Engineering Permit FormOF WAY PERMIT
PERMIT ER
City •EdmondsRIGHT
98020 ENG2024-0132
www.edmondswa.gov i
Description: ROW - FRONTAGE IMPROVEMENTS FOR WESTGATE STATION II
ISSUED: 08/27/2024
Address: 9601 EDMONDS WAY EDMONDS WA 98020-5931
EXPIRES: 08/27/2026
rmit Type: RIGHT OF WAY Permit Subtype: MIXED USE Parcel Number: 00937900001000
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT JARED UNDERBRINK 250 4TH AVE S, EDMONDS WA 98020 (425)778-8500
CONTACT CG ENGINEERING 250 4TH AVE S, EDMONDS WA 98020 (425)778-8500
CONTRACTOR CDK CONSTRUCTION SERVICES PO BOX 1767, DUVALL WA 98019 (425)788-8441
OWNER WZL ENTERPRISES LLC 2800 WESTERN AVE 112, SEATTLE WA 98121 (425)508-0906
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
RIGHT-OF-WAY PERMIT - DISRUPTION
$1,034.70 $1,034.70
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: BAC DATE: 08/27/2024
Printed: Tuesday, August 27, 2024 1:29:53 PM 1 of 3
RIGHT OF WAY PERMIT
PERMIT NUMBE
City of Edmonds
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
FINAL INSPECTION
The engineering division requires 48 hours notice prior to the date of the FINAL Inspection.
SCHEDULING
INSP PRIOR TO BACKFILL
Call for all required inspections. All work shall be inspected prior to backfill.
This property falls within the Olympic View Water and Sewer District. A permit from Olympic View is
OVWSD SEWER LATERAL
required for the sewer lateral installation.
This property falls within the Olympic View Water and Sewer District. A permit from Olympic View is
OVWSD SEWER SERVICE
required for the sanitary sewer installation.
OVWSD WATER LINE/METER
This property falls within the Olympic View Water and Sewer District. Contact Olympic View for
specific water line and/or water meter information.
INSPECTOR: Potholing for the placement of the sewer manhole will be done prior to any utility
POTHOLING
installation. The result of potholing will be reviewed by our Utility Engineer prior to approval.
Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. Asbuilt shall be
PROJECT CIVIL ASBUILT
submitted to Engineeringpermits@edmondswa.gov.
ROW COMPACTION TEST
Right of way compaction tests are required per City standards.
SEWER AND WATER
MAINTAIN 10 FEET OF SEPARATION BETWEEN THE SANITARY SIDE SEWER AND THE WATER SERVICE
SEPARATION
LINE.
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
STORM COVENANT
A stormwater covenant shall be approved for recording prior to project final approval.
TRAFFIC CONTROLS
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
excavation, original locates are no longer identifiable.
UTILITY LOCATES
INSPECTOR: Potholing for the placement of the sewer manhole will be done prior to any utility
installation. The result of potholing etc will be reviewed by our Utility Engineer prior to approval.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
NOTES
COMPLETE
X-2 ENGINEERING FINAL"
E-1 ENGINEERING PRECON
E-4 ACCESS WIDTH SLOPE
E-5 TRASH ENCLOSURE
E-7 CONCRETE SIDEWALK
Printed: Tuesday, August 27, 2024 1:29:53 PM 2 of 3
RIGHT OF WAY PERMIT
City of Edmonds PERMIT NQ�M4BE
:• 1 1
www.edmondswa.gov • •
E-7 CURB GUTTER
E-7 DWY APPROACH
E-7 PVMT SUBGRADE
E-7 RESTOR LIMITS
E-7 SIDEWALK OPEN -CLOSED
E-7 STORM CB
E-7 STREET SIGNS
E-7 STRIPING
E-7 TRAFFIC CTRL
E-7 TRENCH COMPACTION TEST
REPORT
E-8 BOND RELEASE
E-9 COMPOST AMEND
E-9 FIRE AND AID SIGN
E-9 PARKING STRIPING
E-9 PROJECT ASBUILTS
X-0 OVWSD APPROVAL
E-7 FH REFLECTOR
E-9 ENGINEERING OTHER
Printed: Tuesday, August 27, 2024 1:29:53 PM 3 of 3