BLD2022-0754+Supplementals_Condominium_HOA_Requirements+6.8.2022_5.15.20_PM+2921420MyBuildingPermit.com
Jurisdiction: Edmonds
Project Name: Point Edwards - Bldg. 31 Entry & Unit 214 Repa
Application 1D: 1152630
Supplemental Name: Condominium HOA Requirements
Is this an apartment or condominium complex?
If you are not sure go to the Snohomish County Assessor Site and verify before proceeding.
https://www.snohomishcountywa.gov/5167/Assessor
Condominium Complex
If this is a condominium complex, do you have the required HOA Letter from the President authorizing your company to do the work?
YES - Will upload signed letter under "Other" documents.