Breakwater Condominums - DFR 12-21-23GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
December 20, 2023
Mr. Harley Lever (E-Mail)
BREAKWATER EDMONDS CONDOMINIUM ASSOCIATION
300 2"d Avenue N.
Edmonds, WA 98020
RE: CONSTRUCTION TESTING AND INSPECTION
Breakwater Condominiums
300 2"d Avenue N.
Edmonds, Washington
Dear Mr. Lever,
KA No. 096-23144
Permit No. BLD2023-0039
In accordance with your request and authorization, our firm performed construction testing and inspection
for the above -referenced project. The sampling and testing was performed by our inspectors and reports
are included.
If you have any questions, or if we can be of further assistance, please do not hesitate to contact our
office.
Respectfully submitted,
KRAZAN & ASSOCIATES, INC.
fa J'4' -,,—
Jeffrey S. Mercer
Operations Manager
Pacific Northwest Division
JSWlkj
C.C. MORRISON HERSHFIELD (EMAIL)
PACIFIC BUILDING ENVELOPE, INC. (EMAIL)
CITY OF EDMONDS
43031981/ Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837
With Offices Serving the Western United States
09623144 DFR
=91K aZM&Associates,Inc.
Geotechnical Engineering • Environmental Engineering
Construction Testing and Inspection
DATE: 12/19/2023
PROJECT #: 09623144
PROJECT: Breakwater Condos
LOCATION: 300 Second Ave N
KA P.M.: JSM
WELDING INSPECTION
REPORT NO.: 09623144SSR121923-IV
CONTRACTOR: Pacific Building Envelope
PERMIT #: BLD2023-0039
INSPECTOR: Itiaj Vahora
JURISDICTION: City of Edmonds
WEATHER: Rain TEMP: 51 °
STRUCTURAL STEEL
❑✓ FIELD ❑ SHOP WELDING ❑✓ VISUAL ❑ MATERIALID
Items) Inspected:
Walkway decking at level 2, Half pipe support for metal deck
Location:
Level 2 & 3 East side, Metal deck for units 2E, 2F, 2G
welder quaiitication / certification verified for:
on file
Position:
✓
FLAT
VERTICAL
✓
OVERHEAD
HORIZONTAL
Filler Metal:
Process:
✓
SMAW
✓
FCAW
SAW
GMAW
Other:
Weld Type:
✓
FILLET
C.P.
PLUG
P.P.
✓
Other: Puddle welds
Weld Size:
✓
3/16"
1/4"
3/8"
5/16"
Other:
Codes:
✓
AWS
AISC
ASME
IBC
Other:
❑✓
NOTES
❑
DISCREPANCIES
50 % COMPLETE
n site per request for post weld visual welding inspection. Verified welds for size and location per RFI#61 & 71details and AWS
1.1 requirement. Work in roeress for half i e connections per RFI#61.
Reviewed by: 1 `I AAA -
To the best of my knowledge, the above WAS performed for information purposes only.
Superintend ent/Representative:
Technician:
a • d •
Offices Serving the Western United States
Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 •'Tacoma (253) 939-2500
Stmetural Steel Report