Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
APPROVED ENG Traffic Impact Analysis (March 2024 - Bertrand)
Approved by. APPENDIX Page 1 of 2 Transportation Impact Analysis ECEiMar 01 0ED CITY OF EDMONDS ❑EVELOPMENT SERVICES DEPARTMENT Worksheet BLD2024-0274 PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 Name of Proposed Project: Club Pilates Interior Tenant Improvement Owner/Applicant Theresa Greene, Architect, PLLC Name 16198 SE 48th Drive Applicant Contact Person: Theresa Greene Name Street/Mailing Address Street/Mailing Address Bellevue, WA 98006 City State Zip City Telephone: (425) 830-3245 Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: 1. PROJECT DESCRIPTION a. Location - Street address: 23805 Hwy 99 Contact Name E-mail: State Zip (Attach a vicinity map and site plan.) b. Specify existing land use: GC - General Commercial c. Specify proposed type and size of development: 3,054 s.f. tenant improvement in existing 8,972 s.f. Commercial Building (# of residential units and/or square footage of building) d. Date construction will begin and be completed: As soon as permitted, TI approx 6 weeks e. Define proposed access locations: 238th Street SW or Hwy 99 HANDOUT UPDATED 09.02.2021 APPENDIX A Page 2 of 2 f Define proposed sight distance at site egress locations Existing 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X Prior Use $ X Fee New Use Fee: $ - I Prior Use Fee: $ _ $ i ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X = ® NO CHANGE ❑ INDEPENDENT FEE CALCULATION MITIGATION FEE RECOMMENDATION: $ INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) $ TOTAL TRANSPORTATION IMPACT FEE $ ENGINEERING DIVISION APPROVED AS NOTED City of d , Engineerin Division Approval Date 04/1 0/2024 VV ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 09.02.2021 REFERENCE EXISTING SITE PLAN ALL EXTERIOR AND SITE INFORMATION IS FOR REFERENCE, ONLY. ALL SITE CONDITIONS ARE EXISTING TO REMAIN. 238th STREET S.W. aX'vr'"d. a"6AwiTIN � OILWAK - - i AePuNolasTe FkwHrr.lr) -- // --CC,4e OF IMMHk FAVFncNT// ' 11 J . P - I ' 128 99 N 4 -- -- --- --- \ / �3yoOoo \\ WM ti , .. , i L IH t I�i�+rwRraAvld+a + / Pr111A.1'N�'FOj�f• / 13R 5R 1 / AVENUE I j ' fi DENTAL Ww-cArt; Ago, �F ry - (Ikt&M WA)k Tr / py v 1 ! I I o� /Pi to �? TO S, PROJECTco I. -X ` /h r �/ / / s SUBWAY LOCATION ` uooauPu MANNA i JAIMES ! ' �In / TERIYAKI,, i SALON jIG� t 71' o� \ �/ eR�3II�GTI1�TLmN_ .54J%TT.- Fsr_T© iSa, \ L CT.•.p�rrsRlnq I PR ER NNE AY RKkH CMaAK R W4--F- _ ^TRA4�H ENGL.6�°SURcc �._. _-�}t7 1 r