ENG SI REPORT BLOCK WALL 4.17.2024" Earth Solutions NW«C
1 15365 NE 90`h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
FIELD REPORT
Project No.
5839.02 Page 1 of 1 Report ID 5839.02 E 2024 0417
Date
Wed 4/17/2024 Weather 50s°F, Clear
Arrival/Departure Time(s)
5:00 PM; 5:30 PM Travel Time (hr) 1.0
Project Name
Paradise Heights
Location
546 Paradise Lane
ESNW Rep. & Phone
Andrew Kimn (206) 430-9183
Client Info/Contact
Paradise Heights HLD, LLC I John Rettenmier
General Contractor Info/Contact
Michel Design I Rob Michel
Reviewed By
LAC i.A'Z-- HTW lVW
Field Supervisor Initials/Date Project Manager Initials/Date
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative's
observations and testing of the contractor's work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives maybe made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations,
is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep was onsite to observe wall keyways.
Wall Keyways
While onsite, ESNW rep observed that prior to arrival
that contractor had used a medium sized excavator to
cut ad grade wall keyways throughout the site. Rep
used a '/2-inch steel diameter T-probe and observed
wall keyways to be dense, firm, unyielding and
suitable for support of the proposed walls.