2024_0717_Stine Residence_Final-Inspections_FH2kDRICH 17 July 2024 File No. 0208664-000 21702 98th Avenue West Edmonds, Washington 98020 Attention: Todd Stine Subject: Final Completion Letter - Geotechnical Special Inspections Edmonds, Washington Dear Todd: HALEY & ALDRICH, INC. 3131 Elliott Avenue Suite 600 Seattle, WA 98121 206.324.9530 Haley & Aldrich, Inc. (Haley & Aldrich) has completed its geotechnical special inspection services for the retaining wall foundation site drainage, and collection pond construction phase of the above -referenced project in Edmonds, Washington. As specified in the document titled, "Recommendations for Residential Drainage and New Construction Support", dated 18 October 2021, Haley & Aldrich was responsible for the following inspection items: 1. Soil Bearing Verification; 2. Observe Drains and Infiltration Trenches; and 3. Observe Retaining Walls Including Subsurface Drainage. A summary of our construction observations activities is provided in the following sections. Detailed information was documented in our daily field reports that are attached and were submitted to the owner (Todd Stine) via email during construction. 1. Soil Bearing Verification. Haley & Aldrich observed subgrades for retaining wall footings and mat slabs from 7 June through 10 December 2023 on a part-time basis. Limited overexcavation of native subgrade soils and cleaning of loose, sloughed soils at footing subgrade locations was performed by the contractor according to our recommendations during construction. Areas overexcavated were backfilled with structural backfill for walls. 2. Observe Drains and Infiltration Trenches. Haley & Aldrich observed construction of the infiltration trench, drainage pond, and storm drains on a part-time basis. The elements that we observed appeared to use the approved backfill material, had geofabric placed in the trenches, and had backfill around the storm drains compacted to a generally dense and non -yielding condition. www.haleyaldrich.com Todd Stine 17 July 2024 Page 2 3. Observe Retaining Walls and Subsurface Drainage. Haley & Aldrich observed placement of the wall drainage system on a part-time basis. Drains we observed were placed at elevations and locations consistent with the project plans. To the best of our knowledge, work related to the above -referenced items was accomplished in accordance with the recommendations of our geotechnical report and our input during construction, as well as in accordance with the City of Edmonds -approved project plans and specifications. Sincerely yours, HALEY & ALDRICH, INC. Bonnie Govoni Technical Specialist Attachment: Daily Field Reports c: Hanby Construction Co; Attn.: Matt Hanby 7 July 2024 Douglas D. Lindquist, P.E., LEED AP Principal \\haleyaldrich.com\share\sea_projects\Notebooks\1960100_Stine_Residence_Drain_Field\Deliverables\Letters\Final Letter\2024_0717_Stine Residence_Final- Inspections_FAm '%DRICH HRER3131 Elliot Avenue, Suite 600 I CH 206.t324.9530'ngton 98121 FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 06/07/2023 Field Report No.: 1 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 70°, Clear Contractor / Rep. / Ph: Hanby Construction Co. (HBC) / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Zach Stephens / 408.515.1391 HA Rep Arrival / Departure: 0700- 0945 Division & Purpose: Geotechnical — Subgrade Observation ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 06/21/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Zach Stephens was onsite to perform subgrade observations on the soon to be constructed garage. Field Observations HA rep arrived on site at 0700 to observe the subgrade for the planned new garage construction. Upon arrive HA rep met with Kevin (HBC) who directed HA rep to the area in question. HA rep used a %-inch steel T-probe to test subgrade material in the area. Subgrade in most of the area was observed to be firm and unyielding, with the exception of the southeast corner of the garage footing (area of concern). The probe was observed in this area to penetrate the subgrade 1-2 feet. HA rep called Project Manager David Winter to discuss what was observed, and then recommended to the contractor that they excavate the area of concern, approximately a 10x3ft area, and add a fill material that could be compacted. The area of concern was excavated approximately 12-18 inches, and remaining native material was compacted with a 'jumping jack". Fill material (5/8ths minus rock) was then added to the area of concern and compacted in three separate layers, for a total of approximately 12-18 inches of added material. Probing of this material was observed to be firm and unyielding. While onsite, the HA rep was also asked to observe the excavated native material which was being stockpiled on the western side of the site to see if it was acceptable material to be used in the landscaping area for drainage. HA rep informed the contractor that they would need to check in with David Winter but believed it to be acceptable for the proposed purpose. Material is a sandy silt with gravel and some cobbles. HA rep left site around 0945 after compaction of fill material was complete. Upcoming Schedule HA rep was informed that contractor plans to start on the southern retaining wall early next week and will most likely request support from HA to evaluate subgrade conditions for the retaining wall. Haley & Aldrich Page 1 0208664-000 06/07/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 06/13/2023 Field Report No.: 2 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 65°, Cloudy Contractor / Rep. / Ph: Hanby Construction Co. (HBC) / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Zach Stephens / 408.515.1391 HA Rep Arrival / Departure: 0810- 0915 Division & Purpose: Geotechnical — Subgrade Observation ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 06/21/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Zach Stephens was onsite to perform subgrade observations on the soon to be constructed retaining walls. Field Observations HA rep arrived on site at 0810 to observe the subgrade for the planned retaining walls on the south side of the property. Upon arrive HA rep met with Kevin (HBC) who directed HA rep to the area in question. HA rep used a %- inch steel T-probe to test subgrade material in the area. Subgrade in most of the area was observed to be firm and unyielding. It was observed that the top 2-3 inches of the subgrade were wet because of groundwater seepage, but this did not appear to compromise the subgrade material underneath. The probe was observed in the retaining walls area to penetrate the subgrade 3-4 inches. HA rep called David Winter to discuss if the saturated topside was an issue. The contractor informed the HA rep that about 6 inches of W gravel would be placed on top of the current subgrade. HA rep recommended to the contractor that no further action beyond the placement of gravel be taken in the retaining wall area. HA rep left the site around 0915. Upcoming Schedule HA rep was informed that contractor does not know when they will continue to excavate for the retaining wall but will reach out for support from HA when they do. Haley & Aldrich Page 1 0208664-000 06/13/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 07/07/2023 Field Report No.: 3 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 67°, Cloudy Contractor / Rep. / Ph: Hanby Construction Co. (HBC) / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Bonnie Govoni / 206-437-4691 HA Rep Arrival / Departure: 0930-1000 Division & Purpose: Geotechnical — General Site Observations ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/12/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Bonnie Govoni was onsite to perform observations on the soon to be constructed retaining walls, and to observe general site conditions. Field Observations HA rep arrived on site at 0930 to observe the conditions of the subgrade for the planned retaining walls on the south side of the property and general site activities. Upon arrive HA rep met with Kevin (HBC) who directed HA rep to the area in question. Approximately 6 inches of W washed gravel has been placed on top of the current subgrade. Surface water is weeping out of the southern property boundary in the soil cut, and there is some associated sloughing of the cut onto the gravel. Kevin indicated that this would be removed prior to construction of the first course of retaining wall blocks. HA rep recommended to the contractor that no further action beyond removal of the sloughing soil be taken in the retaining wall area. HA rep left the site around 1000. Upcoming Schedule HA rep was informed that contractor does not know when they will continue to excavate for the retaining wall but will reach out for support from HA when they do sometime in the next week. Haley & Aldrich Page 1 0208664-000 07/07/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 07/12/2023 Field Report No.: 4 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 70°, Sunny Contractor / Rep. / Ph: Hanby Construction Co. (HBQ / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Bonnie Govoni / 206.437.4691 HA Rep Arrival / Departure: 1015- 1100 Division & Purpose: Geotechnical — Subgrade Observation ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/12/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Bonnie Govoni was onsite to perform observations on the construction of the retaining walls and associated infiltration drains. Field Observations HA rep arrived on site at 1015 to observe the ongoing construction of the retaining walls along the southern property boundary. Wall aggregate had been placed on the prepared subgrade, and construction of the blocks had begun along the westernmost end along the southern property boundary, including the 4" perforated wall drainpipe. Compaction of the Type 17 gravel backfill for walls was achieved using multiple passes of a small walk - behind plate compactor. HA rep also observed placement of topsoil in the northwestern corner of the site around the infiltration pond. HA rep left the site around 1100. Upcoming Schedule HA rep was informed that contractor will contact Haley & Aldrich sometime in the following week to continue site observations. Haley & Aldrich Page 1 0208664-000 07/12/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 07/26/2023 Field Report No.: 5 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 70°, Sunny Contractor / Rep. / Ph: Hanby Construction Co. (HBQ / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Bonnie Govoni / 206.437.4691 HA Rep Arrival / Departure: 1015- 1045 Division & Purpose: Geotechnical — Subgrade Observation ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/12/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Bonnie Govoni was onsite to perform observations on the construction of the retaining walls and associated infiltration drains. Field Observations HA rep arrived on site at 1015 to observe the ongoing construction of the retaining walls along the southern property boundary. Upon conversations with Kevin Streik, it was brought to the inspector's attention that the homeowner was considering a change in how the wall was built. HA inspector recommended confirming with the wall engineer prior to making any design changes. HA rep left the site around 1045. Upcoming Schedule HA rep was informed that contractor will contact Haley & Aldrich sometime in the following week to continue site observations. Haley & Aldrich Page 1 0208664-000 07/26/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 08/01/2023 Field Report No.: 6 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 65°, Sunny Contractor / Rep. / Ph: Hanby Construction Co. (HBQ / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Bonnie Govoni / 206.437.4691 HA Rep Arrival / Departure: 0745- 0815 Division & Purpose: Geotechnical — Subgrade Observation ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/12/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Bonnie Govoni was onsite to perform observations on the construction of the retaining walls and associated infiltration drains and check the subgrade under a new wall in the southwest corner of the property. HA rep also tested compaction of backfill under the planned slab within the garage footprint. Field Observations HA rep arrived on site at 0745 to observe the ongoing construction of the retaining walls along the southern property boundary. Excavation for the new retaining wall in the southwest corner of the site was completed prior to arrival. Subgrade consisted of light brown sandy silt, with minimal moisture observed. Using a %-inch steel probe, penetrations of less than 1 inch were observed. Based on our observations, the subgrade appeared to be firm and unyielding. Construction on this wall will occur throughout the week. Backfill within the garage footprint consisted of light brown gravelly sand, with minimal moisture observed. Compaction was achieved with multiple passes of a vibratory plate compactor in areas greater than 4 feet away from the foundation tie in. Along the foundation, minimal vibration was used as recommended by the structural engineer in concern for the house footings that were exposed during excavation. Using a %-inch steel probe, penetrations of less than 1 inch were observed in areas compacted with the plate compactor. HA rep left the site around 0815. Upcoming Schedule HA rep was informed that contractor will contact Haley & Aldrich sometime in the following week to continue site observations. Haley & Aldrich Page 1 0208664-000 08/01/2023 H2ER3131 Elliot Avenue, Suite 600 ICH 206.324. 530ington 98121 FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 08/04/2023 Field Report No.: 7 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 70°, Sunny Contractor / Rep. / Ph: Hanby Construction Co. (HBC) / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Bonnie Govoni / 206.437.4691 HA Rep Arrival / Departure: 0830- 0900 Division & Purpose: Geotechnical — Field Observation ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/12/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be for the purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in anyway for defects discovered in the contractor's work. Our firm will not be responsible for job or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Bonnie Govoni was onsite to perform observations on the construction of the retaining walls and associated infiltration drains. Field Observations HA rep arrived on site at 0830 to observe the ongoing construction of the retaining walls along the southern property boundary and associated drainage. Construction activities are consistent with the plans and specifications. HA rep left the site around 0900. Upcoming Schedule HA rep was informed that contractor will contact Haley & Aldrich sometime in the following week to continue site observations. Haley & Aldrich Page 1 0208664-000 08/04/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 08/10/2023 Field Report No.: 8 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 60°, Sunny Contractor / Rep. / Ph: Hanby Construction Co. (HBQ / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Bonnie Govoni / 206.437.4691 HA Rep Arrival / Departure: 0800- 0820 Division & Purpose: Geotechnical — Subgrade Observation ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/12/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Bonnie Govoni was onsite to perform observations on the construction of the retaining walls and associated infiltration drains. Field Observations HA rep arrived on site at 0800 to observe the ongoing construction of the retaining walls along the southern property boundary and associated drainage. Construction of the added wall in the southwest corner is complete, and topsoil is being placed along the boundary slope. Construction activities are consistent with the plans and specifications. HA rep left the site around 0820. Upcoming Schedule HA rep was informed that contractor will contact Haley & Aldrich sometime in the following week to continue site observations. Haley & Aldrich Page 1 0208664-000 08/10/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 08/14/2023 Field Report No.: 9 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 80', Sunny Contractor / Rep. / Ph: Hanby Construction Co. (HBC) / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Alasdair Gourlay / 206.643.3611 HA Rep Arrival / Departure: 0945- 1325 Division & Purpose: Geotechnical — Backfill Observation ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/12/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Alasdair Gourlay was onsite to perform observations on an infiltration trench/drain backfill. Field Observations HA rep arrived on site at 0945 to observe the backfill of an infiltration trench/drain located to the west of the center of the property. Backfill of the infiltration trench/drain was completed with a Kubota KX057-4 Excavator and a Bobcat T450 skid steer. Washed Drain Rock (Type 4) was backfilled into the infiltration trench/drain from a depth between 3.5' to 4' below grade. Geofabric was placed on -top of the Washed Drain Rock (Type 4) once it was to grade, and topsoil was put on -top of the Geofabric in a lift of about 1.5" above grade. Backfill was completed according to specifications. HA rep left the site around 1325. Upcoming Schedule HA rep was informed that contractor will contact Haley & Aldrich sometime in the week to continue site observations. Haley & Aldrich Page 1 0208664-000 08/14/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 08/18/2023 Field Report No.: 10 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 60°, Sunny Contractor / Rep. / Ph: Hanby Construction Co. (HBQ / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Bonnie Govoni / 206.437.4691 HA Rep Arrival / Departure: 0810- 0830 Division & Purpose: Geotechnical — Field Observations ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/13/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Bonnie Govoni was onsite to perform observations on the construction of the retaining walls and associated infiltration drains. Field Observations HA rep arrived on site at 0800 to observe the ongoing construction of the infiltration drains along the central portion of the site. Backfill of the infiltration trench/drain was completed with a Kubota KX057-4 Excavator and a Bobcat T450 skid steer. Washed Drain Rock (Type 4) was backfilled into the infiltration trench/drain from a depth between 3.0' to 3.5' below grade. Geofabric was placed on -top of the Washed Drain Rock (Type 4) once it was to grade. Topsoil to follow later. Backfill was completed according to specifications. Upcoming Schedule HA rep was informed that contractor will contact Haley & Aldrich sometime in the following week to continue site observations. Haley & Aldrich Page 1 0208664-000 08/18/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 08/22/2023 Field Report No.: 11 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 62°, Sunny Contractor / Rep. / Ph: Hanby Construction Co. (HBQ / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Bonnie Govoni / 206.437.4691 HA Rep Arrival / Departure: 0800- 0830 Division & Purpose: Geotechnical — Field Observations ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/13/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Bonnie Govoni was onsite to perform observations on the construction of the storm drain and subgrade conditions for the retaining wall. Field Observations HA rep arrived on site at 0800 to observe the ongoing construction of the storm drains along the south and central portion of the site. Backfill of the infiltration trench/drain was completed with a Kubota KX057-4 Excavator and a Bobcat T450 skid steer. Crushed Surfacing Base Course was backfilled into the utility trench from a depth between 3' to 4' below grade around the non -perforated pipe. Topsoil to follow later. Backfill was completed according to specifications. The subgrade for the remaining retaining wall consisted of gray -brown silty sand with gravel. Using a %-inch steel probe, penetrations between %-1 inch were observed. In areas of increased moisture and organics, penetrations of up to 3 inches were observed. HA rep recommended removing the softer soils prior to construction. Upcoming Schedule HA rep was informed that contractor will contact Haley & Aldrich sometime in the following week to continue site observations. Haley & Aldrich Page 1 0208664-000 08/22/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 08/29/2023 Field Report No.: 12 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 59', Sunny Contractor / Rep. / Ph: Hanby Construction Co. (HBQ / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Bonnie Govoni / 206.437.4691 HA Rep Arrival / Departure: 0745- 0815 Division & Purpose: Geotechnical — Field Observations ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/13/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Bonnie Govoni was onsite to perform observations on the construction of the infiltration drains and subgrade conditions for the retaining wall. Field Observations HA rep arrived on site at 0745 to observe the ongoing construction of the infiltration drains along the east central portion of the site. Backfill of the infiltration trench/drain was completed with a Kubota KX057-4 Excavator and a Bobcat T450 skid steer. Washed Rock (Type 4) was backfilled into the utility trench from a depth between 3.5' to 4' below grade around the perforated pipe. Geotextile fabric for separation and topsoil to follow later. The subgrade for the remaining retaining wall consisted of gray -brown silty sand with gravel. Using a %-inch steel probe, penetrations between %-1 inch were observed. Some standing water was accumulating on the prepared subgrade due to leeching from the nearby hillside. In areas of increased moisture and organics, penetrations of up to 3 inches were observed. HA rep observed the removal of the softer soils prior to placing the wall aggregate to begin construction. Upcoming Schedule HA rep was informed that contractor will contact Haley & Aldrich sometime in the following week to continue site observations. Haley & Aldrich Page 1 0208664-000 08/29/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 09/19/2023 Field Report No.: 13 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 60°, Sunny Contractor / Rep. / Ph: Hanby Construction Co. (HBC) / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Zach Stephens / 408.515.1391 HA Rep Arrival / Departure: 0700- 0800 Division & Purpose: Geotechnical — Subgrade Observation ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/13/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Zach Stephens was onsite to perform observations on the subgrade of new retaining walls. Field Observations HA rep arrived on site at 0700 to observe the ongoing construction of the retaining walls along the southern property boundary. Construction of the northern most retaining wall is to continue as planned. Subgrade underneath the planned retaining wall is firm and unyielding. HA rep left the site around 0800. Upcoming Schedule HA rep was informed that contractor will contact Haley & Aldrich sometime in the following week to continue site observations. Haley & Aldrich Page 1 0208664-000 09/19/2023 3131 Elliot Avenue, Suite 600 ICH 206t324. 530'ngton 98121 H2ER FIELD REPORT HA Job No: 0208664-000 Phase: 000 Date: 10/20/2023 Field Report No.: 14 Job Name & Address: Todd Stine Property Page No.: 1 of 1 Client: Todd Stine Weather: 60°, Sunny Contractor / Rep. / Ph: Hanby Construction Co. (HBC) / Matt Hanby / Permit # 206.953.2595 Subcontractor / Rep. / Ph: HA Rep / Ph: Zachary Stephens / 206.437.4691 HA Rep Arrival / Departure: 0900 - 0930 Division & Purpose: Geotechnical — Subgrade Observation ❑ PRELIMINARY ❑X FINAL Reviewed By: Becca Dozier Review Date: 12/13/2023 This report presents opinions formed as a result of our observation of the contractor's activities relating to geotechnicaI engineering. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of the Haley and Aldrich representative. The presence of our field representative will be forth e purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, nor the contractor's employees or agents. Neither the presence of our representative nor the observation and testing by our firm shall excuse the contractor in any way for defects discovered in the contractor's work. Our firm will not be responsible forjob or site safety on this project. The observations, recommendations, and conclusions of this field report are preliminary until reviewed by the Haley and Aldrich project manager. The recommendations and conclusions of a reviewed report may differ from the preliminary report. Purpose & Location of Observations Haley & Aldrich (HA) representative (rep) Zach Stephens was onsite to perform observations on the subgrade of new retaining walls and drive path. Field Observations HA rep arrived on site at 0900 to observe the ongoing construction of the retaining walls along the southern property boundary, along with the drive path on the southern property boundary. Subgrade underneath the planned retaining wall and drive path is firm and unyielding. HA rep left the site around 0930. Upcoming Schedule HA rep was informed that contractor will contact Haley & Aldrich sometime in the following week to continue site observations. Haley & Aldrich Page 1 0208664-000 10/20/2023