Loading...
REV HEAT PUMP 546 A Paradise Page A2- Heat Pump Site MeasurementsI; c C -72l 8' 41' 24' 3311-1/2" 411-1/2" 211" THR 5HOLD PER IBC 1104, COMPRESSOR UNIT I C A117.1-09, 402 Lp LE55 THAN 36" 2' BEVE ED NO STEEPER THEN 1:2 N 2 HOUR WALL d ® i 9077; � L1—HRCLO i LD , i UUNHEATED AREA E TRIC WAG 427.4 i 208/24O V 40 AMP STORAGE 302 2 HOUR WALL HEAT 4 MIT. . TEMP ATT i ELECTRICAL VEHICLE CHARGING PER i 15' 19'9" 112-1/2" J 55-1/2" _ i 211-1/2" N 80.22 ft 2 AMBIENT AIR TEMPERATURE AND NLD TYF TYP HUMIDITY IN THE MACHINE ROOM 45 MIN W/SELF �p B (� TO BE REGULATED VIA 50 CFM FAN PER MFG. RECOMMENDATIONS CL051NG HINGE T ' 1 HR MACHINE RM i PER IBC 3005.2 J = J P - 1—HR i ui GARAGE 302 TYF ----- 8 N TY _ _ ------ , = N 05ING HINGE Yi'_ ----------------------------------------- AF V R LE S L VATO ANF. E P J , N ATO EET ---- -------------- PAINTED ACCE55 0024 MIN W/ 5E L CLO NG HIN X COMPRESSOR UNIT LE55 THAN 56" i� A51LE / it = 0 P W/ EL TRIC 0 L EVATOR S - i 1:� • WAC 427.4 cp i cp i 208/240 V 40 AM P ELECTRICAL VEHICLE CHARGING i WAG 427.4 � 208/240 V 40 AMP ♦ 60 MIN W/ 5ELF CLOSING HINGE � � - N i � 1 1—HR ELECTRICAL VEHICLE CHARGING ELECTRIC RELEASE ► 10 1 I 11 110 Z_ - , N i N `•. GARAGE 201 z 2 HOUR WALL _ _ o., 913.5 }� TYF2 TY12 ,o N H X w Q B 0 N UP _ P4 H • RISE: 6.81' x ul) 1—HR J " I, TYP 3X3 PAD o v 1- R N N n GARAGE 301 STAIR 5' 211-1/2" CARPET - 16068 OVEiKHEAD DOOR THRESHOLD PER IBC 1104; ICC A117.1-09, 402 i i i_ UNHEATED AREA ELECTRIC TYP T O 90 MIN W/5ELF CL051NG HINGE N J N 1/2" BEVELED NO STEEPER THEN 1:2 i N HE 40 MIN. TEMP 1 WATT ' • PE SQ. MAX N ------- X TYP 3070 �L� i 1—HR U " II 12 7-1/2 10 5 - 3 /2 8 5 II GARAGE 202 3' 5' 7'6" 34'6" 1'10-1/2" - N TYF TYP THRESHOLD PER IBC 1104, Q ICC A117.1-09, 402 B N 1/2" BEVELED NO STEEPER THEN 1:2 _---------- ---- ------ i -- - - --------- i i i i i N i TYP ------ G ------------------------------- 2020 2020 W (�✓ N 7-7 N 3'11" SIGN ON DOOF "FIRE SYSTEM CONTROL" 11'6" OMPRE550R UNIT LE55 THAN 36" 2X6 @ 16" O.C. 5TUD WALL W/ R-21 IN5UL. ® (2)2X4 @ 16" O.C., 1" AIR 51-ACE 1 HR METAL STUD WALL (AFTER ELEV. INSTALL) 0 2X4 @ 16" O.C. 2X6 @ 16" O.C. PLUMBING WALL WOOD COLUMN OA PROVIDE OUTSIDE AIR FOR FURN. & WATER HEATER (RELIEF MUST VENT TO OUTSIDE (NOT GARAGE) 22"00" ATTIC ACCESS (30" MIN. VERT CLEARANCE WEATHERSTRIP & IN5UL. TO R-49 "NO EXIT" SIGN O 120V 5MK DET W/BATT BACKUP (INTERCONNECTED) ■ FIRE DETECTOR INTERCONNECTED 4" EMERGENCY LIGHTING W/BATT BACKUP ' INDICATES ILLUMINATED EXIT 51GN5 W/ BATT BACKUP CONTORL JOINTS BARRIER FREE DIRECTIONAL 51GNAGE LOCATION FUTURE GRAB BARS: PROVIDE BLOCKING ® HORIZONTAL CENTERLINE P05TION = 35" FROM FLOOR PER ICC/ANSI 609.4 ig CARBON MONOXIDE DETECTOR PER IRC 315 ALL UNITS ARE TO BE TYPE "B" UNITI5 PER ICC-ANSI A117-1 SECTION 1004. INSTALL SOLID 2X BLOCKING FOR FURTURE GRAB BARS IN ALL DATHKOOM5 CLEAR FLOORS AREAS ARE INDICATED IN THE TYPE "B" BATHROOMS AND KITCHEN CERTIFICATE WILL BE POSTED IN FURNACE (OK OTHER APPROVED AREA) WITH THE FOLLOWING INFORMATION: K-VLAUNES, U-VALUE5,RE5ULT5 FROM DUCT SYSTEM TEST AIR LEAKAGE TESTING, RESULTS FROM BUIDLING ENCELOPE AIR LEAKAGE TESTING, TYPES AND EFFICIENCIES OF HEATING, COOLING, AND SERVICE WATER HEATING EQUIPMENT PER K401.3 DUCTS ARE REQUIRED TO BE INSULATED TO A MINIMUM OF R-8 PER R403.3.1 THE DWELLING 15 REQUIRED TO BE TESTED & VERIFIED A5 HAVING AN AIR LEAKAGE RATE NOT EXCEEDING 3 AIR CHANGES PER HOUR PER R402.4.1 MECHANICAL DUCTS ARE REQUIRED TO BE SEAL TESTED IN ACCORDANCE WITH 403.3.2 TESTING TO COMPLY WITH W5U K5-33. EXTERIOR HEADERS ARE REQUIRED TO BE INSULATED WITH A MIN. OF R-10 INSULATION. CORNERS OF STUD WALLS ARE REQUIRED TO BE FULLY INSULATED. 've® II I SCALE: 1 /4" = 1'-0" GARAGE 201: 437.96 SQ. FT. GARAGE 202: 549.13 SQ. FT. GARAGE 301: 992.16 SQ. FT. GARAGE 302: 971.06 SQ. FT. COMMON AREA: 574.19 SO. FT. ELEVATOR EQUIPMENT (ZOOM •1351 HEAT DETECTOR @ SPRINKLER HEADS •PROVIDE FRESH AIR THROUGH 4" DUCT •EXAUST FAN TO MAINTAIN A MAX. TEMP OF 900 & VENT TO OUTSIDE AS REQ'D BY MFG SPECS ELEVATOR NOTES •UNHEATED 511ACE•CONTINOU5 RIM @ FLOORS. •IN5TALLATION OF ADDITIONAL ELEVATOR DOOR5 SHALL NOT VIOLATE LISTINGS OF ELEVATOR (TYP) MECHANICAL CHASES •CONTINUOUS RIM @ FLOOR. 5PRINKLER ROOM •FIRE ALARM CONROL PANEL IN SPRINKLER KOOM W/ CENTRAL STATION SERVICE MONITORING •ANNUNCIATOR IN LOBBY STAIR NOTES •MAINTAIN REQ'D 1 HR STAIRS ENCLOU5URE5 & MIN 6'-8" HEADROOM @ STAIRS •ELECTRIC HEAT 40 MIN.TEMP 1 WATT PER SQ. FT. UNHEATED 5PACE •STAIR BACKING FOR HAND RAIL •CONTINUOUS RIM @ FLOOR. •BASEMENT STAIR: R15E = 6.81" RUN =11" ALL OTHER STAIRS: RI5E = 6.72" FIREPLACE NOTES •'O' CLEARANCE FIREPLACE W/ DIRECT VENT FACTORY BUILT FIRE12LCE SHALL BE INSTALLED PER MANUFACTURER'S SPECS AND SHALL HAVE APPROAL LABEL ATTACHED 15/8" TYPE "X" GWB TO ROOF 5HEATING FIREPLACES & 5TOVE5 MUST BE D.O.E CERTIFIED & LABELED AS SUITABLE FOR USE DURING A FIRST STAGE BURN BAN. Tjl PROVIDE ONE OPENA5LE ESCAPE WINDOW IN BASEMENT & IN EACH SLEEPING ROOM MEETING ALL THE FOLLOWING REQUIREMENTS: 1. AN OPENA1 LE AREA OF NOT LE55 THEN 5.7 SQ.FT. 2. A MIN. CLEAR HEIGHT OF 24" 3. A MIN. CLEAR WIDTH OF 20" 4. FINISHED SILL HEIGHT OF NOT MORE THAN 44" ABOVE THE FINISH FLOOR. 5. ALL WINDOWS TO INCLUDE FRESH AIR VENTS OR METERED FRESH AIR 5UPPLY @ FURNACE 6.ALLWINDOWS & DOOR5 HAVING ACCESS TO EXTERIOR OR UNHEATED TO 5E SEALED PER SEC. 402.4.1.1(WAC) • RECESSED LIGHTING TO BE IC RATED • ALL TYPE " B" DECK 5URFACE5 TO 5E NO MORE THAN 4" BELOW INTERIOR FLOOR LEVEL •ALL TYPE " B" FRONT DOOR5 TO BE 2'-10" MIN. & ALL DOOR THRESHOLDS CANNOT EXCEED 1/2" PER 404 •ALL DWELLINGS MUST BE TYPE 13, OPT B •ALL REQUIRED DOOR HARDWARE TO MEET IBC CHAPTER 11 & EXITING PER 1010.1.9.1 IMC TYPE 5 OR L VENT CONNECTORS REQ'D ON FUEL -BURNING APPLIANCE IN UNHEATED SPACES HYDRONIC HEATING 5Y5TEM APPROVAL BY THE WATER SURVEYOR DOE5 NOT RELIEVE THE CUSTOMER OF THE RE51FON5113LITY TO COMPLY W/ THE REQUIREMENTS OF OTHER AGENCIES HAVING JURISDICTION. APPROVAL OF THIS PLAN DOES NOT VEST THE BUILDING OR PLUMBING SINCE FUTURE CHANGES IN THE CUSTOMERS WATER USE MAY INCREASE THE A55E55MENT R15K & THE SURVEYORS PROTECTION REQUIREMENTS. IMC. CHAPTER 12 BUILDING INSPECTORS MUST OBSERVE A HYDROSTATIC TEST ON THE HOT WATER SUPPLY LINES &THE PANEL SYSTEM. •TE5T:100 PSI WATER PRESSURE OR 1-1/2 TIMES THE OPERATING PRESSURE, WHICHEVER 15 GREATER. MIN 30 MINUTES TEST. •PIPING EMBEDDED IN CONCRETE MUST BE PRESSURE TESTED PRIOR TO POURING OF CONCRETE AND BE MAINTAINED DURING PLACEMENT. • GARAGE HEADROOM TO BE MIN. OF 7-0" CLEARANCE FROM ALL PIPES, SPRINKLER HEADS, DUCTS, BEAMS, & INSULATION, ETC. •MIN. HEADROOM CLEARANCE OF 7-6" 15 REGI) IN ALL HABITAL SPACES, & 7'-0" 15 RE 1) ELSEWHERE •LOCATION OF EMERGENCY LIGHTING SHALL BE APPROVED BY FIRE MARSHAL •REQ'D WHEEL STOP @ ALL PARKING STALLS •EXHAUST OUTLETS TO 5E A MIN. OF 3'-0" FROM BUILDING OPENINGS & 10'-0" FROM SUPPLY AIR INLETS (TYP). •DOUBLE CHECK VALVE INSPECTION REQ'D 5Y CITY CRO55 CONNECTION CONTROL SPECIALIST PRIOR TO HYDRO STATIC TEST OF FIRE SPRINKLER SYSTEM. • ACCESS TO DOUBLE CHECK VALVE MUST 5E WITHIN 5' ABOVE FINISHED FLOOR OR A 30"X30" MIN PLATFORM MUST 5E INSTALLED FOR ACCE55 •WALLS SEPARATING DWELLING UNITS FROM COMMON AREAS (STAIR ENCLOSURES, ELEVATOR SHAFT, ETC) MUST HAVE AN 5TC OF 50 OR MORE •SMOKE & DRAFT - A55EM13LIE5 IN L01313Y,1-HR AREAS & ELEVATORS/ ENTRY LOCATIONS SHALL HAVE A FIRE PROTECTION RATING OF NOT LE55 THAN 50 MIN. & BEAR AN APPROVED LABEL IDENTIFING THE RATING OF THE A55EM13LY FOLLOWED BY THE LETTER "5". DOOR5 SHALL BE MAINTAINED 5ELF-CL051NG OR BE AUTOMATIC CL051NG BY ACTIVATION OF A SMOKE DETECTOR ADDITIONAL PLUMBING REQUIREMENT5: •MAIN BUILDING SHUT-OFF REQ'D ON WATER SUPPLY LINE. •PRESSURE REDUCTION VALVE ON MAIN WATER SUPPLY LINE REQ'D BY CITY CODE •EXPANSION TANK REQ'D ON EACH HOT WATER TANK. •VENT HOT WATER TANK RELIEF VALVE DIRECTLY TO THE OUTSIDE *HOT WATER HEATER MUST BE 5EI5MICALLY ANCHORED OR STRAPPED @ POINTS WITHIN THE UPPER 1/3 & LOWER 1/5 OF ITS VERTICAL DIMENSION. @ THE LOWER POINT, A MIN. DISTANCE OF 4" MUST BE MAINTAINED ABOVE THE CONTROLS W/ THE STRAPPING •PROIVIDE INDIVIDUAL 5HUTOFF5 FOR EACH UNIT •1" AIRGAP REQ'D ON DI5HWAH5HER •ALL SHOWERS HEADS TO BE EQUIPPED WITH FLOW CONTROL DEVICE TO LIMIT FLOW TO 1.75 GPM •AIR SWITCH FOR DISPOSAL IN SINK •ALL HOTWATER PIPES MUST BE INSULATED WITH R-3 INSULATION PER 2015 W5EC SEC 405.5.3. z W Q z 0 V O 9 . I . a ... REVISIONS: 1.14.19 6.24.19 10.30.19 6.16.20 9.23.20 10.21.22 10.21.22 TOTAL: 3,524.50 SQ. FT.