Loading...
BLD2024-0770+DOH+6.13.2024_10.36.47_AM+4319924Project Comment Form June 3, 2024 Project Information: CRS# 61506924 Swedish Edmonds Chapter 246-320 WAC Hospital Project Title: Neptune Suction Equipment Project 21601 76th Ave W Location: Snohomish, WA 98026 Local Permit #: Washington State Department of I J�Health Construction Review Services PO Box 47852 111 Israel Rd. SE. Tumwater, WA. 98501 www.doh.wa. og v/crs tel. 360-236-2944 fax.360-236-2321 Electronic Submittal. Plans will be delivered to: Name: Micah Dolen Email: micah.dolen@swedish.org Phone #: 425-922-3399 Key Contacts: Company Name Phone Email DOH Reviewer Nancy Brown 564-669-8830 nancy.brown@doh.wa.gov Facility Contact: Swedish Micah Dolen 425-922-3399 micah.dolen@swedish.org FacilityAdmin,: Swedish Stephen Wickline 206-658-3688 stephen.wickline@swedish.org Arch/Eng.: Other. Other. Other Other. Local AHJ: Addt'1 Copies To: ❑ L&I Electrical Section ❑ L&I Factory Assembled Structures ❑ Local Electrical AHJ Project Status: -Authorized to Begin Construction - Comments are NOT APPROVED The Construction Documents have been reviewed and found acceptable. All plan review comments have not been approved. Construction can begin, subject to construction permitting from the local building official. See page two for important next steps. A2BC Preliminary Initial Issued All Conference Plan Review Construction Comments Closeout Completed Completed Begins Approved Completed N/A Yes Yes No No Licensing Inspection Required ■ No ■ ■ Approved to Use Space ■ No Page 1 of 6 Plan Review Comments for Project 61506924 Swedish Edmonds Chapter 246-320 WAC Hospital To avoid delays it is important you follow these Next Steps: Respond to Comments: • Revise project documents to be compliant with applicable rules and the review comments attached to this form. • Respond, in writing, to the comments attached to this form. • Submit revised plans and responses to comments to the Construction Review Services. During Construction • Maintain a copy of the A213C drawing set on the project site. • Submit any changes to the A213C set to CRS for review and approval prior to executing the work. If you have any questions, please contact Construction Review Services (360) 236-2944. You can monitor project status and history at www.doh.wa. og v/crs. Page 2 of 6 Plan Review Comments for Project 61506924 Swedish Edmonds Chapter 246-320 WAC Hospital Project Details (for internal use only) Occupancy Type Construction Type Fed Code: IBC: 1-2 IBC: IBC: IBC: IBC: IBC: Building Code: 2018 IBC NFPA 101: Healthcare NFPA 101: NFPA 101: Licensing Code: FGI 2014 Number of Beds Added: Removed: CON Required? ❑ Yes ❑ No CON Approved [:]Yes ❑ No Req'd Provided Type/category Are Hospital inpatients seen at this location? ❑ Yes ❑ No Automatic Fire Sprinkler System: Yes Are planned residents/patients incapable of self preservation? ❑ Yes ❑ No Automatic Fire Alarm System: Yes If yes, how many? Emergency Power System: Yes Is sedation provided? ❑ Yes ❑ No If yes, max. planned level? Medical Gas System: N/A Smoke Compartmentation: N/A Is space Medicare certified? ❑ Yes ❑ No Building Department contacted? Estimated construction completion: z W F� O z 3 w w a For Assisted Living Facilities Only Total Sleeping rooms cn Minimum required area of day rooms/areas Total Approved beds A Total area provided in day rooms/areas Total Contract beds W a D O F* w F� O z Page 3 of 6 Plan Review Comments for Project 61506924 Swedish Edmonds Chapter 246-320 WAC Hospital Plan Review Comments: 2 x❑ Plumbing drawings were not included in submittal documents. Provide plumbing connections to sanitary sewer system and domestic water with backflow preventer. 2018/2021 UPC Sect. 304.1 and 602.3 Swedish response: As part of the connection to the domestic water system, MMFS will procure (1) 3/ " Zurn Wilkins 975XL RPBA and install downstream of a new tempered water mixing valve. OTC backflow permit will be procured, and test report documentation provided as part of closeout. Sanitary sewer system tie-in will be through a `guy gray" wall -mounted discharge box for each docking station. Not Approved 05/30/2024 — Concept is acceptable. Provided stamped plumbing design documents to verify compliance. PCRA indicates that part of the fire detection system will be impaired. ALSM says that fire alarm detection and suppression system are not impaired. Clarify if the fire alarm or fire suppression system will be impaired during the project. If the fire alarm system will be out of service for more than 4 hours in a 24 hour period, provide fire watch. 2012 NFPA 101 Sect. 9.6.1.6, 2011 NFPA 25 Sect 15.5.2 Swedish response: We do not anticipate any fire detection impairment on this project. Approved 05/30/2024 — Based on revised PCRA. Identify extent of demolition. WAC-246-320-505(2) Swedish response: Will remove ACM drywall from the floor to lid one foot wide. Approved 5/30/2024 — Based on information provided. Provide dimensions of corridor and ante room to ensure minimum clearance for patient transport and egress. 2014 FGI 2.1-7.2.2.1 Page 4 of 6 Plan Review Comments for Project 61506924 Swedish Edmonds Chapter 246-320 WAC Hospital Swedish response: Door is being relocated from where previously shown. It was previously swinging into the corridor and will now relocate to the shorter side of the ante room wall. The distance from the ante room shown to existing casework is 7' — S " to provide the clearance requirements. existing cabinets - T-5' to existing cabinets w. ante room - 4' wide. ............. ......... - remove emstmg door rK add zipper doov t Do* 2" ' 12 m to .1.tta■t.. t... rb.e... wo Ar �. r.■e.. W" , CORRIDOR Approved 05/31/2024 — Based on revised PCRA received 5/31/2024. See below for approved barrier configuration. Existing Cabinets Anteroom Wh Manometer. $helves for extra bunny whs. Cascadirp allow from corridor to anteroom to wok area, Con 10n 9' Clearance 7 oes oo R2 n■■ ■■.■■...■■.. .n • t47L7.8 Remove Existing Door WBO22 OR 41.71 ft2 Seal ell appy a eattaut �,.J WRn3n W B023 STORAGE 378.46 ft2 WB027A CORRIDOR 1010.73 ft2 Page 5 of 6 Plan Review Comments for Project 61506924 Swedish Edmonds Chapter 246-320 WAC Hospital ❑x Door on construction barrier at ante room swings out into the corridor. This creates a hazard for patients being transported in corridor. Modify door to swing to swing in. 2014 FGI 2.1-7.2.2.3(3) Swedish response: Ante room door location was revised. See attached revised PCRA/ICRA plan. Approved 05/30/2024 — Based on revised plan. Note: This includes hazard material removal. See WAC 296-65 and WAC 296-155. Contact L&I. Asbestos (wa.gov) Compliance with the comments above provided by the Department of Health, Construction Review Services, are necessary for this facility to meet the cited requirements of the applicable licensing regulations found in the Washington State Administrative Code and associated references. These comments, authorization to begin construction or final project approval do not relieve the facilityfrom the responsibility to meet the requirements of any applicable federal, state or local regulations. In the event of conflicts between other jurisdictions and these written comments, the most stringent shall apply. The building owner or operator is ultimately responsible for safety and insuring the building is in compliance with all applicable laws. Page 6 of 6 Plan Review Comments for Project 61506924