BLD2024-1209_Other_9.13.2024_11.23.41_AM_4499207Equipment SummarX
Site:
A&RSOLAR
Modules:
(25)- REC 420AA Pure 2
3211 Martin Luther King Jr Way S.
.•
^c �..` ';;
-:•._
�.."�j :"f��'���:�•; ".'�' :'
•' .
' .' ' :'' - 4
�-
S'.
�.
"•;: "-;.�."f~
Seattle, WA 98144 (206)707-9937
Inverters:
(2)- Tesla Powerwall PV 11.5 kW
ti - _,
�! �`.'•.:t'i.... ,�.,
may.•`•• _'��
• . pa
Racking
Rail- XR100
Mount- Halo Ultragrip
t
r
• •
�• 1
r A
'T7_
�• ✓ t••
�
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
Table of Contents ■
•'
�M � ♦
a ��•(
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
vi
- -
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
Detail Page(s):
AO- Cover Page
>
Al- Site Overview
'
a
N �.....
U
= Q
o
�' o
A2- Roof Layout
y
°�C��00
50
M
2 °' ' Q>
A3- Racking
V N
0) 4-
O� vi
U
O 0
_
�MM E
0 0 O
Electrical Page(s):
a
L Ln E
Ln
w
E1.1- Electrical One -Line
--
K
o
E1.2- Electrical Schedule
40
E2- Electrical Calculations
i~ �� / •�
' A'.
E3- Stringing
=
Net Meter
f- .,
REVISIONS
Rev. #:
Date:
�• 1
-«
,
-
'
As -Built Pages(s):
G1- Roof As -Built
_
G2- Electrical As -Built
Designed by: Thomas N
Project Manager:
O
,11&a
iLVL1
•J�
;•p. �. �� _' "' ,,� „-
AJ Mullen
(615) 761-8685
G3- Micro Optimizer Map
•
Current Date:Sep 13, 2024
G4- Placard
General Notes:
AO Cover Page
G5- Equipment BOM
Required Setbacks from Ridge:
181.
Max. Mount Spacing: Portrait/Landscape
72"
Roof Type:
Comp. shingle
Roof Slope:
300
Array Tilt :
Flush
Array Azimuth(s):
269-, 359°
Roof Area:
4077ft.2
Array Area
521ft.2
Array to Roof Coverage
13%
Module and Rail Selection Guidl
(25) REC 420AA Pure 2
Mount: Iron Ridge QM HUG -
Halo Ultragrip
Clamp Zone "A"
Clamp Zone "B"
Mods per Row
(2)Rows, (6)Portrait
(1)Row, (5)Landscape
(2)Rows, (4)Landscape
A"
B11
I I
AnC)uT1a
3.9-9.85"
15.75-20.90"
Rail typel+ rail tyK
(2)14' (2) split 17'
(4)17'
(4)14'
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
a
U
o
_
Q
z
N
�
C
c
0
�
>Q
M
Oo
—
Q
+
M
0
M
�
>
U
(300
M
M
aC)
..
0
w
Ln
0
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Project Manager:
A3 Mullen
(615)761-8685
Current Date:Sep 13, 2024
A2 Roof Layout
Net Meter
Site Conditions:
Wind Exposure "B"
WindSpeed 110 mph
Roof Type: Composition
Snowload- 25 PSF
Roof Pitch: 300
Z-3-7r Z-2
Z-2
Z-3-a,K Z-2
Module Type:
1 (25)- REC 420AA Pure 2
Pitch:
1 300
Portrait orientation
Landscape orientation
Halo Ultragrip Deck mounting spans -
Halo Ultragrip Deck mounting spans -
Zone Max span
Zone Max span
Z-1 52"
Z-1 72"
Z-2 521'
Z-2 721'
Z-3 52"
Z-3 721'
cantilever- 12" (24" if rafter mounting)
cantilever- 12" (24" if rafter mounting)
Rafter mounting span- 72" zones 1-3 both Portrait and Landscape
if attaching to both rafters and deck, the deck mounting span needs to apply to both sides of the deck mount.
**Deck Mounting spans dependent on site conditions, roof slope and module size. **
Z-
Z-2
Z-2
Z-2
Z-2
— Z-1— 1�4 ---] -
Z-1--�
2714
HUG mount Sample
Attachment Plan
(For demonstration purposes)
Mounting across shingle step is if shingle step over 1/8"
okay if 1/8" thickness or less install on the flat areas
Gable Roof
a� "a�aI
Roof Zones
Hipped Roof
a� � a
3
2
3
3
2
3
2
1
2
2
1
2
3
2
3
3
2
3
to a_
3Y22
3
2 11 2
2
3 2 3
a = 3 feet
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
a
U
O
_
Q
z
N
�
C
c
oo)
>Q
M
Oo
—
Q
+M
0M�>
U
N
as
IN
U
(300
M
M
E
aC)
0
Lu
Ln
O
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Project Manager:
A3 Mullen
(615)761-8685
Current Date:Sep 13, 2024
A3 Racking
Halo
PV
--— — — — — —
I
String 1
v
7 modules
N
String 2
U
6 modules
r--—————— — — — — —
I
String 4 N
U
6 modules
String 5 n F
6 modules
A
Stora e
A
MPPT 1
ry
MPPT 2
MPPT 3
MPPT 4
POWERWALL 3
1707000-xx-y
MPPT 5
MPPT 6
MPPT 1
iv
MPPT 2
MPPT 3
MPPT 4
POWERWALL 3
1707000-xx-y
MPPT 5
MPPT 6
Battery Disconnect
�4 Located within 10'
of net meter
i
i
I A
125A/2p
I
60A/2
r — —
I
I
I
I
60A/2
A
I I I I
I I
I I
I I
I I
p I
I
L---�
Battery combiner panel
Bus Rating: 125A
■ A & R Scope Existing or
Others Scope
Design Notes
1- 30A low -voltage disconnect to act as external RSD initiation device
2-
3-
4-
5-
AC Disconnect,
Located within
10' of net meter
A
Service entrance conductors
1/0 CU XHHW-2
(L1 & L2)
#1 CU XHHW-2
(N)
TESLA Gateway3 with
200A Internal Panelboard
Battery OCPD:125A
NEC 705.12(B)(3)(3)
Co -located with Net ME
125A
I I
� I
— I
1/0 CU XHHW-2
(L
(Ll & L2) I
#1 CU XHHW-2
(N)
#6 CU THWN-2
(EGC)
Protected Loads Panel
(Existing)
Main Service Panel
(1ph 240V Service)
Main Breaker: N/A
Bus Rating: 125A
CL200
Net Meter
Meter Main
(1ph 240V Service)
Main Breaker: 125A, 70A
Bus Rating: N/A
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
O
=
Q
a' fu
N
z
o
00
__
0
0
ON
>
O
O
r1r)
4-
W
0
a
Q
V
N
O
N
�.,
O�
•
to
'F
U
>
U
_
M
M
E
L
0
O
'Ln
O
O
E
Y
N
W
Ln
O
rl
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Project Manager:
A3 Mullen
(615)761-8685
Current Date:Sep 13, 2024
E1.1 Electrical
One -line
PV
0 Equipment Schedule
Ref.
Category
Equipment
QTY
1
Modules
REC 420AA Pure 2
25
2
RSD
Tesla MCI-1
8
3
Jbox
JBox
2
0 Iconductor Schedule
I nverter Specs
Watts
LW-1
Output
L&I
AC
Voltage
#of
Inverters
OCPD
Branch
1-Tesla Powerwall 3(170700
11500
48
240
2
60
****N/A****
0
0
0
0
0
****N/A****
0
0
0
0
0
Module Specs
Watts (w)
I Imp
I Vmp
I Voc
I Isc
REC 420AA Pure 2
420
9.96
42.2
49.1
10.74
Temp. Adjusted
0
0
37.6
52.9
0
MLPE or RSD? Tesla MCI-1
Summary
Distance
(ft)
Current
@125%
Operating
Voltage
Voltage
Drop
V. Drop
(total)
A
(2)#10 CU, (1)#6 EGC, PV Wire 600V, AIR
50
16.78A
263V
0.47%
0.94%
B
(4)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min)
50
16.78A
263V
0.47%
Storage
0 � Equipment Schedule
Ref.
Category
Equipment
QTY
1
Gateway
Tesla Backup Gateway3: Service Rated
1
Breakers
125A Main Breaker (Eaton CSR2125N)
1
2
Battery
Tesla Powerwall 3, 13.5 kWh
2
3
Loadcenters
MLO, 125A, 240V, 1ph, Nema 3R, Surface, 4 space (min.)
1
Breakers
2p60A, 2p60A, 2p125A
4
Disconnect
30A 240V 2 Pole I General Duty, No Fuse, Lockable AC Disconnect
1
5
Disconnect
200A 600V 2 Pole I Heavy Duty, No Fuse, Lockable AC Disconnect
1
ElectricalWork
Tesla Wall Charger Install (wired to 60A breaker)
1
0 lConductor Schedule
Inverter Specs
Watts
ll
Output
AC
voltage
# of
Inverters
OCPD
u
1-TeslaPowerwa113(170700
11500
48
240
2
60
Summary
Distance
(ft)
Current
@125%
Operating
Voltage
Voltage
Drop
V. Drop
(total)
A
(4)#6 CU, (2)#6 N, (1)#10 EGC, THWN-2, & com wire, 1.25"EMT(min)
10
60A
240V
0.20%
0.32%
B
(2)#1 CU, (1)#1 N, (1)#6 EGC, THWN-2, & com wire, 1.5"EMT(min)
10
120A
240V
0.12%
General Notes:
Utility: SnoPUD
1. EGC Where exposed to physical damage will be #6AWG
Bare CU
2. If installing conduit on the roof, maintain greater than 7/8"
above the surface
3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC
Disconnect
4. For supply side taps, a #6 GEC (min.) will be run separately
from the disconnect and connected to the grounding electrode
with an irreversible crimp
&ffl.
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
a
U
0
_
Q
z
N
�
0
c
oo)
>Q
M
Oo
—
Q
+
M
0
M
_
>
U
N
IN
-,
U
(300
_M
M
rn
laC)
0
-0
Lu
Ln
0
,--I
REVISIONS
Rev. #: IDate:
rA3
igned by: Thomas N
ect Manager:
ullen
5)761-8685
Current Date:Sep 13, 2024
E1.2 Electrical
Schedule
Inverter Specs
xx-y)
****N/A****
****N/A****
REC 420AA Pure 2
Temp. Adjusted
MLPE or RSD?
Equipment
Mppt Input
Module
# Modules per String
# Strings
# of Mods per grout
# of Mods/inverter
# of Inverters
Total # of Modules
I nverter
Mppt Input
Amperage (Im
Max Voltage(D
Max Amps (DC
PV Electrical Calculations
Watts
Output
# of
OCPD
Total AC
Comb.
EGC
AC Voltage
u
Inverters
Branch
out.(A)
OCPD
AC
11500
48.00
240
2
60
0
0.00
0
0
0
96.0
125
#6
0
0.00
0
0
0
Watts
EGC
Imp
Vmp
Voc
Isc
Temp. Coef V(oc)
DC
420
9.96
42.2
49.1
10.74
-0.24
#10
37.6
52.9
Interconnection Calcs
Main Breaker
200
Bus Bar
200
Max PV OCD AI lowed
40
PV OCPD Device Used
125
Tap or Breaker?
Tap
Site Conditions
ASHRAE Site:
Seattle
Low Temp (°F)
19
High 21/oTemp ('F)
84
High 0.4%Temp (`F)
91
Tesla MCI-1
Max Array Power(STC): 10.5kW DC
Max Continuous AC Power: 23kW AC
1-Tesla Powerwall 3(1707000-xx-y)
1-Tesla Powerwall 3(1707000-xx-y)
****N/A****
1
2
3
1 4
5
= 6
1
2
3
1 4
1 5
6
1
2
3
1 4
5
6
REC 420AA Pure 2
REC 420AA Pure 2
****SELECT****
7
6
0
0
0
0
6
6
0
0
0
0
0
0
0
0
0
0
1
1
0
O
0
0
1
1
0
0
0
0
0
0
0
0
0
0
7
6
0
0
0
0
6
6
0
0
0
0
0
0
0
0
0
0
13
12
0
1
1
0
25
Array Specs (Adjusted for Temperature)
1-Tesla Po werwall 3 (170 7000-xx-y)
1-Tesla Powerwa113(1707000-xx-y)
****N/A****
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
9.96
9.96
0.00
0.00
0.00
0.00
9.96
9.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
263.2
225.6
0.0
0.0
0.0
0.0
225.6
225.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
370.3
317.4
0.0
0.0
0.0
0.0
1 317.4
317.4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
10.74
10.74
0.00
0.00
0.00
0.00
10.74
10.74
0.00
0.00
0.00
0.00
1 0.00
0.00
0.00
0.00
0.00
0.00
Ref.
Conductor Description
Distance
AL CU
Wire
Gauge
(QTY) Phase
Neutral
Neutral
EGC
(AWE)
Wire Type
Conduit
Min.
Conduit
90'C
Rating
Temp
Correct.
Fill
berate
Derated
75'C
Rating
Current
Operating
Voltage Drop
Conductors
AWG
(QTy)
Type
Ampacity
125%
Voltage
A
String to Jbox
50
Cu
#10
2
N/A
N/A
#6
PV Wire 600V
AIR
N/A
40
1
100%
40.00
35
16.8
263
0.47%
B
Jbox to Inverter
50
Cu
#10
4
N/A
N/A
#10
THWN-2
EMT
0.75"
40
1
80%
32.00
35
16.8
263
0.47%
C
D
E
F
G
H
I
J
DC Voltage Drop 0.94% AC Voltage Drop 0.00%
&ffl.
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
d
U
0
_>
Q
z
N
00
�
>
o
M
OO
S
<
+
M
0
M
U
N
ON
4
U
(300
M
M
E
a>)
0
W
Ln
O
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Project Manager:
a Drop 0.94% (6 Mullen
Total Voltage p 15)761-8685
Current Date:Sep 13, 2024
E2 Electrical
Calculations
Typical Placards
A) NEC 2023 690.13 & 692.17
B) NEC 2023 705.12 (13)(3)(2)
C) Utility Requirement
D) Utility Requirement (Utility -Owned)
D) A&R Solar Requirement (Customer -
Owned)
E) A&R Solar Requirement * if combiner used
F) NEC 2023 690.13 (B)
I) NEC 2023 690.31 (D)(2)
K) NEC 2023 690.13 (B)
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SOLAR ELECTRIC
PV PANELS
SHUTDOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD IN THE
ARRAY
L) NEC 2023 690.12 (D)
Located on or no more than 3' from the
service disconnecting means to which the PV
system is connected
O) A&R Solar Requirement * if
multiple inverters
IAWARNING DUAL POWER SOURCEI
SECOND SOURCE IS PHOTOVOLTAIC SYSTEM
P) NEC 2023 705.12(C) & 690.59
` • D• NOT INSTALL
ADDITIONAL LOADS IN THIS PANEL
R) AHJ Requirement * if combiner used
S) NEC 2023 230.85(E)(1)
T) NEC 2023 230.85(E)(3)
Custom Placards �„���
A&RSOLAR
3211 Martin Luther King Jr Way S.
PLACARD SPECS CITY Seattle, WA 98144 (206)707-9937
NEC 690.54
Letter Height: 1/8"
&X AC OUTPUT CURRENT:
48.0 A AC
Inverter 1 Backfeed
Maintain 1/4" border i
• . •
Red / White
Breaker
NEC 690.53
Letter Height: 1/8"
1-Tesl a Pow erwal I
THIS DRAWING CONSTITUTES THE
DC
Maintain 1/4" border 1
1
3(1707000-xx-y)
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CIRCUITAX OF
CONFER ANY RIGHT IN OR LICENSE TO USE IT
Red/ White
(Inverter 1)
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY GHT TO REPRODUCE THIS
DC • •
�.
DRAWING ORIANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
NEC 690.54
Letter Height: 1/8"
(1) for each PV load
•
.
Maintain 1/4" border 3
center,
• L
Disconnect, MSP/
Red/ White
uostrea m load centers.
NEC 690.54
i
Letter Height: 1/8"
4X AC OUTPUT CURRENT: 48.0 A AC
Maintain 1/4" border 1
inverter 2 Backfeed
U
O
i VOLTAGE:Breaker
Red /White
i Q
T-1
N
O
z
00
NEC 690.53
C
•-i
M
MAX DC • L
Letter Height: 1/8"
•
1-Testa Pow erwal1
C O
cn O
O�
C�
j
Q
Q
L Maintain 1/4" border 1
3(1707000-xx-y)
W N
CIRCUIT OF
Red / White
(Inverter 2)
a)
O
_0
DC TO DC CONVERTER N/A A DC
Oo
U
0
O
O
�O
w
Lq
O
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Project Manager:
AJ Mullen
(615)761-8685
Current Date:Sep 13, 2024
G4 Placards
J) NEC 2023 690.12 (D)(2)
&A'AI P
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
a
U
= Q
o �
Oo
V N
''�U
1_0
a
Ln
0
O
.� No
z oo
c � M
0M >Q
— a
0) 4-
_ ) Li
�MM_0
00 O
Ln Ln E
w
REVISIONS
Designed by: Thomas N
Project Manager:
AJ Mullen
(615)761-8685
Current Date:Sep 13, 2024
G5 Equipment
BOM
Purchasing BOM
Category
Equipment
QTY
Notes
Modules
REC 420AA Pure 2
25
RSD
Tesla MCI-1
8
Jbox
JBox
2
RSD
MCI's
4
extra MCI's (2 per inverter)
IronRidge Racking BOM
XR100 Black,l7'
6
XR100 Black
12
Kit, XR100 Bonded Splice BOSS
10
Universal Module Clamp, Black
40
End Fastening Object ,Black
20
Grounding Lug, Low Profile
5
Square -Bolt Bonding Attachment Hardware
59
1/4 x 3/4 Microinverter Bonding Hardware, T-Bolt
8
End Caps, 10 sets(package) XR100
1
IronRidge QM HUG- Halo Ultragrip ,Black (Spacing: 52")
59
Fastener: RD-1430-01-M1 (6 /mount)
354
System Weights
Racking Weight: 280.1(Ibs)
Scone of Work
Site:
ffl.
_ '
A&RSO�A�
System Size:
._
27 kW DC
�•
•
3211 Martin Luther King Jr Way S.
'
•
f , •
1 `.
.
s?
�•
Seattle, WA 98144 (206)707-9937
- ` *''C;--
Batteries:
(2) - Powerwall 3
- �� • '
^" ' �►
s
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
- • A •i
Table of Contents ■
-
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT REPRODUCE THIS
•s•
PA
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
O
N
,--i O
Detail Page(s):
-
N
•
AO- Cover Page
1.
r r,
..
o
r�'z00
orn
oa
— o
>
0) 4-
_M Ln
'
E
(DOO O
LOB
N
_0
Electrical Page(s):
w
E1- Electrical One -Line
1
• •v
`j __
r Net Meter
~ k
� _ �
•�
_
REVISIONS
Rev. #:
Date:
"'
As -Built Pa es s :
''"��
•�
G1- Storage As -Built
•` ' j
_ .
_
G2- Placards
Designed by: Thomas N
Project Manager:
-
- - •'
t�.,'.-•i3:�X�'ir'_t•�-�•.�•_��:-.r•._
AJ Mullen
(615)761-8685
G3-Storage Commisioning
Current Date:Sep 13, 2024
General Notes:
AO Cover Page
Standard Storage Placards
Label Location:
(BLC)
Label Location:
(GP)
Label Location:
(BLC)
Label Location:
(BLC,MSP,NM)
NEC 705.12(C)
For storage only
projects
Label Location:
(TG if outside,
service disconnect
breaker if TG
is inside)
NEC 230.85
BLC - Backup Load Center
GP - Generation Panel
MSP - Main Service Panel
NM - Net Meter
TG - Tesla Gateway
Label Location:
(BLC,MSP,NM)
NEC 705.12(C)
For PV+storage
projects
Label Location:
(BLC)
NEC 705.12(B)(3)(3)
Label Location:
(TG)
Label Location:
(GP)
Label Location:
(Battery breaker or
battery disconnect)
NEC 706.15(C)
Custom Storage Placards
CAUTION: MULTIPLE SOURCES OF POWER
SOLAR PV INSTALLED BY A&R SOLAR: (206)-707-9937
POWER TO THIS SERVICE IS ALSO SUPPLIED FROM SOLAR PV AND ENERGY
STORAGE SOURCES WITH DISCONNECTS LOCATED AS SHOWN:
N
Directory Placard Qty: 1
AR AND
uHiTERY AC
DISCONNECTS
&*41.
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
0
_
,-1
0
�z()o
0
0
O�
>
01
p
0
Q¢
V
0
�
(D00
M
rn
0
LOB
a
L
`^
E
N
-0
LU
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Project Manager:
AJ Mullen
(615)761-8685
Current Date:Sep 13, 2024
G2 Placards
.Y AC
NECT
LAR AC
:ONNECT
a
CAUTION:
POWER TO THIS SERVICE IS ALSO SUPPLIED FROM SOLAR PV AND ENERGY
STORAGE SYSTEM SOURCES WITH DISCONNECTS LOCATED AS SHOWN:
Goal:
Use Snipping Tool
Stay within box, 5.75" x 4"
open in Paint and save as BMP
5 3/4"
Residential Example
.......................................................................................................................................................................
CAUTION: MULTIPLE SOURCES OF POWER
SOLAR PV INSTALLED BY A&R SOLAR: (206)-707-9937
POWER TO THIS SERVICE IS ALSO SUPPLIED FROM SOLAR PV AND ENERGY
STORAGE SOURCES WITH DISCONNECTS LOCATED AS SHOWN:
SOLAR AND
N NET METER BATTERY AC
DISCONNECTS
.....................................................................................................................................................................:
w
w
ry
H
07
BATTERY AC
DISCONNECT
SOLAR AC
DISCONNECT
SOLAR I
ARRAY
FOR PG E :
DRIVEWAY
CAUTION:
POWER TO THIS SERVICE IS ALSO SUPPLIED FROM SOLAR PV AND ENERGY
STORAGE SYSTEM SOURCES WITH SEPARATE DISCONNECTS. BOTH
DISCONNECTS MUST BE OPERATED TO ISOLATE SOLAR PV AND ENERGY
STORAGE SYSTEMS. DISCONNECTS LOCATED AS SHOWN: