Loading...
Blower Door Test Results* T Blower Door' rig KW 425-312-3914 o BlowerpoorNW.com blowerdoorschedule(t�D.gmail.com Job Site Information Permit #: Address and Lot Number: City: Ire i l-A I f t, . I Cond. Floor Area Source (check one):ans 'Pest results ]BLOWER DOOR TEST RESULTS Date of Test:/ Technician Name: /U Zip Code: Age of House: kj�L ) — Q Estimated Q Measured Q Fail Q Could Not Complete Test Target 5 t D Ring (check one if applicable): Q Open Volume qt(40? ACHso q 'N CFM@SOPa QA x,- - QC Blower Door Fan Location: do,--)cWeather Conditions: Cesar Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal ern -elope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed off at the frame prior to the test. During testing: 1. Exterior windows and doors, {replace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilator shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. supply and return registers. if installed at the time of the test, shall be fully open. Property address: 0 ( �- Bullder/registered design professional name: Builderlreg, design pro, signature: Conditioned Floor area: ft2 (per building permit) _ RL-Values R303.1. Ceiling/ Vaulted R. (Floors: Over unconditioned space R Attic: Attic R- Slab -on -grade floor R Walls: Above grade R. _ Fully insulated slab? Y/N (Circle one) Below, int. R-__,___ Doors: R- p-�- R- Below, ext. R- U-Value of.Windovus;. Skylights and Doors (R3034.9.3) Average area weighted U-value from Glazing Worksheet Average U- - Fuel Normalization Tables R400.2 , and lever Credits ffable 12406.3 System Type Number (1 to 5) (Select one) • Energy Credits selected (1 to 7)_ Fuel Normalization Credit + Total Energy Credits = Total Credits Heating, Cooling and Domestic ?-lot Water :. S stern Type Manufacturer and Model ?Number 1=fficlenc Heating Cooling DHW Drain water heat -- recovery ®mite. Ri inewable Energy. Ele;ctdc Power System :.: System type System design capacity kw ' Rated annual generation ItWh/yr Aga laerrces . Energy latar?. A/lanufacturer and Model (Circle one) Dish washer VorN Refrigerator V orw Washer Y or:N Dryer Vented or u,,,nted? If vented, CEF ratin Y or7v Gas fireplace / heating stove (Section R402.4.2) Fireplace efficiency (FE) Heating or Decorative? (Circle one) ff.VAC System Duct Leakage Testing (R403.3)' Circle one All ductwork and air handler In conditioned space? (See Option 4.2) Y or N Ali ductwork in unconditioned spaces buried and tested at 3% total leakage, and air Y or N handler In conditioned space? (See Option 4.1 ) All ductwork & air handler outside conditioned space Insulated to minimum R-8? Y or N Air handler present at duct leakage test? (Total leakage 4% if yes, 3% if no) Y or N HVAC leakage to outside`test conducted at final? Y or N Do HVAC duct leakage tests include GP5 and time stamp verification? Y or N HVAC system leakage test calculated design target: CFM @ 25 Pa HVAC system leakage test measured results: CFM @ 25 Pa Building. eakage.Yesting (f2402.4.9.2) Dwelling unit leakage test calculated design target: ^ ACH @ 50 Pa Dwelling unit leakage test, measured results: e- c, ACH @ So Pa Whole [wilding Leakage test (R2 non -corridor only) design target: CFM/sf @ 50 Pa Whole Building Leakage test (R2 non -corridor only) measured: CFM/sf @ 50 Pa Do bulldlln leaks a tests Include GPS and time stamp verification? Y or N UVhole.Mous® VenSilaSlon..System,Mewsured Flow at(M9505.�11RC•WA) Circle one Are the system controls correctly labeled? The Whole House Ventilation (WHV) system operation and maintenance (O&M) Y or N Y or N Instructions were provided to the building owner? Provided to: on (date) Whole House Ventilation System Type: (Circle one) (1) Whole house exhaust fan, location (2) Balanced HRVI ERV, location For R2 low-rise, serves more than one unit? (3) Supply or HRV WHV Integral to the air handler. Describe system control sequence Y or N of operations or reference to tiesign submittal: Specify run-time: hours per day WHV caiculated design minimum flow rate per:plan submittal: _ CFM WHV measured min flow rate at commissioning: Exhaust CFM, Supply CFM Do WHV flow tests include GPS & time stamp verification? HRV/ERV sensible heat recovery efficiency: YarN Commissioning Notes: .Other.MandatoryRequirements� : " . Circle one All other mandatory requlremenls of WSEC-R have been met? Y or N * > T Blower Door: g NW 425-312-3914 o BlowerpoorNW.coin blowerdoorscheduleRgmail.com Job Site Information Permit #: Address and Lot Number: City: C' J, Y-vt C) Cond. Floor Area (ft) Source (check one) "Pest results IpT.-S, ]BLOWER DOOR TEST RESULTS Date of Test: e Technician Name: �0. Zip Code: Age of Houser-' �lans ❑ Estimated Q Measured Css Q Fail 0 Could Not Complete Test Target ` l�L Volume '5't ACH50 / 0C CFM@50Pa Ring (check one if applicable): Q Open Q AQ C Blower Door Fan Location: �(� dC-:"'---- Weather Conditions: Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: R402A.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate ofnot exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third parry. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal em,elope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed offat the frame prior to the test. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilator, shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers. if installed at the time of the test, shall be fully open. Property address:- Builder/registered design profession/ name: BuilderNeg. design pro. signature;_ �� Conditioned Moor area: I /1 1 ••a - ft� (per building permit) R;-VaiUes(R30,3:9.1) Ceiling! Vaulted Re _ Floors: Over unconditioned space R Attic: Attic Rm�_ Slab -on -grade floor R- Wails: Above grade R- - Fully insulated slab? Y/N (Circle one) Below, Int, R-.--....­ Doors: T�-F;- , R- Below, ext. R- U-Valud ot'.Wlaadows,.Skylights and Doors (R3034.13) Average area weighted U-Value from Glazing Wo&k heet Average U- - Fuei Normalization Tobles R40&2 : and Energy Credits able R406 3 System Type Number (9 to :5) (Select one) Energy Credits selected (1 to ;/)^_�J-- Fuel Normalization Credit +'Total (Energy Credits Total Credits Heating, Coolie and Domestic Hot Water: .. S stein TVpe 11/lanufacturee and !Model Number E'fficlarlc Heating Cooling DHW o Drain water heat recovery Onsite. Renewable Energy. Electric Dowel* gystem . :.. . . System type _ _ Sys -kern design capacity Bc�iU Rated annual generation _ kWhlyr :.Ap Energy Star?, Manufactu r and Model (Circle one) Y or N Dish washer Refrigerator V or.N Washer Y or:N Dryer _ Y orN Vented or unvented? If vented, CEF ratin Gas fireplace / heating stove (Section R402.4.2) Fireplace efficiency (FE) Heating or Decorative? (Circle one) HYAC System Duct Leakage Testing (R403.3)1 Circh, one All ductwork and air handier In conditioned space? (See Option 4.2) Y or N Ail ductwork in unconditioned spaces buried and tested at 3% total leakage, and air Y or H handier In conditioned space? (See Option 4.1.) All ductwork & air handler outside conditioned space Insulated to minimum R-li? Y or N Air handier present at duct!leakpge test? (Total leakage 4% if yes, 3% if no) Y or N HVAC leakage to outside'test conducted at final? Y or N Do HVAC dudt leakage tests include GPS and time stamp verification? Y or N HVAC system geakage test calculated design target: CFM @ 25 Pa 34VAC system leakage test measured results: CFM @ 25 Pa .::::: _..Su6ldingleakage.-Testing (R402.4.9,2) Dwelling unit leakage test calculated design target: '77 . C.) ACH @ 50 Pa Dwelling unit leakage test, measured results: `3 `�C-ACI I @ 50 Pa Whole Building Leakage test (112 non -corridor only) design target: CFM/sf @ 50 Pa Whole Building Leakage test (R2 non -corridor only) measured: 4-` FM/sf @ 50 Pa Do building leakage tests Include OPS and time stamp verification? Y or N Whole blouse Vend ladon..,;Vsteip, MeasuredFlow.Rates (MI S05.41RO-i A) circle one Are the system controls correctly labeled? Y or N The Whole blouse Ventilation (WHV) system operation and maintenance (O&M) Y or N Instructions were provided to the building owner? Provided to: on - - (date) Whole House Ventilation System Type: (Circle one) (1) Whole i ouse exhaust fan, location (2) Balanced HRV1 ERV, location For R2 low-rise, serves more than one unit? if or N (3) Supply or HRV WHV integral to the air handier. Describe system control sequence of operations or reference to design submittal: Specify run-time: _ hours per day CFM _ IAMV calculated design minimum flow rate per:plan submittal: WHV measured min flow rate at commissioning: Exhaust CFM, Supply FM Do WHV flood tests include GIPS & time stamp verification? Y or N HRVIERV sensible heat recovery efficiency: Commissioning Notes: Ather.Mandato ulrements_ : • rY Re $, -.. _ -..:: Circle one All other mandatory requlremen9s of WSEC-R have been met? Y or N * T Blower Door' g Nina' '425-312-3914 o BlowerpoorNW.com blowerdoorschedule rr,gmail.com Job Site Information BLOWER DOOR TEST RESULTS Date of Test: V Technician Name: Permit #: 1 Address and Lot Number: �✓ L� �' `, l/� f City o ortc4 Cond. Floor Area (ft): ��A P CP' Zip Code:_ Age of House Source (check one): ans Q Estimated U Measured 'Pest Results Q Fail Ci Could Not Complete Test Target &I-ele---1 Volume ACH50 �t CFM@SOPa Ring (check one if applicable): Q Open Q A �B C) C �, � Blower Door Fan Location: `�}`�Aai Weather Conditions: ("`---����0 L,�a Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third party. A written report of the results of the test stall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal em•elope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed off at the frame prior to the test. During testing: l . Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup au, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilator shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers. if installed at the time of the test, shall be fully open. Property address: 1 --.i Builder/registered design professions name. _ Builder/reg. design pro. signs ur®: Conditioned floor area: ffz (per building permit) . :... R= 4falaaes R303:9 1) Ceiling/ Vaulted R- Floors: Over unconditioned space RP Attic: Attic R- Slab -on -grade floor R. Walls; Above grade R- _ Fully insulated slab? YIN (Circle one) Elelow, Int. R Doors: l2- p_ R- Below, ext. R- U-Value Of.WNindow+srSkylights. and Doors (R303.9.9.3):: Average area weighted U-value from Glazing Worksheef Average U-- Fuel Normalization Fables R406.2 : and Energy Credits(Table R406:3 System Type Number (t to 5) (Select one) Energy Credits selected (N to 7)_ Fuel Normalization Credit + Total Energy Credits = Total Credits — • —77 ,:.. :: _ Heating, Cooling and Domestic Hot Watee... S stem Type Mantefacturar and Model Number Efflclenc Pleating Cooling DHW � Drain wafer Poeat _ recovery ®nSite Renewable Energy. Elect ic RowrO sy43tem System type System design capacity kw Rated annual generation ItWh/yr sop IO trces'. .. Energy,afar?. li�anufacturer and Model (Circle one) Dish washer YorN Refrigerator Y or N Washer Y or.N Dryer Vented or unvented? If vented, CEF ratio Y or7V Gas fireplace / heating stove (Section R402.4.2) Fireplace efficiency (FE) _ Heating or Decorative? (Circle one) HYAG System ®tact Leakage` Testing (R403.3)' Circle one All ductwork and air handler In conditioned space? (See Option 4.2) Y or N All ductwork in unconditioned spaces buried and tested at 3% total leakage, and air Y or N handler In conditioned space? (See Option 4.1 ) All ductwork & air handler outside conditioned space Insulated to minimum R-87 Y or N Air handler present at duct!feakage test? (Total leakage 4% if yes, 3% if no) Y or N HVAC leakage to outside'test conducted at final? Y or N Do HVAC duct leakage tests include GPS and time stamp verification? Y or N HVAC system leakage test calculated design target: CFM @ a5 Pa HVAC system leakage test measured results: CFM @ 25 Pa I�Widing: LeakageTesting (R402.4.9.2) Dwelling unit leakage test calculated design target: ACH @ 50 Pa Dwelling unit leakage test, measured results: CH @ 50 Pa Whole Building Leakage test (112 non -corridor only) design target: CFM/sf @ 50 Pa Whole Building Leakage test (R2 non -corridor only) measured: CFM/sf @ 50 Pa Do building leaks a tests Include GPS and time stamp verification? .. Y or N Whole.Mouse Vendlatlon-S;ys.teni:.Measured Flow.Rates (M1505.4 !RC -WA) Circle one Are the system controls correctly labeled? Y or N The Whole House Ventilation (WHV) system operation and maintenance (O&M) instructions were provided to the building owner? Y or N Provided to: on (date) Whole House Ventilation System Type: (Circle one) (1) Whole house exhaust fan, location (2) Balanced HRV/ ERV, location For R2 low-rise, serves more than one unit? Y or N (3) Supply or HRV WHV Integral to the air handler. Describe system control sequence of operations or reference to design submittal: Specify run-time: hours per day CFM WHV calculated design minimum flow rate per:plan submittal: _ WHV measured min flow rate at commissioning: Exhaust CFM, Supply CFM Do WHV flow tests include GPS & time stamp verification? HRV/ERV sensible heat recovery efficiency: YorN Commissioning Notes: .. ._dther.Mandato Re ulrernentss rY G -..r .:. ,...... Circle one All other mandatory requlremenls of WSEC-R have been met? Y or N eP T Blower Door Tung KW 425-312-3914 o BlowerpoorNW.com bl ow erd o ors ch edul e (rD,g m a il. c om Job Site Informatiou Permit #: Address and Lot Number: City BLOWER DOOR TEST RESULTS Date of Test: I f✓ `' Technician Name: � -/t7 t4] Zip Code: Cond. Floor Area (ft): Age of House: Source (check one):?*Plans ❑ Estimated C) Measured ';Pest Results ass C) Fail Ci Could Not Complete Test Target C5 t 0 Ring (check one if applicable): U Open U A 0 C Blower Door Fan Location: Q C Weather Conditions Volume ACH50 CFM@50Pa Cam_ Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 3 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at amv time after creation of all penetrations of the building thermal emelope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed offat the frame prior to the test. During testing: I . Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup au, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilator shall be closed and sealed; D. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers. if installed at the time of the test, shall be fully open. Property address: Builder/registered design professional name: Builder/reg. design pro. signature: Conditioned floor area: --�__ [ � ^ ft2 (per building permit) LL���rTT ... .. .. Rm-Values R303.9.9 Ceiling/ Vaulted R- _ (Floors: Over unconditioned space RP Attic: Attic R-^—_ Slab -on -grade floor Ra Walls: Above grade R- _ Fully insulated slab? YIN (Circle one) Below, Int. R :_._. Moors: R- Below, ext. R-�_ U-Valu6 of.RH(aolof®ws,.Skylighft and Door's (R303.1..9.3) " Average area weighted U-value from Glazing Worksheei Average U- - Fuei Normalization Tables R40&2 : and Energy Credits able R406 3): System Type Number ('I to 5) (Select cane) Energy Credits selected (4 to 7)_ Fuel Normalization Credit + Total Energy Credits = Total Credits _ Heating,. Cooling and Domestic Hot Water:. S stern T e Manufacturer and Model Number Efflcle nc Heating Cooling _ • DHW ° Drain water heat —� recovery Onsite. Renewable Energy. Electric PeaeRre9 �y'Gtem ::. System type System design capacity kW ` Rated annual generation kWh/yr _ A��loa�cas:rter �. Star? Manmfacturer and Molded (Circle one) Dish washer Y or N Refrigerator Y or N Washerr Y or •iV Dryer _ Y or lV Vented or unvented? If vented, CEF ratio Gas fireplace / heating stove (Section R402.4.2) Fireplace efficiency (FF.) Heating or Decorative? (Circle one) HYAC System Duct Lea&aga 'Testing (R403.3) Circla one All ductwork and air handler in conditioned space? (See Option 4.2) Y or N All ductwork In unconditioned spaces buried and tested at 3% total leakage, and air Y or N handler In conditioned space? (See Option 4.1) All ductwork & air handler outside conditioned space insulated to minimum R-A? Y or N Air handier present at duct leakage test? (Total leakage 4% if yes, 3% if no) Y or N HVAC leakage to outside test conducted at final? Y or N Do HVAC duct leakage tests include GP ; and time stamp verification? Y or N HVAC system leakage test calculated design target: CFIVi @ 25 Pa HVAC system leakage test measured results: CFM @ 25 Pa SlujidIng:Leakag'e.Testlrlg (R402.4.9,2) Dwelling unit leakage test calculated design target: C? ACH @ 50 Pa Dwelling unN leakage test, measured results: AGH @ 50 Pa Whole Building Leakage test (R2 non -corridor only) design target: C M15f @ 50 Pa Whole Building Leakage test (R2 non -corridor only) measured: C= CFM/sf @ 50 Pa Do building leaks a tests Include GPS and time stamp verification? Y or N whole.Wlouse Ventilation..$ ys.tem. MeasuredF/pwRates (M1505.41RC-WA) Circle one Are the system controls correctly labeled? Y or N The Whole House Ventilation (WHV) system operation and maintenance (O&IVI) Y or N Instructions were provided to the building owner? Provided to: on (date) Whole Mouse Ventilation System Type: (Circle one) (1) Whole house exhaust fan, location (2) Balancad HRV1 ERV, location For R2 low-rise, serves mare than one unit? Y or N (3) Supply or HRV WHV Integr0i to the air handier. Describe system control sequence of operations or reference to design submittal: Specify run-time: hours per day CFM VUHV calculated design minimum flow rate per:plan submittal: WI1V measured min flow rate at Commissioning: Exhaust CFM, Supply CFM ®o WHV flow tests include GPS & time stamp verification? Y or N HRV/ERV sensible heat recovery efficiency: Commissioning (Votes: 0tPer Mandatory Re ulremews::-'.:....... :.r.. Clrele one All other mandatory requirements of WSEC-R have been met? Y or N *IBDT Blower Door Testing lid 425-312-3914 o BlowerpoorNW.com blowerdoorsch eduleRumail.com Job Site lufor>mation Permit #: Address and Lot Number: City: on� J Cond. Floor Area (ft2): BLOWER DOOR TEST RESULTS Date of Test: Technician Name: It Zip Code: t,4-f '2- �3i Age of House: Source (check one): (Flans Q Estimated ❑ Measured Test Results S14s Q Fail Test Target U Could Not Complete 1(�2JT�1- Volume ef 1E J ACH5o l 1 CFM@50Pa Ring (check one if applicable): E3 Open ❑ A U C Blower Door Fan Location: � Weather Conditions: Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: R402.4.1.2 'Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate ofnot exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed off at the frame prior to the test. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilator shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers, if installed at the time of the test, shall be fully open. '.yn Property address: _ ! f- z Bullderlregistered design profess nal name. Builderlreg. design pro, signature: r _ Conditioned floor area: ft2 (per building permit)-777777 77 R=Values(R303.1.'1) Ceiling! Vaulted R- _ Floors: Over unconditioned space R- Attic: Attic R- _ Slab -on -grade floor R- Walls; Above grade R- _ Fully insulated slab? YIN (Circle one) Below, int. R- Doors: R- p_- R_ Below, ext. R. U-Value of.W hIdow-9f skylights and Doors (R3031.1.3). Average area weighted U-value from Glazing Worksheet Average U- - Fuel Normalization Tobles R406.2 and Enerff Credits ffabie R406.3 System Type Number (f to 5) (Select one) Energy Credits selected (I to 7)_ Fuel Normalization Credit + Total Energy Credits = Total Credits Heating, Cooling and Domestic loot Water S stem Type Mlanufacturat and Model Number Efflcletnc Heating Cooling DHW Drain water heat recovery ®nsite. ftnewable Energy Electric Powel' �p3tBnf System type System design capacity kW Rated annual generation ItWhlyr Ap lances - Energy:'star7.. M 01111 cturer and Model (Circle one) Dish washer Y or IV Refrigerator Y ortV Washer Y or.N Dryer Y ortV Vented or unvented? If vented, CEF ratio Gas fireplace / heating stove (Section R402.4.2) Fireplace efficiency (FE) Heating or Decorative? (Circle one) KVAC System Duct Leakage Testing (R403.3)1 c;rcie one All ductwork and air handier in conditioned space? (See Option 4.2) Y or N All ductwork in unconditioned spaces buried and tested at 3% total leakage, and air Y or N handier In conditioned space? (See Option 4.11 ) All ductwork & air handler outside conditioned space Insulated to minimum R-8? Y or N Air handier present at duct leakage test? (Total leakage 4% if yes, 3% if no) Y or N HVAC leaks a to outsidertest conducted at final? Y or N Do HVAC duet leakage tests include GP5 and time Stamp verification? Y or N HVAC system leakage test calculated design target: CFM @ 25 Pa HVAC system leakage test measured results: CFM @ 25 Pa S.ullpling: Leakage. Vesting (R402.4.9.2) Dwelling unit leakage test calculated design target: - ACH @ 60 Pa Dwelling unit leakage test, measured results: ACH @ 50 Pa Whole Building Leakage test (R2 non -corridor only) design target: C M/sf @ 50 Pa Whole Building Leakage test (R2 non -corridor only) measured: CFM/sf (Co. 5o Pa Do building leaks a tests Include GPS and time stamp verification? Y or N Whole.Mouse Ventllatlon..System;,Measured F19w.Rates (M9505.4 IRC-WA) Circle one Are the system controls correctly labeled? Y or N The Whole House Ventilation (WHV) system operation and maintenance (O&M) Y or N Instructions were provided to the building owner? Provided to: on (date) Whole House Ventilation System Type: (Circle one) (1) Whole (louse exhaust fan, location (2) Balanced HRVI ERV, location For R2 low-rise, serves more than one unit? Y or N (3) Supply or HRV WHV Integrtil to the air handler. Describe system control sequence of operations or reference to geslgn submittal: Specify run-time: hours per day CFM WHV calculated design minimum flow rate per:plan submittal: WHV measured min flow rate at. commissioning: Exhaust CFM, Supply CFM Do WHV flow tests include GPS & time stamp verification? Y or N HRVIERV sensible heat recovery efficiency: Commissioning Notes: Ather..MandatoryRegtrlrements ..'' Circle one All other mandatory requirements of WSEC-R have been met? Y or N *JBDT Blower Door Testing 1W 425-312-3914 o BlowerpoorNW.com blowerd oorsch edule(cD gm aii.com Job Site Information Permit #: BLOWER DOOR TESL' RESULTS Date of Test: Technician Name: Address and Lot Number: t'f--C- 114 a'e City: _=12 �6 Zip Code: Cond. Floor Area (ft2): Z2 0 Age of House: &)21 Source (check one): Mans U Estimated ❑ Measured Test Results ass ❑ Fail Test Target Q Could Not Complete 9-6 /%l Volume Ring (check one if applicable): 0 Open Q A 0 C Blower Door Fan Location: ,�� Weather Conditions: ACH5o CFM@50Pa Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate ofnot exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the Cade official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed off at the frame prior to the test. During testing: i. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers, if installed at the time of the test, shall be Fully open. 2i Property address: _ _ �_� ! .� _ %(—e Bullderlregistered design professional name: c Builderlreg. design pro. signature: Conditioned Floor area: ftl (per building permit) R�.Values R303.1 1: , Ceiling/ Vaulted R- _ (Floors: Over unconditioned space R Attic: Attic R- Slab -on -grade floor R. Walls: Above grade R- _ Fully insulated slab? YIN (Circle one) t;elow, int. R- Doors: R- p- Below, ext. R- U-Vailue of. Windows;, Skylights and Doors (R303 1.1.3).: Average area weighted U-value from Glazing Worksheet Average U- - Fue/ Normalization Tables R406.2 .. and Energy Credits able R406.3 :: System Type Number (t to 5) (Select one) Energy Credits selected (I to 7)•_ Fuel Normalization Credit + Total Energy Credits Total Credits Heating,. Cooling and Domestic blot Water. S stern Type(Manufacturer and Model Number 1:ffiGenc Heating Cooling DHW Drain water heat — recovery Onsite. Renewable Energy. Electric Rowel' System ' System type System design capacity kW Rated annual generation kWh/yr Manufacturer and Model (Circle one) Dish washer Y or JV Refrigerator Y only Washer Y or Dryer Y or1\1 Vented or unvented? If vented, CEF ratio Gas fireplace / heating stove (Section R402.4.2) Fireplace efficiency (FE) Heating or Decorative? (Circle one) HYAG System Duct Leakage` Testing (R403.3)1 circle one All ductwork and air handier In conditioned space? (See Option 4.2) Y or N All ductwork in unconditioned spaces buried and tested at 3% total leakage, and air Y or N handier In conditioned space? (See Option 4.1.) All ductwork & air handler outside conditioned space Insulated to minimum R-8? Y or N Air handler present at duct!Ieakgge test? (Total leakage 4% if yes, 3% if no) Y or N HVAC leakage to outside`test conducted at final? Y or N Do HVAC duct leakage tests include GPS and time stamp verification? Y or N HVAC system leakage test calculated design target: CFM @ 25 Pa HVAC system leakage test measured results: CFM @ 25 Pa `. S.ullding: Leakage:.. Testing (R402.4.1.2) Dwelling unit leakage test calculated design target: r ACH @ 50 Pa Dwelling unit leakage test, measured results: `3. 1 ACH @ 50 Pa Whole Building Leakage test (R2 non -corridor only) design target: CFMI/sf @ 50 Pa Whole Building Leakage test (R2 non -corridor only) measured: —d='�Y CFMlsf @ 50 Pa Do building leaks a tests Include GPS and time stamp verification? Y or N Whole.Mouse Ventilation..Sys.tem..measure d Fiow.Rates (M9505.4 PRG-iNlt) Circle one Are the system controls correctly labeled? Y or N The Whole House Ventilation (WHV) system operation and maintenance (O&M) Y or N Instructions were provided to the building owner? Provided to: on (date) Whole House Ventilation System Type: (Circle one) (1) Whole Douse exhaustfan, location (2) Balanced HRVI ERV, location For R2 low-rise, serves more than one unit? Y or N (3) Supply or HRV WHV Integnil to the air handler. Describe system control sequence of operations or reference to gesign submittal: Specify run-time: hours per day CFM _ WHV calculated design minimum flow rate per:plan submittal: WHV measured min flow rate at. commissioning: Exhaust CFM, Supply CFM Do WHV flow tests include'GPS & time stamp verification? Y or N HRVIERV sensible heat recovery efficiency: Commissioning Notes: :...::... ............:.: :. :. :.:,..Other.MandatoryRequirements-:::'.... ....... . cle one All other mandatory requlremenls of WSEC-R have been met? Y or N *IBDT Blower Door Testang IWW '425-312-3914 o BlowerpoorNW.com blowerdoorscheduleRgmail.com Job Site Information Permit #: ]BLOWER DOOR TEST RESULTS Date of Test: Technician Name: Address and Lot Number: F `t City: Cond. Floor Area (ft): r Zip Code: Age of House: Source (check one): Plans Q Estimated ❑ Measured Zest Results � ss Q Fail Test Target r�: >1- Q Could Not Complete �'✓ �� Volume ACH50 CFM@50Pa Ring (check one if applicable): U Open Q A ID C Blower Door Fan Location: - Weather Conditions:vi Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate ofnot exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third parry. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal emmelope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed offat the frame prior to the test. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings fcr continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5- Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers. if installed at the time of the test, shall be fully open. Property address: Bulkier/registered design professilAal name. a Builder/reg. design pro. signatuf e• Conditioned floor area: fft2 building / (per permit)- .- Ceiling! Vaulted R- _ Floors- Over unconditioned space R-_ Attic: Attic R- _ Slab -on -grade floor RP Walls: Above grade R- _ Fully insulated slab? YIN (Circle one) Below, Int. R-._­ Moore;: P2-__Ft- Below, ext. R- &_m alud ot'.Nilandows,.Skylights-and Doors (R3011.1.3) Average area weighted U-value from Glazing Worksherat average U- - Fuel Normalization Toole s R406e2 : and Energy Credits able R406.3 System Type Number (9 to n) (Select one) Energy Credits selected (9 to 7)_ �— Fuel Normalization Credit + Total Energy Credits ='total Credits " Heatingi Cooling and Domestic Hot tWwea ..: !System a Mae' ufacturee and Model Nurnber Eificle nc Heating Cooling DHW 4 Drain water heat recovery Onsite ftnewable Energy. Electric Power �ystem: System type _ _ System design capacity kW Rated annual generation ItWhlyr Manufacturer and Model (Circle one) Dish washer _ Y os N Refrigerator Y or N Washer Y or:N Dryer — Y or 11 Vented or unvented? if vented, CEF rating Gas fireplace / heating stove (Section R402.4.2) Fireplace efficiency (FF) Heating or Decorative? (Circle one) FGYAC System ®tact Leakage Testing (R403.3) Circle one All ductwork and air handier In conditioned space? (See Option 4.2) Y or N All ductwork in unconditioned spaces buried and tested at 3% total leakage, and air Y or N handler In conditioned space? (See Option 4.1.) All ductwork & air handier outside conditioned space Insulated to minimum R-S? Y or N Air handier present at duct leakage test? (Total leakage 4% if yes, 3% if no) Y or N HVAC leakage to outside'test conducted at final? Y or N Do HVAG duct leakage tests include GPS and time stamp verification? Y or N HVAC system leakage test calculated design target: CFM @ 25 Pa PAVAC system leakage test measured results: CFM @ 25 Pa Rujiding: Leakage .Testing (R402.4.9.2) Dwelling unit leakage test calculated design target: ACH @ 50 Pa Dwelling unlf leakage test, measured results: Whole Building Leakage test (112 non -corridor only) design target; CFM/sf @ 50 Pa Whole Building Leakage test (R2 non -corridor only) measured: i} CFiVI/sf @ So Pa Do building leakage tests Include OPS and time stamp verification? Y or N !N/hol®.House Veniila89on..S stem:.Meassrrod Flg►v,Ra8es (M9505.4 !PC-1N9) Circle one Are the system controls correctly labeled? Y or N The Whole House Ventilation (WHV) system operation and maintenance (O&NI) Y or N Instructions were provided to the building owner? Provided to: on (date) Whole Mouse Ventilation System! Type: (Circle one) (1) Whole house exhaust fan, location (2) Balanced HPVi ERV, location For R2 low-rise, serves more than one unit? Y or N (3) Supply or HRV WHV Integral to the air handier. Describe system control sequence of operations or reference to design submittal: Specify run-time: hours per day CFM _ UIiHV calculated design minimum flow rate per:plan submittal: WI1V measured min flow rate at. commissioning: Exhaust CFM, Supply CFM Do WHV flows tests include GPS & time stamp verification? Y or N HRV/ERV sensible heat recovery efficiency: Commissioning Notes: ..00)er.Mandatoay Regtalrements: Circle one All other mandatory requirements of WSEC-R have been met? Y or N * T Blower Door Testing KW 425-312-3914 o BlowerpoorNW.com blowerdoorschedille rl;gmail.com Job Site Information Permit #: Address and Lot Number: BLOWER DOOR TEST RESULTS Date of Test: 1 Technician Name: v City: Yj Zip Code: J 1 3 Cond. Floor Area (ft2): V Age of House: AP11-1 Source (check one): ugans Q Estimated ❑ Measured 'Pest Results s Q Fail 0 Could Not Complete `E� 1Volume ACH50 Test Target �` v CFM@50Pa Ring (check one if applicable): 0 Open D A /'� D C Blower Door Fan Location: Weather Conditions: t Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate ofnot exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed offat the frame prior to the test. Dunng testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup au, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers. if installed at the time of the test, shall be fully open. '-) ; "J? Property address: Builder/registered design profes tonal name: _ Builder/mg. design pro. signat:um: �V Conditioned floor area: f.' (per building permit) .• ": ' i?-Ps'alues l�3ab,3:9.9� _ ' Ceiling/ Vaulted R- _ Floors: Over unconditioned space Bea Attic: Attic R---- Siab-on-grade floor Ra Walls: Above grade R- Fully insulated slab? YIPi (Circle one) Below, Int. R-M Doors: R-Pl- , R- Below, ext. F2- fl9mMue ot'.ii ndowse,Skylights and Doors (R3034.9.3)::: Average area weighted U.value from Glazing Worksheat Average U-- Fuel Normalization (Tobles R40&2 : andEnergy Credits able R406.; System Type Number (9 to 5) (Select cane) Energy Credits selected (I to 7)_, — Fuel Normalization Credit + Total Energy Credits = Total Credits— He atftj Cooling and Domestic Hot Water. . :. System Type l anufactural• and Model Number) cla�r►c Heating Cooling DHW Drain water heat recovery Of&slte. Renewable Energy Electric Powell' syptem :: . System type System design capacity kVV Rated annual generation ItWh/yr _ Appilopces .:.. Energy Star, (Circle one) _ II,Fansaeao>frrrer and Model Y or N Dish washer_ Refrigerator Y or.N Washer Y or .iV Dryer _ Y or N Vented or unvented? if vented, CEF rating Gas fireplace / heating stove (Section R402.4.2) fireplace efficiency (FE) Heating or Decorative? (Circle one) f1.1/AG System Duct Leakage`TesgTB7� (R4®3.3) Circle one All ductwork and air handier in conditioned space? (See Option 4.2) Y or N Ail ductwork In unconditioned spaces buried and tested at 3% total leakage, and air Y or N handler In conditioned space? ($ee Option 4.1.) All ductwork & air handier outside conditioned space Insulated to minimum R-13? Y or N Air handier present at duct leakage test? (Total leakage 4% if yes, 3% if no) Y or N HVAC leakage to outsidetest conducted at final? Y or N Do HVAC duct leakage tests include GP5 and time stamp verification? Y or N HVAC system leakage test calculated design target: CFM @ 25 Pa HVAC system leakage test measured results: CFM @ 25 Pa r`. B.u6lddng: Leakage`.. Testing (R402.4.1.2) Dwelling unit leakage test calculated design target: —ACH @ 5® Pa Dwelling unN leakage test, measured results: t� ACH @ 90 Pa Whole Building Leakage test (112 non -corridor only) design target: CFM/sf @ 50 Pa Whole Building Leakage test (RZ non -corridor only) measured: CFM/sf @ 50 Pa Do building leakage tests Include CAPS and time stamp verification? Y or N Whole. House Ventllatlop. $ysterp. Measured Fl9WRates (M1505.4 IRC.WA) circle one Are the system controls correctly labeled? Y or N The Whole house Ventilation (WHV) system operation and maintenance (O&M) Y or N instructions were provided to the building owner? Provided to: _ on (date) Whole House Ventilation System Type: (Circle one) (1) Whole f ouse exhaust tan, location (2) BaiancW HRVI ERV, location _ For R2 low-rise, serves more than one unit? Y or N (3) Supply or FIRV WHV Integral to the air handier. Describe system control sequence of operations or reference to design submittal: Specify run-time: hours per day CFM _ 1AIHV calculated design minimum flow rate per:plan submittal: WHV measured min flow rate at commissioning: Exhaust CFM, Supply CFM Do WHV flow tests include GPS & time stamp verification? Y or N HRV/ERV sensible heat recovery efficiency: Commissioning Notes: ... rY G' - _:..".... :. ..:.Atlrer.IVlandato Re uirements:: Circle one All other mandatory requlremenMs of INSEC-R have been met? Y or N *JBDT Blower Door Testing KW 425-312-3914 o BlowerpoorNW.com blowerdoorschedtlle a gmail.com Job Site Information Permit #: Address and Lot Number: City: C d ma-L-j -f Cond. Floor Area (ft): 13LO VER DOOR TEST RESULTS Date of Test: Technician Name: CD Zip Code: Age of House: k jeW Source (check one). Q" tans ❑ Estimated ❑ Measured 'Pest Results 1 (� ass U Fail C.t Could Not Complete `�"' Volume �C l ACH50 Test Target �� C� L' CFM@50Pa Ring (check one if applicable): U Open U A U C Blower Door Fan Location: � `TV` - Weather Conditions: '( oujLi Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate ofnot exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the Cade official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed offat the frame prior to the test. During testing: I . Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilator shall be closed and sealed; 5 � Hearing and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers. if installed at the time of the test, shall be fully open. Property address: Bullder/registered design professional name: Builder/reg. design pro. sig at ®• Conditioned Floor area: ftl (per building permit) ._ RVaiues R303.9 I) _ Ceiling/ Vaulted R. _ (Floors: Over unconditioned space R• Attic: Attic R- _ Slob -on -grade floor R-__ Walls; Above grade R- _ Fully insulated slab? Y/N (Circle one) Below, Int. R-_ _ Doors: R- p-�- R_ Below, ext. R- ..... .. _...... U-Value of.Win doi�rs,. Skylights. sand Doers (R303.1P 9.3):: Average area weighted U-value from Glazing Worksheet Average U- - . Fuel Normaldzatioea TOblee R406.2 , and Energy Credits able R406.3 :. System Type Number (i to 5) (Select one) Energy Credits selected ('I to %)_ Fuel Normalization Credit + Total Energy Credits = Total Credits Heating,Cooling and Domestic Hot Water.. S stern TYPe Manufacturer and Model Number Efficlenc Heating Cooling DHW Drain water heat — recovery ®nsite. RLMeWable Energy Electric Poi o �y�teiDl:: ' System type System design capacity )(W Rated annual generation kWhlyr soda liances . Energy Star?.. Manufacturer and Model (Circle one) Dish washer YorN Refrigerator YorN Washer Y or N Dryer Y or 1V Vented or unvented? If vented, CEF ratin Gas fireplace / heating stove (Section R402.4.2) Fireplace efficiency (FE) Heating or Decorative? (Circle one) _ H.i/AG System Duct Leakage Testing (R403.3) Circla one All ductwork and air handler In conditioned space? (See Option 4.2) Y or N Ali ductwork In unconditioned spaces buried and tested at 3% total leakage, and air Y or N handier In conditioned space? (See Option 4.1 ) All ductwork & air handler outside conditioned space insulated to minimum R-87 Y or N Air handler present at duct eakgge test? (Total leakage 4% if yes, 3% if no) Y or N HVAC leakage to outside'test conducted at final? Y or N Do HVAC duet leakage tests include GPS and time stamp verification? Y or N HVAC system leakage test calculated design target: CFM @ 25 Pa HVAC system leakage test measured results: CFM @ 25 Pa .Sulldfn4Leakage.Testing (R402.4.9.2) Dwelling unit leakage test calculated design target: ACH @ 50 Pa Dwelling unit leakage test, measured results: AC)t @ 50 Pa Whole Building Leakage test (112 non -corridor only) design target: CFM/sf @ 50 Pa Whole Building Leakage test (R2 non -corridor only) measured: CFM/sf @ 50 Pa Do.building leaks a tests Include GPS and time stamp verification? Y or N Whole House Ventilation..S,ys.tem.Meosured Flow.Rates (1149505.41RC-WA) Circle one Are the system controls correctly labeled? Y or N The Whole House Ventilation (WHV) system operation and maintenance (O&M) Y or N instructions were provided to the building owner? Provided to: on (date) Whole House Ventilation System Type: (Circle one) 0) Whole house exhaust fan, location (2) Balanced HRV/ ERV, location For R2 low-rise, serves more than one unit? Y or N (3) Supply or HRV WHV Integral to the air handler. Describe system control sequence of operations or reference to design submittal: Specify run-time: hours per day CFM _ WHV calculated design minimum flow rate per,plan submittal: WHV measured min flow rate at. commissioning: Exhaust CFM, Supply CFM Do WHV tlovd tests include GPS & time stamp verification? Y or N HRV/ERV sensible heat recovery efficiency: Commissioning Notes: _ ... _ . . Other Mandatory Requirements- Circle one All other mandatory requlremen9s of WSEC-R have been met? Y or N * T Blower Door �g NW '425-312-3914 o BlowerpoorNW.com blowerd oorsch edule(ZD.gm ail.com Job Site Information Permit #: BLOWER DOOR TEST RESULTS Date of Test: l < < I �k �� Technician Name: <�%�h 626C,(�,L- S-�-Lf Address and Lot Number: City i >i V l�� 1 Cond. Floor Area (ft): l L-UL Zip Code: Age of House: Source (check one): Pplans ❑ Estimated ❑ Measured Test Results ass Q Fail Test Target c C j' C.t Could Not Complete Ring (check one if applicable): Q Open Q A B ID C Blower Door Fan Location: ,-�— �`,�/ Weather Conditions: Volume ACH50 CFM@50Pa Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: 0 R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate ofnot exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third parry. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at an}' time after creation of all penetrations of the building thermal envelope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed off at the frame prior to the test. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdra t and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilator shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers. if installed at the time of the test, shall be fully open. Property address: Builder/registered design professional name: b Builder/reg. design pro. signature: Conditioned floor area: fft2 (per buildings permit) R;-V'aiues R303.1.I Ceiling/ Vaulted R. (Floors: Over unconditioned space R- Attic: Attic R- _ Slab -on -grade floor R- Walls; Above grade R- _ Fully insulated slab? YIN (Circle one) Below, Int. R Doors: Below, ext. U-VOW6 of.W1ndsaWs,. Skylights. and Doors (R303.1..1.3) : . Average area weighted U-value from Glazing Worksheat Average U- - Fuel Normalization Tables R40&,and.Ener Credits aisle Ro 3 System Type Number (9 to 5) (Select one) Energy Credits selected (I to ;r)_ �— Fuel Normalization Credit + Total (Energy Credits = Total Credits . and Domestic Hot wow.:... Heating, Cooling S stern TYpe itlianufacturoP and Model Nur bps Elficlonc Heating Cooling DHW ° Drain water heat recovery Onsi$e. ftnewabie Energy, Electric Powei �ystears System type _ _ _ System design capacity kW b Rated annual generation kWh/yr Al®does .. ' Energy o�tar.. (Circle vne) Manufacturer anufacturer and Model Y ®h"19i Dish washer Refrigerator Y or N Washer You •iV Dryer _ Y or iM Vented or unvented? If vented, CEF rating Gas fireplace / heating stove (Section R402.4.2) Fireplace efficiency (FE) o _ D leatIng or Decoratgve? (Circle one) i1YAC System Duct Leakage: Testing (de4®3.3) CirCIQ one All ductwork and air handier In conditioned space? (See Option 4.2) Y or N Ail ductwork in unconditioned spaces buried and tested at 3% total leakage, and air Y or N handler In conditioned space? (See Option 4.9 ) All ductwork & air handier outside conditioned space Insulated to minimum R-8? Y or N Air handler present at duct lleakage test? (Total leakage 4% if lies, 3% if no) Y or N KVAC leakage to outside test conducted at final? Y or N Do HVAC duet leakage tests include OP5 and time stamp verification? Y or N HVAC system geakage test calculated design target: CFNi @ 25 Pa HVAC system leakage test measured results: CFM @ 25 Pa .Su ldingLeakaga .Vesting (R402.4.9,2) Dwelling unit leakage test calculated design target: A Cli @ 50 Pa Dwelling unit leakage test, measured results: ACH @ 50 Ira Whole Building Leakage test (112 non -corridor only) design target: CFM/sf @ 50 Pa Whole Building Leakage test (RZ non -corridor only) measured: CFIUI/sf @ 50 Pa Do building leakage tests Include GPS and time stamp verification? Y or N i hoIe.Flouse Ventilagpn..; ;ys.ferra:.Meesureo' FloW,RaBes (MI505.41RG-WA) Circle one Are the system controls correctly labeled? Y or N The Whole blouse Ventilation (WHV) system operation and maintenance (O&NI) Y or N Instructions were provided to the building owner? Provided to: on (date) Whole House Ventilation System Type: (Circle one) (1) Whole house exhaust fan, location (2) Balanced FiRV/ ERV, location For R2 low-rise, serves more than one unit? Y or N (3) Supply or FIRV WHV integral to the air handier. Describe system control sequence of operations or reference to gesign submittal: Specify run-time: _______ hours per day CFM 1AifHV calculated design minimum flow rate per:plan submittal: 1AMV measured min flow rate at.commissionbng: Exhaust CFM, Supply CFM Do WHV flow tests include GPS & time stamp verification? Y or N HRVIERV sensible heat recovery efficiency: Commissioning Notes: .0ther.Mandatory Requirements: Circle one All other mandatory requirements of WSEC-la have been met? Y or N B gm *1 D r. Blower Door Tesfiing ll 425-312-3914 o BlowerpoorNW.com blowerdoorschedule@.gmail.com .Tot➢ Site Information Permit #: Address a City: Cond. Floor Area (ft): `t BLOWER DOOR TEST RESULTS Date of Test: Technician Name: Zip Code: Age of House: Source (check one): 2551, ❑ Estimated Q Measured Test Results Wass U Fail Q Could Not Complete Test Target C5 to fj��Vvojume C� 'T ACH,o CFM@50Pa Ring (check one if applicable): U Open U A rD Q C Blower Door Fan Location: - 0 Weather Conditions: Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate ofnot exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed off at the frame prior to the test. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdrah and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilator shall be closed and sealed; �- Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers, if installed at the time of the test, shall be fully open. Property address: _(S - Bullder/registered design professional Warne: Builder/reg. design pro. signature: e� Conditioned floor area: r ft1(per building permit) Ra-Values R303.1.1) Ceiling/ Vaulted R. _ (Floors: Over unconditloned space R- Attic: Attic R- _ Siab-on-grade floor Rn Wails: Above grade P- _ Bully insulated slab? Y/N (Circle one) Below, Int. R-.__ - Doors: R-!!, F:-, R- Below, ext. R-_ U-Value of.tii Windows;. Skylights_ and Doors (R30 n4.14 Average area weighted U-value from Glazing Worksheet Average U- - .:......... Fuel Norlraalfz40&2). and Energy, Credits able R406.3)... .: System Type Number ('I to a) (Select one) Energy Credits selected (I to 7)_ - Fuel Normalization Credit + Total (Energy Credits-- � Total Credits -- Heating, Cooling and Domestic /°leaf I/ Wei:. S steal Type l anufacfuraae and Model Number) Efflclonc Heating Cooling DHW o Drain water heat recovery ®oaslte. Renewable Energy Electric Power System type _ _ System design capacity k'a(li Rated annual generation ,— kWh/yr Applloaaces.:.. Eraer Star W�nu$'acturer and Model (Circle one) Y od"ill Dish washer _ Refrigerator Y or W Washer Y or:N Dryer _ Y or1V Vented or unvented? If vented, CEF rating._. Ga f re / heating stove (Section R402.4.2) Fireplace efficiency (FE) Heating or Decorative? (Circle one) HYAC System Duct Leakage: 'testing (R403.3) Cir612 one All ductwork and air handier In conditioned space? (See Option 4.2) Y or N All ductwork in unconditioned spaces buried and tested at 3% total leakage, and air Y or N handler In conditioned space? (See Option 4.1 ) All ductwork & air handler outside conditioned space Insulated to minimum R-&? Y or N Air handler present at duct leakage test? (Total leakage 4% if yes, 3% if no) Y or N HVAC leakage to outside test conducted at final? Y 6r N Do HVAC duet leakage tests include GPS and time stamp verification? Y or N HVAC system leakage test calculated design target: CFIVi @ 25 Pa NVAC system leakage Rest measured results: CFM @ 25 Pa :.Sullding : Leakage. Testing (R402.4.1.2) Dwelling uniE leakage test calculated design target: ACH @ 50 Pa Dwelling unO leakage test, measured results: ACH @ 50 Pa Whole Building Leakage test (112 non -corridor only) design target, CFM/sf @ 50 Pa Whole Building Leakage test (R2 non -corridor only) measured: y CFM/sf @ 5o Pa Do building leakage tests Include GPS and time stamp verification? Y or N Whol&House;. Ventf/allon.., ys.tetp Measured Flow.Rwes (M1505.4 IIdC-Vi/A) circle one Are the system controls correctly labeled? )(Or N The Whole House Ventilation (WHV) system operation and maintenance (O&M) Y or N instructions were provided to the building owner? Provided to: _ on (date) Whole Flouso Ventilation System Type: (Circle one) (1) Whole house exhaust fan, location (2) Balancn:d HRVI ERV, location _ For Ra low-rise, serves mare than one unit? Y or N (3) Supplyor HRV WHV Integral to the air handler. Describe system control sequence of operations or reference to d®sign submittal: Specify run-time: _______ hours per day CFM _ IiUHV calculated design minimum flow rate per:plan submittal: WHV measured min flow rate at.commissloning: Exhaust CFM, Supply t FM ®o WHV flood tests include GPS & time stamp verification? Y or N HRV/ERV sensible heat recovery efficiency: Commissioning Notes: ::...OMer.Mandato Re uirements� G Circle one All other rnalrodatory requirements of WSEC-R have been met? Y or N * T Blower Door Tesiitrg IW '425-312-3914 o BlowerpoorNW.com blowerdoorschedule(rDgmail.com Job Site Information Permit #: BLOWER DOOR TEST RESULTS Date of Test: Technician Name: Address and Lot Number: J Zip P Code: Cond. Floor Area (ft): )Gv- D---- Age of House: Source (check one): Bans Q Estimated ❑ Measured 'Pest Results Pass Q Fail Test Target (5` , Q Could Not Complete W, / Volume LL L(, ACH50 j CFM@50Pa Ring (check one if applicable): Q Open 0 A C U C Blower Door Fan Location: Weather Conditions: (fl J Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: ACH50 = (CFM50 x 60)/ Volume Where: CFM50 = Blower door fan flow at 50 Pascal pressure difference Volume = Conditioned Floor Area of the housing unit x ceiling height 2015 Washington State Energy Code reference: R402.4.1.2'Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate ofnot exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Once visual inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed offat the frame prior to the test. Dining testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdrafi and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open, access hatches to conditioned crawl spaces and conditioned attics shall be open; 4. Exterior openings for continuous ventilation systems and heat recovery ventilator shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers. if installed at the time of the test, shall be fully open. Properly address: — 7-- Builder/registered design professional name: - e Builder/reg. design pro, signs ur Conditioned floor area: Ift2 (per building permit R-Values 363:9.9 _ .. Ceiling/ Vaulted R. _ Floors: Over unconditioned space R- Attic: Attic R-- Slab -on -grade floor R Wallis; Above grade R- _ Fully insulated slab? YiN (Circle one) Below, Int. R---.....6_. Doors: R-__R- Below, ext. R- U-Valud c>F.fflndows,.Skylighft and Doors Average area weighted U-value from Glazing Woftheof Average iJ- - d°ttel Normalization Tables R406.2 : and Energy, Credi&s able R406.3 System Type Number (I to 5) (Select one) Energy Credits selected (I to 7)_ Fuel Normalization Credit + Total (Energy Credits -Total Credits _ H€ewtln Cooling and Domestic Hot Water.. S stern T e Manufacturat and Model Number Efficleanc Heating Cooling ®FIW o Drain water heat recovery Onsite. ftnew able Energy. Electric Powo M System type System design capacity kBiU�, ed annual generation ILWhlyr Esser o3tal*�,.. (Circle one) [Dish Manufaetus'er and Model ®d' 101rigerator washerY Y or N sher Y or :iV _ Y orlVVented or unvented? If vented, CEF ratanfireplace UGaslDryer / heating stove (Section R402.4.2.) Fireplace efficiency (FE)eating or Decorative? (Circle one) .. HYAC System Duct Leakage Testingi (R403.3) Circle one All ductwork and air handier In conditioned space? (See Option 4.2) Y or N All ductwork in unconditioned spaces buried and tested at 3% total leakage, and air Y or N handier In conditioned space? (Sea Option 4.1.) All ductwork & air handier outside conditioned space insulated to minimum R-8? Y or N Air handier present at duct!leakege test? (Total leakage 4% if yes, 3% if no) Y or N HVAC leakage to outside test conducted at final? Y or N Do HVAC duct leakage tests include GPS and time stamp verification? Y or N HVAC system leakage test calculated design target: CFM @ 25 Pa PAVAC system leakage test treasured results: CFM @ 25 Pa :::::;:;:,:':;:`..:;.:: •:.:.`:':.Rullding:Leakage: .Testing (R402.4.1.2) Dwelling unit leakage test calculated design target: ACH @ 50 Pa Dwelling unit leakage test, measured results: i ACH @ 50 Pa Whole Building Leakage test (R2 non -corridor only) design target: isf @ 55 Pa Whole Building Leakage test (R2 non -corridor only) measured: r CFMIsf @ 50 Pa Do building leaks a tests Include GPS and time stamp verification? Y or N . Whole.hlouse Ventilatlon..Sys.tem.,Measured Flow:Rates (M9595., circle one Are the system controls correctly labeled? Y or N The Whole House Ventilation (WHV) system operation and maintenance (O&NI) Y or N Instructions were provided to the building owner? Provided to: on ___(date) Whole House Ventilation System Type: (Circle one) (1) Whole house exhaust fan, location (2) Balanced HRVi ERV, location For R2 low-rise, serves more than one unit? if or N (3) Suppiypr HRV WHV Integral to the air handier. Describe system control sequence of operations or reference to gesign submittal: Specify run-time: hours per clay CFM INHV calculated design minimum flow rate per:plan submittal: WHV measured min flow rate at. commissioning: Exhaust CFM, Supply CFM Do WHV flow tests include GPS & time stamp verification? Y or N l IRWERY sensible heat recovery efficiency: Commissioning Notes: Other.Msndato Re ulrements: A Circle one All othew mandatory requirements of WSEC-R have been met? Y or N