Loading...
ENG PROJECT ASBUILT - LFE Cn 0- I N O N 0 U N //7.0/ Ip\\ ,' , ,' ��xxxxxx xx xX �,x x X L xx X-' xx xX - X- , 3 6 7 0 , I \\ / r /-//- 4-- \ - - - \ ,7 / - / , ' H D ° \` 5 1 II '' C 3 S S BUSHES I; 357p 0 ; 12 9 'IE 3 3 135 35 ° IT C ; \ IE = 354. 31 ` 60dNa153.88 Co r PUTTING GREEN ,PER\ l o° ; OWNER DIRECTION "? ® 00 I 1 \toCO n/ It I ?` ,r IN, w. downturned I 3 0 3 4', 8.5 5 elbow I H, _ 6( ) 8 LF 1.0 IN 'C2. m RJM=357.3 ' EC 1 W 6" SD IE,=354.0 (E I �� 1 L" IT I�354.0 (NE) A' B - W SD aE=354.0 (SW �; � UIE LF ,(� 1.0% MIN � Z +/ -- �, ° OUT w. tee /i _ assembly o , = 359.4 z OVERFLOW IE 36A. a 5 DRAIN Cyr -��� - z 1 4 ®� OUTLET TRUCTURE _ w w % 6" IE _ �359.5 E 361W T.5 -- p.° i r / I E A V E S 2ND FL . CAN f-ILE EKED F=372.88 HOUSE #21702 24 372.88 / i 25 SPLIT FF=36 F TNTRY .69 F F=372.8(9 z \ F DS CONNF�TTTTTTTTT�ON 1,) F i12.84 AINWATER CISTERN 3 7 .7 9 X � 6 TIURk NS 6, / FF ' 32/05' �. \ 369.3 CR SS ( I ULLI W ` G F� 369. o. N w�. D � 4 CON I•:-WW &OAR��� L�wr��� _ '. _ Irk,_.. �.. � � , e, • � � �KA 1.N..- --- A -_ ■ . �. , , • _ • I� ■ • • � , � , s��i=1►► �Iwo IN I,I ,=358 ROCKIS- C60NC. a a i � , I I 1a � I 9 N ----- 7.0 I I I I I ------------- ; I S ;88° 2'4�, X-X-X X-- r t-- x X -te--X_X x x-x xx-X x-x xx X-x-x x�-x-X-XI 33 0 1 , I , I O It 334.6 �I 3 5.4 \ x t It PLAN xi W x 8 ti xl ;� 336.2 Ln x II°? 336. �8 , ' •/ / I ob 3, POND DATA: 0' FOOTPRINT=440 SQ FT O VOLUME=530 CU FT x e e� 3 w TOP OF WALL=338.0 z xl "' 33 33, et w ade > IT 0 0 BOTTOM OF WALL=336.0 xl - - ,' LLJ TOP OF POND=335.5 I � � ' ' 40 ` 8 m +333 ' INFILTRATING,T�ENCH 343 ' / � ,/ � N 341.5 �T CO ' BOTTOM OF POND=333.8 x d- (TYP) N ►� , x r7 ) r/- d- 342 , , I E= 339.2 , ' r FILL MATERIAL TO ACHIEVE �'' -.4-,� g 344 �44 w `\ 345 , 346 Z BOTT$If ,6F `POND ELEVATION 4 �I° I II - 37. GRASS-j,� 6"SDIE340.5 /2` r _ SHALL BE SEATTLE AGGREGA / IT IE 340.5 3 4 C )r'/ TYPE 4, OR APPROVED x 3 F) w. dam per Q EQUIVALENT x IE=334.0 = 342.5 note 8. t�\) CIO 3 4 / M x IT IE= 339.2 N,E) 6"SD IE 341.0 35 LF 0 0% MIN. IE 3.3 x .3 6' SD 1­ 339.2 ( � VEL PROTE ON S T33w w I w wA xl � ,- '3 LF @ .5% MIN CC)`\ , = 4.8 334.E 11 LF 6 S (� 1% MIN 6 3 LF @ 1 MIN - \ 0�� ------ ',� a, , T-o -- _ _ - _U 335.3 IE= 334.2 I =34 .9 .0� 6"SDIE339.2/ '34 - ,--- -- ---- ITIE339.2 - -- -- 16 LF) " SD @ 1� --- _ '' -- '--- r� ------------- 1 - 7.1 23't 0. I , ��+� 135-LF 0.5� MIN -� ___10 �; � In - 3 7 . 0.5 �IIN _ - _ _ - 338.4-------- x -� -- - -_ _ 2�tF-(� 0.5 o MIN - 41 F 5l -- -� - -- --C - 10- ---- __- -----x ------ _ / - _ IE=345. 2 3 IE=349 5-4. - - - - - -X _ X- ' x�x= �=T _ X � - x_ _ -i� �r ' x= _ x=xx x x=x ---------- - _ _ - _ _- C0__ MATCH -EX GRADE _ _DRAIN- ___-----_-' ' 334.2 - 342.9 -- - .�_- - ALONG- PROPERTYF----CO= 49.3 -- __------ ,�-- �_ -�-_ _ /.SC7-IC= 334.2 ,- IT090070 M - - -/�13� - - --- -1 /j ___--- ---- 357.7 S / 368x69 w Lc)it � � I ,0 ' o 0 ' z I U� CD z (f �I m�/� N N U / LL O NZ QI �� I 37 rx I I cf� 0 I 37D x 4 Cn I � IMPERVIOUS AREAS: 7 37p.67 PAINT-SPoT PROJECT SITE CATEGORY: CATEGORY 2 DISCHARGE LOCATION: CITY'S MS4 TYPE OF STORMWATER SQUARE FOOTAGE AREA FACILITY LAWN AND 18,146 INFILTRATING LANDSCAPE TRENCHES (ITS) ROOF 2415 ITS HARD SURFACES 4564 ITS APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: M. CITY ENGINEERING DIVISION - - PROPERTY LINE/ROW CENTERLINE 290 FINISHED GRADE CONTOUR 292 - 296 EXISTING GRADE CONTOUR INFILTRATING TRENCH (IT) sn STORM PIPE (SD) - - - - - - - - WALL DRAIN (WD) TRENCH DRAIN (TD) • CLEANOUT (CO) ❑• CATCH BASIN/AREA DRAIN (CB/AD) O 0 O 0 ►1/1Tr[`_ OVERFLOW PATH CONCRETE PERMEABLE PAVEMENT ASPHALT LANDSCAPE 1. TRENCH DRAIN SHALL BE ACO KLASSIKDRAIN K100 OR APPROVED EQUIVALENT. PRODUCT SHALL HAVE A 4" INTERNAL WIDTH AND BUILT IN SLOPE OF 0.5% MINIMUM. COORDINATE WITH ARCHITECT FOR GRATE SELECTION. INCLUDE INLINE CATCH BASIN AND EXIT FROM LOWEST INVERT ON NORTH FACE OR EAST FACE, AS SHOWN ON PLANS. 2. MAINTAIN CONSISTENT SLOPE BETWEEN INVERT ELEVATIONS PROVIDED. 3. BURY CLEANOUTS 6" DEEP WHEN LOCATED IN LANDSCAPE. CLEANOUT IN HARDSCAPE SHALL BE JR SMITH 4220, OR APPROVED EQUIVALENT. 4. MAINTAIN 2 MINIMUM COVER AND 1.0% MINIMUM SLOPE FOR 4" DOWNSPOUT CONNECTIONS, UNLESS NOTED OTHERWISE. MAINTAIN 1' MINIMUM COVER OVER 6" SD PIPES IN LANDSCAPE AND 2' UNDER DRIVEABLE SURFACES, UNLESS OTHERWISE NOTES. 5. CONTRACTOR SHALL COORDINATE FILL PLACEMENT AND COMPACTION WITH PROJECT GEOTECHNICAL ENGINEER. 6. IF STRUCTURE RIM TO INVERT ELEVATION EXCEEDS 5-FEET, A TYPE II MANHOLE WILL BE REQUIRED. 7. ALL STORM DRAINS SHALL BE ADS N12 WT IB PIPE OR APPROVED EQUIVALENT. 8. Provide impermeable trench dam (CDF, clay, etc.) to prevent drainage migration through trench/pipe bedding material surrounding solid pipe Call 811 • = two business days before you dig 0 5' 10' 20' EMMW 1 inch = 10 feet 2 liidhwll Md i !Mcd 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com W O W N CJ W O Z W � Z a WCO) > W 111% Q co� = o W H Z Z_oo0 CO)� N 0 O ti W r N A 79 4 1-12-07 �SSIONAL EgG DATE: December 7, 2021 JOB NO: 2100167 DESIGNED BY: SB DRAWN BY: JEP/KA CHECKED BY: JC APPROVED BY: JC DRAINAGE & GRADING PLAN