Loading...
Breakwater Condominums - DFR 12-19-23GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 18, 2023 Mr. Harley Lever (E-Mail) BREAKWATER EDMONDS CONDOMINIUM ASSOCIATION 300 2nd Avenue N. Edmonds, WA 98020 RE: CONSTRUCTION TESTING AND INSPECTION Breakwater Condominiums 300 2nd Avenue N. Edmonds, Washington Dear Mr. Lever, KA No. 096-23144 Permit No. BLD2023-0039 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. �Zkk�. I -- Jeffrey S. Mercer Operations Manager Pacific Northwest Division JSM/lkj C.C. MORRISON HERSHFIELD (EMAIL) PACIFIC BUILDING ENVELOPE, INC. (EMAIL) CITY OF EDMONDs 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09623144 DFR _-0Krazan&Ass ociate s, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 12/15/2023 PROJECT #: 09623144 PROJECT: BREAKWATER CONDOS LOCATION: 300 2ND AVE N KA P.M.: JEFF MERCER STRUCTURAL STEEL WELDING INSPECTION REPORT NO.: 09623144SSR121523-YK CONTRACTOR: PACIFIC BUIDLING ENVELOPE PERMIT #: BLD2023-0039 INSPECTOR: Youna Kim JURISDICTION: EDMONDS WEATHER: CLOUDY TEMP: 45 ° ❑ FIELD F71 SHOP WELDING F71 VISUAL ❑ MATERIAL ID Item(s) Inspected: RFI#71 Bearing Plate - 3/16" filet weld @ 12" O.C. Location: Welding Shop - Northwest Erection & Fab. 409 N Kelesey St., Monroe Welder qualification / certification verified for: WABO Welders Position: FLAT VERTICAL OVERHEAD ✓ HORIZONTAL Filler Metal: Process: SMAW ✓ FCAW SAW GMAW Other: Weld Type: ✓ FILLET C.P. PLUG P.P. Other: Weld Size: ✓ 3/16" 1/4" 3/8" 5/16" Other: Codes: ✓ AWS AISC ASME IBC Other: ❑ NOTES ❑ DISCREPANCIES % COMPLETE Is of the welding. Pe cted thoroughly and rformed visual inspection on the welding connections on the items. All welding connections were it's all acceptable as per plan and AWS D1.l. 7f j ``4 r Reviewed by: To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Youlsbo (360) 598-2126 • Tacoma (253) 939-2500 SWcmral Steel Report Effb dive 12/812023 Them`—fionprovided ou this report is prepared for the eacbeive—offtdiem. 7Liv report may mt he reprodacedmany far-t wilhmi the writmpormssionofIDe client and Kr— & Anociams. This mpon idimte9 ow®pato,s ohaenmtionam teatmg resulm Lasedmsae wad'niora aad roIDactor activities. This info —ion is s4oct to revcw prior to fuel wbmvel. BYs*ningdismWn,m ffiq crordoesmtacceptrespomibiityforvelilhyofreemts. lbe a h&or timhashemprovidedbyotbersonsae. 7ffi teal resWaepply oolym dw aped! locetims,ad ae�uapected or tested.