APPROVED BLD BLD2024-0194+Plumbing_Plan+2.13.2024_12.33.51_PM+4057032GENERAL NOTES - FLOOR PLAN
A B C T
T
T
G
FLOOR PLAN - LEVEL 02 0 4' 8'
16'
1 N
1. PATCH AND REPAIR EXISTING GWB AS REQUIRED AND PREPARE SURFACE TO ACCEPT NEW FINISH
2. REPAIR FLOOR SUBSTRATE AS REQUIRED FOR NEW FINISHES
3. PATCH AND REPAIR EXISTING TO REMAIN RELITE FRAMES THROUGHOUT
4. WATER RESISTANT GWB TO BE USED AT ALL WET AREAS
5. ALL DIMENSIONS ARE FROM FINISH FACE UNLESS NOTED OTHERWISE
6. PRIOR TO COMPLETION OF CONSTRUCTION, CLEAN ALL SURFACES INCLUDING, BUT NOT LIMITED TO,
WINDOWS, STOREFRONTS, SWITCH & OUTLET PLATES, HVAC GRILLES, CEILING GRID. RESTORE ANY OF
THE ABOVE TO LIKE -NEW GOOD WORKING CONDITION AS REQUIRED
7. ALL MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS TO BE BIDDER -DESIGNED.
SUBCONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION OF DESIGN PLANS, ENGINEERING, AND
PERMITS
8. REFERENCE SHEET A9.00 FOR DOOR AND WINDOW INFORMATION
9. GC TO PROVIDE ALL ELECTRICAL, EXHAUST, GAS, AND WATER CONNECTION FOR TENANT PROVIDED
EQUIPMENT AND FURNITURE. COORDINATE EXACT LOCATIONS WITH TENANT AS REQUIRED
10. PRIME AND PAINT ALL WALLS THROUGHOUT SCOPE OF WORK PER FINISH PLAN A3.30
KEYNOTES - FLOOR PLAN
FP-01 NEW INTERIOR NON STRUCTURAL PARTITIONS SEE WALL SCHEDULE FOR ADDITIONAL
INFORMATION
FP-02 PROVIDE AND INSTALL NEW OR REUSED FROM DEMOLITION STOCKPILE BUILDING
STANDARD DOORS AND HARDWARE SEE DOOR SCHEDULE FOR ADDITIONAL INFORMATION
FP-03 INSTALL RELITES TO MATCH EXISTING BUILDING STANDARD; SEE A9.00 FOR ADDITIONAL
INFORMATION
FP-04 PROVIDE NEW FLOORING AND WALL BASE THROUGHOUT AREA OF WORK PER A3.30
FP-05 PROVIDE AND INSTALL NEW CASEWORK SEE ENLARGED CASEWORK PLANS ON SHEET
A8.00 FOR ADDITIONAL INFORMATION
FP-07 INSTALL NEW WASHER DRYER COMBO PROVIDED BY THE TENANT, GC TO COORDINATE
POWER AND PLUMBING REQUIREMENTS, VENTING PER DESIGN BUILD MECHANICAL
FP-08 PROVIDE AND INSTALL PLUMBING AND POWER FOR TENANT PROVIDED FURNITURE. GC TO
VERIFY ALL REQUIREMENTS WITH TENANT
FP-09 PROVIDE BUILDING STANDARD BLACKOUT SHADES IN INTERIOR GLAZING WITHIN THE
TASTING LAB
FP-10 OWNER PROVIDED OWNER INSTALLED RACKING
FP-11 PROVIDE AND INSTALL NEW HOT WATER HEATER AND DRIP PAN, GC TO VERIFY SIZE AND
FINAL PLACEMENT PER DESIGN BUILD PLUMBING
FP-12 GC TO PROVIDE PLUMBING, POWER AND INSTALL OWNER PROVIDED FREE STANDING SINK
DI H
F -13 PROVIDE MID INSTALL NEW BUILT-IN BEN H WITH UPH STER D SEA AND STORAGE
WALL. SEE 5/A8.00-7/A8.00 FOR DETAILS
FP-14 PROVIDE AND INSTALL NEW SIGNAGE / GRAPHIC WALL PER 4/A6.01
FP-15 PROVIDE AND INSTALL GREEN WALL (MATERIALS INC / HYDRA WOOD) PER 3/A6.01
FP-16 PROVIDE AND INSTALL LOWER CABINETS AND SOLID SURFACE COUNTERTOP WITH OPEN
UPPER SHELVES PER 4/A8.00
FP-17 PROVIDE AND INSTALL 2' WIDE BUILDING STANDARD RELITE. PROVIDE PRIVACY BLINDS ON
RELITE
FP-18 INFILL WALL AS REQUIRED TO MATCH ADJACENT WALL CONSTRUCTION
WALL SCHEDULE
(1) LAYER 5/8" TYPE'X' GWB EACH SIDE TO UNDERSIDE
1 ON 3-5/8" METAL STUDS @ 24" O.C. OF CEILING
SOUND BATT INSULATION IN CAVITY
2 5/8" GWB - 6" MTL STUD TO UNDERSIDE
OF CEILING
NOTE: ALL WALLS TO BE TYPE'V UNLESS INDICATED OTHERWISE
LEGEND - FLOOR PLAN
NO WORK THIS AREA
0 EXISTING CONSTRUCTION
TO REMAIN
NEW WALL CONSTRUCTION
® NEW PARTIAL HEIGHT WALL
CONSTRUCTION
01.1 WALL TAG - SEE SCHEDULE
100A DOOR TAG - SEE SCHEDULE
OWINDOW TAG - SEE SCHEDULE
NON -RATED
NON -RATED
a
N
Cn
cn
M
FREIHEIT
ARCHITECTURE
Z
W
2
\W
ONN
ry
I..L
Z
ZIV—
LLJ N
W
W �o
W ��
LL 0')
LL c Q
O W�
U Q cn
U =o
Q �o
Q CV LULU
ISSUE LIST
PERMIT SET
1 BID SET
06.16.2023
08.15.2023
Scale: 1/8" = 1'-0"
FLOOR PLAN
A3.1 0