Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
REV 4 APPROVED ENG BLD2021-1384+Civil_Plan+8.22.2023_11.31.00_AM+3739670
r-1 I (fin rV (V U U r-1 r-1 LU 1 LU z z J 1 J U 1 U QIQ 21� 1 1 1 1 1 _SS SS I\ I _W*�—/ (CONCRETE I �3- 1 1 1 1 1 1 1 1 1 1 1 1 ASPHALT SS SS — N co W* rV fair IN E F"M 1Wf.VfFi W HIGH VISIBILITY PLASTIC OR METAL FENCE FOR PROJECT CLEARING LIMITS/CONSTRUCTION ACTIVITY AREA PER CODE BMP C103 —SS SS REMOVE EXISTING PARKING STRIPING AT LOCATION OF PROPOSED BULB OUT (r-- 3: S ADMIRAL WAY *�6 W* W* W* — W ��1 s5L TEMPORARY EROSION CONTROL AND DEMO PLAN SCALE: 1" = 10' 11— — INSTALL CB INSERTS ON ALL CB'S DOWNSTREAM 500' FROM THE SITE IN ABOVE GR OUND POWERLINE G* G* G* — _SS Ss \SS RIM=1 1.51 6" PVC SW IE=9.31 12"CONC NNE IE=9.21 12"CONC SW IE=8G.86 SD G* SS SS — REMOVE EXISTING PARKING STRIPING ALONG SITE FRONTAGE 2 ,-- EXISTING 3-HR PARKING SIGNS SHALL Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. S X '6' CHAINLINK j OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. 10 TEMPORARY EROSION CONTROL AND DEMO PLAN NOTES: 1. CLOSURES (IF/WHEN NEEDED) SHOULD BE COORDINATED WITH CITY, 48 HRS MINIMUM IN ADVANCE. FRONTAGE WILL BE INOPERABLE DURING FRONTAGE IMPROVEMENTS, ROAD WILL BE PARTIALLY CLOSED, ONE DIRECTION ONLY, FOR OVERLAYS AND/OR UTILITY CONNECTIONS. 2. INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION. 3. ALL DISTURBED AREAS TO BE COMPOST AMENDED PER 2014 SWMMWW BMP T5.13. 4. ANY DE -WATERING OPERATIONS ON SITE WILL REQUIRE A SETTLING TANK PRIOR TO DISCHARGING TO THE CITY SYSTEM, WHICH IS DIRECTLY CONNECTED TO THE PUGET SOUND. 5. ALL SPILLS SHALL BE CONTAINED WITHIN THE SITE LIMITS TO THE MAXIMUM EXTENT POSSIBLE AND LEGALLY REMOVED AND DISPOSED. SPILLS REACHING BEYOND THE PROJECT LIMITS SHALL GENERALLY BE ASSUMED TO HAVE REACHED THE PUGET SOUND, AND ADDITIONAL CLEANUP MAY BE REQUIRED OF THE CONTRACTOR BY BOTH CITY AND STATE OFFICIALS. SPILLS WHICH REACH BEYOND PROJECT LIMITS, AFTER PROVIDING BEST EFFORT AT INITIAL CONTAINMENT, SHALL BE IMMEDIATELY REPORTED TO THE CITY INSPECTOR AND DEPARTMENT OF ECOLOGY. 6. SEQUENCING AND LIMITING THE EXPOSURE OF SOILS TO RAINFALL EROSION SHALL BE CONSIDERED AS A BMP FOR THIS SITE. CONTRACTOR SHALL LIMIT REMOVAL OF EXISTING ASPHALT ONLY TO AREAS NEEDED FOR IMMEDIATE CONSTRUCTION ACTIVITIES IN ORDER TO LIMIT THE POTENTIAL FOR SEDIMENT LADEN RUNOFF LEAVING THE SITE. CONSTRUCTION AND LABORER TRAFFIC SHALL MAKE USE OF EXISTING PAVED SURFACES AND LIMIT CONTACT WITH EXPOSED SOILS TO THE MAXIMUM EXTENT FEASIBLE. d) 0 5 10 20 REVISION Aug 22 2023 BLD2021-1384 CITY OF EDMONDS B L D2021 1384 DEVELOPMENT SERVICES _ DEPARTMENT PPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: ENGINEERING DIVISION APPROVED AS NOTED 09/05/2022 BY: CITY ENGINEERING DIVISION JACKSON I MAIN ARCHITECTURE 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM 7 �, GUIL CS�d �F1 A S�1, %' 1x ll 08/ 22123 U) 0 z O o CN00 p warn LU 0JQ L 0 3: 0 00�U) Quo � zoo LQ2i J M p U c� L U) 0 z CD 0 W CN L L O � Q J �� LUC) J >Q L.L m < < 0� U) O z c)�o LLJ— U Z �QO on �QL �ti� L wwwwwwwo z z z z z z z z as 00000000 m w w w w w w w w PQ m MDOZZZZZZZZ w LL 0 0 0 0 0 0 0 0 w U U U U U U U U LU LU m m m m m m a - a- z z z z z z z z O O O O O O O O U U U U U U U U O N z N N N N N N N N N N �t M � � 00 � CO N O O O N O N N 0 0 0 0 0 0 0 0 0 0 6NGINEERM 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 PROJECT NO.: 21160 PROJECT MGR.: JPU DRAWN BY: ATD CHECKED BY: GAG TEMPORARY EROSION CONTROL AND DEMO PLAN C201 JACKSON I MAIN ARCHITECTURE P.S. © 2021 ----------- ��_�� -- -------- ------ --- --- ==- ---- --f� '-_=-- ----------'�----rl-Fm ----- —----— (V (V --- _U1U _ 1 p p p D 0 - — — D / — — — — — D 3 p� — — � — — — — — 17 ( n--- ------ LU 7w TPM _ - ' / \�` � ' TPM - TPM TPM 1 TPM U U I �1� JJ J SS SS SS 42 2 51 E 68. 9 N 42�32'51 " E 298.08' 1 — — — — — — — — — — — — — — — / — — — — — — — — — — — — — — — — — 52.53 _ 1 < REMOVE TREE FOR NEW PUD VAULT D — T _ D 0 p p p p 0 0 ® D D p p v � p D / D � � p zz 1 1 / 1 1 1 / / / 1 O ' © I 61.91 \n� 8.61 r, m Ar) -ZI) ono �c)�--- ,- TEMPORARY EROSION CONTROL AND DEMO PLAN SCALE: 1" = 10' �o I �9 1 \ 1 K) �� 1 <<\ 10 0 5 10 20 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. TEMPORARY EROSION CONTROL AND DEMO PLAN NOTES: 1. CLOSURES (IF/WHEN NEEDED) SHOULD BE COORDINATED WITH CITY, 48 HRS MINIMUM IN ADVANCE. FRONTAGE WILL BE INOPERABLE DURING FRONTAGE IMPROVEMENTS, ROAD WILL BE PARTIALLY CLOSED, ONE DIRECTION ONLY, FOR OVERLAYS AND/OR UTILITY CONNECTIONS. 2. INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION. 3. ALL DISTURBED AREAS TO BE COMPOST AMENDED PER 2014 SWMMWW BMP T5.13. 4. ANY DE -WATERING OPERATIONS ON SITE WILL REQUIRE A SETTLING TANK PRIOR TO DISCHARGING TO THE CITY SYSTEM, WHICH IS DIRECTLY CONNECTED TO THE PUGET SOUND. 5. ALL SPILLS SHALL BE CONTAINED WITHIN THE SITE LIMITS TO THE MAXIMUM EXTENT POSSIBLE AND LEGALLY REMOVED AND DISPOSED. SPILLS REACHING BEYOND THE PROJECT LIMITS SHALL GENERALLY BE ASSUMED TO HAVE REACHED THE PUGET SOUND, AND ADDITIONAL CLEANUP MAY BE REQUIRED OF THE CONTRACTOR BY BOTH CITY AND STATE OFFICIALS. SPILLS WHICH REACH BEYOND PROJECT LIMITS, AFTER PROVIDING BEST EFFORT AT INITIAL CONTAINMENT, SHALL BE IMMEDIATELY REPORTED TO THE CITY INSPECTOR AND DEPARTMENT OF ECOLOGY. 6. SEQUENCING AND LIMITING THE EXPOSURE OF SOILS TO RAINFALL EROSION SHALL BE CONSIDERED AS A BMP FOR THIS SITE. CONTRACTOR SHALL LIMIT REMOVAL OF EXISTING ASPHALT ONLY TO AREAS NEEDED FOR IMMEDIATE CONSTRUCTION ACTIVITIES IN ORDER TO LIMIT THE POTENTIAL FOR SEDIMENT LADEN RUNOFF LEAVING THE SITE. CONSTRUCTION AND LABORER TRAFFIC SHALL MAKE USE OF EXISTING PAVED SURFACES AND LIMIT CONTACT WITH EXPOSED SOILS TO THE MAXIMUM EXTENT FEASIBLE. BLD2021-1384 BLD2021-1384 REVISION Aug 22 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: ENGINEERING DIVISION APPROVED AS NOTED 09/05/202� BY: JACKSON I MAIN ARCH ITECTU RE 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM 7 �3 GUIL CS�d �F1 A S�1, %' 08/ 22/ 2� O o U)>� Q � W � � LU �JQ LL pQ� O 0 0 lU) Quo � zoo WQ2 -J 0 U c� W U) 0 Z CD O Z W CN worn o Q W C)J� LL Oz~750 m < < LLJ— U Z �QO on Q RE` ti� W wwwwwwwo z z z z z z z z 0 0 0 0 0 0 0 0 QQ��LOLOLOLOLOLO� m w w w w w w w w MDOZZZZZZZZ �0LL00000000 w U U U U U U U U a - a- z z z z z z z z 00000000 U U U U U U U U O z N N N N N N N N N N 1E) M t t 00 � CO N O O O N O N N 0 0 0 0 0 0 0 0 0 0 Q1IGINEERI111% 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 CG#: 21160.20 PROJECT NO.: 21160 PROJECT MGR.: JPU DRAWN BY: ATD CHECKED BY: GAG TEMPORARY EROSION CONTROL CITY ENGINEERING DIVISION C203 A JAC ON I MAIN ARCHITECTURE_ P.S. c 021