ��c 6776 � DESIGN WEST ENGINEERING d These and drawings specify and for the service emed ohis and nt. nca �'SS.IONAL 1�� MECHANICAL •ELECTRICAL •ENERGY CONSULTANTS efficieate Theent This issnot o preclude tlng anticipated. her products equally as good tractor) shall prepare bid one the basis of the particular equipment and materials specified for the purpose of determining the low bid. e. The awarding of the contract shall constitute a contractual obligation to furnish the specified equipment and materials. f. After the execution of the contract, should the contractor desire to substitute equipment other than that specified in the contract documents, such substitution will be considered for one reason only: The equipment proposed for substitution is superior in construction and efficiency to that specified herein. g. In the event the contractor obtains the Engineer's approval of equipment other than that herein described; he shall, at his own expense, make any changes in the structures, buildings, or piping necessary to accommodate the equipment and shall furnish record drawings to the Engineer. RESERVED FOR BUILDING DEPT STAMP C) 0 Ln 0 C:,M O N ON In 00 a J Q In Q N j N vi ^ r, 0) in `° oLn 3 Lnwd � 0 o NF- J 0 o cNC: 0 0 a1 0 MO co TW VJ L }, 7W L �+ W W 0 0 O - 0 }0 Co 0 0 06 W `'� ' - O �^^♦ W -I.-+ O E co C__ W 0 O L V 0 Cn 0 N M N REVISION SCHEDULE # DESCRIPTION DATE Di FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB No. 22-268 DATE 05/02/2024 DRAWN KIN REVIEWED Si SHEET NAME PLUMBING SPECIFICATIONS CONT. SHEET NO. MP-503 22-268 GENERAL NOTES ABBREVIATIONS POWER LE END AND SYMBOLS GENERAL DEMOLITION NOTES 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE LATEST CODE OF FEDERAL REGULATIONS (CFR), A AMPERE MH MANHOLE / METAL HALIDE SYMBOL DESCRIPTION 1. THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND MAKE THEMSELVES COMPLETELY FAMILIAR WITH THE EXISTING NATIONAL ELECTRICAL CODE EDITION AND ALL APPLICABLE LOCAL CODES AND REGULATIONS. AF AMPERE FRAME RATING (CIRCUIT BREAKER) MLO MAIN LUGS ONLY INSTALLED CONDITIONS. A FIELD SURVEY VERIFICATION IS MANDATORY IN ORDER TO SUBMIT AN ELECTRICAL BID, FAILURE TO DO SO SHALL NOT RELIEVE THIS CONTRACTOR FROM PERFORMING THE WORK OF THIS CONTRACT. 2. ALL WORK IS NEW UNLESS NOTED OTHERWISE. AFC AVAILABLE FAULT CURRENT M/M METER AND MAIN SECTION 200-Y CONDUIT WIRING DESCRIPTION PER FEEDER SCHEDULE ON OTHER PLAN AFF ABOVE FINISHED FLOOR MV MEDIUM VOLTAGE 2. ALL EQUIPMENT OR WORK REQUIRED TO CARRY OUT THE DEMOLITION SCOPE OF WORK IS CONSIDERED TO BE PART 3. ALL PANELS, SWITCHES, ETC. SHALL HAVE SUFFICIENT GUTTER SPACE AND LUGS IN COMPLIANCE TO UL AFG ABOVE FINISHED GRADE NC NORMALLY CLOSED OF THE CONTRACTOR SCOPE OF WORK. NO EXTRAS WILL BE CONSIDERED TO PERFORM THE REQUIRED WORK. REQUIREMENTS TO ACCOMMODATE CONDUCTORS SHOWN. CONCRETE ELECTRICAL PULL BOX WITH LID APPROPRIATE FOR INSTALLATION LOCATION. LID AFU AMPERE FUSE RATING (FUSE) NEC NATIONAL ELECTRICAL CODE ® SHALL BE LABELED "ELECTRICAL" OR "COMM" ACCORDING TO USE. 3. THE CONTRACTOR SHALL OBTAIN WRITTEN PERMISSION FROM THE FACILITY DIRECTOR PRIOR TO THE SCHEDULING OF 4. WHERE WIRE SIZES ARE INDICATED ON PLANS, FOR INDIVIDUAL CIRCUITS, THE WIRE SIZE INDICATED SHALL APPLY TO AIC AMPERE INTERRUPTING CAPACITY NEMA NATIONAL ELECTRICAL MANUFACTURER'S ANY POWER OUTAGE. SUCH PERMISSION MUST BE OBTAINED IN WRITING AND BE GRANTED AT LEAST 7 DAYS PRIOR TO THE COMPLETE CIRCUIT, UNLESS OTHERWISE NOTED. AS AMPERE SWITCH RATING (FUSE) ASSOCIATION SMOKE FIRE DAMPER ANY SCHEDULE SHUT DOWN. THE SHUT DOWN SHALL NOT EXCEED A DURATION OF 4 HOURS. 5. WHERE EXISTING CIRCUITS OR DEVICES ARE DEMOLISHED, MODIFIED, OR REUSED, ENSURE ALL EXISTING AT AMPERE TRIP RATING (CIRCUIT BREAKER) NEW (N) NEW, TO BE FURNISHED AND INSTALLED BY 4. THE CONTRACTOR SHALL NOT STORE ON SITE ANY ITEMS THAT WERE DEMOLISHED FOR ANY EXTENDED PERIOD OF ELECTRICAL UTILIZATION DEVICES TO REMAIN ARE ENERGIZED UPON COMPLETION OF WORK. AWG AMERICAN WIRE GAUGE CONTRACTOR DUCT MOUNTED SMOKE DETECTOR. TIME, WITHOUT THE WRITTEN PERMISSION OF THE CAMPUS FACILITY DIRECTOR. 6. CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF MECHANICAL, PLUMBING AND OTHER EQUIPMENT REQUIRING BCG BARE COPPER GROUND NF NON -FUSED THERMOSTAT SUPPLIED BY MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR SHALL STUB 3/4" 5. ALL ELECTRICAL ITEMS DESIGNATED AS EXISTING TO REMAIN SHALL AS PART OF THIS SCOPE OF WORK BE CLEANED ELECTRICAL CONNECTION PRIOR TO ANY WORK. BKBD BACKBOARD NIC NOT IN CONTRACT O C.O. 6" ABOVE CEILING SPACE, PROVIDE BUSHING AND PULL WIRE. IF INSTALLED IN AREA WITH AND TESTED, TO INSURE PROPER OPERATION. ANY ITEMS THAT FAIL TO PASS THE TEST SHALL BE BROUGHT TO THE BLDG BUILDING N/L NIGHT LIGHT EXPOSED STRUCTURE ABOVE OR HARDLID CEILING, PROVIDE 3/4" C.O. BACK TO ASSOCIATED HVAC ATTENTION OF THE FIELD INSPECTOR AND THE ENGINEER OF RECORD FOR RESOLUTION. 7. CONTRACTOR SHALL EXTEND WIRING FROM ALL JUNCTION BOXES, SWITCHES, ETC. AND MAKE FINAL CONNECTION AS UNIT. REFER TO MECHANICAL DETAILS FOR T-STAT MOUNTING HEIGHT REQUIREMENTS. VERIFY REQUIRED TO ALL BUILDING EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS. gKR BREAKER NO NUMBERNORMALLY OPEN , LOCATIONS WITH HVAC CONTRACTOR PRIOR TO ROUGH IN. 6. THE CONTRACTOR SHALL REMOVE ALL EXISTING SWITCHBOARDS, DISTRIBUTION BOARDS, PANEL BOARDS, LIGHTING C CONDUIT NTS NOT TO SCALE FIXTURES, CONDUITS, WIRES AND OTHER ELECTRICAL APPARATUS DESIGNATED AS EXISTING TO BE REMOVED. 8. LOCATION OF LOCAL WALL SWITCHES ARE SUBJECT TO MODIFICATIONS. AT OR NEAR DOORS, INSTALL SWITCHES ON CB CIRCUIT BREAKER OC ON CENTER CARBON MONOXIDE SENSOR SUPPLIED BY MECHANICAL CONTRACTOR. ELECTRICAL CONTRACTOR DEMOLITION ITEMS, IF NOT REQUIRED TO BE SALVAGED BY OWNER, BECOME THE PROPERTY OF THE CONTRACTOR SIDE OPPOSITE TO DOOR HINGE. VERIFY FINAL HINGE LOCATION IN FIELD PRIOR TO ANY WORK. CO SHALL PROVIDE 3/4" GALVANIZED RIGID CONDUIT WITH PULL STRING BACK TO HEAD END CARBON AND SHALL BE DISPOSED OF IN AN APPROPRIATE MANNER. CKT CIRCUIT OD OUTSIDE DIAMETER MONOXIDE PANEL. REFER TO MECHANICAL DRAWINGS FOR EXACT EQUIPMENT LOCATIONS AND 9. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED. FOLLOW CFSD COMBINATION FIRE SMOKE DAMPER PB PULL BOX WIRING DETAILS. 7. THE CONTRACTOR SHALL REMOVE ALL CONDUITS SERVING DEVICES WHICH ARE DESIGNATED AS EXISTING TO BE DRAWINGS IN LAYING OUT WORK AND CHECK DRAWINGS OR OTHER TRADES RELATING TO WORK TO VERIFY SPACE IN CO CONDUIT ONLY PF POWER FACTOR CEILING MOUNTED PLUG LOAD CONTROLLER. REMOVED, BACK TO THE SOURCE. WHICH WORK WILL BE INSTALLED. MAINTAIN HEADROOM AND MINIMUM CODE REQUIRED WORKING CLEARANCES AT ALL TIMES. CT CURRENT TRANSFORMER PNL PANEL CU COPPER POC POINT OF CONNECTION CONTACT SENSOR FOR HVAC SHUTDOWN. 4S BOX, MOUNTED ABOVE DOOR OR WINDOW, U.O.N. 8. DEMOLITION AND/OR REMOVAL OF ELECTRICAL EQUIPMENT IN AREAS TO BE REMODELED SHALL BE THE 10. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL WALL OUTLET BOXES FOR SWITCHES, BELL/STROBES, FIRE CL CENTERLINE PP POWER POLE F® STUB 3/4" C.O. 6" ABOVE CEILING SPACE. PROVIDE BUSHING AND PULL WIRE. IF INSTALLED IN RESPONSIBILITY OF THE CONTRACTOR. ALARM PULL STATIONS. RECEPTACLES ETC. WITH CABINETS, FURNITURE, EQUIPMENT ETC., TO AVOID CONFLICT. AREA WITH EXPOSED STRUCTURE ABOVE OR HARD LID CEILING, PROVIDE 3/41, C.O. BACK TO 9. WHERE OUTLETS ARE REMOVED IN EXISTING WALL, REMOVE DEVICES, OUTLETS AND WIRING BACK TO PANELBOARD DISC DISCONNECT PWR POWER LOCATION OF ASSOCIATED HVAC THERMOSTAT. OR BACK TO NEAREST OUTLET WITH OTHER EXISTING LOAD TO REMAIN. 11. WHERE ELECTRIC MOTORS OR HEATERS ARE INSTALLED IN HUNG CEILINGS, PROVIDE DISCONNECT SWITCH IN HUNG DSBN DISTRIBUTION SECTION PVC POLYVINYL CHLORIDE CEILING WITHIN REACH FROM ACCESS POINT. DN DOWN QUAD QUADRUPLEX 10. WHERE EXISTING CONDUIT AND CONDUCTORS ARE TO BE REMOVED AND CONDUIT IS INSTALLED IN GROUND OR DWG DRAWING QTY QUANTITY EMBEDDED IN CONCRETE, REMOVE WIRE AND CUT CONDUIT TO BELOW FLOOR, PLUG CONDUIT, PATCH FLOOR AND 12. FURNISH APPROVED EXPANSION FITTINGS WHERE RACEWAY CROSSES BUILDING EXPANSION JOINTS. ABANDON CONDUIT. EA EACH RGS RIGID GALVANIZED STEEL LIGHTING LEGEND AND SYMBOLS 13. FURNISH PULL STRING IN EACH RACEWAY RUN OVER 10' IN LENGTH, IN WHICH PERMANENT WIRING IS NOT INSTALLED. EC ELECTRICAL CONTRACTOR RMC RIGID METALLIC CONDUIT 11. WHERE ELECTRICAL DEVICES ARE TO BE REMOVED, REMOVE ALL CONDUIT AND CONDUCTORS BACK TO SOURCE, TERMINAL CABINETS AND RACKS, PROVIDE BLANK COVER PLATE FOR ABANDONED JUNCTION BOXES. 14. NOT MORE THAN THREE LIGHTING OR CONVENIENCE OUTLET CIRCUITS ARE PERMITTED IN ONE CONDUIT, PROVIDE EGC EQUIPMENT GROUNDING CONDUCTOR RM ROOM SEPARATE CONDUIT FOR EACH HOMERUN INDICATED ON THE DRAWING, UNLESS INDICATED OTHERWISE. EM EMERGENCY RNC RIGID NONMETALLIC CONDUIT 12. PROVIDE BLANK COVER PLATE FOR ALL EMPTY OUTLET BOXES WHERE DEVICES AND/OR CONDUCTORS HAVE BEEN SYMBOL DESCRIPTION EMT ELECTRICAL METALLIC TUBING SHT SHEET REMOVED AS PART OF THIS CONTRACT. 15. PROVIDE PULL BOXES WHEREVER NECESSARY TO FACILITATE PULLING OF CONDUCTORS. COORDINATE LOCATIONS 2'X4' RECESSED LUMINAIRE. FN INDICATES LUMINAIRE TYPE REFER TO LUMINAIRE SCHEDULE, OF BOXES WITH OTHER TRADES TO AVOID CONFLICT. PULL BOXES SHALL BE ACCESSIBLE. THE SIZE OF PULL BOX EPO EMERGENCY POWER OFF SN SOLID NEUTRAL 13. AFTER REMOVAL OF WIREMOLD AND ASSOCIATED FITTINGS, PATCH, REPAIR AND PAINT AFFECTED SURFACES TO SHALL COMPLY WITH N.E.C. REQUIREMENTS. EXIST, (E) EXISTING SPEC SPECIFICATIONS FN 2ab/2AB TYPICAL. SUBSCRIPT tab REFERS TO CIRCUIT AND SWITCH LEG'a' AND'U, SUBSCRIPT 2AB MATCH EXISTING. 16. OUTLET BOXES FOR FIXTURES RECESSED IN HUNG CEILING SHALL BE ACCESSIBLE THROUGH OPENING CREATED BY EXO EXTERNAL OPERABLE DISCONNECT SW SWITCH N/L REFERS TO CIRCUIT AND ZONE DESIGNATION'A' AND'B'. SUBSCRIPT N/L REFERS TO REMOVAL OF FIXTURES. F FUSE SWBD SWITCHBOARD UNSWITCHED LEG. TYPICAL OF ALL LIGHTING. 14. EXISTING CONDUIT CAN BE REUSED PROVIDING IT IS CODE COMPLIANT, IS CHECKED FOR CONTINUITY OF GROUND, CLEAN AND MANDREL, AND DOES NOT INTERFERE WITH NEW CONSTRUCTION. FA FIRE ALARM TIC TIME CLOCK 17. SEE MECHANICAL AND PLUMBING DRAWINGS AND SPECIFICATION FOR ADDITIONAL CONNECTION REQUIREMENTS TO FACP FIRE ALARM CONTROL PANEL TEL TELEPHONE SWITCH, SINGLE POLE 20A. MOUNTED 48" A.F.F. TO TOP OF DEVICE. SUBSCRIPTS INDICATE THE 15. REMOVALS AND REPAIRS TO EXISTING ELECTRICAL WORK REQUIRED TO AVOID CONFLICTS WITH NEW CONSTRUCTION CONTROL PANELS, CONTROL TRANSFORMERS, POWER FOR CONTROL SYSTEM EP AND PE SWITCHES, TIME CLOCKS, FOLLOWING: TO MEET MINIMUM CODE REQUIREMENTS. VALVES, STATS, RELAYS, DUCT SMOKE DETECTOR LOCATIONS, ETC. INDICATED ON CONTROL WIRING DIAGRAMS. FF FINISHED FLOOR TERM TERMINAL ELECTRICAL CONTRACTOR SHALL VERIFY FINAL CONTROL WIRING REQUIREMENTS WITH MECHANICAL AND PLUMBING FG FINISHED GRADE TP TEMPORARY POLE &3ab M - MOTOR RATED K - KEY OPERATED CONTRACTORS PRIOR TO ANY WORK AND PROVIDE ALL NECESSARY DEVICES AND CONNECTIONS AS REQUIRED. FLA FULL LOAD CURRENT TYP TYPICAL 3 - THREE WAY D - DIMMER SWITCH 18. ALL EXTERIOR ELECTRICAL DEVICES AND EQUIPMENT INCLUDING THOSE THAT ARE EXPOSED TO OUTSIDE GEC GROUNDING ELECTRODE CONDUCTOR UGPS UNDERGROUND PULL SECTION 4 - FOUR WAY T - TIMED SWITCH ENVIRONMENT SHALL BE WEATHERPROOF TYPE, NEMA 3R. GEN GENERATOR UL UNDERWRITERS LABORATORY a, b, c, ETC. - DESIGNATES SWITCH -LEGS CONTROLLED AND QUANTITY OF SWITCHES AT EACH 19. NO CONDUIT RUNS SHALL BE ALLOWED IN CONCRETE SLABS. ALL CONDUITS WILL BE PLACED ABOVE ACCESSIBLE GFCI GROUND FAULT CIRCUIT INTERRUPTER UPS UNINTERRUPTIBLE POWER SUPPLY LOCATION. CEILING SPACES UNLESS SPECIFICALLY INDICATED TO BE UNDERGROUND. GFP GROUND FAULT PROTECTION LION UNLESS OTHERWISE NOTED GND GROUND V VOLT, VOLTAGE ® OCCUPANCY SENSOR, DUAL -TECHNOLOGY, SURFACE CEILING MOUNTED. WATT STOPPER NOTE TCONTRACTOR 20. LIGHTING, POWER, TELEPHONE AND COMMUNICATIONS OUTLETS SHALL NOT BE PLACED BACK-TO-BACK. MODEL #DT-300 OR LEVITON MODEL #OSC20-MOW. PROVIDE WITH POWER PACK(S) AS REQUIRED. GRC GALVANIZED RIGID CONDUIT VA VOLT-AMPERE 21. WHERE MORE THAN ONE LIGHT SWITCH OCCURS AT SAME LOCATION, SWITCHES SHALL BE MOUNTED IN A MULTIPLE HD HEAVY DUTY VD VOLTAGE DROP DUAL TECHNOLOGY OCCUPANCY SENSOR, SURFACE WALL MOUNTED 180' U.O.N. LEVITON GANG BOX UNDER A SINGLE COVER PLATE. PLATES WITH MORE THAN (3) LIGHT SWITCHES SHALL BE LABELED TO HOA HAND -OFF -AUTOMATIC VFC VARIABLE FREQUENCY CONTROLLER MODEL #OSSMT-GD (FOR SINGLE POLE SWITCHING) & LEVITON MODEL #OSSMD-GD FOR (DUAL DO NOT SCALE DRAWINGS INDICATE THE LIGHT FIXTURES CONTROLLED. SWITCHING) HP HORSE POWER VFD VARIABLE FREQUENCY DRIVE 22. DISCONNECT SWITCHES SHALL BE MOUNTED ON INDIVIDUAL SUPPORTS, OR OTHERWISE DIRECTLY ON EQUIPMENT, HV HIGH VOLTAGE W WATT PROVIDED NO MODIFICATION TO EQUIPMENT IS NECESSARY. IDF INTERMEDIATE DISTRIBUTION FRAME WH WATT-HOUR CONTRACTOR SHALL VERIFY PLANS AND EXISTING DIMENSIONS AND CONDITIONS ON THE JOB SITE AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK OR BE 23. ALL ELECTRICAL POWER, LIGHTING, TELEPHONE OR SIGNAL WIRING IN FIRE RATED WALL IS TO BE INSTALLED IN A IG ISOLATED/INSULATED GROUND WP WEATHERPROOF RESPONSIBLE FOR THE SAME. METALLIC CONDUIT SYSTEM. ISC SHORT CIRCUIT CURRENT AVAILABLE IN RMS WW WIREWAY SYMMETRICAL AMPERES XP EXPLOSION PROOF POWER LEGEND AND SYMBOLS 24. ALL ELECTRIC MATERIAL SHALL BE LISTED BY "UL" FOR THE TYPE OF APPLICATION AND "UL" LABEL SHALL APPEAR ON ALL ELECTRICAL EQUIPMENT. J-BOX JUNCTION BOX Z IMPEDANCE KCMIL THOUSAND CIRCULAR MILS SYMBOL DESCRIPTION Sheet List Table 25. ALL DISTRIBUTION AND CONTROL EQUIPMENT (SUCH AS CB's, SWITCHES, CONTACTORS, ETC.), TERMINATIONS SHALL KW KILOWATT 4W FOUR -WIRE SHEET NUMBER SHEET TITLE BE FULLY RATED PER UL AS FOLLOWS: KV KILO VOLT 3W THREE -WIRE SUBSCRIPT "A-1"REFERS TO PANEL DESIGNATION WITH CIRCUIT NUMBER. TYPICAL OF ALL a. 100A OR LESS: 60°C OR MORE; KVA KILO VOLT-AMPERE 5S JUNCTION BOX A 1 RECEPTACLE OUTLETS. E-001 ELECTRICAL LEGENDS AND NOTES b. MORE THAN 10OA : 75°C OR MORE. LDC LOCAL DISTRIBUTION CABINET (4 11/16" SQUARED X2 1/8" DEEP) 0DIAMETER, PHASE DUPLEX RECEPTACLE OUTLET, CONVENIENCE. (20 AMPS, 125 VOLTS, GFCI TYPE) WITH E-002 SINGLE LINE DIAGRAM 26. ANY ERRORS, OMISSIONS, OR DESIGN DISCREPANCIES ON PLANS OR SPECIFICATIONS SHALL BE BROUGHT TO THE LDF LOCAL DISTRIBUTION FRAME �t 9v MOUNTING HEIGHT HORIZONTALLY ABOVE COUNTER TOP PER ARCHITECTURAL PLANS OR E-003 PANEL SCHEDULES ATTENTION OF THE ELECTRICAL ENGINEER FOR CLARIFICATION OR CORRECTION PRIOR TO CONSTRUCTION AND LCL LONG CONTINUOUS LOAD # NUMBER APPROVAL. E-100 BUILDING H OVERALL ELECTRICAL FLOOR PLAN PREPARATION OF SUBMITTAL PACKAGES. LFMC LIQUID TIGHT FLEXIBLE METAL CONDUIT oC DEGREE CELSIUS E 201 BUILDING H WORKROOM BATHROOM ELECTRICAL FLOOR PLANS 27. CONDUCTORS SHALL HAVE UNDERWRITER'S LABORATORIES, INC.(UL) LISTED, 600 VOLT INSULATION OF TYPE LSIG LONG, SHORT, INSTANTANEOUS, GROUND RECESSED WALL MOUNTED JUNCTION BOX, WITH COVER, PER NATIONAL ELECTRICAL CODE (NEC) TABLE 314.16(A)/(B), 4" SQUARE DEEP, WITH PLASTER RING. SPECIFIED BELOW OR ELSEWHERE IN THE SPECIFICATIONS. CONDUCTORS SHALL BE COPPER AND LISTED FOR 90 LTG LIGHTING (E) EXISTING DEVICE TO REMAIN E-202 BUILDING H ALL GENDER RESTROOM ELECTRICAL FLOOR PLANS DEGREE APPLICATIONS. LV LOW VOLTAGE (R) REMOVE EXISTING DEVICE AND ASSOCIATED 36" O.C. MFR MANUFACTURER CONDUIT AND WIRE STAINLESS STEEL SURFACE MOUNTED WIREMOLD MOUNTED AT 48" A.F.F. U.O.N. IF POWER AND E-301 ELECTRICAL DETAILS 1. BRANCH CIRCUITS -LIGHTING AND POWER. (RL) REMOVE EXISTING DEVICE AND RELOCATE AS DATA ARE SHOWN, PROVIDE WITH DUAL CHANNEL RACEWAY. WIREMOLD 4000 SERIES. MAX MAXIMUM E-401 ELECTRICAL SPECIFICATIONS a. #10 AWG AND SMALLER, SOLID WIRE TYPE THW OR THHN/THWN-2, THHW(THHN FOR DRY LOCATION ONLY). MCC MOTOR CONTROL CENTER SHOWN ON PLAN b. #8 AWG TO #2 AWG, STRANDED TYPE THW OR THHN/THHW. MIN MINIMUM (NL) NEW LOCATION OF RELOCATED DEVICE MOUNTING HEIGHT FROM FINISHED FLOOR TO BOTTOM LINE OF OUTLET OR EQUIPMENT. FOR c. #1 AWG AND LARGER, STRANDED TYPE XHHW-2. +96" OR T-6" AFF LIGHT FIXTURES, IT IS TO BOTTOM OF FIXTURE. 2. FEEDERS: TYPE THW OR THHN/THWN-2, OR XHHW-2. 28. PROVIDE GREEN INSULATED GROUNDING CONDUCTOR IN EACH RACEWAY INCLUDING CONDUITS, PLUG STRIPS, MOLDED CASE CIRCUIT BREAKER WIREMOLD. SIZE OF GROUNDING SHALL BE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE ARTICLE 250. 29. WIRING METHOD SHALL BE EMT ABOVE GROUND AND MOUNTED IN CONCEALED SPACES AND SCHEDULE-40 PVC FOR UNDERGROUND INSTALLATION. USE RIGID WHEN ENCASED IN CONCRETE OR SUSCEPTIBLE TO DAMAGE. UTILITY COMPANY PULL SECTION LUGS 30. ALL SWITCH LOCATIONS ARE REQUIRED TO HAVE A NEUTRAL CONDUCTOR PROVIDED AT THE SWITCH LOCATION PER GROUNDING CONNECTION TO MAIN BUILDING GROUND SYSTEM U.O.N. NEC 404.2(C). - N 31. UNLESS OTHERWISE INDICATED, SHARING OF NEUTRAL/GROUNDED CONDUCTORS AMONG SINGLE PHASE BRANCH CIRCUITS OF DIFFERENT PHASES INSTALLEDNRACEWAY NOTPERMITTED. PROVIDE DEDICATED G GROUNDING CONNECTION AT SWITCHGEAR/DISTRIBUTION BOARD WITH NEUTRAL BONDING. D P pg 110 James St., Suite 106 �� WA,shl�'Edmonds, WA 98020 NEUTRAL/GCONDUCTOR OR EACHINDIVIDUAL BRANCH CIRCU - ��� Phone:425.458.9700 Fax:909.890.3770 (D 32. BASIS OF ELECTRICAL DESIGN LIMITS VOLTAGE DROP TO 2% FOR FEEDERS AND 3% FOR BRANCH CIRCUITS. ANY M IN -LINE UTILITY COMPANY METER z Email: cadd@designwesteng.com CHANGES MADE IN THE FIELD SHALL LIMIT VOLTAGE DROP TO THESE PERCENTAGES. 54830 ��0�4 DESIGN WEST ENGINEERING 33. BRANCH CIRCUIT CONDUITS SHALL BE CONCEALED IN WALL OR CEILING SPACES. EXPOSED CONDUITS ARE NOT UTILITY METER WITH CIRCUIT TRANSFORMERS (CT'S) METER GISTEgs� ALLOWED WHERE CONCEALED METHODS ARE AVAILABLE. �sSIONAL�� MECHANICAL •ELECTRICAL •ENERGY CONSULTANTS 34. CONTRACTOR SHALL PROVIDE CONDUCTORS AND CONDUITS REQUIRED FOR ALL BRANCH CIRCUITS AND FEEDERS. DETAIL No. (a:SHEET DETAIL REFERENCE FOR CIRCUIT SIZES NOT SHOWN, REFER TO PANEL SCHEDULES FOR CONDUCTOR AND CONDUIT SIZES. No. 35. THE CONTRACTOR SHALL COORDINATE THE WORK WITH OTHER TRADES. ANY COSTS TO INSTALL WORK TO EQUIPMENT EQUIPMENT REFERENCE ACCOMPLISH SAID COORDINATION, WHICH DIFFERS FROM THE WORK AS SHOWN ON THE CONTRACT DOCUMENTS, ID. No. SHALL BE INCURRED BY THE CONTRACTOR. ANY DISCREPANCIES, AMBIGUITIES OR CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE DURING BID TIME FOR CLARIFICATION. ANY SUCH CONFLICTS NOT CLARIFIED PRIOR TO BID SHALL BE SUBJECT TO THE INTERRUPTION OF THE OWNER'S REPRESENTATIVE AT NO ADDITIONAL COST TO THE OWNER. RESERVED FOR BUILDING DEPT STAMP C) 0 1�1 O p m E 0 N rn In 00 ON j Q In Q M N j N M p1 o `° 3 Lnwd � 0 o NF_j 0 o cNc: 0 0 v 0 Of N LL C) 00 L },7 L W 0 0 W.0 O 4-0 co 0 06 W �� VJ O 0 � + V J 0 Qco Q c-_ W 0 O L 0 0 Cn 0 N M N REVISION SCHEDULE # DESCRIPTION DATE Di FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN BZ REVIEWED LM SHEET NAME ELECTRICAL LEGENDS AND NOTES SHEET NO. E-001 22-268 GENERAL NOTES MAIN SWITCHBOARD #1 2500AA UGPS I M I I I 2500A 3P I I L- 2500A 208Y/120V 30 4W 100KAIC. I T 1 2 I (E) (E) 100A 100A N I� T EXISTING INCOMIN �/ POWER UTILITY SERVICE EXISTING SERVICE GROUND N W W J _ H W m N O Lo 0 GV O N 3P I 3P SPARE TIN 4 EXISTING PANEL U 1. REFER TO'GENERAL NOTES' ON ELECTRICAL LEGENDS AND NOTES SHEET FOR WIRING METHODS, MATERIALS, AND REQUIREMENTS. 2. ALL CIRCUIT BREAKERS, PANELBOARDS AND TRANSFORMERS SHALL BE OF THE SAME MANUFACTURER. 3. CONTRACTOR SHALL UPDATE ALL MODIFIED PANEL DIRECTORIES OR CREATE A NEW TYPED DIRECTORY, IF ONE DOES NOT EXIST, IDENTIFYING EACH CIRCUIT AND INSTALLED CIRCUIT LOADS, MOUNTED IN GLASS OR PLASTIC INSIDE DOOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR UPDATING DIRECTORIES TO INDICATE ALL NEW CIRCUITS AND ACTUAL AREA SERVED WHICH IS NOT NECESSARILY THE DESCRIPTION INDICATED ON THE BID DOCUMENTS. USE A COMPUTER OR TYPEWRITER TO CREATE DIRECTORY; HANDWRITTEN DIRECTORIES ARE NOT ACCEPTABLE. 4. EQUIPMENT DATA AND CONFIGURATIONS SHOWN ON THE SINGLE LINE DIAGRAM PROVIDE GENERAL EQUIPMENT INFORMATION. CONTRACTOR SHALL REVIEW ELECTRICAL PLANS AND SPECIFICATIONS TO VERIFY ALL EQUIPMENT ASSOCIATED DESIGN INFORMATION. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY COMPONENTS REQUIRED FOR A COMPLETE AND OPERATIONAL INSTALLATION. ANY DISCREPANCIES BETWEEN DESCRIPTIONS, SPECIFICATIONS, AND EXISTING CONDITIONS ARE TO BE PRESENTED TO THE ENGINEER OF RECORD PRIOR TO COMPLETION OF THE BID PROCESS FOR CLARIFICATION. NO EQUIPMENT SHALL BE ORDERED UNTIL DISCREPANCIES ARE RESOLVED THROUGH A FORMAL RFI PROCESS. 5. GROUND ALL ELECTRICAL EQUIPMENT, BRANCH CIRCUITS, FEEDERS, PANEL AND DISTRIBUTION BOARDS, ELECTRICAL SERVICES, ETC. PER ADOPTED NEC ARTICLES 250. 6. ELECTRICAL CONTRACTOR TO INCLUDE IN BID ALL ASSOCIATED COSTS FOR THIRD PARTY TESTING OF ELECTRICAL EQUIPMENT, GROUND FAULT, CONDUCTORS, ETC. - CONSTRUCTION NOTES 1T PROVIDE NEW CIRCUIT BREAKER IN EXISTING DISTRIBUTION PANEL 3 4 5 6 7 8 9 TO—[ � 11 12 13 BOARD. TYPE TO MATCH EXISTING. AIC RATING TO BE GREATER THAN AVAILABLE FAULT CURRENT. UPDATE PANELBOARD DIRECTORY PER GENERAL NOTE REQUIREMENTS. 175A 125A 175A 225A 300A 300A 300A 200A 100A 100A 3P I 3P I 3P I 3P I 3P I 3P I 3P I 3P I 3P I 3P SPARE SPACE TINC--TIN�C--�•F`TIN�C--�TIN�C--�TIN�C--�TIN�C--�TIN�C--�TIN�C--�TIN�C--� EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL S V T P1 P3 DPH P4 X1 BB T •F`T19--t XISTI9 EXISTING I I EXISTING PANEL PANEL CPH1 CPH2 �OJ �OJ L— ___J L— SINGLE LINE DIAGRAM 11 RD P 110 James St., Suite 106 WAS.hr �y Edmonds, WA 98020 w I� Phone:425.458.9700 Fax: 909.890.3770 Z Email: cadd@designwesteng.com 54830 GISTEg�� DESIGN WEST ENGINEERING �sSIONAL�� MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS RESERVED FOR BUILDING DEPT STAMP C) 0 0 CD M E O N 00 rn N 4�J- =) rn In Q Q N j N ^ M p1 t, o `° 3 Lnwd � 0 0 o N�--U 0 o cN� 0)QEL - 0 0 v 0 � N � O 00 ca M Q },7 L O O 4-0 co v 06O W 0 cI�+ ) 0 E co c—_ W O O L �..� O Cn O N M N REVISION SCHEDULE # DESCRIPTION DATE Di FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN BZ REVIEWED LM SHEET NAME SINGLE LINE DIAGRAM SHEET NO. E-002 22-268 co Q Q Y w N w x w x LU w m N 0 0 v 0 N MOUNTING: SURFACE PANEL VOLTAGE: 208Y1120V3PH 4W FED FROM: PANEL'DPH' CPH1 BUS: 100 A NEMA 1 ( EXISTING) MAIN: 100 A AIC RATING: 22,000 LOCATION: BLDG H FEEDER: EXISTING H d J C.7 Oz a Q w w 4 n Oz DESCRIPTION A B C ¢ J 7 0 o PHASE 0 c> 7 -j a A B C DESCRIPTION 1 COPIERLIBRARY1000 N 1 20 1 A- - 2 20 1 N 1000 COPIER -STAFF LOUNGE 1 1 COMP- LIBRARY 720 N 1 20 3 B- 4 20 1 N 1200 COMP- WORK RM 1 1 REC. -HEALTH/SRO/RECEPTION 1200 N 1 20 5 C 6 3W' 1.40 70 #12 20 1 N 720 RECEPT-WORK RM. TOILET 2 1 COMP- HEALTH, SRO 1200 N 1 20 7 A - - 8 20 1 N 1200 COMP- PRINCIPAL. ASSIST 1 1 COMP ATTENDANCE/RECEPTION 1200 N 1 20 9 B - 10 20 1 N 1080 RECEPT- PRINC. ASSIST. CONF 1 1 COMP- OFFICE H11A 600 N 1 20 ill C 12 20 1 N 600 COMP- CONFERENCE H12D 1 1 COMP - OFFICES H11B.11C 1200 N 1 20 13 A - - 14 20 1 N 1200 COMP -REGISTRAR 1 1 RECEPT - OFFICES 1080 N 1 20 15 B - 16 20 1 N 1200 COMP - CIA CONF 1 1 RECEPT - OFFICES H9C, H9D 1200 N 1 20 17 C 18 20 1 N 1080 RECEPTS CIAICONFIREGIST. 1 1 RECEPT- OFFICES H9C. H9D 720 N 1 20 19 A - - 201 1 20 1 N 830 REF. STAFF LOUNGE 1 1 COMP- OFFICES 119A H9B 1200 N 1 20 1 21 B - 22 20 1 N 1200 DISHWASHER STAFF LOUNGE 1 1 RECEPT -OFFICES H9A H9B 720 N 1 20 23 C 24 20 1 N 100 FI RE ALARM NAC PANEL 1 1 RECEPT- STAFF H13 COUNTER 500 N 1 20 25 A - - 26 20 1 N 300 TERMINAL BOARD 1 1 RECEPT - MIRCROWAVE H13 1200 N 1 20 27 B - 28 20 1 SPARE 1 RECEPT - STAFF H13 COMP. 1000 N 1 20 29 C 30 20 1 SPARE SPARE 1 20 31 A - - 32 20 1 SPARE SPARE 1 20 33 B - 34 20 1 SPARE SPARE 1 20 35 - C 36 20 1 SPARE SPARE 1 20 37 A - - 38 20 3 - TVSS SPARE 1 20 39 B - 40 -- ------ SPARE 1 20 41 C 42 ------ SUBTOTALS 4620 5400 4720 4530 4680 2500 NECICEC LOAD CALC: CONNECTED DEMAND DEMAND DEMAND SUBTOTALS: PHASE NOTES: LOAD TYPE VA FACTOR VA AMPS 9150 VA A 1. EXISTING BREAKER, EXISTING LOAD (L) LIGHTING 0 1.25 0 0 10080 VA B 2. EXISTING BREAKER, MODIFIED LOAD (R) RECEPTACLE 0 NEC 220.44 0 0 7220 VA C (M) MOTOR 0 1.25 0 0 26450 VA TOTAL LARGEST MOTOR 0.25 0 0 84 AMPS (C) CONTINUOUS 0 1.25 0 0 (N) NON -CONTINUOUS 26450 1.00 26450 73 (K) KITCHEN (NEC 220.56) 0 0.65 0 0 (S) SPECIAL DEMAND 0 1.00 0 0 TOTALS 26450 26450 TOTAL AMPS CONNECTED AT 208Y/120V 3PH 4W WITH LCL 73 A MOUNTING: SURFACE PANEL VOLTAGE: 208YI120V 3PH 4W FED PANEL 'DPH' CNEH? BUS- 100 A NEMA MAIN: 100 A Ad RATING: 22,000 LOCATION: UTILITY ROOM FEEDER: EXISTING 0 O Q z o C)0 Z Z o C.7 z Q J O> a 0 z DESCRIPTION A B C a ¢ w J >0 0 o PHASE 0 o w ¢ a A B C DESCRIPTION Z SPARE 1 20 1 A - - 2 314" 0.13 40 #12 20 1 M 120 EF-H-10 2 SPARE 1 20 3 B- 4 20 1 1 SPARE 1 COMP CLASSROOM H16 500 N 1 1 20 5 C 6 1 20 1 1 SPARE 1 COMP HOME ARTS H2O 500 N 1 20 7 A - - 8 20 1 SPARE 1 COMP HOME ARTS H21 500 N 1 20 9 B - 10 20 1 SPARE 1 COMP HOME ARTS H22 500 N 1 20 Ill C 12 20 1 SPARE SPARE 1 20 13 A - - 14 20 1 SPARE SPARE 1 20 15 B - 16 20 1 SPARE SPARE 1 20 17 C 18 20 1 SPARE SPARE 1 20 19 A - - 20 20 1 SPARE SPARE 1 20 1 21 B - 22 20 1 SPARE SPARE 1 20 23 C 24 20 1 SPARE SPARE 1 20 25 A - - 26 20 1 SPARE SPARE 1 20 27 B - 28 20 1 SPARE SPARE 1 20 29 C 30 20 1 TIM SPARE SPARE 1 20 31 A - - 32 20 1 SPARE SPARE 1 20 33 B - 34 20 1 SPARE SPARE 1 20 35 C 36 20 1 SPARE SPARE 1 20 37 A - - 38 20 1 SPARE SPARE 1 20 39 B - 40 20 1 SPARE SPARE I 1 1 20 1 141 C 42 20 1 ISPARE SUBTOTALS 500 500 1000 120 0 0 NEC/CECLOAD CALC: CONNECTED DEMAND DEMAND DEMAND SUBTOTALS: PHASE NOTES: LOAD TYPE VA FACTOR VA AMPS 620 VA A 1. EXISTING LOAD. EXISTING BREAKER (L) LIGHTING 0 1.25 0 0 500 VA B 2. NEW BREAKER, NEW LOAD (R) RECEPTACLE 0 NEC 220.44 0 0 1000 VA C (M) MOTOR 120 1.25 150 0 2120 VA TOTAL LARGEST MOTOR 0.25 0 0 8 1 1 AMPS (C) CONTINUOUS 0 1.25 0 0 (N) NON -CONTINUOUS 2000 1.00 2000 6 (K) KITCHEN (NEC 220.56) 0 0.65 0 0 (S) SPECIAL DEMAND 0 1.00 0 0 TOTALS 2120 2150 TOTAL AMPS CONNECTED AT 208Y1120V 3PH 4W WITH LCL 6 A MOUNTING: SURFACE PANEL VOLTAGE: 20BY1120V 3PH 4W FED FROM: SERVICE SWITCHBOARD 01 DPH BUS: 400 A NEMA: 1 ( EXISTING) MAIN: 400 A All RATING: 22.000 LOCATION: BUILDING H FEEDER: EXISTING o r 0 0' Q x n. x C� z o p Z O Z o x C7 z x a CL Q J 0 a r LU LU 0 z DESCRIPTION A B C a ¢ w J 0 U PHASE 0 U > w ¢ a A B C DESCRIPTION Z 1 PANEL CPH2 1400 C 3 100 1 A- - 2 100 3 C 8817 PANEL CPH1 1 1400 C -- -- 3 B- 4 C 8817 ;------ C .t 8817 ------ 1 WATER HEATER DWH-1 2496 N 2 30 7 A - - 8 30 2 N 2080 WATER HEATER DWH-2 1 N 2 S PAC E 1 FAN COIL UNIT FCU-1 2553 N 3 30 13 A - - 14 60 3 N 4667 KILN 1 2553 4 2553 N -- -- 17 C 18 N 4667 SPACE 19 A - - 20 50 3 N 4460 . FCU-2 1 1 RANGE N 4460 S PAC E ..........I 25 A - - 26 3/4" 0.05 81 #12 20 1 M 23 ......... i EF-1 2 SPACE 27 B - 28 314" 0.83 60 #12 20 1 N 500 L-1 2 SPACE 29 C 30 SPACE SPACE 31 A - - 32 SPACE SPACE 33 B - 34 SPACE SPACE 35 C 36 SPACE SPACE 37 A - - 38 SPACE SPACE 39 B - 401 ISPACE SPACE 41 C 1421 1 ISPACE SUBTOTALS 6449 10449 7953 20046 20523 18083 NECICEC LOAD CALC: CONNECTED DEMAND DEMAND DEMAND SUBTOTALS: PHASE NOTES: LOAD TYPE VA FACTOR VA AMPS 26495 VA A 1. EXI STI NG B REAKER, EXISTING LOAD (L) LIGHTING 0 1.25 0 0 30973 VA B 2.NEW BREAKER, NEW LOAD (R) RECEPTACLE 0 NEC 220.44 0 0 26037 VA C (M) MOTOR 23 1.25 29 0 83505 VA TOTAL LARGEST MOTOR 0.25 0 0 258 1 AMPS (C) CONTINUOUS 30650 1.25 38313 106 (N) NON -CONTINUOUS 52832 1.00 52832 147 (K) KITCHEN (NEC 220.56) 0 0.65 0 0 (S) SPECIAL DEMAND 0 1.00 0 0 TOTALS 83505 91173 TOTAL AMPS CONNECTED AT 208Y1120V 3PH 4W W1TH LCL 253 A D P 110 James St., Suite 106 WAshl� � Edmonds, WA 98020 Phone: 42458.9700 Fax: 909.890.3770 Email: cadd@designwesteng.com t ST Eg��w� 30 548 DESIGN WEST ENGINEERING SIONAL�� MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS 0 v 0 n ^ E O CDn O U 0N00 0 < J Ln Q N V ^ N o 0 cn w o � 0 fV�IJ 0 0 C:N� a1Q._ O O 41 CD f l� CV 1..` MO W Co V J L i Z }+ L cn O OW.0 E co y � >O W vJ O c LU W O L U O O N co N REVISION SCHEDULE # DESCRIPTION DATE Di FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN BZ REVIEWED LM SHEET NAME PANEL SCHEDULES PANEL SCHEDULES 11 I I RESERVED FOR BUILDING DEPT STAMP SHEET NO. E-003 22-268 GENERAL NOTES 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 F n /1— 1 F ❑ ❑ G — — — — — — — — — — -----I — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — I I G ----------------- I ❑ ------------ ❑ ------------ ❑ -------------- ----- I --- --------- J- - - - - - - - - - - - - - - -i- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - -F,7J I ❑ ❑ I I ❑ ❑ ❑ ❑ ____7 -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —�y----- ------------- I F_-1 LIZ I (E) PANEL 'AAA ❑ I L — — — — — — (E) PANEL'CPH1' — — —- (E) PANEL'DPH' (E) PANEL'AA' SECTION 2 PANEL'AA' SECTION 1 - - - - - - - - - - - - L - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - L — — — — — — — — — El(E) I I I I I ----------------- CONSTRUCTION NOTES ° N- - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - ❑ ❑ ❑ - - - - - - - - - - - - - ❑ ❑ - - - - - - -- - - - - - - - - - - - N I ❑ ❑ � o o I o 0 o I ❑❑❑ ❑❑❑❑ ❑ ° --------------------- ❑ 7 1 2 E-202 E-202 Q ------ ----- ----I— 0------------❑--------- -------- -- ----I--- ------------- ❑ ❑ ❑ Q — I I o — — — — — — — _ _ — — — — — — — — — — — — — — — — — — — — — — — T -----i-- I I I U— zn — — — — — 1 - — — — — — — — — — — — — — 0 — — — — — U — — — — — — — — — — — — — — — — — — — — — — — — V 0 a ❑- --1-- 1 2 o w ------ ------ ----------- ----------j I I I — I I — j----------------------- I I I ------------- w I ------------------------Ll I I I Y ------ I ------------------------ — — I ------------ --- Y ----- I I I I ❑ ❑ ❑ I ❑I❑ 110 James St., Suite 106 WASh, Edmonds, WA 98020 Phone:425.458.9700 `Y Fax: 909.890.3770 Do Z Email: cadd@designwesteng.com 54830 ��0 DESIGN WEST ENGINEERING -IST- s �sSIONALMECHANICAL • ELECTRICAL • ENERGY CONSULTANTS NORTH RESERVED FOR BUILDING DEPT STAMP BUILDING H OVERALL ELECTRICAL FLOOR PLAN SCALE: 3/32" = V-0" C) 0 0 CD M E O CV C) CD•a�-� In 00 rn a J Q to Q r14 M L, � c: Ln Iwo � 0 o NF-�i 0 0 cN� 0)Q'- 0 0 v 0 LL C) 00 C� cy) L C U 0 0 0 � 0 co -0 06 W ��v^^ VJ O o a) 0 cI 0 Qco Q c—_ W O 0 L 0 O Cn o N M N REVISION SCHEDULE # DESCRIPTION DATE Di FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN BZ REVIEWED LM SHEET NAME BUILDING H OVERALL ELECTRICAL FLOOR PLAN SHEET NO. E-1 00 22-268 GENERAL NOTES 1. COORDINATE POWER AND DATA DEVICE LOCATIONS, AND DEVICE PLATE COLOR WITH ARCHITECT. 2. REFER TO MECHANICAL AND PLUMBING PLANS FOR THE EXACT LOCATION OF HVAC EQUIPMENT AND ADDITIONAL WIRING REQUIREMENTS. 3. PROVED FLEXIBLE SEAL TYPE CONDUIT FOR CONNECTION TO ALL HVAC EQUIPMENT. 4. PROVIDE 3/4" CONDUIT FOR ELECTRICAL CIRCUITS U.O.N.. 5. CONTRACTOR SHALL PROVIDE CONDUCTORS AND CONDUITS REQUIRED FOR ALL BRANCH CIRCUIT AND FEEDERS FOR CIRCUIT SIZES NOT SHOWN, REFER TO PANEL SCHEDULES FOR CONDUCTOR AND CONDUIT SIZES. 6. EXCEPT FOR THE HOMERUN INDICATION, CONDUIT AND WIRING SHOWN FOR REFERENCE ONLY. IT IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO PROVIDE THE NUMBER OF CONDUCTORS REQUIRED FOR HOT LEGS, NEUTRAL AND GROUNDING AT EACH DEVICE FOR PROPER BRANCH CIRCUITING. 7. ALL 125 AND 250-VOLT, 15- AND 20-AMPERE NONLOCKING TYPE RECEPTACLES SHALL BE LISTED TAMPER RESISTANT RECEPTACLES IN AREAS SPECIFIED IN NEC 406.12. � � 2 2 1 (R)l (R) � O CONSTRUCTION NOTES O PROVIDE PROGRAMMABLE DIGITAL TIMER FOR EXHAUST FAN CONTROL. PROVIDE IN LOCATION AS DIRECTED BY DISTRICT. SET TO OPERATE FAN DURING OCCUPIED HOURS. 2O PROVIDE NEW LED SURFACE MOUNT LIGHT FIXTURE. FIXTURE 1 SPECIFICATION IS AS FOLLOWS: LITHONIA LIGHTING BLWP4 20L ADP GZ10 (E) LP840. 3D PROVIDE NEMA 1 MOTOR RATED SNAP SWITCH FOR NEW EXHAUST FAN. 4O CONTRACTOR SHALL CIRCUIT TRACE EXISTING STORAGE ROOM LIGHTING AND REUSE EXISTING CIRCUIT FOR NEW STAFF RESTROOM AND STORAGE NORTH ROOM LIGHTING. O5 PROVIDE 120V POWER FOR RESTROOM PLUMBING LOW VOLTAGE DEVICES. PLUMBING CONTRACTOR TO PROVIDE LOW VOLTAGE TRANSFORMER TO CONNECT TO PLUMBING DEVICES, ELECTRICAL BUILDING H ENLARGED ELECTRICAL DEMOLITION FLOOR PLAN SCALE: 112"=1'-0" 1 CONTACTOR TO MAKECONNECTION. COORDINATE EXACT AREQUIREMENTS ELLECTRICALLOCATION AND WITHPLUMBINGPRORTO ROUGH -IN. DEMOLITION NOTES ALL GENDER TILT + I CONTRACTOR SHALL REMOVE EXISTING WIREMOLD AS SHOWN. REMOVE O 240 I I STAFF TILT _ _ _ _ _ _ WINDOW DISPLAY EXISTING CONDUIT AND CONDUCTORS BACK TO IT'S SOURCE. CPH1-6 20 22 O2 CONTRACTOR SHALL REMOVE EXISTING LIGHT FIXTURES IN SPACE. REMOVE EXISTING CONDUIT AND CONDUCTORS BACK TO IT'S SOURCE. L DPH-28 E (E) 1 2 4 5 STORAGE ROOM I I I 1 I I 21 I I O I I I 2G I I O I I I I OEF 1 DPH-26 3 I I P I I p,RD P 110 James St., Suite 106 WAShr Edmonds, WA 98020 w I� Phone:425.458.9700 Fax: 909.890.3770 I I C�] Z Email: cadd desi nwesten @ 9 9.com I I (E) �50 F LI 54830 DESIGN WEST ENGINEERING -ISTE- s �sSIONAL�� MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS NORTH RESERVED FOR BUILDING DEPT STAMP BUILDING H ENLARGED ELECTRICAL REMODEL FLOOR PLAN SCALE: 1/2"=1'-0" 2 v 0 T O p m E 0 CV 00 M In a,Q In Q fV � j N M p1 o It�� 3 Lnwd � 0 o r'4F—1 0 0 cN� 0 0 v O LL C) 00 co L },7 L }+ (/) O 0 W.0 o4-0 co 0 06 W O to 4� 0 }, C� 0 0 Q Q co c_ _0 J W O O L V O Cn O N M N F_ REVISION SCHEDULE # DESCRIPTION DATE Q FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN BZ REVIEWED LM SHEET NAME BUILDING H WORKROOM BATHROOM ELECTRICAL FLOOR PLANS SHEET NO. E-201 22-268 GENERAL NOTES 1. COORDINATE POWER AND DATA DEVICE LOCATIONS, AND DEVICE PLATE COLOR WITH ARCHITECT. 2. REFER TO MECHANICAL AND PLUMBING PLANS FOR THE EXACT LOCATION OF HVAC EQUIPMENT AND ADDITIONAL WIRING REQUIREMENTS. 3. PROVED FLEXIBLE SEAL TYPE CONDUIT FOR CONNECTION TO ALL HVAC EQUIPMENT. 4. PROVIDE 3/4" CONDUIT FOR ELECTRICAL CIRCUITS U.O.N.. (R) K� (R) (R) (R) (R) O O O O 5. CONTRACTOR SHALL PROVIDE CONDUCTORS AND CONDUITS REQUIRED FOR ALL BRANCH CIRCUIT AND FEEDERS FOR CIRCUIT SIZES NOT SHOWN, (R) O REFER TO PANEL SCHEDULES FOR CONDUCTOR AND CONDUIT SIZES. 1 (R) 6. EXCEPT FOR THE HOMERUN INDICATION, CONDUIT AND WIRING SHOWN FOR REFERENCE ONLY. IT IS THE RESPONSIBILITY OF THE ELECTRICAL 1 CONTRACTOR TO PROVIDE THE NUMBER OF CONDUCTORS REQUIRED (E) FOR HOT LEGS, NEUTRAL AND GROUNDING AT EACH DEVICE FOR PROPER BRANCH CIRCUITING. 7. ALL 125 AND 250-VOLT, 15- AND 20-AMPERE NONLOCKING TYPE RECEPTACLES SHALL BE LISTED TAMPER RESISTANT RECEPTACLES IN (E) AREAS SPECIFIED IN NEC 406.12. 1 8. COORDINATE LIGHT FIXTURE LOCATIONS AND LIGHT SWITCH LOCATIONS, (E) COLOR, AND STYLE WITH ARCHITECT. 9. WHERE OCCUPANCY SENSORS ARE SHOWN ON PLANS, VERIFY WATTAGE (E) PANEL'ZZ' �� �� �� AND COVERAGE OF PRODUCT PROVIDED IS ADEQUATE FOR SPACE TO BE (E) PANEL'CPH2' u (R) (R) (R) CONTROLLED. COVERAGE IS TO BE ADJUSTED TO AVOID ACCIDENTAL ACTIVATION OUTSIDE OF AREA. VERIFY WIRING REQUIREMENTS TO ADDITIONAL SENSORS, ROOM CONTROLLERS, RELAY PACKS, ETC WITH (E) O O O PRODUCT BEING PROVIDED. OCCUPANCY SENSORS SHALL NOT BE 1 J 10. LOCATED WITHIN FOUR FEET OF ANY HVAC DIFFUSER. PROVIDE NON-SWITCHED'HOT' POWER WIRE TO BATTERY PACK 1 R (R) (R) (R) (R) CHARGING/SENSOR IN FIXTURE. O O O 11. REFER TO LIGHTING CONTROL DETAILS FOR WIRING AND CONDUIT REQUIREMENTS. CONTRACTOR SHALL PROVIDE ALL WIRING AND (R) CONDUITS REQUIRE BY MANUFACTURER TO FIXTURES AND CONTROLS. 12. FINAL MOUNTING LOCATIONS OF ALL OCCUPANCY AND PHOTOCELL DEVICES SHALL COORDINATED WITH MANUFACTURERS RECOMMENDATIONS AND FIELD ADJUSTED WITH REPRESENTATIVE AS NECESSARY. CONSTRUCTION NOTES NORTH 1O CONTRACTOR SHALL REUSE EXISTING LIGHTING CIRCUIT(S) IN SPACE FOR NEW FIXTURES. FIXTURE SPECIFICATION IS AS FOLLOWS: LITHONIA 0 LIGHTING BLWP4 20L ADP GZ10 LP840. SHALL REUSE EXISTING RECEPTACLE CIRCUIT(S)INSPACE BUILDING H ALL GENDER RESTROOM ELECTRICAL DEMOLITION FLOOR PLAN SCALE: 1/4"=1'-0" 1 3O ONTRACTOR R NEW. NOT USED. 4O PROVIDE NEMA R MOTOR RATED SNAP SWITCH FOR NEW EXHAUST FAN. VERIFY EXACT LOCATION AND CONTROL REQUIREMENTS WITH MECHANICAL CONTRACTOR. 5O CONTRACTOR SHALL REUSE EXISTING LIGHTING CIRCUIT(S) IN SPACE FOR NEW FIXTURES. FIXTURE SPECIFICATION IS AS FOLLOWS: GOTHAM LIGHTING EV06 25/07 AR MD MVOLT GZ10. O CONTRACTOR SHALL REUSE EXISTING LIGHTING CIRCUIT IN SPACE FOR NEW FIXTURE, SPECIFICATION IS AS FOLLOWS: LITHONIA LIGHTING 1 OLVTWM LAVS1 O (E) O (TYP.7) O 35 AGT-5 AG 4 AG.3 AG.2 AG-1 29 30 31 32 33 (TYP. 8) 5 2 4 CPH2-2 H O (ON ROOF ABOVE) ® ® DEMOLITION NOTES EXG UTILITY 25 EXISTING CHASE TO REMAIN 6 O CONTRACTOR IS TO DEMO ALL LIGHT FIXTURES AND LIGHTING DEVICES ® IN INDICATED SPACE UNLESS OTHERWISE NOTED. REMOVE CONDUIT (E) PANEL'ZZ' AG-7 AG-8 27 26 AND CONDUCTORS BACK TO SOURCE. (E) PANEL'CPH2' CIRCULATION 36 ® ® O 2 AG-6 28 ga OL 34 (E) �1 T� 110 James St., Suite 106 20 YPA$Edmo��' Phone: ds, WA 0 42 458.9700 Fax: 909.890.3770 � Z Email: cadd@designwesteng.com ��0 54830 DESIGN WEST ENGINEERING GIST- s �sSIONALMECHANICAL • ELECTRICAL • ENERGY CONSULTANTS NORTH RESERVED FOR BUILDING DEPT STAMP BUILDING H ALL GENDER RESTROOM ELECTRICAL REMODEL FLOOR PLAN SCALE: 1/4" = V-0" 2 C) O �n O O m E CV 00 M Ln a,Q < In Q fV j N M p1 n c -tea M E N � -0 3 Enwd0 � 0 o r4 0 0 cN� 0 0 N v 0 CV LL CD CXD cu M L a, o 0 W.0 o4-0 CU 0 06 W �� VJ O U 0 �+ V J 0 Q Q E cu c—_ W 0 O � V 0 Cn 0 N M N REVISION SCHEDULE # DESCRIPTION DATE 0 FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN BZ REVIEWED LM SHEET NAME BUILDING H ALL GENDER RESTROOM ELECTRICAL FLOOR PLANS SHEET NO. E-202 22-268 GENERAL NOTES: 1. FIXTURE SHALL BE'UL' LISTED FOR LOW DENSITY CEILING MOUNTED. CEILING JOIST HANGER BAR JUNCTION BOX 3#12-143" LONG SHEET METAL SCREW TO JOIST (IF REQUIRED) STUD STIRRUPING BLOCKING A GYPBOARD A STUD CEILING BLOCKING JOIST STUD BLOCKING STIRRUPING GYPBOARD O O O 3#12-143" LONG SHEET METAL SCREW A -A SECTION SURFACE MOUNT LIGHT FIXTURE DETAIL 1 -110 - 7 - 4 - 2 P 110 James St., Suite 106 WASh, Edmonds, WA 98020 w I� Phone:425.458.9700 Fax: 909.890.3770 � Z Email: cadd@designwesteng.com 54830 ��0' ��GISTEg�� DESIGN WEST ENGINEERING - s�' �sSIOIST MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS -Jill - 81 5 RESERVED FOR BUILDING DEPT STAMP C) 0 1�1 0 CD M E O N rn In In Q N � j N M p1 `° oLn 3 �nwd � -00 o NF— j 0 0 cN� 0 0 N v 0 O N O 00 C� O -0 Z O W.0 E 0 4-0 co -0 v 06O W to 4� 0 }, C� O O Q Q E co c_ � J W O O � V O Cn O N M N REVISION SCHEDULE # DESCRIPTION DATE 1A FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN BZ REVIEWED LM SHEET NAME ELECTRICAL DETAILS SHEET NO. E-301 22-268 W Q N w w J _ w L m ELECTRICAL SPECIFICATIONS PART 1 GENERAL HEREIN SPECIFIED. SPACE CONDITIONS, INCLUDING HEADROOM CLEARANCES AND INTERFERENCES WITH CEILING COMPONENTS SUCH AS I. ALL ROTATING ELECTRICAL EQUIPMENT SHALL BE SUPPLIED WITH A FLEXIBLE, LIQUID -TIGHT CONDUIT WITH DUCTS, OPENINGS, BEAMS AND PIPING PRIOR TO INSTALLATION. APPROPRIATE SLACK AND SHALL NOT EXCEED THIRTY-SIX (36) INCHES. 1.01 SCOPE OF WORK B. LIGHTING AND POWER CONDUCTORS SHALL BE COPPER, 600 VOLT, TYPE THWN/THHN, NO. 12 MINIMUM UNLESS OTHERWISE NOTED. C. CHECK THE ARCHITECTURAL FINISHES AND, REGARDLESS OF THE CATALOG PREFIXES AND SUFFIXES SHOWN, FURNISH J. ALL POWER WIRING SHALL BE INSTALLED IN CONDUIT. A. WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING ALL LABOR, EQUIPMENT, SUPPLIES, AND MATERIALS, FIXTURES WITH THE PROPER TRIM, FRAMES, SUPPORTS, HANGERS AND OTHER MISCELLANEOUS APPURTENANCES OR UNLESS OTHERWISE SPECIFIED, AND IN PERFORMING ALL OPERATIONS NECESSARY FOR THE INSTALLATION OF A C. CONTROL CONDUCTORS SHALL BE 600V, TYPE THWN/THHN, NO.14 MINIMUM SIZE UNLESS OTHERWISE NOTED. PROPERLY COORDINATE WITH SAID FINISHES. WHERE REQUIRED, FURNISH REINFORCING FOR CEILING CONSTRUCTION COMPLETE AND OPERABLE ELECTRICAL SYSTEM AS REQUIRED BY THESE SPECIFICATIONS AND AS INDICATED ON THE TO SUPPORT THE WEIGHT OF THE FIXTURES. K. TELEPHONE WIRES SHALL BE PLENUM RATED CABLE FOR MOUNTING IN CEILING SPACES WITHOUT CONDUIT UNLESS DRAWINGS. 2.04 FITTINGS OTHERWISE NOTED. D. FIXTURES SHALL BE FREE OF LIGHT LEAKS AND DESIGNED TO PROVIDE SUFFICIENT VENTILATION OF LAMPS AND B. THE CONTRACTOR SHALL EXAMINE ALL DRAWINGS AND SPECIFICATIONS IN A MANNER TO BE FULLY COGNIZANT OF ALL A. CONNECTOR, COUPLING, LOCKNUT, BUSHINGS AND CAPS USED WITH RIGID CONDUIT SHALL BE STEEL, THREADED AND BALLASTS, INCLUDING VENT HOLES WHERE REQUIRED. OUTDOOR FIXTURES WITH VENT HOLES SHALL HAVE WIRE MESH L. ALL WIRES FOR ALL SYSTEMS SHALL BE CONTINUOUS FROM SWITCH TO TERMINAL OR FURTHEST OUTLET. NO JOINTS WORK REQUIRED UNDER THIS SECTION. GALVANIZED. BUSHINGS SHALL BE INSULATED. SCREENS IN THE VENT HOLES. SHALL BE MADE EXCEPT IN PULL, JUNCTION OR OUTLET BOXES, OR IN PANEL OR SWITCHBOARD GUTTERS. C. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS UNLESS OTHERWISE ARRANGED AND B. EMT FITTINGS, CONNECTORS AND COUPLINGS SHALL BE STEEL, ZINC, OR CADMIUM PLATED, COMPRESSION TYPE, WITH E. REPLACE BLEMISHED, DAMAGED OR UNSATISFACTORY FIXTURES AT NO ADDITIONAL COST TO THE OWNER AND IN A M. ALL RECEPTACLE, CONTROL DEVICE, AND SWITCH MOUNTING HEIGHTS SHALL BE COORDINATED WITH ARCHITECTURAL SCHEDULE ALL REQUIRED INSPECTIONS FOR THE EXECUTION OF THE WORK UNDER THIS CONTRACT. INSULATED THROAT. MANNER SATISFACTORY TO THE ARCHITECT. ELEVATIONS PRIOR TO ROUGH -IN. 1.02 GENERAL REQUIREMENTS C. FLEXIBLE STEEL CONDUIT CONNECTORS SHALL BE TWIST -IN -TYPE WITH INSULATED THROAT. THE FINISH SHALL BE ZINC J. LED LIGHT FIXTURES OR CADMIUM PLATING. 3.06 GROUNDING A. WORK DONE UNDER THIS SECTION SHALL COMPLY WITH THE LATEST EDITION OF THE NEC (NATIONAL ELECTRICAL A. GENERAL: CODE), THE WASHINGTON STATE ENERGY CODE (WSEC), THE STATE BUILDING STANDARDS, (OSHA) OCCUPATIONAL D. EMT CONDUIT FITTINGS SHALL BE THE COMPRESSION TYPE; SET SCREW FITTINGS SHALL NOT BE USED. A. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AS INDICATED ON DRAWINGS AND AS REQUIRED BY THE LATEST SAFETY AND HEALTH ADMINISTRATION, AND TO ANY APPLICABLE LOCAL JURISDICTIONAL REQUIREMENTS. IN CASE OF 1. LED LIGHT FIXTURES SHALL BE IN ACCORDANCE WITH IES, NFPA, UL, AS SHOWN ON THE DRAWINGS, AND AS SPECIFIED. EDITION OF APPLICABLE CODES. CONFLICT BETWEEN REQUIREMENT, THE MOST RESTRICTIVE SHALL APPLY. 2.05 JUNCTION AND PULL BOXES 2. LED LIGHT FIXTURES SHALL BE REDUCTION OF HAZARDOUS SUBSTANCES (ROHS)-COMPLIANT. 3. LED DRIVERS SHALL INCLUDE THE FOLLOWING FEATURES UNLESS OTHERWISE INDICATED: B. FURNISH AND INSTALL ALL GROUNDING CONDUCTORS, CONDUIT AND CLAMPS. THE SIZE OF THE GROUNDING 1.03 ELECTRICAL CONTRACTOR'S RESPONSIBILITY A. FOR INTERIOR DRY LOCATIONS, BOXES SHALL BE GALVANIZED ONE-PIECE DRAWN STEEL, KNOCKOUT TYPE WITH a. MINIMUM EFFICIENCY: 85% AT FULL LOAD. CONDUCTORS SHALL BE NOT LESS THAN THAT SPECIFIED IN THE NEC. REMOVABLE, MACHINE SCREW SECURED COVERS. b. MINIMUM OPERATING AMBIENT TEMPERATURE: -20 DEG C. (-4 DEG F.) A. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN A COMPLETE SET OF DRAWINGS AND SPECIFICATIONS. c. INPUT VOLTAGE: 120 - 277V (±10%) AT 60 HZ. C. BUILDING GROUNDING SYSTEM RESISTANCE TO GROUND SHALL NOT EXCEED 25 OHMS. CONTRACTOR SHALL CHECK THE DRAWINGS OF THE OTHER TRADES AND SHALL CAREFULLY READ THE ENTIRE B. ALL BOXES SHALL BE SIZED FOR THE NUMBER AND SIZES OF CONDUCTORS AND CONDUITS ENTERING THE BOX AND SPECIFICATIONS AND DETERMINE HIS RESPONSIBILITIES. EQUIPPED WITH PLASTER RINGS WHERE REQUIRED. d. INTEGRAL SHORT CIRCUIT, OPEN CIRCUIT, AND OVERLOAD PROTECTION. e. POWER FACTOR: >=0.95. D. EACH BRANCH CIRCUIT SHALL BE EQUIPPED WITH CODE SIZE GREEN GROUND, EQUIPMENT WIRE (PER NEC 250-95) B. BEFORE SUBMITTING THE BID, THE ELECTRICAL CONTRACTOR SHALL VISIT THE JOB SITE AND FULLY ACQUAINT 2.06 OUTLET BOXES f. TOTAL HARMONIC DISTORTION: <=20%. (NOT INDICATED ON DRAWINGS) WITHIN THE SAME CONDUIT FOR ALL CIRCUITS OF PANELBOARDS. HIMSELF WITH EXISTING CONDITIONS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL THE EQUIPMENT g. COMPLY WITH FCC 47 CFR PART 15. AND ASSOCIATED WIRING IN SUCH A MANNER AS TO CONFORM WITH THE EXISTING STRUCTURE OF THE BUILDING, A. FOR FIXTURES, BOXES SHALL BE GALVANIZED, ONE-PIECE DRAWN STEEL, KNOCKOUT TYPE EQUIPPED WITH 3/8" 3.07 BRANCH CIRCUITS AVOID OBSTRUCTIONS, AND MEET APPLICABLE CODE REQUIREMENTS. FIXTURE STUDS AND PLASTER RINGS WHERE REQUIRED. 4. LED MODULES SHALL INCLUDE THE FOLLOWING FEATURES UNLESS OTHERWISE INDICATED: A. NO MORE THAN THREE BRANCH CIRCUITS PERMITTED IN ONE CONDUIT UNLESS INDICATED OTHERWISE C. THE INTENT OF THESE DRAWINGS IS TO DESCRIBE A COMPLETE AND OPERABLE SYSTEM. WHERE EXISTING B. FOR CONVENIENCE OUTLETS, WALL SWITCHES, OR OTHER DEVICES, OUTLET BOXES SHALL BE GALVANIZED ONE-PIECE CONDITIONS DIFFER FROM DRAWINGS, ADJUSTMENT SHALL BE MADE AND ALLOWANCES INCLUDED FOR ALL DRAWN STEEL, KNOCKOUT TYPE 4"X4"X1-1/2" MINIMUM. a. COMPLY WITH IES LM-79 AND LM-80 REQUIREMENTS. NECESSARY EQUIPMENT TO COMPLETE ALL PARTS OF THE DRAWINGS AND SPECIFICATIONS. BRING ANY QUESTIONS b. MINIMUM CRI 80 AND COLOR TEMPERATURE 4000K UNLESS OTHERWISE SPECIFIED IN LUMINAIRE SCHEDULE. 3.09 PROTECTION TO THE ARCHITECT OR ENGINEER'S ATTENTION PRIOR TO BIDDING. C. FOR LOCATIONS WHERE STANDARD BOXES ARE NOT SUITABLE, SPECIAL BOXES SHALL BE DESIGNED TO FIT SPACE OR c. MINIMUM RATED LIFE: 50,000 HOURS PER IES L70. MEET OTHER REQUIREMENTS AND SUBMITTED FOR APPROVAL. d. LIGHT OUTPUT LUMENS AS INDICATED IN THE LUMINAIRE SCHEDULE. A. USE ALL MEANS NECESSARY TO PROTECT THE WORK AND MATERIALS FROM LOSS DURING AND AFTER INSTALLATION, D. WHEREVER A DISCREPANCY IN QUANTITY OR SIZE OF CONDUIT, WIRE, EQUIPMENT, DEVICES, CIRCUIT BREAKERS, ETC., AND PROVIDE ADEQUATE AND PROPER STORAGE FACILITIES DURING THE PROGRESS OF THE WORK. PROVIDE FOR ARISES ON THE DRAWING AND/OR SPECIFICATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND 2.07 SWITCHES 2.16 SUPPORTING DEVICES THE SAFETY AND GOOD CONDITION OF ALL WORK UNTIL FINAL ACCEPTANCE OF THE WORK BY THE OWNER. REPLACE INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITION NOTED ON DRAWINGS AND/OR IN ALL DAMAGE OR DEFECTIVE WORK, MATERIAL, AND EQUIPMENT AT NO EXPENSE TO THE OWNER BEFORE REQUESTING SPECIFICATIONS TO ENSURE COMPLETE AND OPERABLE SYSTEMS AS REQUIRED BY THE OWNER AND ENGINEER. A. ALL DEVICES SHALL CONFORM TO NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEMA) STANDARDS AND FINAL ACCEPTANCE. SHALL BE UNDERWRITERS' LABORATORIES, INC., (UL) LISTED AND LABELED AND SHALL BE "SPECIFICATION GRADE," ALL EQUIPMENT CONDUITS SHALL BE SUPPORTED, ANCHORED AND BRACED IN ACCORDANCE WITH THE MOST STRINGENT 1.04 WORK NOT INCLUDED MEETING THE REQUIREMENTS OF FEDERAL SPECIFICATION WS-896-E, FOR SWITCHES. CODES AND REQUIREMENTS. COMPLY WITH CHAPTER 23 OF THE LATEST IBC (INTERNATIONAL BUILDING CODE). 3.10 CLEANING OF EQUIPMENT, MATERIAL, AND PREMISES PART 3 EXECUTION A. CERTAIN LABOR, MATERIALS, OR EQUIPMENT MAY BE FURNISHED UNDER OTHER CONTRACTS BY THE OWNER. WHEN 1. WALL SWITCHES SHALL BE SPECIFICATION COMMERCIAL GRADE (MINIMUM), FULLY ENCLOSED, QUIET -TYPE TUMBLER 3.01 WORKMANSHIP AND COMPLETION OF INSTALLATION SUCH IS THE CASE, THE EXTENT, SOURCE, AND DESCRIPTION OF THESE ITEMS WILL BE INDICATED ON THE DRAWINGS SWITCHES RATED 20 AMPERES, 120/277-VOLT, BAKELITE OR COMPOSITION, BACK AND SIDE WIRED, BUMPER PAD, FULL A. SITE SHALL BE LEFT BROOM CLEAN AFTER COMPLETION OF WORK EACH DAY. UPON COMPLETION OF THE WORK, OR DESCRIBED IN THE SPECIFICATIONS. UNLESS OTHERWISE NOTED, ALL LABOR, MATERIALS AND EQUIPMENT FOR THE RATING FOR INDUCTIVE OR NON -INDUCTIVE LOADS AND INCANDESCENT OR FLUORESCENT LIGHTING LOADS. A. WORKMANSHIP AND NEAT APPEARANCE SHALL BE AS IMPORTANT AS THE ELECTRICAL AND MECHANICAL EFFICIENCY. LEAVE THE PREMISES CLEAN OF ALL DIRT AND DEBRIS. COMPLETE INSTALLATION OF THE ELECTRICAL WORK SHALL BE PROVIDED UNDER THIS SECTION OF THESE DEFECTIVE AND DAMAGED MATERIALS SHALL BE REPLACED OR REPAIRED PRIOR TO FINAL INTERPRETATIONS SPECIFICATIONS. 2. SINGLE POLE SWITCHES: G.E. 59511, HUBBELL #1221, ARROW #1991 OR PASS & SEYMOUR 20AC1. INCLUDED. ANY DEFICIENCY PERTAINING TO EITHER WORKMANSHIP OR MATERIALS FOUND BY THE INSPECTOR SHALL B. ALL EQUIPMENT AND MATERIAL CONNECTED WITH THIS PROJECT SHALL BE INSTALLED COMPLETE, THOROUGHLY BE CORRECTED WITHOUT ADDITIONAL COST TO THE OWNER. CLEANED, AND ALL RESIDUE REMOVED FROM INSIDE SURFACES. EXTERIOR SURFACES OF ALL MATERIAL AND 1.05 SPECIAL REQUIREMENTS 3. THREE-WAY QUIET SWITCHES: G.E. 59531, HUBBELL #1223, ARROW #1993 OR PASS& SEYMOUR 20AC3. EQUIPMENT SHALL BE CLEANED AND DELIVERED IN A PERFECT, UNBLEMISHED CONDITION. A. THE DRAWINGS INDICATE GENERAL ARRANGEMENT OF CIRCUITS, OUTLETS, LOCATIONS OF MOTOR CONTROLLERS 4. WALL SWITCH AND PILOT LIGHTS SHALL BE FLUSH MOUNTED COMBINATION WALL TYPE WITH SWITCH AND PILOT LIGHT B. THE CONTRACTOR SHALL MAINTAIN ON JOB SITE A SET OF THE WORKING DRAWINGS WHICH SHALL BE UPDATED DAILY 3.11 HANDLING OF WIRE AND CABLE WITH DISCONNECTS, PANELBOARDS, CONDUIT ROUTING, AND OTHER WORK. INFORMATION SHOWN ON THE DRAWINGS EQUIPPED WITH A 6-WATT, 125-VOLT CANDELABRA BASE LAMP. THE PILOT LIGHT SHALL HAVE A GREEN JEWEL WITH IN DETAIL FOR WORK ACCOMPLISHED. UPON COMPLETION OF THE WORK, A SET OF REPRODUCIBLE CONTRACT IS ESSENTIALLY DIAGRAMMATIC; HOWEVER, RECIRCUITING OR RELOCATING ELECTRICAL EQUIPMENT WILL NOT BE BRASS RIM FLUSH MOUNTED IN THE WALL PLATE. DRAWINGS SHALL BE OBTAINED FROM THE GENERAL CONTRACTOR AND ALL CHANGES AS NOTED ON THE RECORD SET PERMITTED WITHOUT SPECIFIC WRITTEN APPROVAL OF THE ENGINEER. OF PRINTS SHALL BE INCORPORATED THEREON WITH RED INK IN A NEAT, LEGIBLE, UNDERSTANDABLE AND A. HANDLE WIRE AND CABLE SO AS TO AVOID DAMAGE TO CONDUCTORS AND TAKE EVERY PRECAUTION TO AVOID SHARP 5. ALL SWITCHES SHALL BE OF THE SAME MANUFACTURE. PROFESSIONAL MANNER. BENDING OR SCORING OF THE CABLE. CABLE SHALL NOT BE LAID NOR DRAGGED UPON THE GROUND. 1.06 SUBMITTALS 6. NORMAL SWITCH COLOR IS WHITE APPROVED BY ARCHITECT/OWNER. SWITCHES CONTROLLING CIRCUITS CONNECTED C. ALL EQUIPMENT AND MATERIAL CONNECTED WITH THIS PROJECT SHALL BE INSTALLED COMPLETE, THOROUGHLY REQUIRED TO REMOVE AND REPLACE AT HIS OWN EXPENSE ALL WIRE AND CABLE B. THE CONTRACTOR SHALL BE RE Q A. AFTER AWARD OF THE CONTRACT AND BEFORE ANY MATERIALS ARE DELIVERED TO THE JOB SITE, A COMPLETE LIST TO EMERGENCY POWER SOURCE SHALL BE RED. CLEANED, AND ALL RESIDUE REMOVED FROM INSIDE SURFACES. EXTERIOR SURFACES OF ALL MATERIAL AND DAMAGED DUE TO IMPROPER HANDLING, AND SHALL PAY FOR THE NEW WIRE OR CABLE. OF ALL MATERIALS PROPOSED TO BE FURNISHED AND INSTALLED UNDER THIS SECTION MUST BE PROVIDED. EQUIPMENT SHALL BE CLEANED AND DELIVERED IN A PERFECT, UNBLEMISHED CONDITION. 7. 30 AMP MOTOR RATED SNAP SWITCHES SHALL BE LEVITON MS302-DS. PROVIDED IN NEMA 1 OR 3R ENCLOSURE AS 3.12 TESTING AND INSPECTIONS B. SUBMIT TO THE ENGINEER FOR APPROVAL ONE PRINT AND ONE REPRODUCIBLE OF ALL LIGHTING FIXTURES, SHOWN ON DRAWING. D. UPON COMPLETION OF THE INSTALLATION AND AS A CONDITION OF ITS ACCEPTANCE FURNISH ONE COPY OF THE FINAL SWITCHGEAR, PANELBOARDS, MOTOR CONTROL CENTERS, TRANSFORMERS, AND MOTOR STARTERS. SHOP DRAWINGS INSPECTION CERTIFICATE TO THE OWNER. A. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND ARRANGE ALL REQUIRED INSPECTIONS SHALL INCLUDE MANUFACTURER'S PRINTED INFORMATION FOR EACH OF THESE ITEMS IDENTIFIED ON THE DRAWINGS. B. SENSOR SWITCH (MOTION SENSOR) FOR THE EXECUTION OF THE WORK UNDER THIS CONTRACT. THE INFORMATION SHALL INCLUDE, AS MINIMUM, OVERALL DIMENSIONS, WEIGHT, PHASE, VOLTAGE RATINGS, WIRING 3.02 PREPARATION COORDINATION. DIAGRAMS, AND NAMEPLATE DATA. 1. WALL SENSOR SWITCH SHALL BE WATT STOPPER DUAL TECHNOLOGY OCCUPANCY SENSOR LEVITON MODEL #OSSMT-GD (FOR SINGLE POLE SWITCHING) & LEVITON MODEL #OSSMD-GD FOR (DUAL SWITCHING). B. THE CONTRACTOR SHALL REPLACE ALL DAMAGED OR DEFECTIVE EQUIPMENT OR WORK. 1.07 STANDARDS AND MATERIALS A. THE CONTRACTOR SHALL COORDINATE THIS WORK WITH ALL OTHER CONTRACTORS FURNISHING LABOR, MATERIALS 2. CEILING SENSOR SWITCH SHALL BE WATT STOPPER DUAL -TECHNOLOGY MODE. AND WORK, SO THAT THE WORK AS WHOLE SHALL BE EXECUTED AND COMPLETED WITHOUT CONFLICT OR DELAY. C. ALL CIRCUITS SHALL BE TESTED FOR CONTINUITY AND CIRCUIT INTEGRITY BY THE CONTRACTOR. ADJUSTMENTS A. ALL MATERIALS SHALL CONFORM WITH THE CURRENT APPLICABLE INDUSTRY STANDARDS, NEMA (NATIONAL SHALL BE MADE FOR CIRCUITS NOT COMPLYING WITH TESTING CRITERIA. ELECTRICAL MANUFACTURER'S ASSOCIATION), ANSI (AMERICAN NATIONAL STANDARDS INSTITUTE), IPCEA (INSULATED 3. PROVIDE 120/277V CEILING SENSOR POWER PACK INSTALLED IN J-BOX NEXT TO LIGHTING CIRCUIT. B. EXAMINE THE DRAWINGS AND SPECIFICATIONS AND DETERMINE THE WORK TO BE PERFORMED BY THE ELECTRICAL, POWER CABLE ENGINEERS ASSOCIATION), IEEE (INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS), NATIONAL MECHANICAL AND OTHER TRADES. PROVIDE THE TYPE AND AMOUNT OF ELECTRICAL MATERIALS AND EQUIPMENT D. THE CONTRACTOR SHALL FURNISH ALL INSTRUMENTS AND PERFORM ANY ADDITIONAL TESTS REQUIRED BY THE ELECTRICAL SAFETY CODE. 2.08 RECEPTACLES NECESSARY TO PLACE THIS WORK IN PROPER OPERATION, COMPLETELY WIRED TESTED AND READY FOR USE. THIS AUTHORITY HAVING JURISDICTION. CONTRACTOR SHALL ALSO CORRECT ALL FAILURES AND REPLACE ANY DAMAGED SHALL INCLUDE ALL CONDUIT, WIRE, DISCONNECTS, RELAYS, AND OTHER DEVICES FOR THE REQUIRED OPERATION PORTIONS OF THE WORK RESULTING FROM THOSE TESTS. THE COST OF THE FOREGOING ITEMS SHALL BE PAID BY THE B. UNLESS OTHERWISE INDICATED, ALL MATERIALS SHALL BE UNDERWRITERS LABORATORIES LISTED AND LABELED, OR A. DUPLEX RECEPTACLES SHALL BE SPECIFICATION GRADE, 20 AMPS, 125 VOLTS, 3-WIRE, SIDE -WIRED WITH BINDING SEQUENCE OF ALL ELECTRICAL, MECHANICAL, AND OTHER SYSTEMS OR EQUIPMENT. CONTRACTOR. CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY. SCREWS, PARALLEL SLOTS, U-GROUND, PLASTER EARS AND CAPTIVE MOUNTING SCREWS. BODY SHALL BE PHENOLIC, PLASTIC, OR BAKELITE. RECEPTACLES SHALL BE HEAVY-DUTY, 3-BLADE CURRENT CARRYING CONTACT AND C. PERFORM ALL WORK IN A MANNER WHICH WILL NOT CAUSE UNNECESSARY INCONVENIENCE OR DANGER TO THE E. CONTRACT DRAWINGS AND SPECIFICATIONS, GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND C. WORKMANSHIP AND NEAT APPEARANCE SHALL BE AS IMPORTANT AS THE ELECTRICAL MECHANICAL EFFICIENCY. DOUBLEWIDE FLAT BLADE GROUND CONTACTS. PROVIDE ARROW HART 5242-1 HUBBELL 5242-1 OR LEVITON 5242-1. OCCUPANTS, NOR INTERFERE WITH THE ACTIVITIES IN THE BUILDING. SUPPLEMENTARY CONDITIONS, ELECTRICAL PROVISIONS AND DIVISION-1 SPECIFICATION SECTIONS APPLY TO WORK OF DEFECTIVE AND DAMAGED MATERIALS SHALL BE REPLACED OR REPAIRED PRIOR TO FINAL APPROVAL AND INSTALL GROUND PIN DOWN. ACCEPTANCE. THE DRAWINGS AND SPECIFICATIONS TAKE PRECEDENCE WHEN THEY ARE MORE STRINGENT THAN THIS SECTION. CODES, STATUTES, OR ORDINANCES IN EFFECT. APPLICABLE CODES, STANDARDS, ORDINANCES, AND STATUTES TAKE 2.09 DEVICE PLATES D. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE EACH POWER INTERRUPTION WITH OWNER, AND SHALL PRECEDENCE WHEN THEY ARE MORE STRINGENT OR CONFLICT WITH THE DRAWINGS OR SPECIFICATIONS. PROVIDE AT LEAST TWO WEEKS NOTICE OF PROPOSED INTERRUPTION AND WORK TO BE ACCOMPLISHED. 1. PROVIDE PLATES FOR ALL SWITCHES, RECEPTACLES, JUNCTION BOXES, TELEPHONE AND OTHER OUTLETS. 1.08 DELIVERY AND STORAGE OF MATERIALS 3.04 CORE CUTTING, DRILLING, AND PATCHING 2. PROVIDE ENGRAVED OR ETCHED PLATES FOR ALL LOCK SWITCHES, PILOT SWITCHES, SWITCHES FROM WHICH A. THE CONTRACTOR SHALL INVESTIGATE EACH SPACE IN THE BUILDING THROUGH WHICH EQUIPMENT MUST PASS TO EQUIPMENT OR CIRCUIT CONTROLLED CANNOT BE READILY SEEN, THREE OR MORE SWITCHES UNDER A COMMON A. NO HOLES WILL BE ALLOWED IN ANY STRUCTURAL MEMBERS WITHOUT THE WRITTEN APPROVAL OF THE ARCHITECT OR REACH ITS FINAL LOCATIONS. IF NECESSARY, THE MANUFACTURER SHALL BE REQUIRED TO SHIP HIS MATERIAL IN PLATE AND FOR SWITCHES AS INDICATED. STRUCTURAL ENGINEER AND GENERAL CONTRACTOR. SECTIONS, SIZED TO PERMIT PASSING THROUGH SUCH RESTRICTED AREAS IN THE BUILDING. 3. STAINLESS STEEL PLATES SHALL BE AMERICAN IRON AND STEEL INSTITUTE (AISI) TYPE 302, WITH BEVELED EDGES, B. THE CONTRACTOR SHALL RETAIN IN HIS POSSESSION AND SHALL BE RESPONSIBLE FOR ALL PORTABLE AND 0.040" THICK WITH SATIN SMOOTH FINISH. "SMOOTHIE," HUBBELL #97071 SERIES. 3.05 INSTALLATION DETACHABLE PARTS OF PORTIONS OF INSTALLATIONS SUCH AS FUSES, KEY LOCKS, ADAPTERS, BLOCKING CLIPS, AND INSERTS UNTIL FINAL COMPLETION OF WORK. THESE PARTS SHALL BE DELIVERED TO THE OWNER UPON COMPLETION 4. PLASTIC COVER PLATE SHALL BE HIGH IMPACT THERMOPLASTIC, HIGH STRENGTH, SCRATCH -RESISTANT, SMOOTH AND A. WORKMANSHIP IS TO BE NEAT, BY EXPERIENCED WORKMEN WITH ADEQUATE SUPERVISION, AND IN LINE WITH NORMAL OF THE WORK. SELF -EXTINGUISHING, HUBBELL "PI" SERIES OR PASS & SEYMOUR RP SERIES. INDUSTRY WORK PRACTICES. PART 2 PRODUCTS 5. WHERE OUTLETS ARE INDICATED TO BE WEATHERPROOF, PROVIDE AN AISI TYPE 302 STAINLESS WITH DOUBLE HINGED B. MAINTAIN WORKING CLEARANCE AROUND ELECTRICAL EQUIPMENT, IN ACCORDANCE WITH CODE REQUIREMENTS AS A COVERS, PASS & SEYMOUR #WPD-8. MINIMUM. 2.01 EQUIPMENT AND MATERIALS 6. GALVANIZED STEEL PLATES SHALL BE SQUARE OR RECTANGULAR AND HOT DIPPED GALVANIZED OR SHERARDIZED, A. ALL MATERIALS FURNISHED AND INSTALLED UNDER THIS CONTRACT SHALL BE NEW, FREE FROM DEFECTS, AND SHALL BEVELED EDGES AND 0.040" THICK. GALVANIZED STEEL PLATES SHALL BE USED IN UTILITY AREA. C. WHERE LIGHTING FIXTURES AND OTHER ELECTRICAL ITEMS ARE SHOWN IN CONFLICT WITH LOCATIONS OF STRUCTURAL MEMBERS AND MECHANICAL OR OTHER EQUIPMENT, FURNISH AND INSTALL ALL REQUIRED SUPPORTS BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE OF THE WORK. SHOULD ANY TROUBLE AND WIRING TO CLEAR THE ENCROACHMENT. DEVELOP DURING THEIR PERIOD DUE TO DEFECTIVE MATERIALS OR FAULTY WORKMANSHIP, THE CONTRACTOR SHALL 7. PROVIDE PLATES EQUIPPED WITH CLOSE FITTING OPENINGS FOR THE EXACT DEVICE TO BE USED. PROVIDE PLATES FURNISH ALL NECESSARY MATERIALS AND LABOR TO CORRECT THE TROUBLE WITHOUT ANY COST TO THE OWNER. FOR TELEPHONE OUTLETS EQUIPPED WITH BUSHED OPENINGS. ANY DEFECTIVE MATERIAL OR INFERIOR WORKMANSHIP NOTED AT THE TIME OF INSTALLATION SHALL BE CORRECTED D. VERIFY LOCATION OF EACH OUTLET FOR POWER, SIGNAL, TELEPHONE/DATA, AND EACH LIGHTING FIXTURE WITH IMMEDIATELY TO THE SATISFACTION OF THE OWNER. 8. 9. REFER TO SECTION 3.08 FOR LABELING OF PLATES. COVER PLATES ON PRESSED STEEL OUTLET BOXES IN FURRED AREAS, ATTICS, ETC., OR EXPOSED IN MECHANICAL ARCHITECT PRIOR TO ROUGH -IN. INCLUDE IN BID COST OF RELOCATING EACH ITEM WITHIN TEN -FEET RADIUS OF ITS INDICATED LOCATION. �,gD P 110 James St., Suite 106 OF WAS, Edmonds, WA 98020Phone:425.458.9700 B. ALL MAJOR EQUIPMENT COMPONENTS SHALL HAVE THE MANUFACTURER'S NAME, ADDRESS, MODEL NUMBER, AND �O �� SERIAL NUMBER PERMANENTLY ATTACHED IN A CONSPICUOUS MANNER. EQUIPMENT ROOMS SHALL BE OF THE SAME MATERIAL AS THE OUTLET BOX. E. ALL CONDUIT TO BE RUN CONCEALED UNLESS OTHERWISE NOTED. ALL CONDUITS SHALL BE ROUTED OVERHEAD IN `�' Fax:909.890.3770 CEILING SPACES. NO CONDUITS SHALL BE PERMITTED IN CONCRETE SLAB, MASONRY WALLS UNLESS SPECIFICALLY SO C-0 z(D Email: cadd@designwesteng.com 2.02 CONDUIT 10. COVER PLATES IN LOCATIONS CONCEALED FROM PUBLIC VIEW SHALL HAVE THE CIRCUIT NUMBERS AND SOURCE INDICATED. CONDUIT SHALL BE RUN SO AS NOT TO INTERFERE WITH OTHER PIPING FIXTURES OR EQUIPMENT. FEED POINT HAND LABELED WITH MARKING BLACK PEN (PERMANENT MARKER). SEE SECTION 3.08 FOR LABELING. � 54830 ���' ��GISTEg'sDESIGN WEST ENGINEERING A. PROVIDE RACEWAYS AS INDICATED ON THE DRAWINGS AND AS HEREIN SPECIFIED. CONDUITS SHALL BE RIGID STEEL F. WHERE ALLOWED, EXPOSED CONDUIT RUNS SHALL BE INSTALLED PARALLEL OR PERPENDICULAR TO WALLS, �'SS. "GRC" THICK WALL GALVANIZED; ELECTRICAL METALLIC TUBING "EMT" THIN WALL); FLEXIBLE STEEL, GALVANIZED; ( ) () 11. PROVIDE PLASTIC COVER PLATES UNLESS NOTED OTHERWISE STRUCTURAL MEMBERS, OR INTERSECTION OF VERTICAL PLANES AND CEILINGS. G� MECHANICAL • ELECTRICAL • ENERGY CONSULTANTS IDNA L LIQUID -TIGHT, FLEXIBLE STEEL CONDUIT WITH GROUND BOND; ALUMINUM CONDUIT; OR SCHEDULE 40 PVC. B. ALL EMPTY CONDUITS (CO) SHALL BE SCHEDULE 40 PVC UNLESS OTHERWISE INDICATED ON THE DRAWING. 2.11 INTERIOR LIGHTING FIXTURES G. ALL ELECTRICAL CONDUITS AND OTHER ELECTRICAL RACEWAYS PASSING THROUGH FIRE RATED CEILINGS, SLABS, CABLE TRAYS, WALLS AND PARTITIONS SHALL BE SEALED TO PREVENT THE SPREAD OF FIRE, SMOKE, AND GASSES. C. WHERE CONDUIT CROSSES AN EXPANSION JOINT, PROVIDE APPROVED FITTINGS WHICH ALLOW DEFLECTIONS A. FURNISH, INSTALL AND WIRE LIGHTING FIXTURES SCHEDULED OR INDICATED BY TYPE DESIGNATION ON THE DRAWINGS. USE A UL LISTED AND APPROVED FIRE -STOP MATERIAL EQUAL TO RATING OF A WALL OR A FLOOR SLAB PENETRATED; EQUIVALENT TO TWICE THE MOVEMENT ALLOWED BY THE DESIGN. IF TYPE DESIGNATION IS OMITTED, FIXTURES SHALL BE OF THE SAME TYPE AS SHOWN FOR ROOMS OF SIMILAR USAGE. INSTALLATION OF FIRE -STOP MATERIAL SHALL BE IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. VERIFY BEFORE PURCHASE AND INSTALLATION. NO ALTERNATIVE FIXTURES WILL BE ACCEPTED. 2.03 CONDUCTORS H. UNLESS WRITTEN PERMISSION IS GRANTED BY THE ARCHITECT, NO MATERIAL SHALL BE MOUNTED ON THE EXTERIOR B. LOCATIONS OF FIXTURES ON ELECTRICAL DRAWINGS ARE DIAGRAMMATIC. VERIFY LOCATION AND SPACING WITH WALLS OR PARAPET TOP OF THE BUILDING. A. PROVIDE A COMPLETE SYSTEM OF CONDUCTORS IN RACEWAY SYSTEMS AS SHOWN ON THE DRAWINGS AND THEN ARCHITECTURAL REFLECTED CEILING PLANS AND OTHER REFERENCE DATA BEFORE PURCHASING. COORDINATE RESERVED FOR BUILDING DEPT STAMP C) 0 O p m E 0 N rn vi Q In Q N M `° orQ 3 Lnwd � 0 OL 0 o cN� 0)Q'- 0 0 v 0 N f1 LL 00 Co L _U 7 L W 0 O O E co 0 c � W ��0 V J %4- O = 3: 0 V �+ J O Q Q co c- C:)W O L 0 O Cn O N M N REVISION SCHEDULE # DESCRIPTION DATE Di FIXTURE CHANGE 4/5/24 RECEIVED Jul 08 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT JOB NO. 22-268 DATE 05/02/2024 DRAWN BZ REVIEWED LM SHEET NAME ELECTRICAL SPECIFICATIONS SHEET NO. E-401 22-268