Loading...
APPROVED ENG BLD2023-0612+TIA+12.21.2023_12.28.48_PM+3966711ESUB Dec 21 2023 OF eoM CITY OF EDMONDS ,� ` U7. VELOPMENTSERVICES`�, -''r '1P DEPARTMENT wlol PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 Sth Avenue N P: 42 S.771.0220 www.edrnondswa.gov BLD2023-0612 APPENDIX A Page I of 2 Transportation Impact Analysis Worksheet Name of Proposed Project: OLD Xa-3 - 06 f a Owner/Applicant l �Lrol J �nSC f~ Name 0. Street/Mailing Ad ss City State Zip Applicant Contact Person: Tolv►, Name��,/ n� Street/Mailing Address �✓>Q GI S6�i City State Zip Telephone: yas�3l9'SGS/� Telephone: yes-31�-S�sa Traffic Engineer who prepared the Traffic Impact: Analysis (if applicable): Firm Name Telephone: PROJECT DESCRIPTION a. Location -Street address: b. Specify existing land use: 54' T,.;1 Contact Name E-mail: a vicinity map and site plan.) c. Specify proposed type and size of development: Gt/�IQ EJt's{'��erdeq c. �d ,,lA AN (# of residential units and/or square footage of building) H� d. Date construction will begin and be completed: ! yWroy -,Uw " I ady e. Define proposed access locations: f. Define proposed sight distance at site egress locations: HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2- MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: ❑ NO CHANGE 41 CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. Units in ITE Land Use Category Per Unit Fee square feet. Use Fee Rate # of dwelling, of , etc. New Use $ X _ $ Prior Use $ X = $ New Use Fee: $ - Prior Use Fee: $ = FEE DUE: $ ' f2 NEW DEVELOPMENT Units in ITE Land Use Category Per Unit Fee square feet, FEE DUE Rate # of dwelling, vfp, etc. New Use ;-M $ X e* r = $ ❑ INDEPENDENT FEE CALCULATION Impact/Mitigation Fee: I $ FEE DUE L Independent Review Fee: $296.00 (+ peer review fee) 1 $ 1 i 1 /2/2024 City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023