RFI 39 Decay at unit 3H deck_MH RESPONSEPACIFIC ❑ BUILDING ENVELOPE,INC. ❑ EXTERIOR RENOVATIONS 8 REVAIRS ❑ REQUEST FOR INFORMATION PROJECT: Breakwater Edmonds Condominiums REFERENCE CONTRACT DOCUMENTS R.F.I. NO: 39 DATE: 7/1 1 /2023 SUBJECT: Decay at unit 3H deck rim, cantilevered beam, joists, metal strap SPEC. SECTION: 06 1053 PLAN PAGE NO: ATTACHMENTS: Photos INFORMATION REQUESTED We have uncovered decay at unit deck 3H rim, joists, beam. The South beam decay starts 23" from the front of the beam. How would you like us to proceed with repairs to the beam, 3 joist, and rim? BY: Ashley Hogan FIRM: Pacific Building Envelope, Inc. NOTE: 7/1 2/2023 is the date by which an answer is needed. Time Impact Yes 0 No ❑ Possible ❑ Cost Impact Yes 0 No ❑ Possible ❑ Site Visit Required Yes 0 No ❑ Possible ❑ INFORMATION RESPONSE Repair deteriorated deck beam (cantilevered 4x12 typ.) and edge deck joist, and rim joist at unit 3H per the attached detail sketch. Replace rusty existing straps at joists to match existing, or use Simpson LSTA12. Shawn Stevenson, PE, SE Morrison Hershfield 7/26/2023 '� �, •.fir: " N 00 M_Lin Np ;F ODO \ .. O � r Im tV 'gpyypp' �y -1 . r,• !( ___ -- , CxQ. -SIVs4 (E) z.xlo vr- 2-x1241- u} QS ReRA-- Re w+eV�% u � G -F;r �eke.r'ir9r'a�ed{ I.K� o �F 13e-a wt ( l 2" AA ct N (N� 2 x D Na'l w� oP� area k�T�-1-e.r' -7%13AS P. be4L Re-pCe f �,e,V 7lZ R;p to Mahch Thy,►\ LcA c z-i 7 Z (,C10) "?-" ,—o►�a�nno� 7 X l o or Z. X I Z. -to na a 4 G� c x aVIc- (4� �co d P, 5.�5 z5 oo P1KqEhal @ Eh N :� S.