Loading...
ENG SI REPORT BLOCK WALL 4.17.2024" Earth Solutions NW«C 1 15365 NE 90`h Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 1 Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 5839.02 Page 1 of 1 Report ID 5839.02 E 2024 0417 Date Wed 4/17/2024 Weather 50s°F, Clear Arrival/Departure Time(s) 5:00 PM; 5:30 PM Travel Time (hr) 1.0 Project Name Paradise Heights Location 546 Paradise Lane ESNW Rep. & Phone Andrew Kimn (206) 430-9183 Client Info/Contact Paradise Heights HLD, LLC I John Rettenmier General Contractor Info/Contact Michel Design I Rob Michel Reviewed By LAC i.A'Z-- HTW lVW Field Supervisor Initials/Date Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative's observations and testing of the contractor's work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives maybe made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe wall keyways. Wall Keyways While onsite, ESNW rep observed that prior to arrival that contractor had used a medium sized excavator to cut ad grade wall keyways throughout the site. Rep used a '/2-inch steel diameter T-probe and observed wall keyways to be dense, firm, unyielding and suitable for support of the proposed walls.