APPROVED Cost Estimate-Paradise Heights 1-25-2021RESUB
Feb 11 20212/11/2021
ROW and Private Improvements Cost Estimate CITY OFEDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Prepared by: CITY OF EDMONDS
Donna Breske &Associates, LLc BUILDING PERMIT #BLD2019-0026
21 Ave A, suite 4, Snohomish, WA 98290 ROW PERMIT #ENG2020-0395
360-294-8941
Project Name: Paradise Heights
Location: 546 Paradise Lane, Edmonds, WA
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
ROW AND TESC IMPROVEMENTS:
$13,624.00 + $64,542.40 = $78,166.00
TOTAL ENGINEERS COST ESTIMATE:
$302,462.15
Prepared by: Donna Breske and Associates, LLC
Date: 2/11 /2021
Project No.:
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
ENGINEERING DIVISION
APPROVED AS NOTED
3/15/2021
-PERFORMANCEBOND AMOUNT$• •• 1
•• 11 x 120%)
L����������_1���������_
FUTURE MAINTENANCE
BOND AMOUNT = $14,069.88
(93,799.20 x 15%)
INSPECTION FEES =
(302,462.15 x 3.3%)
$ 9981.25
5
Version: 3/2/2015
Report Date: 2/11 /2021
RESUB
ROW and Private Improvements Cost Estimate
Feb 11 2021
2/11 /2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
1
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
309
1
464
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
1000
1
1500
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
1000
1
800
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESCA0
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESCA 1
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESCA5
SWDM 5.4.2.3
$ 4.00
SY
1000
1
4000
Rip Rap, machine placed; slopes
ESCA6
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESCA7
SWDM 5.4.4.1
$ 1,800.00
Each
1
1
1800
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
50
1
50
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
8
1
880
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
WRITE -IN -ITEMS **** (see page 91
Straw Wattles
SWDM D.2.1.2.5
$ 1.25
LF
309
1
386
CB PROTECTION INSERTS
$120.00
EA
5
600
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
Prepared by: Donna Breske and Associates, LLC
$ 616.25 $10,480.00
$ 2,584.88 $ 3,144.00
$ 11,201. $13,624.00
A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 2/11 /2021
ROW and Private Improvement Cost Estimate 2/11/2021
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
RES U B
Feb 11 2021
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
CITY OF EDMONDS
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI - 2
$ 9.00
CY
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$ 10,000.00
Acre
0.694
6,940.00
Excavation - bulk
GI - 5
$ 2.00
CY
885
1,770.00
3218
6,436.00
Excavation - Trench
GI - 6
$ 5.00
CY
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 2
GI - 9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
4
100.00
80
2,000.00
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
1353
2,706.00
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
1
850.00
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
0.45
810.00
Traffic control crew ( 2 flaggers)
GI - 24
$ 120.00
HR
20
2,400.00
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
756
41,580.00
Wall, rockery
GI - 29
$ 15.00
SF
SUBTOTAL 4,270.00 61,322.00
Prepared By: Donna Breske and Associates, LLC Page 3 Paradise Heights
ROW and Private Improvement Cost Estimate 2/11/2021
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
MMOUD
Feb 11 2021
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
CITY OF EDMONDS
DEPARTMENT
ROADIMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
80
2,400.00
AC Grinding, 4' wide machine 1000-2000
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000sy
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
80
2,800.00
Barricade, type III ( Permanent)
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
328
4,100.00
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
320
2,240.00
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
420
1,260.00
Sealant, asphalt
RI - 14
$ 2.00
LF
63
126.00
Shoulder, AC, ( see AC road unit price )
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
167
6,346.00
102
3,876.00
Sidewalk, 4" thick, demolition and dispos
RI - 18
$ 32.00
SY
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and dispos
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
Striping, thermoplastic, ( for crosswalk )
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
SUBTOTAL 17,032.00 6,116.00
Prepared By: Donna Breske and Associates, LLC Page 4 Paradise Heights
ROW and Private Improvement Cost Estimate 2/11/2021
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Feb 11 2021
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
CITY OF EDMONDS
DEPARTMENT
ROAD SURFACING
No.
(4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top
course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
436
12,208.00
1353
37,884.00
HMA Road, 2", 4" rock, Qty. over 2500 S
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 S
RS - 6
$ 42.00
SY
HMA Road, 3", 9 1/2" Rock, Qty Over 25
RS - 7
$ 35.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1 ", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Desi
RS - 15
Thickened Edge
RS - 17
$ 8.60
LF
SUBTOTAL 12,208.00 37,884.00
Prepared By: Donna Breske and Associates, LLC Page 5 Paradise Heights
ROW and Private Improvement Cost Estimate 2/11/2021
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
MMOUD
Feb 11 2021
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
CITY OF EDMONDS
VELOPMENT SERYJLES
DEPARTMENT
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D
D - 1
1 $ 21.001
SY
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
1 Each
" (CBs include frame and lid)
CB Type I
D - 4
$ 1,500.00
Each
2
3,000.00
5
7,500.00
CB Type IL
D - 5
$ 1,750.00
Each
CB Type II, 48" diameter
D - 6
$ 2,300.00
Each
for additional depth over 4'
D - 7
$ 480.00
FT
CB Type II, 54" diameter
D - 8
$ 2,500.00
Each
for additional depth over 4'
D - 9
$ 495.00
FT
CB Type II, 60" diameter
D - 10
$ 2,800.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type II, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
13
1,950.00
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
Culvert, PVC, 6"
D - 19
$ 13.00
LF
180
2,340.00
Culvert, PVC, 8"
D - 20
$ 15.00
LF
Culvert, PVC, 12"
D - 21
$ 23.00
LF
241
5,543.00
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31
$ 350.00
LF
SUBTOTAL 3,000.00 17,333.00
Prepared By: Donna Breske and Associates, LLC Page 6 Paradise Heights
ROW and Private Improvement Cost Estimate 2/11/2021
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
MMOUD
Feb 11 2021
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
S
CIVEITY M NT SEERVILEa
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
DEPARTMENT
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
47
1128
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
1 D - 63
$ 480.00
1 Each
Trash Rack, 21"
1 D - 64
1 $ 550.00
1 Each
SUBTOTAL 1128
Prepared By: Donna Breske and Associates, LLC Page 7 Paradise Heights
ROW and Private Improvement Cost Estimate
2/11 /2021
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
MMOUD
Feb 11 2021
Unit Price
Unit
Quant. Price
Quant. Cost
Quant. Cost
CITY OF EDMONDS
DEPARTMENT
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base cour
PL - 2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL - 4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied byFranchise Utility's Cost Estimate
Utility Pole(s) Relocation
UP-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
$ 7,500.00 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Storm Filters
WI-1
$ 8,500.00
EACH
3
25 500.0
Infiltration Trenches
WI -2
$ 65.00
LF
154
10,010.00
Side Sewer 6" PVC
WI - 3
$ 13.00
LF
176
2,288.00
Sewer Clean Out 6"
WI - 4
$ 170.00
EACH
6
1,020.00
Sewer Manhole
WI - 5
$ 10,600.00
EACH
1
10,600.00
Sewer Main 8" PVC
WI - 6
$ 15.00
LF
109
1635
Traffic Control Edmonds Way
WI - 7
$ 10,000.00
EACH
1
10000
Storm Trench Drain
WI-8
$ 18.50
LF
25
462.50
Mailboxes
WI - 9
$ 375.00
EACH
1
375
[.Y11l l[95111-1114
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
B
12,010.00
49,648.00
14,894.40
64,542.40
C
2" awn cncn 49,880.50
147-e55-5&- 172,535.50
""�T 51,760.65
-tRt--� 224,296.15
701
Prepared By: Donna Breske and Associates, LLC Page 8 Paradise Heights
Bond Quantity Worksheet
Original bond computations prepared by:
Name: Donna L. Breske, PE
PE Registration Number: 27367
Firm Name: Donna Brekse & Associates, LLC
Address: 21 Ave A, Snohomish, WA 98290
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Tatal Right of Way ameliar Soto Restaratiam * **
(First $p�ebeq�'-efl�ae cfasla
Reef Fffi.,RG8 Q,,pd a � �.,+ (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
(B
RESUB
2/11/2021
Feb 11 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Date: 2/11 /2021
Tel. #: 206-715-9582
Project No: BLD20160026
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND* MINIMUM BOND* AMOUNT PUBLIC ROAD & DRAINAGE
M U REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND*
TEMPORARY OCCUPANCY AT
13,624.00 4�- $ r2^ SUBSTANTIAL COMPLETION ***
$ 64,542.4 ROW & TESC
(C) -
(D) $ 224,296.15 t9t 4"
(A+B) $ 78,166.00 75--
(T) $ 302,462.15 266,889.7
> % Minimum is $20WI > > , �
TOTAL ENGINEERS
COST ESTIMATE
T x 0.30 $ e&-,e66--9-
Minimum is $2000.
Date:
(B+C) x
0.25 = $ Erg 3rsEr
Minimum is $2000.
2/11 /2021
Prepared By: Donna Breske Associates, LLC Paradise Heights