REVIEWED RESUB1 BLD2021-1385+SI FORM+1.25.2022_3.33.37_PM+2641116RESUB
Jan 26 2022 BLD2021-1385
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT OE ED tl'
y��1%
E W �e -m it #:
BY Project:
CITY OF EDMONDS
SPECTION AND TESTING AGREEMENT
1-
A Edmonds Admin BLD, 471 Admiral Wa,
Prior to issuance of a permit, this_4rm must be completed in its entirety and returned to the City for
approval. The completed form must have signatures of acknowledgment by all parties.
DUTIES AND RESPONSIBILITIES
Special Inspection Firm and Special Inspectors:
The Special Inspection firm of Otto Rosenau & Associates, Inc. will perform special
inspection for the following types of work (separate forms must be submitted if more than one firm is to be
employed):
OPERATION
CONT
PERIODIC
REMARKS
SOILS
GROUND IMPROVIAENT
X
GEOTECHENGMEER
CONCRETE
REINFORCING PLACEMENT
X
ANCHOR BOLTS
X
CONCRETE TEST SPECIMENS
X
CONCRETE PLACEMENT
%
EMBEDDED PLATES
X
STRUCTURALSTEEL
FABRICATION & ERECTION
X
HIGH STRENGTH BOLTING
X
SHOP & FIELD WELDING
SINGLE PASS FILLET WELDS s 5/16"
X
HLLEI WELDS >Si16"
X
PARTIAL& COMPLETE PENETRATION
X
OTHER WELDING
%
NOTE:
ALL ITEMS MARKED WITH AN X' SHALL BE INSPECTED IN ACCORDANCE WITH IBC CHAPTER 17 SPECIAL
INSPECTION SHALL BE PERFORMED BY A QUALIFIED TESTING AGENCY DES'GNA rE D BY THE OWNER. THE
ARCHITECT, STRUCTURAL ENGINEER, AND BUILDING OFFICIAL SHALL BE FURNISHED WITH COPIES OF ALL
RESULTS ANY INSPECTION FAILING TO MEET THE PROJECT SPECIFICATIONS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE DESIGN TEAM
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector
and the firm are qualified by education and experience to perform the work and testing required by the project
design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any
nonconforming work and resolution of nonconforming items.
\\edmsvr-userfs\userprof$\dakau\Desktop\Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2021-1385 Port of
Edmonds Admin BLD.docl2/22/2021
• A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be
detailed in the final report.
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
BuildinE Department:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Design Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to ensure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner: o oitKvti.1 Signature Date `d
Contractor:
Signature
Date:
Arch./Eng: Dennis Titus, PE, SE Signature Date: 1/14/22
Special Insp. Carley Trammell _Signature Date: 1/14/2022
Special Insp. ;\ cn Otto Rosenau & Associates, Inc.
\\edmsvr-userfs\userprof$\dakau\Desktop\Comments Letters and Special Inspection forms 2019\Special Inspection Forms\SI 2021-1385 Port of
Edmonds Admin BLD doc 12/22/2021
ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION
Date:
\\edmsvr-userfs\userprof$\dakau\Desktop\Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2021-1385 Port of
Edmonds Admin BLD.docl2/22/2021