ENG SI GEOTECH FIELD REPORTEarth
Solutions
NW LLC
Earth Solutions NWLLC
15365 NE 901h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 i Fax (425) 449-4711
www.esnw.com
CONSTRUCTION STORMWATER
ESNW Rep.
Project No.
Page
Report No.
GFB
5839.02
1 of 3
1
Time On Site
Time Off Site
Date
Day of Week
1:55
2:25
9/30/21
Thurs
NPDES Permit No.
Reviewed
GENERAL PERMIT - FIELD REPORT
Project Name
Job Location
Client/Owner
Paradise Heights
546 Paradise Lane, Edmonds
H4 Contracting
Erosion Control BMPs
Overall
Needs
(13 Elements)
Condition
Repair?
Comments
(Good; Fair; Poor)
(Yes; No)
1. Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas
G
N
Buffer zones established.
• Silt Fence
2. Establish Construction Access
• Fabric; Quarry Spalls
G
N
Quarry spalls have been placed in site entrance.
• Wheel Wash
• Sweeper Truck
3. Control Flow Rates
• Stormwater Vault or Facility
G
N
• Straw Wattles
• Check Dams
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers
• Vegetation
• Straw
G
N
Silt fence placed. The contractor should have a
• Sediment Ponds, Traps & Filters
water truck available for dust suppression.
• Treatment
• Sediment Pond (Temp. or Perm.)
• Water Truck
5. Stabilize Soils
• Nets & Blankets
• Mulch, Bark & Rock
• Hydroseeding; Grass
G
N
Cover all stockpiles left unworked for 2+ days.
• Plastic Sheeting
• Straw Stockpiles
• Stockpiles
• PAM
6. Protect Slopes
• Benching; Track -Walking
G
N
Site is relatively flat with minimal slopes. Existing
• Pipe Slope Drains
slopes should be track -walked to maintain stability.
• Plastic Sheeting; Anchors
7. Protect Drain Inlets
Catch Basin Inserts
G
N
Catch basin inserts should be placed in the CBs
•
onsite.
• Gutter; Road
8. Stabilize Channels and Outlets
• Channel Lining
• Check Dam
-
-
N/A
• Outlet Protection
• Nets and Blankets
9. Control Pollutants
• Chemical Storage Area Covered
G
N
Will provide recommendations, as necessary.
• Concrete Handling
10. Control Dewatering
G
N
11. Maintain BMPs
G
N
12. Maintain SWPPP & Site Logbook
G
N
Available upon request.
13. Protect Low -Impact Development (LID BMPs)
• Bioretention Rain Garden Facilities
-
-
N/A
• Permeable Pavement
Earth Solutions NWLLC
15365 NE 901h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 i Fax (425) 449-4711
www.esnw.com
CONSTRUCTION STORMWATER
ESNW Rep.
Project No.
Page
Report No.
GFB
5839.02
2 of 3
1
Time On Site
Time Off Site
Date
Day of Week
1:55
2:25
9/30/21
Thurs
NPDES Permit No.
Reviewed
GENERAL PERMIT - FIELD REPORT
Project Name
Job Location
Client/Owner
Paradise Heights
546 Paradise Lane, Edmonds
H4 Contracting
Monitoring, Records & Recommendations
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? ❑ Yes 0 No
List the action items in the table below:
Element
#
Description and Location
Action Required
Completion
Date
Current Weather: Rain, 55°F
Precipitation since last inspection (approximate): - inches
Precipitation in the last 24 hours (approximate): 0.80 inches
Type of Visit: 0 Weekly ❑ Monthly ❑ Post —Storm Event
Phase of Active Construction (check all that apply):
❑ Pre -Construction Q Clearing/Demo/Grading ❑ Infrastructure/Roads ❑ Concrete pours ❑ Vertical Construction
❑ Utilities ❑ Offsite improvements ❑ Site temporarily stabilized ❑ Final Stabilization
Was water quality sampling part of this inspection? ❑ Yes 0 No
If "Yes":
• Record results in the table below.
. Hanna Turbidity Meter #
Monitoring
Point
Monitoring Location
Turbidity
(NTU)
pH
Description of Discharge
Notes
"This report is true, accurate, and complete to the best of my knowledge and belief."
Inspector Name: Greg Buzitis CESCL Number: ECO-3-3072123 Inspection Date: 9/30/21
Earth Solutions NWLLC
15365 NE 90`h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
CONSTRUCTION STORMWATER
GENERAL PERMIT - FIELD REPORT
ESNW Rep.
Project No.
Page
Report No.
GFB
5839.02
3 of 3
1
Time On Site
Time Off Site
Date
Day of Week
1:55
2:25
9/30/21
Thurs
NPDES Permit No.
Reviewed
Project Name
Job Location
Client/Owner
Paradise Heights
546 Paradise Lane, Edmonds
H4 Contracting
BMP LEGEND
MONITORING POINT v
ACTIVE HOMEBUILDING LOTS Q
JOB SHACK
STORMWATER VAULT Q
CONSTRUCTION ENTRANCE Q
SILT FENCE
4
I
ZIP
l*