BEC RFI 62 Special Inspection MH RESPONSEPROJECT: SUBJECT: SPEC. SECTION: PLAN PAGE NO: ATTACHMENTS: PACIFIC BUILDING ❑ ENVELO E,INC. ❑ rENOVATIONS & REPAIRS ❑ REQUEST FOR INFORMATION Breakwater Edmonds Condominiums REFERENCE CONTRACT DOCUMENTS Special Inspections 5.002 R.F.I. NO: 62 DATE: 10/27/2023 INFORMATION REQUESTED Plan Page 5.002 shows continous inspection of "concrete placement at composite slabs, single pass fillet welds less than or equal to 5/16", & installation of composite slab decking". Is continous inspection needed for all three of these items? BY: George Strong FIRM: Pacific Building Envelope, Inc. NOTE: 1 1 /3/2023 is the date by which an answer is needed. Time Impact Yes ❑ No 0 Possible ❑ Cost Impact Yes ❑ No pi Possible ❑ Site Visit Required Yes ❑ No 0 Possible ❑ INFORMATION RESPONSE Periodic special inspection can be used in lieu of continuous inspection for single pass fillet welds less than or equal to 5/16" and at installation and welding of composite slab decking. Continuous special inspection is required for concrete placement of composite slabs. Shawn Stevenson, PE, SE Morrison Hershfield / 10-30-2023 BY: Firm: DATE: