RESUB 1-Structural_Calculations+1.5.2022CARTER
QUINN
MEMORANDUM
Date: December 28`', 2021
To: Jim Musar
aspectsinc@comcast. net
Attn: Jim Musar
Re: Structural Correction Notice #1
STRUCTURAL
ENGINEERING
From: Nick Carter/Drew Carpenter
Project: Boehlke Remodel
Project #: AS
copy to: File
The responses below correspond to the structural comments on Plan Review Comments for
the Boehlke Remodel, project no. BLD2021-1561, dated 12/10/2021
2. An additional detail has been added showing the garage infill walls.
3. Ledger callout and attachment to the building has been added to the plans.
4. At the entrance of the carport, the detail has been updated to detail B as opposed to
detail C.
5. Floor/Roof Framing Plan Notes have been added.
Please let us know if you have additional questions.
No, 2033 Sixth Avenue #995 Seattle. WA 98121 206-264-7784 www.BCO-SE.com