APPROVED Transportation Impact Worksheet-550 Paradise550 Paradise Lane
APPENDIX A
Page I of 2
SUB
Transportation Impact Analysis Mar 02 2021
Worksheet CITY M EDMONDS
TSERVI
DEVELOPMENT SERVICES
DEPARTMENT
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
Name of Proposed Project:
Owner/Applicant
Paradise Hts HLD, LLC
Name
24144 E Greystone Lane
Street/Mailing Address
Woodway, WA 98020
City State
Telephone:
425-750-5965
Paradise Heights
Applicant Contact Person:
Rob Michel
Name
7305 Soundview Drivie
Street/Mailing Address
Edmonds, WA 98026
Zip City
Telephone:
State Zip
206-930-2445
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
1. PROJECT DESCRIPTION
Contact Name
E-mail:
a. Location - Street address: 550 Paradise Lane
(Attach a vicinity map and site plan.)
b. Specify existing land use: SF
c. Specify proposed type and size of development: 4unit condo
(# of residential units and/or square footage of building)
d. Date construction will begin and be completed: 4121 - 4123
e. Define proposed access locations: 546 Paradise Lane
APPENDIX A
Page 2 of 2 FRUE C U B
Mar 02 2021
f. Define proposed sight distance at site egress locations: STY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X =
Prior Use I I$ 1 X I
New Use Fee: $ = - I Prior Use Fee: $
0 NEW DEVELOPMENT
New Use
❑ OTHER
ITE Land Use Category
230 - Condo
Per Unit
Fee Rate
$3,318.13 1 X
Units in
square feet,
# of dwelling,
vfp, etc.
4
Fee
= 1 $13,272.52
MITIGATION FEE RECOMMENDATION:
INDEPENDENT FEE CALCULATION: $240.00 + consultant fee
$
TOTAL TRANSPORTATION IMPACT FEE
$
March 12, 2021
City of Edmonds, Engineering Division Approval Date
No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.