RFI 31 Decay at unit 3D deck_MHPACIFIC ❑ BUILDING ENVELOPE,INC. ❑ EXTERIOR RENOVATIONS 8 REPAIRS ❑ REQUEST FOR INFORMATION PROJECT: Breakwater Edmonds Condominiums REFERENCE CONTRACT DOCUMENTS R.F.I. NO: 31 DATE: 7/11/2023 SUBJECT: Decay at unit 3D deck cantilevered beam, rim & metal strap SPEC. SECTION: 06 1053 PLAN PAGE NO: ATTACHMENTS: Photos INFORMATION REQUESTED We have uncovered decay at unit deck 3D rim, and cantilevered beam. The beam has decay of around 1 /2" at the top face. How would you like us to proceed with repairs at the beam, and rim? BY: Ashley Hogan FIRM: Pacific Building Envelope, Inc. NOTE: 7/1 1 /2023 is the date by which an answer is needed. Time Impact Yes P1 No ❑ Possible ❑ Cost Impact Yes 0 No ❑ Possible ❑ Site Visit Required Yes 0 No ❑ Possible ❑ INFORMATION RESPONSE Repair deteriorated deck beams (cantilevered 4x12 typ.), and edge deck joist, and rim joist per the attached detail sketch. Replace rusty existing straps at joists to match existing, or use Simpson LSTA12. Shawn Stevenson, PE, SE Morrison Hershfield 7/13/2023 ar MORRISON HERSHFIELD LIMITED I 1 � `� 1 (E�2XIo S_ C xQ. 311�2 � JOB NO. FILE DESIGNED BY DATE -7/13/z� P Dec.L (E) zxkv- �— zxlz LVL 57S4-e.r I —T �R , p to Ma��ti L.UG2.1oZ 6 CiZ"A^a� @l.Vl..dX lil2.� �oho.Mo� � 11 iI II II (/,l) Z x 10 R ,, w, n ta4 c.(•_ e.x �-S4; r-LA e -,� i i N.6,5.