PLUMBING SYSTEM LEGEND
LINE TYPE FULL NAME ABBR LINE TYPE FULL NAME ABBR
DOMESTIC WATER SANITARY SEWER
DOMESTIC COLD WATER CW - - - - - - - - - - SANITARY VENT V
- - NPCW - NON -POTABLE COLD NPCW SANITARY WASTE W
PLUMBING GENERAL ABBREVIATIONS
ABBV
FULL NAME
ABBV
FULL NAME
ABBV
FULL NAME
AAV
AIR ADMITTANCE VALVE
DN
DOWN
NIC
NOT IN CONTRACT
ABV
ABOVE
DS
DOWNSPOUT
NTS
NOT TO SCALE
AFF
ABOVE FINISHED FLOOR
DWG
DRAWING
OFD
OVER FLOW DRAIN
AP
ACCESS PANEL
E
EXISTING
POC
POINT OF CONNECTION
BEL
BELOW
ELEV
ELEVATION
PRV
PRESSURE REDUCING VALVE
BFP
BACKFLOW PREVENTER
ET
EXPANSION TANK
PVC
POLYVINYL CHLORIDE
BOP
BOTTOM OF PIPE
EWH
ELECTRIC WATER HEATER
RD
ROOF DRAIN
BV
BALL VALVE
F
FIRE
RPBA
REDUCED PRESSURE BACKFLOW ASSY
BWV
BACK WATER VALVE
FCO
FLOOR CLEAN OUT
TOG
TOP OF GRATE
CB
CATCH BASIN
FD
FLOOR DRAIN
UG
UNDER GROUND
CFF
CAP FOR FUTURE
FU
FIXTURE UNIT
LINO
UNLESS NOTED OTHERWISE
CI
CAST IRON
GI
GREASE INTERCEPTOR
VTR
VENT THRU ROOF
CL
CENTER LINE
GPM
GALLONS PER MINUTE
W/
WITH
CO
CLEAN OUT
GWH
GAS WATER HEATER
WCO
WALL CLEAN OUT
CPVC
CPVC MATERIAL
HB
HOSE BIBB
WH
WALL HYDRANT
DCBP
DOUBLE CHECK BACKFLOW PREVENTER
HP
HIGH PRESSURE
WHA
WATER HAMMER ARRESTOR
DCVA
DOUBLE CHECK VALVE ASSEMBLY
IE
INVERT ELEVATION
WM
WATER METER
DEMO
DEMOLISH
MFR
MANUFACTURER
YH
YARD HYDRANT
DFU
DRAINAGE FIXTURE UNIT
MH
MANHOLE
BACKFLOW PREVENTER SCHEDULE
SYSTEM AIR GAP MAX DESIGN FLOW WEIGHT
SYMBOL LOCATION TYPE SERVICED MFR. & MODEL NO. SIZE MODEL PRESSURELOSS (LBS) NOTES
BFP-01 MECHANICAL ROOM REDUCED DOMESTIC WATER WATTS LF009-QT 3/4" 909AGC 13 PSI @ 3-20 GPM 8 1,2
PRESSURE
NOTES:
1. PROVIDE WITH PRESSURE DIFFERENTIAL RELIEF VALVE LOCATED BETWEEN TWO INDEPENDENTLY OPERATED SPRING LOADED CHECK VALVES, TWO RESILIENT SEAT BALL VALVES AND
FOUR RESILIENT SEATED BALL TEST COCKS, AND A "Y" STRAINER. W/ AIR GAP.
2. BRONZE CONSTRUCTION, ASSE 1013 & NSF-61 LISTED.
PLUMBING EQUIPMENT SCHEDULE
NO. EQUIPMENT DESCRIPTION
SA -AA SHOCK ARRESTOR - SIOUX CHIEF 660-AA, PDI RATED SIZE AA, 1/2" THREADED CONNECTION, SEALED CHAMBER WITH PISTON RATED FOR WALL CLOSURE.
FIXTURE CONNECTION SCHEDULE
NO. FIXTURE LOCAL CONNECTION
WASTE VENT HOT COLD
EC-1 EQUIPMENT WATER CONNECTION - GUY GRAY DIALYSIS BOX 82688 - DBSS1SV SGL VLV L/DOOR, SHUT-OFF 2" 1 1/2" - 1/2"
VALVES W/ HOSE THREADS OUTLET, DRAIN OUTLET, STEEL HOT DIPPED GALVANIZED BOX, UNPAINTED.
PIPING INSULATION SCHEDULE -WASHINGTON
INSULATION CONDUCTIVITY
PIPING TYPE PIPE SIZE INSULATION TYPE THICKNESS RANGE
COLD WATER OVERHEAD AND EXPOSED TO SIGHT ALL FIBERGLASS 1/2" 0.21 - 0.27
COLD WATER WITHIN WALLS AND SHAFTS NOT REQUIRED
ALL HOT WATER PIPING INSULATION SHALL MEET THE REQUIREMENTS OF THE WASHINGTON STATE ENERGY CODE, 2021 EDITION, TABLE C403.10.3.
ALL PIPING INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS.
ELASTOMERIC INSULATIONS WHICH MEET THESE RATINGS MAY BE USED AS A SUBSTITUTE FOR FIBERGLASS.
PROVIDE A VAPOR BARRIER COVERING ON ALL ROOF DRAIN, RAIN LEADER, AND COLD WATER PIPING INSULATION.
INSULATE THE OVERFLOW DRAIN BODY AND PIPE 10 FEET DOWN STREAM FROM THE DRAIN.
PROVIDE A COVERING FOR ALL INSULATION EXPOSED TO SIGHT WITHIN THE BUILDING.
PROVIDE AN INCOMPRESSIBLE INSULATED PAD WITH A MINIMUM THERMAL RESISTANCE OF R-10 UNDER ALL ELECTRIC WATER HEATERS IN UNCONDITIONED SPACES OR ON CONCRETE
FLOOR.
PLUMBING PIPING MATERIAL SCHEDULE
LOCATION PIPING SIZE MATERIAL (FOOTNOTE) JOINT
DOMESTIC WATER 1/2" TO 2" COPPER TYPE L (c) PRESSED MECH JOINT
NON -POTABLE WATER 1/2" TO 2" COPPER TYPE L (c) PRESSED MECH JOINT
SANITARY WASTE 2" AND LARGER CAST IRON (g, m, n, o) NO HUB
SANITARY VENT 6" AND LARGER CAST IRON (g, n, o) NO HUB
FOOTNOTES:
(c) PRESSURE LIMIT OF 200 PSI
(g) STANDARD NO -HUB BANDS
(m) WASTE PIPING THAT CONVEYS CARBONATED LIQUID FROM BEER OR SODA DISPENSERS IS CORROSIVE IN NATURE & MUST BE INSTALLED USING PVC-DWV OR
STAINLESS STEEL MATERIAL. CONNECT CARBONATED LIQUID WASTE TO MAIN OR BRANCH PIPING LOCATED DOWNSTREAM OF FREQUENTLY USED FIXTURES TO
PROVIDE DILLUTION & PREVENT CORROSION OF METAL DRAINAGE SYSTEMS
(n) AT THE INSTALLERS' DISCRETION, 6" & LARGER PVC MAY BE USED FOR VERTICAL STACK INSTALLATIONS (EXCEPT WITHIN PLENUM SPACES & OTHER AREAS LISTED
HEREIN WHERE CAST IRON MUST BE USED)
(o) DWV STACKS / WET COLUMNS FOR FUTURE TENANT CONNECTIONS & PIPING LOCATED WITHIN OPEN CEILINGS / TENANT WORK SPACES MUST BE CAST IRON ONLY
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
APPROVED
PLANS MUST BE
ON JOB SITE
PLUMBING GENERAL NOTES - WASHINGTON
1. THIS PROJECT WAS DESIGNED UNDER THE 2021 EDITION OF THE UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS. MATERIALS, METHODS AND INSTALLATION
SHALL COMPLY WITH THESE PROVISIONS.
2. WATER SYSTEM IS DESIGNED PER THE FOLLOWING PARAMETERS AND REQUIREMENTS:
-STATIC WATER PRESSURE TO FIXTURES SHALL NOT EXCEED 80 PSIG (608.2)
-DESIGNED MAXIMUM DCW VELOCITIES SHALL NOT EXCEED 8 FPS & DHW SHALL NOT EXCEED 5 FPS (610.6 and 610.12)
-PRESSURE LOSSES FOR IN -LINE DEVICES HAVE BEEN INCLUDED IN THE ABOVE PRESSURE CALCULATIONS (610.2)
-WATER SIZING IS AS PER APPENDIX A (Table 103.1)
-WATER CONNECTIONS TO MECHANICAL EQUIPMENT, STEAM PRODUCING EQUIPMENT, DISHWASHERS THAT INJECT DETERGENT INTO THE WATER LINE, CARBONATORS, OR ANY
OTHER CONDITION WHERE A CROSS CONNECTION OF THE MAIN WATER SYSTEM MAY OCCUR, A REDUCED PRESSURE BACKFLOW PREVENTER ASSEMBLY AND ASSOCIATED DRAIN
PIPING MUST BE PROVIDED.
-WATER DISINFECTION TEST SHALL BE PERFORMED IN ACCORDANCE WITH SECTION 609.9 PRIOR TO FINAL APPROVAL OF PLUMBING PERMIT.
-ALL ITEMS IN THE DOMESTIC WATER DISTRIBUTION SYSTEM MUST SHOW COMPLIANCE WITH NSF-61 LEAD FREE REQUIREMENTS. DOCUMENTATION MUST BE AVAILABLE ON SITE.
-PROVIDE WATER PIPING IDENTIFICATION ON PIPING PER TABLE 601.3.2.
-LIMITATION OF HOT WATER TEMPERATURE TO PLUMBING FIXTURES SHALL BE IN ACCORDANCE WITH UPC CHAPTER 4.
3. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE PLUMBING CONTRACTOR IS TO COORDINATE WITH ALL
OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK.
4. ALL PIPE SIZES NOTED ON DRAWINGS ARE MINIMUMS
5. SLOPE ALL RAIN LEADER, STORM, AND WASTE PIPING AT 2% UNLESS OTHERWISE NOTED ON DRAWINGS. OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE INSTALLING WASTE
PIPING AT LESS THAN 2% (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS).
6. HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH SECTION 313 AND TABLES 313.3 AND 313.6 OF THE 2021 UNIFORM PLUMBING CODE WITH WASHINGTON STATE
AMENDMENTS.
7. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE
FLOOR OR WALL.
8. FOR EXACT ROUGH -IN LOCATIONS AND ELEVATIONS OF PLUMBING FIXTURES REFER TO ARCHITECTURAL DRAWINGS.
9. PROVIDE STOPS OR ANGLE VALVES AT ALL FIXTURES
10. PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS.
11. PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS.
12. CLEANOUTS SHALL BE INSTALLED SO THEY ARE EASILY ACCESSIBLE.
13. PLUMBING EQUIPMENT, VALVES AND TRAP PRIMERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS
PANELS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR.
14. FLOORS SHALL SLOPE TO FLOOR DRAINS WHERE DRAINAGE OCCURS ON A REGULAR BASIS. PLUMBER TO COORDINATE WITH GENERAL CONTRACTOR FOR EXACT ELEVATION OF
DRAIN. (EXAMPLES TOILET ROOMS, KITCHENS AND LAUNDRY ROOMS)
15, THE PLUMBER SHALL PROVIDE AND LOCATE ALL REQUIRED FLOOR, WALL, AND FOOTING SLEEVES.
16. HEAT TRACING OF PIPING, WHERE INDICATED, SHALL BE PROVIDED AND INSTALLED BY THE PLUMBING CONTRACTOR. THE PLUMBING CONTRACTOR IS TO COORDINATE THE HEAT
TRACE WIRING SUPPLY WITH THE ELECTRICAL CONTRACTOR.
17. TRENCHING, BACKFILLING, AND COMPACTING FOR UNDERGROUND PIPING SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR UNLESS STATED OTHERWISE IN
CONTRACT DOCUMENTS.
18. PIPING BURIED IN THE SLAB TO HAVE A PROTECTIVE SLEEVE.
19. PROVIDE EARTHQUAKE RESTRAINT FOR PLUMBING PIPING AND EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2021 IBC AND ASCE 7.
20. VENTS FROM FLOOR MOUNTED FIXTURES SHALL RISE VERTICALLY TO AT LEAST 6" ABOVE THE FLOOD RIM OF THE FIXTURE, UNLESS STRUCTURAL CONDITIONS PROHIBIT A
CONTINUOUS VENT. WHERE A "FLAT VENT" IS USED, IT SHALL BE INSTALLED WITH DRAINAGE FITTINGS AND SLOPE BACK TO THE FIXTURE AT STANDARD 2% SLOPE.
CONTACT LIST
TITLE
NAME
COMPANY
PHONE #
EMAIL
PLUMBING ENGINEER
DAVID JACQUES
MACDONALD-MILLER
206-768-4148
david.jacques@macmiller.com
PLUMBING DESIGNER
PARRIS TALBERT
MACDONALD-MILLER
206-768-4046
parris.talbert@macmiller.com
PROJECT MANAGER
BREANNA LANGSTON
MACDONALD-MILLER
206-889-2792
breanna.langston@macmiller.com
LEGAL DESCRIPTION
PARCEL NUMBER: 00580700002500
LEGAL DESCRIPTION: SOLNERS 5 ACRE TRACTS BILK 000 D-00 - N 1/2 OF TRS 27 & 28 & S 1/2 OF TRS 25 & 26 TGW TH PTN OF VAC 10TH ST SE (FORMERLY 216TH ST SW ADJ THRTO) & TGW TH
PTN OF TR 29 SD PLAT LY WLY OF FDL - COM AT NWCOR SD TR 29 TH ELY ALG N BDY 42.12FT TO BEG OF LN HEREIN DESC TH SLY TAP 35.44FT FIR SW CR OF SD TR 29 AS MEAS ALG S BDY SD
TR & TERM OF LN HEREIN DESC (PER CITY EDM BLA REC AF NO 199909155005)
PLUMBING SCOPE OF WORK
INSTALL BACKFLOW PREVENTER. ROUTE BACKFLOW PREVENTER DRAIN TO EXISTING FUNNEL FLOOR DRAIN.
INSTALL TWO WATER CONNECTIONS WITH SA -AA WATER HAMMER ARRESTORS FOR NEPTUNE WASHING UNITS. CONNECT WASTE AND VENT TO EXISTING SINK WASTE AND VENT LINES.
GENERAL SHEET LIST - PLUMBING
SHEET
NUMBER SHEET NAME NUMBER SHEET SHEET NAME
TP0.01 SCHEDULES - PLUMBING
TP0.01S SITE PLAN - PLUMBING
TP5.01 MULTIPLE FLOOR PARTIAL PLANS - PLUMBING
City Of Edmonds
Building Department
Work PLUMBING
Address 21601 76TH AVE W
Owner SWEDISH HOSP- O.R.
Approved Date 06/18/2024
Building Official Erie Ctiwf r
Permit Number BLD2024-0770
00 E
^�
W
U
�.3 o
L
Q�
5
C
E
G
U U
0
Co co
1
07
_
C
o �
co
00
Cr
o
CD
_v
O
U'
mo
0
C)
C6
Q
C
LL
D-
rna
�
b/1 1/ZUZ4
I
w
Q
0
66
z
O
Ln
w
I I I I I I I NI w
o Q0
0
1--
W
z
O
w �
a �
w
LU
z z
Ow
�__ CU
LU
_ 0.
F/
VJ Q
I(D U
z_z
UJ
Oa
W
U)
_ ~ LU c
W=�00 J�
zI�WQ
LLJ (0 Q W
w �C)2 U
z (nN W
ENGINEER: LAST REVISED:
P TALBERT 06-09-24
CHECKED BY: DATE PLOTTED:
D JACQUES 06-09-24
CAD: ISSUE DATE:
P TALBERT 06-09-24
DRAWING NUMBER:
C-2355-7732257-00
SHEET NUMBER:
z
O
U
L.L
CO
z
O
U
O
LL
0
LU
U)
CO
TPO.01
RECEIVED
Jun 12 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Tuesday, June 11, 2024 8:08:47 AM
n
z
U Z
,:
-�
a
f
J:\7723\2257 - SMC-ED OR Neptune Install\00\2 - Engineering\DWG\Shts\77232257TP0_01.dwg
Cn
NEPTUNE DOCKING STATION — — — —
c
,�
W
D
D
D
m
A
SWEDISH HEALTH CARE CENTER — — — —
Ajo
A
m
21601 76TH AVE. WEST
EDMONDS, WA98026
r
MacDonald -Miller
01
0����
— — — —
P
o
SITE PLAN
For1l ITY.qnl I jTinni_�
m
o
c
rn
O
d�
_
Co
O
d�
o
m
O
— — — —
PERMIT SET 06-10-24 �1
17930 Intl. Blvd. Suite 120, SeaTac, WA 98188
Phone:206-763-9400 www.macmiller.com
m o
�y0
— — —
D m T
�Zm
iii
, ■,
O
o
D
O
CP
O
m
<
s
Z C
Op
<U)
m
�
o
�
o
REVISIONS: DATE REVISIONS: DATE CD
o
ro
ISSUED FOR CONSTRUCTION
0
m
3
0
a
M
N
0
0
m
W
N
0
0
a
z
w
0
0
w
U
N
N
M
N
Q
0
0
N
Ijh.. -
FTW,-=—,r-o,, -
BFP-1
(E) 3/4"CW STUB F 3/4"NPCW
D__�l3/4"CW
FD
i
3/4"NPCW UP
USE EXISTING LABEL NEW PIPE
PENETRATION IN AS NON -POTABLE
CEILING
ROOM
SB031 MECH
—� D
3/4"NPCW DN EMO'D SINK
1O 2"V & 2"W
EC-1 I
1 /2"NPCW J
2"V
L __1
1 /2"NPCW
ROOM
WB021
F —1 DECONTAM.
2„V L —1
ROVER
UNITS
OWNER SUPPLIED
STRYKER "NEPTUNE 2"
DOCKING STATIONS
FLOOR A
1 /4" = V-0"
NOTE:
10 CONNECT WASTE AND VENT TO
DEMOLISHED SINK WASTE AND
VENT.
°o° E
^�
(D
o
Q `
5
C
E
G
U U
c6 co
-
1
U) 3
_
C
o
04
(�
0
U'
o
_v
0
U'
2,6 r`
—
m
U
c
=N
0
LL
o�
Ia
b/1 1 /ZU;e4
LU
H
Q
0
66
z
0
U)
w
�I N W
O Q
o
0
w
z
w
0
a
w
U)
w z
I— Q
z Z J
w w
O
U J
Q z
Qw 0
U) Q Q
—(D
U
DU 0
Z= �
� �7 t-13
�J 0— z
UQ 0 0
0 �u J m v
�_� �C
w=�00 w� 0
Zc/);QLL
o I— w
�w�Z JJ
W �c>2 )
zcr) >_� cn
N W
ENGINEER: LAST REVISED:
P TALBERT 06-09-24
CHECKED BY: DATE PLOTTED:
D JACQUES 06-09-24
CAD: ISSUE DATE:
P TALBERT 06-09-24
DRAWING NUMBER:
C-2355-7732257-00
SHEET NUMBER:
TP5.01
RECEIVED
Jun 12 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT