Loading...
RESUB 1-Structural_Calculations+1.5.2022CARTER QUINN MEMORANDUM Date: December 28`', 2021 To: Jim Musar aspectsinc@comcast. net Attn: Jim Musar Re: Structural Correction Notice #1 STRUCTURAL ENGINEERING From: Nick Carter/Drew Carpenter Project: Boehlke Remodel Project #: AS copy to: File The responses below correspond to the structural comments on Plan Review Comments for the Boehlke Remodel, project no. BLD2021-1561, dated 12/10/2021 2. An additional detail has been added showing the garage infill walls. 3. Ledger callout and attachment to the building has been added to the plans. 4. At the entrance of the carport, the detail has been updated to detail B as opposed to detail C. 5. Floor/Roof Framing Plan Notes have been added. Please let us know if you have additional questions. No, 2033 Sixth Avenue #995 Seattle. WA 98121 206-264-7784 www.BCO-SE.com