REQUEST FOR INFORMATION
Breakwater Edmonds Condominiums
REFERENCE CONTRACT DOCUMENTS
Special Inspections
5.002
R.F.I. NO: 62
DATE: 10/27/2023
INFORMATION REQUESTED
Plan Page 5.002 shows continous inspection of "concrete placement at composite slabs, single pass fillet welds
less than or equal to 5/16", & installation of composite slab decking". Is continous inspection needed for all
three of these items?
BY:
George Strong
FIRM: Pacific Building Envelope, Inc.
NOTE: 1 1 /3/2023 is the date by which an answer is needed.
Time Impact Yes ❑ No 0 Possible ❑
Cost Impact Yes ❑ No pi Possible ❑
Site Visit Required Yes ❑ No 0 Possible ❑
INFORMATION RESPONSE
Periodic special inspection can be used in lieu of continuous inspection for single pass fillet
welds less than or equal to 5/16" and at installation and welding of composite slab decking.
Continuous special inspection is required for concrete placement of composite slabs.
Shawn Stevenson, PE, SE
Morrison Hershfield / 10-30-2023
BY: Firm: DATE: