Loading...
REV2 BLD2023-0699+REVISION LETTER+6.6.2024_3.04.24_PM+4306585EDWAY TAPHPOUSE - Vault Removal & Revisions Please see comments below Olympic View Water District - I am checking to see if Edmonds would be okay with an above ground enclosure for a DCDA installation within the ROW. We are requiring Edmonds approval of this, but I am not sure if the developer has reached out to the city to check? 22811 1001" AVE W, Edmonds WA 98020. We had approved the plan but after some field verification it seems the design wasn't feasible so an above ground installation is currently proposed. Thanks, Christopher Scott, Senior Water Treatment Plant Operator South Snohomish County Fire Marshall - 1. The "hot box" is acceptable for use from the fire marshal's office perspective. However, there may be city codes that come into play within the planning division's codes. I am not an expert on the Planning department requirements. I don't want to speak for Engineering, but it sounded like it would be acceptable if installed in correctly. I do not recall a discussion regarding moving the back flow assembly unless the Planning Department doesn't approve for some reason or if its been installed in the ROW. Just so that you are aware, the fire marshal's office and all city departments work tirelessly to review plans prior to approving them. We want to approve plans that will allow projects to move forward successfully and without issue. When changes are made to those approved plans such as in this case, delays occur. For example, if the "hot box" had been included in the plans or at very least as a revision after some correspondence with Fire, Engineering and Planning departments we would not be discussing this now. The City and the Fire Marshal's Office wants you to succeed. We want you to open and thrive. Things just have to be done correctly. They need to be done according to the city's codes. would like to help you move forward. I am willing to start conducting fire related inspections if you are ready. We can start testing the fire alarm system. We could start preliminary final fire inspections on the TI permit as well. This will help you get ahead in the process to open. I am sure the building department would also be willing to assist with inspections as well. Chris Burt Deputy Fire Marshal 12425 Meridian Ave. S, Everett WA 98208 Fire Prevention: (425) 551-1264 1 O: (425) 327-5800 cburt@southsnofire.org I www.southsnofire.org