Loading...
APPROVED WSDOT SEWER AND TCP - UF05104RAM03_CityofEdmonds_SR104_MP25.78_Executed_SecuredAML Washington State To Department of Transportation March 1, 2023 Jeanie McConnell City of Edmonds 121 5th Avenue North Edmonds, WA 98020 Subject: SR 104 MP 25.75 to MP 25.78 Northwest Region 15700 Dayton Avenue North P.O. Box 330310 Seattle, WA 98133-9710 206-440-4000 TTY: 1-800-833-6388 www.wsdot.wa.gov Install 8" sanitary sewer lateral connection to existing manhole in WSDOT ROW Utility Franchise UF05104RAM03 Dear Jeanie McConnell, Please respond with a confirmation email that you have received the attached utility permit or franchise. Enclosed is your approved Utility Franchise for City of Edmonds to install approximate 175' of a 8" PVC sanitary sewer pipe via directional bore, a new type 1 manhole, and approximate 20' of 8" PVC sewer pipe to existing City's manhole in pavement within WSDOT SR 104 limited access right of way. Construction of your utility must begin within one calendar year and be completed within three years of the date of approval shown on the application. Please note that the Traffic Control Plan for work within WSDOT right-of-way, Exhibit'D', was approved as noted on February 27, 2023 and is valid for six months from that date. The Traffic Control Plan requires 5-day notice be provided to Krissy Kauffman at WSDOT's Construction Traffic Coordination Office: Krissy Kauffman Construction Traffic Coordination Office 15700 Dayton Ave. N., NB82-125 P.O. Box 330310 Seattle, WA 98133-9710 206-440-4454 KaufmK@wsdot.wa.gov Prior to any construction equipment or personnel entering WSDOT right-of-way, a pre -construction conference is required with WSDOT's inspector, Michael Rudd. The utility shall notify Michael Rudd a minimum of 5 working days in advance: Michael Rudd NW Local Agency & Development Services Office 15700 Dayton Ave. N., MS 82-240 Seattle, WA 98133-9710 206-440-4709/206-327-1877 RuddMic@WSDOT.WA.GOV City of Edmonds UF05104RAM03 3/1 /2023 Page 2 of 2 Contact WSDOT NW Region Radio at (206) 440-4490 five minutes prior to start of all traffic closures and again upon reopening to traffic. A copy of the approved Utility Franchise must be on -site. Please note, WSDOT invoice account number JZ1576 GROUP 02 will continue to be charged for personnel time for inspection activities and attendance to the pre -construction conference. For your convenience, here is the link to the WSDOT's Standard Specifications of Road, Bridge, and Municipal Construction: htt2://www.wsdot.wa.gov/Publications/Manuals/M41-10.htm If you have any questions regarding your application, please contact me at 206-440-4127 or tranp@wsdot.wa.gov. Sincerely, Phuc Tran Utility Permitting/Project Delivery Engineer PT:pt Enclosures cc: Michael Rudd, NW Local Agency & Development Services Office File Adak Washington State wo Department of Transportation Utility Accommodation (Permit or Franchise) Utility Company: City of Edmonds IMPORT CLEAR FORM Permit/Franchise Number Expiration Charge Code* Group UF05104RAM03 03/02/2033 JZ1576 02 Date Received Reviewed By Region Address 08/03/2022 P. Tran Northwest: 15700 Dayton Ave. N, Shoreline, WA 98133 Application Type Category, Impact to R/W Fees* Access Control Franchise Amendment Category 1 - High Impact $500 Partial - LP ❑x In accepting this Franchise Amendment No. 03 to UF05104R Utility agrees that the General Provisions to the original Franchise shall be replaced in their entirety with the General Provisions as included with this Amendment. All other terms and conditions of the original franchise shall remain in full force and effect. * The fees required under WAC 468-34 and RCW 47.44 are paid by the Utility to cover the basic administrative expenses incidental to the processing of this application. The applicant promises to pay any additional costs for all work associated with the review, processing and inspection for the proposed installation. Checks or money orders are to be made payable to "Washington State Department of Transportation". Exhibits The above -noted Permit, Franchise or Franchise Amendment is subject to the terms and conditions stated in the General Provisions, as well as all the Exhibits. Exhibit A: Special Provisions for Permits and Franchises Page(s) 1-5 of 5 Exhibit B: Utility Facility Description (UFD) Page(s) 1 of 1 Exhibit C: Plan Sheets/Maps Page(s) 1-9 of 9 Exhibit D: Traffic Control Plan Page(s) 1 of 1 Exhibit E: Pre -Construction Notification Page(s) 1 of 1 Exhibit F: Maintenance Notification Page(s) 1 of 1 Exhibit G: Page(s) Exhibit H: Page(s) Vicinity Maps State Route: 104 MIL Begin Milepost: 25.75 Link End Milepost: 25.78 Link Seavleva Park © �Iderwcod Q WORK AREA 'J Boor,�� SR 104 MP 25.75-25.78 Lynnwood s:a QEvent Management serv,ces r.rr oo,v, or Louaeoa © Fred Meyer © Edmonds vtarina AlderwoodManor � ach Park w Bothell West WmCo FoodsQ BEGIN WORK d MP 25.75 n Woodw y ' Esperance Mountlake MPD 5 ORK ^ way sw 0 Terrace Brier Richmond Beach QCoslco Wholesale Itwater Park '� st Sec BaM ECHO Aac McCormick Medical 9DislnbuUon Loy Boorn Park McMeAnderson © Anderson School School V , Lake Bothell Forest Park © Kenmore ShorNlne� 6 Chermak Construct, n Q - — '' • FIVEQ s l - ® Saint Edward r. Stale Park 19 MAl'l[R LARK *YMPIC NrLLS L. 226th St SW 226th St SW IT Rr11ER URF 11 LAKE CY 00 Denny Q Park .Inennn Departmental Approval WSDOT Authorized Signatory Printed Name and Job Title Date Issued OMJAssistant NW Region Digitally signed by Tom Chi IUtilitiesManager For Date: 2023.03.0216:57:42-08.00 Maria Mayrhofer - NW Region Utilities Manager 3/2/20223 DOT Form 224-695 Revised 10/2019 r Washington State Utility Accommodation Application Department of Transportation (Permit or Franchise) Utility Contact Information (Applicant) Utility Company Utility Contact Name City of Edmonds Jeanie McConnell Email Phone (Office/Cell/Voicemail) jeanie.mcconnell@edmondswa.gov 425-771-0220, x 1338 Location (www.snagmp.com) State Route Milepost Begin Milepost End County 104 6.82 25.75 25..83 25.78 Snohomish Installation Submit the Following Documentation: Please Check One Please Check All That Apply Utility Facility Description (UFD) ❑ Power Q Sewer Q Buried Plan Sheets Water Telecommunication Aerial ❑ Gas ❑ Surface Feature (Pole, ped, vault) For Additional Documents Applicable to your work, see Submitting a Utility ❑ Other [:]Attached to a bridge/structure Accommodation Application Webpage (Link) Describe Installation Type (Briefly explain) Install 8" PVC sanitary sewer lateral to existing manhole in SR 104 Anticipated Construction Start Date: 8-9-2022 Project Duration: 2-5 days Billing Information* Contact Name Regent Construction, Inc. Street 3717 Bells Beach Rd City State Zip + 4 Langley WA 98260 Phone (Office/Cell/Voicemail) Email 206-930-2445 rwmichell@me.com Federal Tax ID Applicant Reference Work Order (optional) 27-457433 Utility Authorized Signatory Signature Printed Name & Title/Owner Date Jeanie McConnell, Eng Program Mgr, City of Edmonds 08/02/2022 The Authorized Signature indicates the General Provisions, as provided, have been read and are agreed to by the Utility. The Utility understands, based on the proposed installation, applicable special provisions will be provided at issuance of your Permit or Franchise. WSDOT has the authority to invoice the Utility for all work associated with the review, processing and inspection of the proposed installation. The applicant promises to pay any additional costs, in addition to the fees, incurred by WSDOT in accordance with WAC 468-34 and RCW 47.44. Supplemental Contact Information of Authorized Agent if NOT the Utility Company Name Contact Name Regent Construction, Inc. Rob Michel Email Phone (Office/Cell/Voicemail) rwmichell@me.com 206-930-2445 - cell DOT Form 224-696 Revised 02/2022 AdW Washington State General Provisions for the Utility Department of Transportation Accommodation Application This Permit or Franchise is issued pursuant to the terms of RCW 47.32, RCW 47.44, and WAC 468-34, and amendments thereto. Renewal of a Franchise must be by application prior to expiration of this Franchise as required by RCW 47.44.020(3). 1. A copy of this Permit or Franchise must be on the job site, protected from the elements, at all times during any construction authorized by this Permit or Franchise. The Utility agrees to pay the reasonable costs for investigating, handling, and granting the Permit or Franchise, including, but not limited to basic overhead charges and for providing an inspector during construction and/or maintenance of the Utility's facilities. Further, the Utility agrees that it shall be responsible for and pay WSDOT's expended direct and indirect costs associated with applicable provisions of the Permit or Franchise. WSDOT will assign a reimbursable account to the Utility as a means of invoicing the Utility for the costs associated with this Permit or Franchise. (a) WSDOT will assign a reimbursable account to the Utility as a means of invoicing the Utility for the costs associated with this Permit or Franchise. (b) WSDOT will invoice the Utility and the Utility agrees to pay WSDOT within thirty (30) calendar days of receipt of an invoice. 3. Upon approval of this Permit or Franchise, the Utility shall diligently proceed with the Work and comply with all General and Special provisions herein. Construction of facilities proposed under this Permit or Franchise shall begin within one (1) year and must be completed within three (3) years from date of WSDOT approval. "Work" under this Permit or Franchise shall mean construction, operation, and maintenance of the Utility's facilities as authorized herein. 4. The Utility shall notify WSDOT representative in special provision 1 of the name, address, and telephone number of its contractor when Work outlined herein is going to be performed with other than its own forces. When the Utility uses a contractor, an authorized representative of the Utility shall be present at all times unless otherwise agreed to by WSDOT representative. A list of authorized representatives shall be submitted prior to the construction start date. (Authorized representatives are defined as persons having signatory authority for the Utility and or the authority to control the Work as needed for any issues identified by WSDOT.) 5. The Utility agrees to schedule and perform its Work in such a manner as not to delay WSDOT's contractor's work when WSDOT has a contractor performing work in the vicinity of the Utility's Work. 6. All contact between WSDOT and the Utility's contractor shall be through the Utility representative. Where the Utility chooses to perform the Work with its own forces, it may elect to appoint one of its own employees engaged in the Work as its representative. The Utility, at its own expense, shall adequately police and supervise all Work performed by itself, its contractor, subcontractor, agent, and/or others, so as not to endanger or injure any person or property. 7. The Utility shall contact the identified WSDOT representative two (2) weeks prior to conducting Work, to determine the location of survey control monuments within the area in which the Utility will be working. In the event any monument or right of way marker will be altered, damaged, or destroyed by the Utility, WSDOT, prior to Utility Work, will reference or reset the monument or right of way marker. During the Work, upon discovery of a monument or right of way marker, the Utility shall cease Work in that area and immediately notify WSDOT of the discovery. WSDOT will coordinate with the Utility to ensure that the monument or right of way marker is recorded or replaced. The Utility agrees to pay all WSDOT costs to perform monument or right of way marker work, as provided in this provision, in accordance with general provision 2. 8. In the event any milepost, fence, or guardrail is located within the limits of the Utility's Work and will be disturbed during Utility Work, the Utility agrees to carefully remove these highway facilities prior to Utility Work and reset or replace these highway facilities after the Utility Work, to WSDOT's sole satisfaction and at the sole cost of the Utility. The Utility agrees that all highway signs and traffic control devices shall not be removed or disturbed during Utility Work. DOT Form 224-696 GP Revised 06/2019 9. The Utility agrees that all Work shall be done to the satisfaction of WSDOT. All material and workmanship shall conform to WSDOT's Standard Specifications for Road, Bridge, and Municipal Construction, current edition, and amendments thereto, and shall be subject to WSDOT inspection. All WSDOT acceptance and inspections are solely for the benefit of WSDOT and not for the benefit of the Utility, the Utility's contractor (if any), or any third party. The Utility agrees that it shall pay all WSDOT inspection costs in accordance with general provision 2. 10. The Utility shall comply with the Manual on Uniform Traffic Control Devices for Streets and Highways (Federal Highway Administration) and the State of Washington modifications thereto (chapter 468-95 WAC) while it performs the Work. If WSDOT requires, the Utiltiy shall submit a signing and traffic control plan to WSDOT's representative for approval prior to construction or maintenance Work. No lane closures shall be allowed except as approved by WSDOT's representative. Approvals may cause revision of Special Provisions of this Permit or Franchise, including hours of operation. 11. This Permit or Franchise may not be amended or modified without WSDOT's prior review and approval. Upon completion of the Work, the Utility shall provide a written notice of completion of the Work to WSDOT's representative within ten (10) calendar days of the completion of the Work so that WSDOT may make its final inspection. Further, the Utility shall provide the Region Utilities Engineer with detailed as -built drawings within ninety (90) calendar days of Work completion, if the originally approved Permit or Franchise construction plans have been revised during the course of construction. 12. If WSDOT, at its sole discretion, shall determine that any or all of the Utility's facilities must be modified, removed from, or relocated within the state-owned highway right of way as necessary, incidental, or convenient for the construction, alteration, improvement, repair, relocation, or maintenance of the state highway, or for the safety of the traveling public, the Utility, its successors and assigns, shall, at its sole cost and expense, upon written notice by WSDOT, modify, relocate, or remove any or all of its facilities within or from the state-owned highway right of way as required by WSDOT. The Utility shall perform in a timely manner all facility modifications, relocations, and/or removals as WSDOT directs, to avoid highway project impacts or delays and in such manner as will cause the least disruption of traffic or interference with WSDOT's continued operation and/or maintenance of the highway. 13. Should the Utility fail or refuse to comply with WSDOT's direction, pursuant to general provision 12, to modify, remove, or relocate any Utility facility, WSDOT may undertake and perform any modification, removal, or relocation of the Utility facility that WSDOT, in its sole discretion, deems necessary. The Utility agrees to pay WSDOT's expended costs and expenses for performing the work, in accordance with general provision 2. 14. If WSDOT determines in good faith that emergency maintenance work on the Utility's facility is needed to (a) protect any aspect of the state highway right of way, or (b) secure the safety of the traveling public due to a failure of the Utility's facility, WSDOT may perform the necessary work without the Utility's prior approval, and the Utility agrees to pay WSDOT's expended costs and expenses for performing the work in accordance with general provision 2. WSDOT will notify the Utility of the emergency work performed as soon as practicable. 15. WSDOT may amend, revoke, or cancel this Permit or Franchise at any time by giving written notice to the Utility. If the Permit or Franchise is amended, the Utility will have thirty (30) calendar days to modify the facility as the Permit or Franchise amendment(s) require. If the facility modifications cannot be made within thirty (30) calendar days, the Utility shall respond to WSDOT, in writing, as to when the facility modifications can be made. If the Permit or Franchise is revoked or canceled, the Utility shall immediately remove all facilities from the right of way. Any facilities remaining upon the right of way thirty (30) calendar days after written notice of Permit or Franchise revocation or cancellation may be removed by WSDOT at the expense of the Utility. The Utility agrees to pay WSDOT's expended costs and expenses for performing the work in accordance with general provision 2. 16. Should the Utility breach any of the conditions and requirements of this Permit or Franchise, or should the Utility fail to proceed with due diligence and in good faith with the Work as authorized by this Permit or Franchise, WSDOT may cancel or revoke the Permit or Franchise upon thirty (30) calendar days written notice to the Utility. 17. The Utility shall not excavate or place any obstacle within the state-owned highway right of way in such a manner as to interfere with WSDOT's construction, operation, and maintenance of the state- owned highway right of way or the public's travel thereon without first receiving WSDOT's written authorization. 18. The Utility agrees to maintain, at its sole expense, its facilities authorized by this Permit or Franchise in a condition satisfactory to WSDOT. 19. The Utility agrees that it is financially responsible to WSDOT for all necessary expenses incurred in inspecting the construction and restoring the highway pavement or related transportation equipment or facilities to a permanent condition suitable for travel as determined by WSDOT, as well as financially responsible to WSDOT for trenching DOT Form 224-696 GP Revised 06/2019 work not completed and for compensating WSDOT for the loss of useful pavement life caused by trenching as required by RCW 47.44.020. 20. Upon completion of all Work, the Utility shall immediately remove all rubbish and debris from the state- owned highway right of way, leaving the state-owned highway right of way in a neat, presentable, and safe condition to WSDOT's satisfaction. Any Workrelated rubbish and debris clean up, or any necessary slope treatment to restore and/or protect the state-owned right of way, not done within one (1) week of Work completion, unless otherwise negotiated, will be done by WSDOT at the expense of the Utility. The Utility agrees to pay WSDOT's expended costs and expenses for performing the work in accordance with general provision 2. 21. For the benefit and safety of the traveling public, the Utility voluntarily agrees to permit WSDOT to attach and maintain upon any Utility facility under this Permit or Franchise any required traffic control devices, such as traffic signals, luminaires, and overhead suspended signs, when the use of such devices or attachments does not interfere with the use for which the facility was constructed. WSDOT shall bear the cost of attachment and maintenance of such traffic control devices, including the expended cost of any extra Utility infrastructure construction beyond what is necessary for the Utility's facility; such extra cost to be jointly determined by WSDOT and the Utility. WSDOT shall not share in the Utility facilities' cost of installation, operation, or maintenance of any of the facilities installed under this Permit or Franchise 22. The Utility shall comply with WSDOT's Temporary Erosion and Sediment Control Manual (M 3103.01) and any revisions thereto, for erosion control and/or to mitigate any erosion occurring as a result of the Work. If the Utility Work performed under this Permit alters, modifies, changes, or interferes in any way with the drainage of the state- owned highway right of way, the Utility shall, at its own expense, make all corrections and/or provisions WSDOT requires to fix and restore the state-owned right of way drainage to its original condition and function prior to the Utility's Work. Any flows from the Utility shall not exceed the flows discharging to WSDOT drainage prior to the new work. Any flows discharged to state- owned highway right of way shall meet the requirements for quantity and water quality according to the current version Highway Runoff Manual (M 31-16). Should the Utility not make the required drainage restoration, WSDOT reserves the right to make such changes as necessary to restore the original drainage function at the sole cost of the Utility, and the Utility agrees to pay WSDOT's expended costs and expenses for performing the work in accordance with Stormwater Discharge General Provision 2. 23. The Utility shall be responsible for securing all necessary permits, including but not limited to, federal, state, and local regulatory, tribal, environmental, archeological, and railroad permits and permits from the Washington State Department of Ecology, the Washington State Department of Fish and Wildlife, and/ or the U.S. Army Corps of Engineers prior to beginning the Work authorized by this Permit or Franchise. The Utility shall be responsible for mitigation measures where wetlands have been disturbed and agrees that it is responsible for any fines imposed for noncompliance with the permit(s) conditions or for failure to obtain the required permits. In addition, the Utility, on behalf of itself and its contractors, officers, officials, employees, and agents, agrees to indemnify, hold harmless, and defend, at its sole cost and expense, WSDOT and its officers, officials, employees, and agents from any and all fines, costs, claims, judgments, and/or awards of damages (to regulatory agencies, persons, and/or property), arising out of, or in any way resulting from, the Utility's failure to (1) obtain any required permit for the Utility Work or (2) comply with permit conditions. Further, the Utility shall be responsible for compliance with all federal, state, and local laws, regulations. 24. For any of the Utility's Work that requires permit coverage under the "CONSTRUCTION STORMWATER GENERAL PERMIT — National Pollutant Discharge Elimination System and State Waste Discharge General Permit for Stormwater Discharges Associated with Construction Activity" (Construction Stormwater General Permit), the Utility shall obtain said permit coverage and shall comply with all requirements of the Construction Stormwater General Permit. Upon WSDOT's request, the Utility shall provide a copy of the Construction Stormwater General Permit. In addition, the Utility, on behalf of itself and its contractors, officers, officials, employees, and agents, agrees to indemnify, hold harmless, and defend, at its sole cost and expense, WSDOT and its officers, officials, employees, and agents from any and all fines, costs, claims, judgments, and/or awards of damages (to regulatory agencies, persons, and/or property), arising out of, or in any way resulting from, the Utility's failure to (1) obtain coverage under the Construction Stormwater General Permit for Utility Work or (2) comply with the Construction Stormwater General Permit requirements. DOT Form 224-696 GP Revised 06/2019 25. This Permit or Franchise does not authorize the Utility, or its employees, contractors, or agents, any right to cut, spray, retard, remove, destroy, disfigure, or in any way modify the physical condition of any vegetative material located on the state-owned highway right of way. Should the Utility anticipate that its Work will alter the appearance of the state-owned highway right of way vegetation, the Utility shall notify WSDOT representative listed in special provision 1 to obtain WSDOT's prior written approval of the Utility's proposed work. If WSDOT permits the Utility to modify the state-owned highway right of way vegetation, it agrees that any vegetation cutting and/or trimming activities shall be conducted in such a manner that the state-owned highway right of way vegetation appearance will not be damaged. Should the Utility damage the appearance of the state-owned highway right of way vegetation without WSDOT's prior written approval, the Utility is subject to penalties provided for in RCWs 47.40.070, 47.40.080, and 4.24.630, as applicable. 26. The Utility hereby certifies that its facilities described in this Permit or Franchise are (1) in compliance with the Control Zone Guidelines, or (2) for a franchise consolidation or renewal, a mitigation plan has been submitted and approved for any existing Location I or Location II utility objects to be corrected in accordance with the Control Zone Guidelines, pursuant to Chapter 9 of WSDOT's Utilities Manual (M 22-87) and any revisions thereto. 27. The Utility shall not assign or transfer this Permit or Franchise without WSDOT's prior written approval. The Utility understands that any assignment or transfer requires the assignee or transferee to have the means to assume all obligations, duties, and liabilities of the terms and conditions of this Permit or Franchise, and the Utility will advise the assignee or transferee of its obligation to apply for an updated or replacement Permit or Franchise. If WSDOT does not approve the assignment or transfer, this Permit or Franchise shall automatically terminate, and the facility occupying state-owned highway right of way shall be subject to the terms of RCW 47.44.060. 28. The Utility, its successors and assigns, shall indemnify, defend at its sole cost and expense, and hold harmless the State of Washington, its officers and employees, from all claims, demands, damages (both to persons and/or property), expenses, regulatory fines, and/or suits that (1) arise out of or are incident to any acts or omissions of the Utility, its agents, contractors, and/or employees, in the use of the state- owned highway right of way as authorized by the terms and conditions of this Permit or Franchise, or (2) are caused by the breach of any of the terms or conditions of this Permit or Franchise by the Utility, its successors and assigns, and its contractors, agents, and/or employees. The Utility, its successors and assigns, shall not be required to indemnify, defend, or hold harmless the State of Washington, its officers and/or employees, if the claim, suit, or action for damages (both to persons and/or property) is caused by the acts or omissions of the State of Washington, its officers and/or employees; provided that, if such claims, suits, or actions result from the concurrent negligence of (a) the State of Washington, its officers and/ or employees, and (b) the Utility, its agents, contractors, and/or employees, or involves those actions covered by RCW 4.24.115, the indemnity provisions provided herein shall be valid and enforceable only to the extent of the acts or omissions of the Utility, its agents, contractors, and/or employees. 29. The Utility agrees that its obligations under this Permit or Franchise extend to any claim, demand, and/or cause of action brought by, or on behalf of, any of its employees or agents while performing Work under this Permit or Franchise while located on state-owned highway right of way. For this purpose, the Utility, by MUTUAL NEGOTIATION, hereby waives, with respect to the State of Washington only, any immunity that would otherwise be available to it against such claims under the Industrial Insurance provisions in chapter 51.12 RCW. 30. The indemnification and waiver provided for in general provisions 28 and 29 shall survive the termination of this Permit or Franchise. 31. Any action for damages against the State of Washington, its agents, contractors, and/or employees, arising out of damages to a utility or other facility located on state-owned highway right of way, shall be subject to the provisions and limitations of RCW 47.44.150. 32. This Permit or Franchise shall not be deemed or held to be an exclusive one and shall not prohibit WSDOT from granting rights of like or other nature to other public or private utilities, nor shall it prevent WSDOT from using any of the state-owned highway right of way or other properties for transportation purposes, or affect WSDOT's right to full supervision and control over all or any part of the state-owned highway right of way or properties, none of which is hereby surrendered. Further, WSDOT reserves the exclusive right to require that all utility facilities be subject to joint trenching and occupancy. DOT Form 224-696 GP Revised 06/2019 CrLEAR FORM Adak Washington State wo Department of Transportation Applicable provisions are denoted by (./) Special Provisions for Utility Accommodation Application �✓ 1. No Work provided for herein shall be performed until the Utility is authorized by the following Washington State Department of Transportation (WSDOT) Representative(s): Name: Michael Rudd Title: WSDOT Inspector Street: 15700 Dayton Ave. N., MS 82-240 City: Seattle State: WA Zip: 98133-9710 Phone: 206-440-4709 Cell: 206-327-1877 Email/Fax: Rudd M ic(a)-WS DOT.WA. GOV Name: Title: Street: City: State: Zip: Phone: Cell: Email/Fax: The Utility shall notify in writing the identified WSDOT representative(s) at least five (5 ) working days (Monday through Friday excluding any holidays), in advance of commencing Work on state-owned highway right of way. ❑✓ 2. Prior to beginning the Work, a pre -construction conference shall be held at which WSDOT, Utility's engineer, contractor, and inspector (as applicable) shall be present. The Utility shall give a minimum 5 working days (Monday through Friday excluding any holidays) notice to WSDOT's representative(s) (prior to the pre - construction conference) 3. Work within the state-owned highway right of way shall be restricted to No Work shall be allowed on Saturday, Sunday, or holidays, without prior approval by WSDOT. In addition, the Utility shall be off the highway by noon the day prior to a holiday unless authorized by WSDOT. If a holiday falls on a Saturday, the preceding Friday is counted as the holiday, and the Utility shall be off the highway by noon Thursday. When the Holiday falls on a Monday the Utility shall be off the right of way at noon on the preceding Friday. Nothing in this section shall limit the authority of WSDOT to further restrict work within state-owned highway right of way at WSDOT's discretion. The hours of closure are subject to change if required by WSDOT. ❑✓ 4. During non -working hours equipment and materials shall not be located or stored within the work zone clear zone (WZCZ) area. Minimum WZCZ distances will be measured from the edge of the traveled way (the portion of the roadway intended for the movement of vehicles, exclusive of shoulders and lanes for parking, turning, and storage for turning) and will be determined as follows: Minimum Work Zone Clear Zone Distance Posted Speed Distance From Traveled Way (ft) 35 mph or less 10 40 mph 15 45 to 55 mph 20 60 mph or greater 30 Exhibit 'A' UF05104RAM03 Special Provisions for Permits and Franchises Page 1 of 6 DOT Form 224-030 Revised 08/2019 ❑✓ 5. In the event that during the course of this project an inadvertent discovery of historical/archeological objects, human remains, or a bone/bones of uncertain origin is made, the Utility shall immediately cease operations and contact WSDOT Representative in section 1 and WSDOT Archaeologist: Name: Jason Cooper Phone: 206-487-0604 Email: CoopJas(a@wsdot.wa.gov Determination of necessary follow-up actions or the ability to continue work shall be at the sole discretion of the WSDOT. 26. The Utility agrees that, in the event any construction and/or maintenance of the highway facility becomes necessary within the proximity of the utility installation, it is expressly understood that, upon request from WSDOT's representative, the Utility will promptly identify and locate by suitable field markings any and all of its underground facilities so that WSDOT or its contractor can be fully apprised at all times of their precise locations. ❑ 7. Construction of this facility will not be permitted from the shoulders or through the traffic lanes and/or ramps of SR �. All construction access will be from BOND AND INSURANCE COVERAGE ❑ 8. The Utility has provided bond coverage for the Work under this Permit or Franchise by furnishing a blanket surety bond held by WSDOT at the WSDOT Headquarters Utilities in Olympia, WA. ❑ 9• The Utility or its contractor shall provide a surety bond to WSDOT in the amount of $ written by a surety company authorized to do business in the State of Washington, or shall set up a WSDOT approved escrow account prior to the start of construction to cover the Work under this Permit or Franchise. The surety bond or escrow account shall remain in force for a period of one (1) year after the written notice of completion of the Work (as provided in general provision 11), except that when the Work impacts the paved highway (open cuts, bores or damage to the highway surface), the Utility shall be required to maintain the surety bond or escrow account for a period of two (2) years after the notice of completion. ❑ 10. When the Utility chooses to perform the Work with other than its own forces and requires its contractor to provide a surety bond to WSDOT before performing any Work to ensure compliance with all of the terms and conditions of this Permit or Franchise, the bond shall be in the amount of $ E , written by a surety company authorized to do business in the State of Washington and shall remain in force until all Work under this Permit or Franchise has been completed, and the Utility's contractor has restored any affected WSDOT property and right of way to the satisfaction of WSDOT. ❑ 11. The Utility shall provide proof of insurance coverage prior to performing any Work within state-owned highway right of way, as follows: (a) Commercial General Liability covering the risks of bodily injury (including death), property damage, and personal injury, including coverage for contractual liability, with a limit of not less than $3 million per occurrence and in the aggregate. (b) Business Automobile Liability (owned, hired, or non -owned) covering the risks of bodily injury (including death) and property damage, including coverage for contractual liability, with a limit of not less than $2 million per accident. (c) Employers Liability covering the risks of Utility's employees' bodily injury by accident or disease, with limits of not less than $1 million per accident for bodily injury by accident and $1 million per employee for bodily injury by disease. Such insurance policies or related certificates of insurance shall name the Washington State Department of Transportation as an additional insured on all general liability, automobile liability, employers' liability, and excess policies. A forty-five (45) calendar day written notice shall be given to WSDOT prior to termination of or an material change to the policy(ies) as such relate(s) to this Permit or Franchise. Exhibit 'A' UF05104RAM03 DOT Form 224-030 Special Provisions for Revised 08/2019 Permits and Franchises Page 2 of 6 ❑✓ 12. If the Utility is a city or county, it has provided verification of insurance coverage to WSDOT by providing proof of its coverage through a Risk Pool or verification that the city or county is self -insured, to comply with the insurance terms and conditions of this Permit or Franchise. UNDERGROUND FACILITIES ❑ 13. The Utility shall completely remove all Deactivated Facilities (as defined in Washington State Department of Transportation Utilities Manual M 22-87). ❑✓ 14. Deactivated facilities left within the state owned right of way shall remain owned by the Utility, who shall continue to bear all responsibility for any future costs incurred for removal of the Deactivated facilities if required by WSDOT in its sole discretion. ❑✓ 15. For underground facilities, markers shall be placed at both ends of a crossing, and at all changes in offset distance from right of way line or centerline of the highway and placed approximately every 500 feet for longitudinal installations. Marker information as a minimum shall include owner name, pipeline or cable identification and station, and telephone number or other means to contact a local office. Markers must be in compliance with WSDOTs Standard Specifications for Road, Bridge, and Municipal Construction Manual M 41-10, Division 9 (9-17 Flexible Guideposts), not create a safety hazard, and all markers shall be placed and maintained so as to minimize interference with WSDOT maintenance operations. It is the Utility's responsibility to maintain its markers. Maintenance of markers includes but is not limited to update of Utility's name (if changed) or Utility's successors' or assigns' contact information, and replacement of damaged or missing markers. ❑✓ 16. All underground facilities shall include a component by which the utility can be located with conventional methods, provided that for all installations in trenches, the Utility shall install detector tape approximately 12 inches above the underground facility. The tape shall conform to the standards of the American Public Works Association Uniform Color Code. ❑✓ 17. Utility facilities or casings for facilities crossing under highways surfaced with oil, asphalt concrete pavement, or cement concrete pavement shall be by trenchless construction, using the appropriate equipment to jack, bore, or auger the facility through the highway prism with a minimum depth of 5 feet along any point from the top of facility to the lowest point of the finished highway grade, at a minimum of 3.5 feet depth from bottom of ditch/toe of slope to top of facility or casing. ❑✓ 18. If PVC or HDPE casings are utilized for crossings, they shall be greater than Schedule 80 or equivalent or as approved by WSDOT. ❑ 19. Casing requirements (WAC 468-34-210) for utilities are specified individually or in whole on the attached exhibits. Any variances to these casing requirements must be approved by WSDOT, in writing prior to installation. ❑ 20. Pipeline installation shall meet the provisions of chapter 480-93 WAC, Gas Companies- Safety, and amendments thereto. ❑ 21. Open trenching (cutting a trench for direct placement of a utility that does not include cutting an existing paved highway surface) will only be allowed at the locations identified on the plan sheets and/or listed on Exhibit(s) 'C' with restoration to be performed as noted on the attached "Open Trench Detail," Exhibit 'C' ❑,/ 22. Open cuts (cutting a trench for direct placement of a utility that does include cutting the existing paved highway surface) of the highway are a variance to WSDOT policy, requiring justification (Open Cut Variance Request) and approval by WSDOT prior to the Work beginning. Open cuts are only allowed at approved locations identified on the plan sheets and/or listed on Exhibit(s) 'C' with restoration to be performed as noted on the attached "Open Cut Detail," Exhibit 'C' ❑✓ 23. If determined necessary by WSDOT representative, any or all of the excavated material shall be removed and replaced with suitable material as specified by WSDOT. It is the Utility's responsibility to obtain any necessary permits or comply with applicable requirements to haul or dispose of any excavated material. Exhibit 'A' UF05104RAM03 DOT Form 224-030 Special Provisions for Revised 08/2019 Permits and Franchises Page 3 of 6 ❑✓ 24. If determined by the Washington State Department of Labor and Industries and/or WSDOT representative that extra Shoring (beyond that specified in Section 7-08.3(1)B of WSDOT's Standard Specifications for Road, Bridge, and Municipal Construction) is necessary for the safety of the workers or the protection of the highway pavement, the trenching or excavation work shall be stopped and no Work in the trench or excavation area will be allowed until satisfactory modifications are made. ❑✓ 25 All trenches, boring or jacking pits, etc., shall be backfilled as soon as possible. If left open during nonworking hours, they shall be protected to the satisfaction of WSDOT. Methods of protection shall be submitted a minimum of Ten (10 ) calendar days in advance for approval by WSDOT prior to use. AERIAL/ABOVEGROUND FACILITIES ❑ 26. All facilities on joint use poles shall be relocated at the time the pole owner either moves or removes its poles. (The pole owner is the Permit or Franchise holder under which the poles were installed and is responsible for ensuring the removal of the pole.) ❑ 27. Neutral conductors associated with circuits of 0 to 22 Kilovolts, where the neutral is considered to be 0-750 Volts, shall have a minimum clearance of 24 feet Vertical Clearance as indicated in WAC 468-34-290, 20 feet provided the facility is grounded at each pole at each end of the crossing. ❑ 28. The Utility agrees to underground the aboveground facilities covered by this Franchise in Scenic Classes "A" and " "B", as defined on the attached Exhibit(s) 1 1, either at the time of major construction of the facility , for that portion of facility to be reconstructed, or prior to expiration of this Franchise. ❑ 29. The Utility agrees to underground the aboveground facilities covered by this Franchise in Scenic Classes "A," "AX," "B," and/or "BX," as defined on the attached Exhibit(s) J, at the time the pole owner undergrounds its facility. The existing aboveground facility may remain or be relocated as aboveground in Scenic Classes "AX" or "BX," if acceptable to WSDOT. ❑ 30. The Utility agrees to underground or relocate the existing aboveground facilities covered by this Franchise in Scenic Classes 'A" "AX," "B," and/or "BX," as defined on the attached Exhibit(s) 1, to a location acceptable to WSDOT either at the time of reconstruction, for the portion ot line to be reconstructed, or prior to the expiration of this Franchise. The existing aboveground facility may remain or be relocated as aboveground in Scenic Classes "AX" or "BX," if acceptable to WSDOT. MAINTENANCE ❑ 31. No routine maintenance of the facility authorized by this Permit or Franchise will be allowed within the limited access area. ❑ 32. Maintenance access of this facility will not be permitted from the shoulders, thru-traffic lanes, and/or ramps of �, and all service to this facility will be accessed from ❑ 33. The Utility will notify WSDOT representative(s), listed in Special Provision 1, ( ) working days (Monday through Friday excluding any holidays) prior to any scheduled main enanc�e work to be performed in the state-owned highway right of way. Exhibit 'A' UF05104RAM03 Special Provisions for Permits and Franchises Page 4 of 6 DOT Form 224-030 Revised 08/2019 Washington State Department of Transportation UF05104RAM03 Special Provisions for Utility Accommodation Application ® 34. Traffic control plans for this permit have been reviewed by the WSDOT Construction Traffic Coordination Office (CTCO) and have been Approved/Approved As Noted, when applicable. The Utility shall be required to follow the lane closure hours provided by WSDOT-Reviewed Traffic Control Plan. See Exhibit'D' for approved Traffic Control Plans. The Utility, or the Utility's contractor, shall contact the following CTCO Engineer five (5) working days prior to traffic control set up for coordination: Krissy Kaufman Construction Traffic Coordination Office 15700 Dayton Ave. N., NB82-120 P.O. Box 330310 Seattle, WA 98133-9710 206-440-4454 KaufmK@wsdot.wa.gov The approved traffic control plan expires on August 23, 2023 and is intended to be renewable through the construction phase of this Utility Franchise. For traffic control plan renewal or modification, send request to: Michael Rudd 206-440-4709/206-327-1877 Rudd Mic@WSDOT.WA.GOV ® 35. No closures will be allowed from noon the day prior to a holiday or holiday weekend through noon the day following a holiday or holiday weekend. It is a holiday weekend when the holiday falls on a Friday, Saturday, Sunday, or Monday. ® 36. The Utility shall notify the WSDOT representative(s), listed in Exhibit'F', twenty (20) working days (Monday through Friday excluding any holidays) prior to any scheduled maintenance work to be performed in the state-owned highway right of way. ® 37. Excavated areas shall be restored in accordance with the "Open Cut Detail" listed in Exhibit 'C'. Backfill shall be gravel or select borrow, match existing CSBC and HMP depth using HMA Class'/2" Pg 58H-22. Paving shall be full lane width and top lift extended 10' in both directions beyond the excavated area. All excavated material shall be hauled off. ® 38. The Contractor shall conduct all operations to minimize any drop-offs (abrupt changes in roadway elevation) left exposed to traffic during non -working hours. Unless otherwise specified in the Traffic Control Plan, drop- offs left exposed to traffic during non -working hours shall be protected as specified in WSDOT Standard Specification 1-07.23. Steel -plates used to protect open trenches shall meet, but are not limited to, the following requirements: Steel plates shall, at a minimum, be designed for the span width of the trench, and for the maximum weight of the vehicles permitted to use the facility Steel plates shall include a factory installed anti-skid surface, in a color that is in contrast to the pavement for ease of driver identification Installation of steel plates shall follow industry standards and shall include the following: — Shall be of the correct size to span the entire lane(s) with the open trench, and without encroachment into the adjacent lane — Wedges or other non -asphaltic devices used for leveling to eliminate rocking — Anchors to keep the plates from moving — Temporary wedges of a suitable material to provide a smooth transition for drivers — Install motorcycle warning sign (W21-1701) and steel plate warning sign (W8-24) Use of steel plates for open trench protection is permitted for a maximum of 5 days. Exhibit 'A' UF05104RAM03 Special Provisions for Permits and Franchises Page 5 of 6 Washington State Department of Transportation UF05104RAM03 Special Provisions for Utility Accommodation Application ® 39. The pipes shall be installed without damage to traveled lanes and shoulders, or other facilities above the pipe. Damage to existing facilities as a result of the Utility's operations shall be repaired to the satisfaction of WSDOT at the Utility's expense. The repair procedure shall be proposed by the Utility and approved by WSDOT. ® 40. Restore shoulder striping and lane channelization markers in accordance with the City of Edmonds Standard Plans. ® 41. The Utility shall restore disturbed ground surfaces as follows: • Dress the ground surface to match surrounding grades, materials, and drainage function. • Apply 3 inches of mulch to any areas where vegetation has been damaged by construction activities. Exhibit 'A' UF05104RAM03 Special Provisions for Permits and Franchises Page 6 of 6 Adw Washington State wo Department of Transportation Utility Facility Description All Greyed Out Areas are For Department Use Only Accommodation Number: UF05104RAM03 State Route Number: 104 SnagMP (Link) Access Control: Limited Scenic Class: C Begin Mile Post: 25.75 End Mile Post: 25.78 T, R, Sec: 27N, 3E, 25 Facility Description - Provide a summary of the proposed work: (press ALT+Enter to insert line break) Direct bore to install approximate 175 linear feet of a 8" PVC Sanitary Sewer (DIAGONAL) within SR 104 ROW soft shoulder. Proposed 8" Sewer will connect to existing SSMH within pavement of SR104 westbound lane. Open cut -trench into pavement is approximately 20 linear feet. See Exhibit 'C' page 1 of 8 for work site location in L/A ROW Additional Notes: Begin Mile Post End Mile Post Left, Right or Xing Offset Distances (feet) Facility Description Right of Way Aerial, Buried' Bridge or Surface y 2 U d j ° c o U y �, 0 Q Remarks and Installation Comments From Center Line From Edge of Traveled Way (Fogline) Depth or Height Facility to be Installed/ Deactivated/ Upgraded (indicate size and/or diameter, and material) Left Right 1) Indicate where item enters/leaves R/W. 2) Include pertinent topography info (turnouts, Rd. approaches, intersections, culvert, guardrail, xing method, split grade/under/overpass, etc.) 25.75 25.78 Left 120'(L) 32'(L) 112' (L)- 20'(L) 6' Min Approximate 175' of 8" PVC sanitary sewer pipe 120' Buried C LP Directional bore from privatey property to new MH in ROW. Enter ROW approx. MP 25.75 25.78 25.78 Left 12' - 32' 0-20' 6.6' Type 1 MH, approximate 20' of 8" PVC pipe in pavement 62.5' Buried C LP Open cut -trench to exisitng MH in pavemetn across exit lane for connection. End in ROW aijorox. MP 25.78 DOT Form 224-697 Rev. 08/2019 Exhibit'B' UF05104RAM03 Utility Facility Description (UFD) Page 1 of 1 T. 2 7 N. Q. 3 E. W M. F`0 - IWA91i F F- 104rj { D 1\1 a, 0................... ............... .................. ••......................................................, 01 01= in O O r I 0` 3�s eD o 4_ '0 In aa' : ` �' END OF PLAN! 1�1 FOR R 1 %/l �o F ELINC�U sty ENT .0 ° �°'" ;' oar :;� �►t` v.� / STA.8f453.34 SKI ; , HO dl - LL CUL-[SE SACONsT ; `� ■�� --,� �,� i!X,a/./. ?° M.P. 25.aI B4C.= TO CITY }( Ot 'LL1 „eyed to city of Edmonds 0 w Q w 4 0 / I /7�/ 1 b, -cce 1-5`,0 �_ _ ,' /?�. Fr •v+ End in ROW at MP 25.78 (Approx.)y_�; -----J-------- - s4.3 UNE o C - --------------- - ------ '" Install new MH d open tren h 8" PV ' ° I 7684 - / /Ar --------------------- --�}~_AV E------------ .... .. .. ...... ....... ...... .. - ---- - Vocercd is R/w /i d°-� ........... ;z NIFIrO6Ls•N. ----- sanitar ;ewer pipe to existing ewer y - i 30 .... ..-........ ............. ............ . _.._ '95.... 1..'._. ,. ��r.O.27.._.�.: or Plan ahead -- NOT OPEN y w e � �n s .I o manhole in pavement s¢e sR+oa r6r� P s+ OFr 3'0 O r i SO : p ® rD^i Sheet 2sof 6ASheets 6u5t S W. ' fe..... 's� : y .y .: vF.3.2• - , A O. i .T wb "' .Appr1vOd-44-� ,W? ^-1 4 6tis7RUCTIDN Direct bore 8" PVC sanitary sewer pipe from , , ,.9 �d'o. ;� ,.ti 5W I/4 NW%4 SEC. 25 r r%J NW : : r I-,t�t3o new MH o new sewer m e `' ° 'L ' ' ''� ' ° •5Wl/ W'/4 5EC.25 w 2 EASEMENT n t r s ste in rivat C:Z ■ W rYi•1 r Y P :r. 1-7683 0\ :v�f /fir g I: '......-"' h f property. Enter ROW at MP 25.75 (Approx.) ,� ,, �l n o L-79.Oo +c 1 • n`n ; O N r r r / 8o a nz o< 1O '° • - '0p i °• 4rtn - 6 O� �\� J f� v f I .'J 'c + 0 a a e .. .. L, :O r-:rr W -a i : y ? N SHED o .... a 'OI .0 fly O a - is aY E [�. --- -- 10�• ACCESS NOTES ^ O o+ * . Z o ++I v ? �r ■ -i -J + OIO P Q '9 O a + rn --�" / / HO. / o Type A approach is an Off and On approach Ar, 9 ,y. ; w -1« ` n ^ 1 - / _ s> i ` Y8 6 6 • yP PA PP > oID F- in (egol manner not to exceed 14 feet in width, �9 f- - o �, Av Ep :g / �o , qp\.. for Sole purpose of serving a single family Z ~ a ` �' " C�(- w O + 1 e� \',\ O residonce. it maybe reserved b abut fin owner > ' 7 6 x 2 8 N F �''SAC... �, f `. �_t 9� For specified Y 9 \�6` \ a >> o �HMENT Ha 1. { �. �' �,�k c}0 -' t/ / i2r c" use at o point satisfactory to c � 9 �6� " E� �� � _ Cl�i � _� � , P y ft E: O-T© r - b V: N v � ` w t.. '� N 1 a+vER - ,- ! aQ i . � :: No. I I Me State of or between designated ° �� 'I!i 6r lr0 highway stations. FOR RELINQUISHME T � ', _.-_ ...- '' ; 6 � -; '�'` o ° :; 6• '� � ��, � L.I ,, `�^ TO CITY o uo- 'on�eyed to Cit a4 - - _ 6 _ cP o . , o �, TURNBNICK !NE '- . . • �„�..�' ( 9' c EAmonds by de¢I t-5•-:e Cut r.. n ,'. o CONSTRUCTION EASEMEhIT O i 9 "6 90, _ a bb9 I ip f , i i O 9:• Ito. ;af �]� I- �/� s cs�r9430P.G s a CONSTRUCTION +� -OWNERSHIPS r _ __,NAME -TUT AR 1-1652 . NOT USED 1-7654 BERALO OIMUNE SWEMoP_ - ItE 5" ET 3S fit - 1.7656 N07 U5T 5 - I.T ROY C 0 E E SH ET O.3 1 65 OBERT JEANNETTEJDIWSON iEE SH_ El NOL 3 1- 1619 LILL15 ST RIN 356405F. 3 6 SF 3208OSF 17660 MADELINAJAHILDNY R 35.64 .. 2 4305E 122103.F. 10"S.F. I.16W BEN1 I I K1EL1(OVALK 2561OSf. 28b1 S.F. 62 1 N L 4 6D0 6 T IF 1.7663 PHILIP HELEN SMM 92.9005 6-4 530 S . _ _ - 28,370 1-1664 NlEXIEDOROTKT LOH AN 3167ogF 17,fto 19_790 3.250SF. 701E 1-1665 NELUEDOROTHY.LOHMAN 37,500 (Oi.-003F 3,130 424OOSF 343705E 58.620SF 1-1666 VEABALR.HALL 1.760 JDAME U. GOSI4 12AOOS.F A2.000S. 16615 LELANOWENUff BAUGH 87092ST 32.200 54092 STI 11669 -167 I 6'1l WS EME VYEIMANN WOONY YPA�IH NOT Y104 00AOMY_ HUCK 1 0?0 -. l ,200SF1{2750 F 973505E 34,200 SF - 63ISO SF, 13 OOSF 12.2503f, 34300SF 1. ,25 _ F 210ODSE. V7672 IVY MHOFF I-T613 AF. LOUISE FREDEAI SON B.SOOSF. 8,500Sf MP 25.40 - 31400F. _ 39b0031. 8500 I.7674 I.E. HUBBARD MOST_ _ ei' S(0 70.G OSF I6. 0 -F Z5.100S.F' Boo5F. FT67 5 1.767 6 J E... M.N MAUNOWSKI HOWARDD MARY AND 150 6.000 WT 0 7 JESSIE EIAAAY NEVILL 65 300IF 1-1678 DON EDWARDS 91.858Sf '- 915S8 . 1. 7b7 9 R L. O /Yr1fEF0I6EDALEN 88,3 663. - 8605E ST496 5F. 1-7680 6020EN WALTER11 40.25 F 10300SF g650SF, 9.67OSf 30600SF-__ 6301E __ 1.7681 DOROTHY J. CARROL = 1.7682 0.1CHAR J BLANOAU II$Z505F 16.2gSF t0700 . 41,B�F __ t0750 5SF II,Z roSE #�# 1-7683 00NAID BROWN 1-7684 ORIE E &APRON it OS.F. 34201F Lti40SF 8,366IS-k 263605E _ 1.7685 LEROY_B_5111TH.21ifiiF. 1.168 6 MERVIN WIRE 23190SF. 5605. 24.630SF 1.76 7 TF.ORO TNER f,7 2 _ f6,ZOO 5M 0 51 DOl1GEL -SUE T N 0 .3 I-76S9 GEOR CU VER 71 S I 6 213F. _ 1-7655 HARRY 1OUIS6 FREOPK 14520Sf. It 660S.. @70Sf -_ : J o If > ; , ASEMENT P.C. 70+ 10 63 � , „ e � � ;� r O.tO ---- - ----=-y-- - .__._--? - ° I EDMONDS CITY LIAAITS s ;21 6 ---- - - - - NDE ROSSIN _ ,., I O O' e.. 30' �3 .SZ--3 -_ • r_•= 5+8 3' 1- -�_ - 4'' r- " . K d0. 1CvV13.319 DI7�s y 5T�rm oA -- _gl_64!4_ s4 to or ._ _ - - - -'n a 4�581 ... p 277=._.........�.._a•w - II -_ -. - ` = "AL 6 iis9 P� its -- --- - l'�-;-�� L r .07 lave 1 1 1 +32 'Al 5* -,LIP ''3�i' _v' L P 13 <f635- -i L N Kai S:E 4RE./4S 26 d� >'p a �-Y° .� h� lt0 W11�2 \ TU '/ • 253'' 2.i >, r o�Aa L11+ta 1(WIIt23$3.P.T. Rd ACK LINE W00DWAY CITY L.,v1lT5 �AR65•S0. Rl. Q p �',KW-I I.00.0-P. j. I I �Q o• � Ho. 3 s,� . � w�+� . 1 I ; ---r_ IN � S.E./a S.E. /a SEC 26 Q o f , t �:- O INE. s FOR REl NQUISHMENT TO CITY 9( O Or T I : Conveid 1n fheTawnof Op vs T 0.�� �0 1 0 �_\�1 - �• OKw 1��1116 p'- JKwl0,0o W-d ybydvd,6-1680 2 , • b P_ Kwe+ ro T 2 O T O� ' C a yA VR 049 o r 6 7 -14 + 9xto ....- OA.E. P ` •b eo -( . a O, t<W9a50 KW IO�OOIEiP1.•... Q ��' BAR 9. �• ry x.b c�w'p_t C L iUl dESAC br ST5'S)' AR65.SOy� o41 R0,b0 �s c 0 4„4, -kw9. ' -67 v 1. i': [ I- 67� o . N _ �� _ +3'' 1n C� .. ,' Kw9+ j e set' -•c'• -- t + a` - 0q W Limited Access features tentatively approved January 9. 1969 !..192• ... _ �� -Io5 ..1 -`?, s mryy -v'_ o �, KW-9+ -- , Q• � '4 �: , -y� fLtT-t' �"� �.-T �• ,- �.:.' / 64,0�T _ 'by ovihoritp of Washington Stale Highway Commission -°o N?'It ,.� c O Io Lt. -. EXHIBIT A +Io,. ■2 >to J h i,M L- T3+9T.95(` 62:9OR i +r o �00. rlY 5+d5 '( shed y Commission Findings and Order r NAPProx.) a� issued May 19969.oR R:6MENTNAS5EC.26 TOCTY : ;, -' t C K c taweyed+octy : r...., i I510-s SR 104 MP 24.45 TO MP 25.81 - :..� EDMONDS FERRY o- 3 TERMINAL TO STH AVENUE SNOHOMISH COUNTY 4 I 1�0 -' +Ir RIGHT OF: WAY t LIMITED ACCESS. OGT r'Isl ch0 �o..j ;' NOTE: ALL BEARNNC75 ANp PARTIALLY: CONTROLLED EDI`101VDS CITY LII'11TS-� 3 ,_e�E►.Jo PRECEDED BY AN ASTER Exhibit'C' sTA.bo-oo To sTasl+s334 GUQVE DATA, TOBSPROHIBITED ,,,,>,,,,;, TAKEN FROMTITLE REPORT WAS IGOffH HIGIMINT OF wAr�A noN YS P.J.5TATION A R T j L PROPERTY OWNERSHIP NUMBERS r7660 PLAT MAPS. UF05104RAM03 ® OLYMPIA.WASHINOTIDIN PROPERTY LINES ••.... AR 65 t50:66 51. 39' 56" I011.00' 489.45' 911.65' Pedestrlrn tfa�f+c movement w1',1 pe c"••'••+••�� Plans Sheets/Maps LL•W»• .._ �«, AL 69 +45.94 73. 59' 35" 500.00' •- 376.73' 645.1 l' J wi`Y,in the 5r+' Avenge Interd•\Bnge e / ,..+..... II Page 1 of 9 4t_74+5 .I3 5105R'44" 500.00 24tS•2P 4$'t.73' p=6� -- - %+dewaIYS a5 provided. Pg , II 76 +0T• I4 63 59' 00' 955.94' S96.51' t066.39' __ - �..rw� eq ww January 9,1969 so Fronlo •Rood Curvs�gtel E►bf3ells.�.: go ,00• .�• FEET (ethr3.24-77 Cal3d5-17 A'ev.l•24.78 Noledpropert conveyed to oFEdrrwedsbydeed1.5.78 RL5 1 SHUT 4 OF fIMlTf MrI. /- a r•fi1i. msd_r+etas±•�M Tc, �- MR pe;�g.,cred 4or Ltmlted Access Control by OSOUTH PARK ADDITION O WOOD WAY PARK HQ}116HLAUDS PARK o„+u. s•zs-sscom^r ass -Ls 612-690,..v - c"m.rxstr/usinse, lu..r ,wfwns,ARs�6.7+._..� - 1Commsson Rcsolvlion No197T,Juntl7.1968. - REFERENCE. AUTHORITY DATE SU55EOUENT APPROVAL 8Y yw SR•10'1/, ' U,9 A \\\\ DRIVEWA \ '\ \� ACCESS \\ \ NEW SSMH#1 TYPE-1 \\ �\ COE GU-421 \\ 5'X7' \ RIM=265.8 FA \ E C V T \\ E=259.75 (IN- 8" NW) \\ PIT \ R IE=259.65 (OUT- 8" SW) \\ EXISTING SSMH RIM=266.15 \\ 2' WIDE 'H \ 24" CONC. NW&SE \ TRENCH 12" CONC. S \ CTR. CH.=25Z55 \\ 5'X5' (LOCATED 3-15-22) \\ CONNECTION PIT \ Zo �sA�J 1 E.-7d (N_ a, W - t X-ARE3 (wr- a• SR; F)IeTIHG eaNH Raa)E6.1 S Ir S CFA]rIC. NWaSE or.. r ONIC. rlx Ia LOCAL (IOCATGD D-11:zJ1 9W - 2SASS - N Mh1 WORK AREA CONNECTION PIT, TRENCH & SSMH EXCAVATION PIT DETAIL Exhibit I(�I anuTY CONRICr NOTE l/ i"E CONIRACRM SHALL BE RESFWSIBIE FOR VERIFYING 7HE L047m,, DNENSr'ON AND DEP7N GF ALL EXISTING UTIRES "" S°""� " PLANS DT"°' eY`°"o�rG UF05104RAM03 UNDIES AND ff SURkIiNG I HORZONTAL AND OUICAL LOCA7M PRIOR TO C0YSMCRON. 7MS SNALL INCLUDE CAWNG UTILITY LOCAIE AT I-800­424-= AN° 71#N Plans Sheets/Maps PO7NONNG ALL OF THE EXISTING UIX177ES AT RIFJR LDCA7/(AVS CF NEW U71UTY CROSSINGS TO PN)SCALLY 115 a"Y WE 7 ' OR Page 2 of 9 ONTHEEPLASAR SARDL0017UPON RE UnL nE5 ASS ONN ON RNA PLANS ARE BASED T TO VA DNYEAI 0 PUBUC INFOAMARON AND ARE SUBJECT TO YAR/AIIOV. aM)CR!! a1PaY 1M� 1 � aae Role o .EVlNNA HEw rMI p �D CONCRETE CETAIL 1 1R INCH JOINT SEAL AT END OF CONIC RETE 0 0 0 60 Scale 1" = 60' Q tuwr2rt DETAIL 2 1 INCH JOINT SEALATMD O CONCRETE E WYKYT VICINITY MAP N.T.S. g EAV4FAR 19Fc HOT. al Ew HrrA = OOrpRItTE EIrS�M; , p "-Q• OETAIL S DETAIL A In INCH CONCRETE ASPHALT BUTT JOINT 1 INCH CONCRETE ASPHALT BUTT JOINT NOTES T. Usethe 1T2 d What detelle 1Or bRCOb asn 100 leer and fw bridges rith L" Wxt, ns, lasa the 1 Inch jN t dells ID,ome- eppkWC1e Use DELI 5 On a _el 1—see end Ilm�i Dr:due wnh P m1•. 2. Snvrta ehee ee as descra•d n slend•rtl speeflkmlRn sactlPn E-OS.]19) and saalatl ­anw+rah SWrd SpeHTieellan 9eeNEn 505.71818. urA.r ulp sEAL IIEVEL rAtH � -E) E EJIISTING JUNt nEw L Nml corliliEiq E EXISTING JOINT 3. Tiro CprIt-Wor stall arY/0 s.nagar wrava, at al bwtons. For DNalls 1 an0 2. the FANStluctlon tolerarae ID Dcal.e Ire 5 R, " tl�cN�GrRDBrtt "CCOrtawcT n1 I sarwl n 114 inM (0 mire to iR inch mu.) Irom theeorr�ele. IEEE p� A p aPEc I[C710N sa1.xN i (SEE-2) {. for b—A. 1, 11. arDl a, pre aern •IAMA SAKCUT AND SEAL' shall be used I. p.,m For D.U% 6 and s, nc Iles _ I-n-1 I SAVED PANEL JOINT SEAL' mall . us •d 1> pai -n F., 0"17, M. 11am -SEALING EXISTING I ; I i I LONGITUDINAL ADD TRANSVERSE JOINT shall be 1aM for Asapera. rC 1Na rIAA JONT NrI£VE swTr1T. aMTERPROOf vENewn. 2Ar.r•+nr tP4. MGORC� lOM ACCWMHLE VATEPP0.0dF rur ; SECTION SH.]Ry dta•.n ue• NEABRINE . .P • a L�fYaO:. COREE CONCRETE COICREIE CCIICPA 6 a• CDONCRET'E o V4jAm 1u%f4fBaA/NHi Ian 17M1711.-DAM ['AIM•AkTE s6, • D P4 A N BRIDGE PAVING D JOINT SEALS • D• • STANDARD PLAN A-40.20-04 —2eNEE18 FO"M 6aD�R ROD FOAMS —ER ROO FdM WCI®IROD APFgOVEn FOR P1111TICN DETAIL 5 DETAIL 6 DETAIL 7 112 INCH PAVED PANEL JOINT SEA L I INCH PAVED PANEL JOINT SEAL CONCRETE OPEN JOINT �raslgm )ea OrrewN.lrNrp�Mri' 15. Know what's below. Call 811 two business days before you dig. OWNER: PARADISE HEIGHTS HLD, LLC 190 W DAYTON ST STE 103 DMONDS, WA 98020 PROJECT CONTACT LIST: CIVIL ENGINEER: DONNA L. BRESKE, P.E. SNOHOMISH, WA 98290 PHONE: (425) 334-9980 EMAIL: donnab@donnobreske.com SITE INFORMATION: PARCEL NUMBER: 27032500JO2600 SITE ADDRESS: 546 PARADISE LANE EDMONDS, WA 98020-4650 TOTAL SITE AREA: 30,238SF (0.694 ACRES) COUNTY.- SNOHOMISH COUNTY ZONING: RM-2.4 MAXIMUM BUILDING HEIGHT 25' SETBACKS: FRONT: 15' SIDE: 10' REAR: 15' DEVELOPER: MICHEL CONSTRUCTION, INC. 7907 212TH SW, #102 EDMONDS, WA 98026 PHONE (425) 776-2211 APPROVED FOR CONSTRUCTION CITY OF EDMONDS CITY ENGINEERING DIVISION 15.F (30.0 DL) Q\\\\r\\� � Oi, / CO 1 PER COE RIM=264.75 IE=262.16 I SSMH 2 TYPE-1 COE GU 421 \ 14 X RIM=266.8 _ IE=260.73(IN - 6" PVC N & E) > x-x X Nx 88 42'00'`W 140.82' IE=260.63 (OUT- 8 SW) \ X x-X-x-x--x- 268.6 ; I 20.0 269.4 \ (40.0 DL) 48.0 270 \ - (50.0 DL) Rik Tp 25X.60\� p �'` 6 20.0 1E ,N) 1.9� \ (40.0 DL) L25 \11A() 271.3 �= \ X ko.9\ X \ \ \ 270.5 271.3 X o 270.8 270.3 \ \ \ \ \X 40.0 N (50.0 DL) X 50.O L) I REMOVE TREE • X ss Open to place new 8" sewer 2 x 7 main connect to ex. SSMH 2 8.9 (located 3-15-22) \ 609 \ \ \ \ \ 268.5 \ \X 63.5 M03 (Maps V 263.3 264. \ \ \ .5 f9AW / / \ so i SSMH 1 -1 COE GU-421 .W RIM=265.8 FA 1_20' IE=259.75 (IN- IE=259.65 (OUT- 8" ® - EXISTING SSMH RIM=266.15 21 24" CONC. NVM,$E 12" CONC. S SSA CL SR 104 MP 25.7e 125' i�3' +/12�70W � CA CTON IAIII 1 AAICC DTUAI 1AlVCT Q/11 IAIl1 I AAICC ,16' _ 12' YELLOW 1 5 n GETATED OW o z LINES S 270 0 (TURN EX. PROW MIT OFLANEREQUIRE) RIICAL C RBH LSIDE >270 EX. PA VEMENT — — — — o 0 — FOR WORK AND — ; —— — COVER' OVER — 6.05 COVER OVER m z 260 > Q � 3 TRAFFIC CONTROL (ENDS AT WESTERN N NEW NW IE W o z W 260 O'--8 PVC YELLOW TURN LANE STRIPING) ® 0.5 250 EX. SSMH RI 266.15 SSMH 1 TYPE--1 OE GU-4 1 250 24" CONC. N &SE RIM=265.8 FA 240 12" CONC. S IE=259. 5 (IN- " NW) 240 CTR CH.=25 ,55 IE=259. 5 OUT- 8 SW LO ATED 3- 5-22 9.55 - 1 (NEW) 230 1 (NE) = 2 230 EXHIBIT "F" PROFILE VIEW 1 "=20' Exhibit 'C' UF05104RAM03 Plans Sheets/Maps LK Page 4 of 9 na Beach Park nt Edwards Park Edmonds w Edmonds Marsh a D N D Pine St rn \a A r 11 Deer Park Reserve VICINITY MAP Yost Park D ° Wdo%q < Way u rn > < 216th St SW N 0 ,a3 Way 0.2�0.4m. Woodway s v rino aaaress or piace �.L*J1!Jt1J@ o CLOY, JI J- 228th St SW Esperance 234111 St SW A236th St SW A S D m 228th St SV1 A34� W �236th St SW Exhibit 'C' U F05104RAM03 /l AAnthnv_Rn11in— Plans Sheets/Maps Page 5 of 9 10A I 1,,Al i 1 • � � . � .fin �� �.. ����� ��� '� a \ 2 �� •• r��, ': _"„ ` - moo. _ LO NAI I � _ •1 �r _ . \ a i � • co •, � J �}t. y� - v it �_ R PAW •` f l�.f . Google -- SR 104 MP 25.78 -VIEWING NORHTWEST Exhibit 'C' U F05104RAM03 Plans Sheets/Maps Page 7 of 9 SR 104 MP 25.78 - OPEN CUT AREA Exhibit 'C' UF05104RAM03 Plans Sheets/Maps Page 8 of 9 PAVEMENT REMOVE/PAVEMENT REPLACE LIMITS WIDTH S;AR:E&-SEE SPECIAL # 37 IN EXHIBIT'A' _--T-SAWCUT (TYP) D D 4 0 4 C SEE 4 6 4 NOTE 3 '^ SEE NOTE 2 CROSS SECTION NTS LEGEND Op EXISTING HMA (HOT MIX ASPHALT) OR PCCP (PORTLAND CEMENT CONCRETE PAVEMENT). OB HMA CLASS '/z INCH OR PCCP: DEPTH AND MATERIAL SHALL MATCH EXISTING PAVEMENT. REMOVAL AND REPLACEMENT LIMITS OF PAVEMENT TO BE DETERMINED AT THE TIME OF UTILITY PERMIT/FRANCHISE REVIEW. OC APPROVED BACKFILL MATERIAL OR CDF (CONTROL DENSITY BACKFILL) OR AS SPECIFIED BY WSDOT. OD BEDDING MATERIAL DEPTH BENEATH THE PIPE/CASING SHALL BE SIX (6) INCHES. ADDITIONAL PIPE BEDDING SHALL BE PLACED EQUAL TO HALF THE DIAMETER OF THE PIPE/CASING OR SIX (6) INCHES, WHICHEVER IS LESS. OE EXISTING CRUSHED SURFACING BASE COURSE. O CRUSHED SURFACING BASE COURSE DEPTH SHALL MATCH DEPTH OF EXISTING CRUSHED SURFACING BASE COURSE. O HMA BUTT JOINT REQUIRES TACK, SEAL, AND SAND. FOR PCCP, REFER TO GENERAL NOTE 5. EDGE OF PAVEMENT GENERAL NOTES 1. TRENCHING AND PIPE INSTALLATION SHALL MEET THE REQUIREMENTS OF WSDOT STANDARD SPECIFICATION 7-08. EDGE OF LANE 2. MAXIMUM TRENCH WIDTH SHALL NOT EXCEED CASING/PIPE DIAMETER PLUS AN ADDITIONAL ONE (1) FOOT ON EITHER SIDE. 3. COMPACTION SHALL BE METHOD "C" PER STANDARD SPECIFICATION SECTION 2.03.3(14)C. �- • - - • - - - • - • - • - - • • - 4. 5. MINIMUM DEPTH SHALL BE SIXTY (60) INCHES FROM THE FINISHED SURFACE TO TOP OF CASING. PCCP SHALL BE REPLACED TO THE NEXT PANEL JOINT IN EACH DIRECTION AS APPROVED BY WSDOT. ALL WORK SHALL BE AS SPECIFIED IN WSDOT STANDARD SPECIFICATION SECTION 5-01.3(4). SAW CUT SAW CUT 6. WHEN CONNECTING TO AN EXISTING FACILITY UNDER THE PAVEMENT, PAVEMENT RESTORATION MAY, AT THE DEPARTMENT'S DISCRETION, INCLUDE THE FULL LANE WIDTH AND ENCROACHED SHOULDER. EDGE OF TRENCI EDGE OF TRENCH 7. CASING PIPES SHALL EXTEND A MINIMUM OF SIX (6) FEET BEYOND THE TOE OF FILL SLOPES, BOTTOM EDGE OF LANE OF DITCHLINE, OR OUTSIDE OF CURB. 8. TACK ASPHALT PER WSDOT STANDARD SPECIFICATION 5-4.3(5)A. EDGE OF PAVEMENT ' ' ,,,,,,,,,,,,,,,,,, Exhibit C PLAN VIEW NTS UF05104RAM03 Plans Sheets/Maps OPEN CUT DETAIL Page 9 of 9 CUL-DE-SAC �iPR�. NOTE: SPOTTERS T BE ON SITE TO� SSIST PEDESTRIANS SAFELY THROUGH THE WORK ZONE NOTE: ' BACKFILL SHALL BE GRA VEL OR SELECT BORROW, MATCH EXISTING CSBC AND HMA DEPTH USING HMA CLASS 112" PG 58H-22. PAVING SHALL BE FULL LANE WIDTH AND TOP LIFT EXTENDED 10' IN BOTH DIRECTIONS BEYOND OPEN EXCA VA TED AREA. ALL EXCA VA TED MATERIAL SHALL BE HAULED OFF. PROPERTY OWNERS WITH DRIVEWAY ACCESS ALONG AREA OF WORK/DRUM CHANNELIZA TION TO BE NOTIFIED BEFORE CONSTRUCTION STAR IS PROVIDE STEEL PLATING AS DEEDED IN WORK AREA OVER OPEN UTILITY TRENCHES MAINTAIN IRA VEL LANE HOURS OF WORK: MONDA Y - FRIDA Y 6AM TO 6PM *MAY BE ADJUSTED TO ACCOMMODATE AN TI CIPA TED TRAFFIC AND CONTRACTORS SCHEDULE. UTILITY CONFLICT NOTE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION. DIMENSION AND DEPTH OF ALL EXISTING U71UIIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING 7HE U17U77ES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATIONS PRIOR TO CONSIRUC7100V THIS SHALL INCLUDE CALLING UTILITY LOCATE AT 1-800-424-5555 AND THEN POTHOLING ALL OF THE EXISANG U17UIlES AT THEIR LOCATIONS OF NEW U77LITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCAAON OF SAID U71LI71ES AS SHOWN ON 7HESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMA LION AND ARE SUB ECT TO VARIA 170M NOTE: DISTANCE BETWEEN SIGNS SHALL BE 350' (FOR RESIDENTIAL STREETS 35 MPH) FIELD ADJUST AS NEEDED (TYP) LEGEND: *FLASHING BEACON SHALL BE INSTALLED AT EACH SIGN FOR NIGHT-TIME USE *DISTANCES MAY VARY AS APPROVED BY THE ENGINEER 'FLAGGERS REQUIRED TO CONTROL TRAFFIC WHENEVER THE CONTRACTOR MUST INTERRUPT TRAFFIC FLOW r0 ACCESS THE WORK SITE WITH MATERIALS OR EQUIPMENT. 'SIGN SIZE PER MUTCD � CHANNELIZING DRUM SIGN FACING DIRECTION SEQUENTIAL ARROW SIGN _tSPOrTER (TO ASSIST PEDESTRIANS THROUGH WORK ZONE M--IrRUCK WITH FLASHING BEACON DRI VEWA Y WSDOT Notes. 1. Notify WSDOT CTCO 5 days before starting Work by contacting (206) 440-4454. 2. At time of Work, call WSDOT Radio at (206) 440-4490 when lane/shoulder is closed, and again when lane/shoulder is opened. Leave contact name and mobile phone number with WSDOT Radio 3. Notify Transit Agency(ies) & affected businesses 5 days prior to beginning Work. 4. Pedestrians and bicyclists shall be accommodated through the work zone. Assistance or signed detour shall be provided. 5. Only essential equipment and materials shall be on WSDOT R/W during working Hours. No equipment or materials shall be on WSDOT R/W during non -working hours. 6. Channelization devices shall be Traffic Safety Drums with Type C Lights. 7. During non -Working hours. area shall meet criteria in WSDOT Std Specs. 1-07 23, Including, but not limited to, "drop off" protection. 8. All W-Series signs shall be 48"x48" Black on Orange. 9. All R-Series signs shall be Black on White. 10. Closure hours shall be Sunday through Thursday, 7:00 PM- 7:00 AM. Holiday Impacts: No closures will be allowed from noon the day prior to a holiday or holiday weekend through noon the day following a holiday or \� holiday weekend. It is a holiday weekend when the holiday falls on \gyp a Friday, Saturday, Sunday, or Monday. WHITE REFLECTIVE \ \\rt� TAPE (TYP) T. \ \ \ ORANGE _ \ (TYP) --- --- \\ CHANNELIZING DRUM \ (W-20 1) ROAD WORK - O AHEAD (W4-2(L) i Know what's below. Call 811 two business days before you dig. APPROVAL EXPIRES 6 MONTHS AFTER DATE SIGNED REVIEWED AS NOTED WSDOT TRAFFIC OPERATIONS Contingent Upon Local Jurisdiction Acceptance 0 60 Scale 1 " = 60' SIGN SPACING=X (1) FREEWAYS & EXPRESSWAYS 55170 MPH 1500'+ 1- RURAL HIGH WA YS 60/65 MPH 800'+ - RURAL ROADS 45%55 ^APH 500 RURAL ROADS & URBAN ARTERIALS MPH35/40 350 + - RURAL ROADS & URBAN ARTERIALS MPH251JO 200 +l--(2) RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100: L- (1)ALL SPACING MAY BE ADJUSTED TO ACCOMODA TE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FI T ROADWAY CONDITIONS. MINIMUM LANE CLOSURE TAPER LENGTH=L (FEET) ,LANE WIDTH I POSTED SPEED (MPH) 25 30 35 40 45 50 5 60 65 70 10 10.5 150 20 21 4501 `�00 5. 0 — — — 11 115 16522505 �956501605560 - - 12 125 180 L451,320154016001660 720 780 840 MINIMUM SHOULDER TAPER LENGTH=L,/3 (FEET) I ANF wI0 rH P0STEL cp FT (MON 25 30 35 40 4 50 15 0 �)_ 70 8' 40140 50 yU j,2_1 3 150 'r1 Z01,c�Q 1U 40 l b U 190 90 U 1 M9 0 0 ! 24C) USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' Jk (W20-5R) � RIGHT � ANE CLOSED \ HEAD (W-201) (w-2o 1) ROAD WORK � AHEAD. �s 0 E ,f PL 4p/ SITE y h 01RI elf �J�c KULSHAN RD 13TH �9r ALGONQUIN RD 2267H ST SW tN a s o0G VICINITY MAP N. T. S. ��as Qa�G �y 220TH ST SW Q / PARADISE, LN SI1E 546 <I PARADISE LN 2287H ST SW 228TH ST SW EXIT 177 A/ Ln a WE r 236TH ST SW �auos wqY NE 2057H STNE205TH ST BUFFER DATA LONGITUDINAL BUFFER SPACE=B SPEED MPH 25 130 5 0 145 150 155 160 165170 LENGTH FEET 5 0 5 0 36 42 495 7 645 730 TRANSPORTABLE A TTENUA TOR ROLL HOST VEHICLE WEIGHT 9,900 TO 22, 000 lbs. AHEAD DISTANCE =R HOST VEHICLE WEIGHT >22 000 lbs. <45 MPH 45- 55 MPH >55 MPH >45 MPH 45- 55 MPH >55 MPH 100 123 172 74 ' . _273 REDG�?�� 'sTOf+IAL ' ►,M M#Cam. :1:i = r0i. ► , wo of CHANNEUZA LION DEVICE SPACING (FEET) MPH TAPER TANGENT 50 70 35 45 30 60 25 30 HAUL ROUTE N. T. S. f' : /7 �`lllr[i�r���Y�l� OWNER: PARADISE HEIGHTS HLD, LLC 190 W DA YTON ST STE 103 EDMONDS, WA 98020 CIVIL ENGINEER: DONNA L. BRESKE, P.E. SNOHOMISH, WA 98290 PHONE (425) 334-9980 EMAIL: donn ob 0donn obreske. com DEVELOPER: MI CHEL CONSTRUCTION, INC. 7907 212TH SW, J102 EDMONDS, WA 98026 PHONE. • (425) 776-2211 SITE INFORMATION: PARCEL NUMBER: 27032500302600 SITE ADDRESS: 546 PARADISE LANE EDMONDS, WA 98020- 4650 TOTAL SITE AREA: 30,238SF (0.694 ACRES) COUNTY- SNOHOMISH COUNTY ZONING: RM-2.4 MAXIMUM BUILDING HEIGHT.- 25' SETBACKS. FRONT 15' SIDE 10' REAR: 15' SHEET INDEX: 1. TRAFFIC CONTROL & PEDESTRIAN DETOUR PLAN 2. TRENCHING L OCA TION & PA VEMEN T PA TCHBA CK DETAILS DONNA BRESKE & ASSOCIATES LAND USE PLANNING & CIVIL ENGINEERING PHONE: 206-715-9582 DonnaB(a7DONNBRESKE. COM www.DONNABRESKE.com ST APPROVED FOR CONSTRUCTION CITY OF EDMONDS CITY ENGINEERING DIVISION TRAFFIC CONTROL & PEDESTRIAN DETOUR PLAN FOR PARADISE HEIGHTS TAX PARCEL: 27032500302600 ISSUE DATE: 01-11-23 SCALE: 1 " = 60' SHEET: 1 of 2 _--l-te-ConstructionNotificat I 10q lInand accordance with Washington State Department of Transportation (WSDOT) Special Provisions for Permits Franchises, provide requested information to below -designated WSDOT construction contacts prior to the beginning of construction. Use Alternate Contact or surface mail if phone or e-mail are no longer in effect. This form is NOT for maintenance work. No work shall take place until the Utility has participated in the Pre -Construction conference. Accommodation No.: UF05104RAM03 State Route No: SR 104 Expiration Date: 3/2/2033 From Mile Post: 25.75 WO/Charge Code: Paradise Heights / JZ1576 02 To Mile Post: 25.78 • • • • dh nSLDOT Inspector (notify at least five (5) days prior to starting work) ocal Agency & Development Services Office NAME: Michael Rudd 15700 Dayton Ave. N. TITLE: WSDOT Inspector PO BOX 330310, MS 82-240 Seattle, WA 98133-9710 PHONE: 206-440-4709/206-327-1877 E-MAIL: Rudd Mic@WSDOT.WA.GOV WSDOT Traffic Control (notify at least five (5) days prior to starting work) Construction Traffic Coordination Office NAME: Krissy Kaufman 15700 Dayton Ave. N. TITLE: WSDOT NWR CTCO Engineer P.O. BOX 330310, NB82-125 Seattle, WA 98133-9710 PHONE: 206 440-4454 E-MAIL: KaufmK@wsdot.wa.gov Anticipated Start Date: Estimated Duration: Permit/Franchise Holder City of Edmonds NAME: COMPANY TITLE: STREET ADDRESS PHONE: CITY, STATE ZIP E-MAIL: OFFICE PHONE Contractor NAME: COMPANY TITLE: STREET ADDRESS PHONE: CITY, STATE ZIP E-MAIL: OFFICE PHONE THE PERMIT/FRANCHISE HOLDER OR THEIR REPRESENTATIVE SHALL NOTIFY NORTHWEST REGION UTILITIES IMMEDIATELY IF THEY ARE UNABLE TO START CONSTRUCTION ON THE DATE INDICATED ABOVE. FAILURE TO PROVIDE NOTIFICATION MAY RESULT IN INSPECTION CHARGES BEING INCURRED. J Z 0 Exhibit 'E' UF05104RAM03 N.I Pre -Construction Notification Z Page 1 of 1 Maintenance Notification Update and re -use this form as needed for in -kind repair or replacement of EXISTING primary and secondary facilities associated with the referenced utility permit or franchise number ONLY. Maintenance activities are subject to the general and special provisions of the referenced utility permit or franchise, a WSDOT-approved, site -specific Traffic Control Plan, and submittal of this Notification Form. This form does NOT apply if there will be an upgrade, change in capacity, location/route, appurtenances, or subcontracted/ outsourced work. Please call the NW Region Utilities Office if you have questions. No work shall take place until the Utility has received written or verbal authorization from WSDOT to proceed. Accommodation No.: UFO5104RAM03 State Route No: SR 104 Accommodation Expiration Date: 3/2/2033 From Mile Post: 25.75 Maintenance Notification No.: To Mile Post: 25.78 Maintenance Work Order No.: Charge Code: In accordance with Washington State Department of Transportation (WSDOT) Special Provisions for Permits and Franchises, provide the project information below to the following WSDOT representative twenty (20) working days prior to the beginning of construction. Use Alternate Contact or surface mail if phone or e-mail are no longer in effect. WSDOT NW REGION UTILITIES Contact: Phuc Tran 15700 DAYTON AVE. N., NB82-113 Phone: 206-440-4127 P.O. BOX 330310 E-Mail: To: NWRutilities@WSDOT.WA.GOV SEATTLE, WA 98133-9710 Cc: tranp@wsdot.wa.Pov Alt. Contact: NWR Utilities Office Alt. Phone: 206.440.4120 Provide Description of Work Activity Anticipated Start Date: Estimated Duration: Provide Utility Contacts Permit/Franchise Holder City of Edmonds CONTACT NAME: COMPANY TITLE: STREET ADDRESS PHONE: CITY, STATE ZIP E-MAIL: OFFICE PHONE Contractor CONTACT NAME: COMPANY TITLE: STREET ADDRESS PHONE: CITY, STATE ZIP E-MAIL: OFFICE PHONE WSDOT Authorization SIGNATURE: NWR UTILITIES OFFICE DATE: TITLE MAINTENANCE NOTICE EXPIRATION DATE: THE PERMIT/FRANCHISE HOLDER OR THEIR REPRESENTATIVE SHALL NOTIFY NORTHWEST REGION UTILITIES IMMEDIATELY IF THEY ARE UNABLE TO START WORK ON THE DATE INDICATED ABOVE. FAILURE TO PROVIDE NOTIFICATION MAY RESULT IN INSPECTION CHARGES BEING INCURRED. Co G a -I Ln 0 LL J Z 0 li 0 LLI U Z a Z LLI Z a Exhibit'F' UF05104RtAM03 Maintenance Notification Page 1 of 1