Construction SCODe
1. Empty Room of all equipment and supplies
2. Set up Construction barriers and Neg Air Machine
3. Demo drywall and Abate ACM
4. Add water supply and drain
5. Add electrical outlets
6. Patch and Paint drywall
7. Term Clean r r
Authorized to Begin Construction
WA ST Department of Health - Construction
Review Services has authorized this project to
begin construction.
o See accompanying project comment form for
review status and corrections.
o This is not a building permit, check with your
local building department.
06/03/2024 8:32:27 AM
RECEIVED
Jun 13 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
REVIEWED
BY
CITY OF EDMONDS
New Docking Station Location
-�-177
(1 ■
r --�■ ■CORRIDOR
ew Docking • • a ion
77
OR
V �I WB888 WB818 WB885
HOLDING OR WB93 OR
141.98M 6t0OORRIDO 881.8188
3.33 M
o ws000
soaLD 1u.ea M1t
56.19 ft2
WB898A
RE TM A
BB.OBM 11L
PACG Z WBO27
CORRIDOR
755.63 2
r3�•y��yz��rrz��
RECEIVED
Jun 13 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Smoke Com
3,960SF
Authorized to Begin Construction
WA ST Department of Health - Construction
Review Services has authorized this project to
begin construction.
o See accompanying project comment form for
review status and corrections.
o This is not a building permit, check with your
local building department.
06/03/2024 8:32:32 AM
artment
SC-A.A
WBOO5
COMM
61.03 ft2
NEOA
WB006
MECH
241.65 ft2
Anteroom with Manometer.
Shelves for extra bunny suits.
Cascading airflow from corridor
to anteroom to work area.
V V RRI
31.00
RESTS
f RESTS
60.49
AFF
� d ^
■
WBO18
Area of constmaion
FREIGHT OA
WBO10
OFFICE
085.00 ft2
ELEV ..........
n n ■��Q 1A
LOCKERS-M
1 2
196.12 ft2
SCN
•����������������
������.... �......�����
57.48 ft2
COR OR
41.1 tft2
WB012
WB004 W
��
0 H E CHUTE
L10.12
LOCKERS-M
73.95 ft2
r
L
OFFICE HAZ 16
198.38 ft2
5 2 43 2 -
.11111.NKroa
I I I I n I I I I n I I I owes"
I I I I I I I n I
-
I a I nt
CORRIDOR
249.40
ft2
Neptune Dock
location}y;1
4!7L$=B�
O
I
478.78 ft2millililil
"emuI
WB004A
bin and
IIIII-��I-lu
sump
PPIY stns 9e.
Emply bi
WB042
LOCKERS-W
540.03 ft2
WB044
STAFF
280.62 ft2
t�
MD
WB042A
WB043A
RESTSTAFF
LOCKERS-U
81.70 ft2
97.20 ft2
MD
W
L
2
MD
WB041
STAFF
490.88 ft2
v
�I
WBO17
WORK
78.58 ft2
WB001 .48
LOBBY
729.58 ft2 WB032
OFFICE
E V .00 210.97 ft2
ELEV 4 001 66.95 ft2
WB045
E
CORRI R
EI
Co I R
7
WB036
LAB
L0
WB033
CONTROL WB037
175.13 ft2 HOLDING
139.82 ft2
0 0
WB001B
CORRIDOR
515.91 ft2
WB038
HOLDING
141.98 ft2
WB038A
WB039
RESTPAT
RECOVERY
63.08 ft2
1464.43 ft2
PACU
bin antl
sump
pply storage.
Full Dins
WBO19
CORRIDOR
1436.12 ft2
WB030
OR
385.35 ft2
W B029
OR
375.45 ft2
WB028
OR
410.64 ft2
Seal off supply
& exhaust
WB031
DOR
9 9.2 ft2
LE Cf
Existing Cabinets
8' Clearance
Remove Existing Door
W B022
OR
401.71 ft2
WB023
STORAGE
378.46 ft2
WBO24
OR
425.60 ft2
II WB025
Aft12
26A OR
RIDO 391.81 ft2
3 ft2
WB027
CORRIDOR
755.63 ft2
WB027A
CORRIDOR
1010.73 ft2
LEGEND
Visqueen Over Casework
Starc Barrier Wall
......... Construction Pathway
Negative Air Machine
Tacky Mat
Bunny Suits
Smoke Compartment
13,797SFI SC-A.B
LEGEND
■ ■ ■ ■ ■ M! ■
3 HR FIRE BARRIER
MENNEN ■
2 H R FIRE BARRI E R
■smsmsmsmsmsm
2 HR FIRE W/ SMOKE
■ommommossom
1 HR FIRE BARRIER
.S,S,S,S,S,S,S,S
1 HR FIRE W/ SMOKE
■ ■ ■ ■ ■ ■ 1
SMOKE BARRIER
.S,S,S,S,S,S,S,S1
1 HR SMOKE BARRIER
IMMIIIIIIMrIIIIIIMr�����rrr■
NON -RATED
SMOKE PARTITION
XX 12345
DR RATING I NUMBER
90 = (90 minute fire rating)
HG = rated hinge (UL-5L49)
SM = Smoke Limiting Door
(HAZ
HAZARDOUS STORAGE
JQ SUITE NUMBER
Smoke Compartment
0,000 ID
EXIT
SUITE ACCESS DOOR
SHAFTS /ELEV
CHUTES
Corridors, Suite Separations and
Hazardous rooms in Healthcare
occupancies are smoke partitions,
unless otherwise indicated
EXIT ACCESS
CORRIDOR
TRAVEL DISTANCE
TO EXIT
EXIT SIGNS
SC-
p o p
COMPARTMENT LEGEND - Suites in color
0000 = Year of construction.
no date indicates const. prior to July 2016
EAST TOWER
Construction Type: II (111)
OCCUPANCY LEGEND
Healthcare
Business
Ambulatory
Assembly
Residential
SPRINKLER LEGEND
Sprinklered
No Sprinklers
Partial Sprinklers
SWEDISH
Health Care
Center
Edmonds
Campus
Life Safety
Drawings
Per
NFPA 2012
Life Safety
Code
Z
0
F__
U
W
0
W
H
Q
W
DESIGNED BY:
CHECKED BY:
PROG. NO.
DATE NOV 2017
DWG.
Life Safety Plan
Edmonds
Campus
Floor A
Not to Scale
DWG.
SOA
r3�•y��yz��rrz��
RECEIVED
Providence
� SWEDISH
Jun 13 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Swedish Edmonds Neptune Suction Equipment
DOH CRS#61519112
Prepared by
Micah Dolen
micah.dolen(a)_swedish.org
2/2/2024
Project Scope-
• Purchase 5 new Neptune Suction Machines for Main OR.
• Install 2 docking stations in Soiled Utility room.
o 1 docking station will be purchased from Stryker and 1 new unit will be
relocated from Swedish Issaquah campus that is no longer needed.
Project Information-
SBAR Submitted and Approved for Project funding
SITUATION: Fluid management System at Edmonds OR to meet the states requirements for
smoke evacuation and fluid management
BACKGROUND: New State law requires smoke evacuation. Historically Swedish Edmonds
utilizes ConMed Buffalo filtration systems and this system will aid in maintaining this new
expectation.
ASSESSMENT: Handling suction containers is not considered best practice and place caregivers
at risk for a body fluid exposer. Stryker Neptune is a closed system for contaminated surgical
fluids where staff will be better protected.
RECOMMENDATION: Purchase 5 new Neptune suction machines and install 2 new docking
stations in Soiled utility room
Authorized to Beain Construction
WA ST Department of Health - Construction
Review Services has authorized this project to
begin construction.
o See accompanying project comment form for
review status and corrections.
o This is not a building permit, check with your
local building department.
06/03/2024 8:32:33 AM
BLD2024-0770 RECEIVED
Jun 13 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Functional Narrative for DOH -
Swedish Edmonds Main Surgery A -Floor of West Tower
21601 761" Ave W, Edmonds WA 98026
CRS#61519112
Equipment location
• 5 Neptune Suction Machines will be kept in Main Surgery operating rooms and will be
moved between ORs as needed
• 2 docking stations will be installed in Soiled Utility Room WB021
Equipment Cleaning
• Post surgery Swedish Staff will connect Neptune to docking station in Soiled Utility room
to empty and clean the tank.
• Swedish Environmental Services (EVS) will clean and wipe down the exterior of the
equipment as part of their room turnover cleaning.
Equipment Training
• Stryker Rep will train Clinical Engineering and Surgery staff before machines are put in
service.
Equipment Maintenance
• Clinical Engineering will place asset tags on each unit and track PM schedule with other
medical equipment.
Authorized to Begin Construction
WA ST Department of Health - Construction
Review Services has authorized this project to
begin construction.
o See accompanying project comment form for
review status and corrections.
o This is not a building permit, check with your
local building department.
06/03/2024 8:32:33 AM
BLD2024-0770 RECEIVED
Jun 13 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Project Team -
Swedish Team
• Kayla Reece- Senior Director Surgical Services
• Brad Russell- Surgery Business Manager
• Shiela Yncierto-Le- OR Manager
• Mark Ruark- Clinical Engineering
• Ryan Long- Clinical Engineering
• Brandon Keith- Clinical Engineering
• Steven Wickline- Facilities
• Mark Rose- Safety
• Bobbi Ragland- Infection Prevention
• Cameron Iszkula- Infection Prevention
• Joaquin Lopez- EVS
• Micah Dolen- Pre Con Project Manager
• Christina Millan- Construction and Close out Project Manger
Support Team
• Jim Levin- Stryker — Equipment supplier
• Josh Kline- MacDonald Miller- Plumbing
• Chris Larson- Cochran - Electrical
• Josh McGaffey- BNBuilders — Construction containment, Drywall, Paint
• Crystal Lasnier- BNBuilders- Construction containment, Drywall, Paint
• Bill Walker- Walker Construction — Drywall demo, Abatement
Authorized to Beain Construction
WA ST Department of Health - Construction
Review Services has authorized this project to
begin construction.
o See accompanying project comment form for
review status and corrections.
o This is not a building permit, check with your
local building department.
06/03/2024 8:32:33 AM