REVIEWED STM RESUB 4-Geotech ReportRESUB !;HM.TCROWS [R A division of Haley & Aldrich MEMORANDUM DATE: January 25, 2022 To: Todd Stine From: David Winter, Hart Crowser, a division of Haley & Aldrich Re: Addendum to October 25, 2021 Geotechnical Letter Report Stine Residence - 21701981h Avenue West Edmonds, Washington 19601-00 Jan 27 2022 CITY OF EDMONDS DEVELOPMENT SERVICES -- DEPARTMENT 22609 4 ZS12�- This memorandum summarizes concurrence by Hart Crowser, a division of Haley & Aldrich (Hart Crowser), with the drainage plans prepared by KPFF for the referenced property. After discussions with you and the civil engineers at KPFF, we agree that it is reasonable to install a collection pipe at the base of the reconstructed south slope to collect groundwater from the apparent spring and from new drains installed into the reconstructed slope. The water will then be tightlined to the collection pond. In our opinion, runoff from the spring and from the south slope was already draining west towards the existing collection area in the current unimproved configuration. The new system will manage and direct that flow. We also have discussed with the City reviewer and with you and KPFF the design and operation plan of the stormwater infiltration system into the west yard. The system of infiltration trenches and overflow sections should allow a maximum volume of water to infiltrate within the newly constructed yard. Our October 25, 2021 revised geotechnical design letter is superseded by the discussions, agreements, and modifications as shown on the submitted plans and summarized in this letter. We have been a part of those discussions and agree with the conclusions and interpretations of our original recommendations. \\haleya Id rich. com\share\sea_projects\Notebooks\1960100_sti ne_Residen ce_Drai n_Field\Deliverables\Memos\2022_0125_HCHA_Geotech Letter Rpt Addendum_F.docx 3131 Elliott Avenue. Suite 600 Seattle. Washington 98121 206 324.9530