RFI 29 Decay at unit 3C deck_MHPACIFIC BUILDING ENVELOPE,INC. REQUEST FOR INFORMATION PROJECT: Breakwater Edmonds Condominiums REFERENCE CONTRACT DOCUMENTS R.F.I. NO: 29 DATE: 7/11/2023 SUBJECT: Decay at unit 3C deck cantilevered beam, rim & metal strap SPEC. SECTION: 06 1053 PLAN PAGE NO: ATTACHMENTS: Photos INFORMATION REQUESTED We have uncovered decay at unit deck 3C rim, and beam. The North beam has 1 /2° of decay on top of the beam at the face. There is a metal strap on top of the joists to beam. How would you like us to proceed with repairs to the beams, rim and straps? BY: Ashley Hogan FIRM: Pacific Building Envelope, Inc. NOTE: 7/1 2/2023 is the date by which an answer is needed. Time Impact Yes P1 No ❑ Possible ❑ Cost Impact Yes 0 No ❑ Possible ❑ Site Visit Required Yes 0 No ❑ Possible ❑ INFORMATION RESPONSE Repair deteriorated deck beams (cantilevered 4x12 typ.), and edge deck joist, and rim joist per the attached detail sketch. Replace rusty existing straps at joists to match existing, or use Simpson LSTA12. Shawn Stevenson, PE, SE Morrison Hershfield 7/13/2023 "OWN MORRISON HERSHFIELD LIMITED I 1 � `� 1 (E�2XIo S_ C xQ. 311�2 � JOB NO. FILE DESIGNED BY DATE -7/13/z� P Dec.L (E) zxkv- �— zxlz LVL 57S4-e.r I —T �R , p to Ma��ti L.UG2.1oZ 6 CiZ"A^a� @l.Vl..dX lil2.� �oho.Mo� � 11 iI II II (/,l) Z x 10 R ,, w, n ta4 c.(•_ e.x �-S4; r-LA e -,� i i N.6,5.