Loading...
Engineering Permit FormOF WAY PERMIT PERMIT ER City •EdmondsRIGHT 98020 ENG2024-0132 www.edmondswa.gov i Description: ROW - FRONTAGE IMPROVEMENTS FOR WESTGATE STATION II ISSUED: 08/27/2024 Address: 9601 EDMONDS WAY EDMONDS WA 98020-5931 EXPIRES: 08/27/2026 rmit Type: RIGHT OF WAY Permit Subtype: MIXED USE Parcel Number: 00937900001000 i NAME TYPE NAME ADDRESS PHONE APPLICANT JARED UNDERBRINK 250 4TH AVE S, EDMONDS WA 98020 (425)778-8500 CONTACT CG ENGINEERING 250 4TH AVE S, EDMONDS WA 98020 (425)778-8500 CONTRACTOR CDK CONSTRUCTION SERVICES PO BOX 1767, DUVALL WA 98019 (425)788-8441 OWNER WZL ENTERPRISES LLC 2800 WESTERN AVE 112, SEATTLE WA 98121 (425)508-0906 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 RIGHT-OF-WAY PERMIT - DISRUPTION $1,034.70 $1,034.70 RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: BAC DATE: 08/27/2024 Printed: Tuesday, August 27, 2024 1:29:53 PM 1 of 3 RIGHT OF WAY PERMIT PERMIT NUMBE City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. FINAL INSPECTION The engineering division requires 48 hours notice prior to the date of the FINAL Inspection. SCHEDULING INSP PRIOR TO BACKFILL Call for all required inspections. All work shall be inspected prior to backfill. This property falls within the Olympic View Water and Sewer District. A permit from Olympic View is OVWSD SEWER LATERAL required for the sewer lateral installation. This property falls within the Olympic View Water and Sewer District. A permit from Olympic View is OVWSD SEWER SERVICE required for the sanitary sewer installation. OVWSD WATER LINE/METER This property falls within the Olympic View Water and Sewer District. Contact Olympic View for specific water line and/or water meter information. INSPECTOR: Potholing for the placement of the sewer manhole will be done prior to any utility POTHOLING installation. The result of potholing will be reviewed by our Utility Engineer prior to approval. Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. Asbuilt shall be PROJECT CIVIL ASBUILT submitted to Engineeringpermits@edmondswa.gov. ROW COMPACTION TEST Right of way compaction tests are required per City standards. SEWER AND WATER MAINTAIN 10 FEET OF SEPARATION BETWEEN THE SANITARY SIDE SEWER AND THE WATER SERVICE SEPARATION LINE. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. STORM COVENANT A stormwater covenant shall be approved for recording prior to project final approval. TRAFFIC CONTROLS Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of excavation, original locates are no longer identifiable. UTILITY LOCATES INSPECTOR: Potholing for the placement of the sewer manhole will be done prior to any utility installation. The result of potholing etc will be reviewed by our Utility Engineer prior to approval. INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE X-2 ENGINEERING FINAL" E-1 ENGINEERING PRECON E-4 ACCESS WIDTH SLOPE E-5 TRASH ENCLOSURE E-7 CONCRETE SIDEWALK Printed: Tuesday, August 27, 2024 1:29:53 PM 2 of 3 RIGHT OF WAY PERMIT City of Edmonds PERMIT NQ�M4BE :• 1 1 www.edmondswa.gov • • E-7 CURB GUTTER E-7 DWY APPROACH E-7 PVMT SUBGRADE E-7 RESTOR LIMITS E-7 SIDEWALK OPEN -CLOSED E-7 STORM CB E-7 STREET SIGNS E-7 STRIPING E-7 TRAFFIC CTRL E-7 TRENCH COMPACTION TEST REPORT E-8 BOND RELEASE E-9 COMPOST AMEND E-9 FIRE AND AID SIGN E-9 PARKING STRIPING E-9 PROJECT ASBUILTS X-0 OVWSD APPROVAL E-7 FH REFLECTOR E-9 ENGINEERING OTHER Printed: Tuesday, August 27, 2024 1:29:53 PM 3 of 3