ENG ASPHALT COMPACTION REPORTEarth Solutions NW«C I , 15365 NE 90" Street, Suite 100 FIELD REPORT Redmond, WA 98052 Main (425) 449-4704 1 Fax (425) 449-4711 www.esnw.com Project No. 5839.02 Page 1 of 3 Report ID 5839.02 E 2024 0627 Date Thu 6/27/2024 Weather 59°F Cloudy Arrival/Departure Time(s) 7:30 PM — 10:45 PM Travel Time (hr) 0.75 Project Name Paradise Heights Location 546 Paradise Lane, Edmonds ESNW Rep. & Phone Hannah Huntington I Field Technician 1206.496.2281 Client Info/Contact Paradise Heights HLD, LLC I John Rettenmier Reviewed By LAC L4KZ` HTW Field Supervisor Initials/Date Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the Feld representative's observations and testing of the contractor's work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our Feld representative. Jobsite safety, including compliance with all applicable state orfederal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested, ESNW rep was onsite to observe and test compaction of paving along Edmonds Way. Edmonds Way Paving — Density Testing: ESNW rep observed a pavement grinder remove a small rectangular patch of asphalt along Edmonds Way. The asphalt contractor then paved over the patch and paved the adjacent driveway that is connected to home address 541 Edmonds Way. The asphalt came out of Everett with a provided RICE value of 155.6. ESNW rep used infrared thermometer to measure the temperature of the asphalt and found that it was 285°F. A small vibratory plate compactor and a large double barrel vibratory drum roller were used to compact the asphalt. Density test results indicate adequate compaction of at least 92% of the RICE value at the tested locations. ESNW rep will return if requested. Please see the table, map, and images below. Test Number Test Location Elevation Rice Value (pcf) Test Density (pcf) % of Rice Value 1 541 Edmonds Way Home Driveway 541 Edmonds Way Home Driveway 541 Edmonds Way Home Driveway FG 155.6 142.7 92 2 FG 155.6 143.2 92 3 FG 155.6 142.5 92 4 Edmonds Way Rectangular Patch FG 155.6 144.0 93 5 Edmonds Way Rectangular Patch FG 155.6 143.0 92 Report ID 5839.02 E 2024 0627 Page 2 of 3 Earth Solutions NW. LLC � �}z % «>1A - r"j