Loading...
BLD2024-1209_Other_9.13.2024_11.23.41_AM_4499207Equipment SummarX Site: A&RSOLAR Modules: (25)- REC 420AA Pure 2 3211 Martin Luther King Jr Way S. .• ^c �..` ';; -:•._ �.."�j :"f��'���:�•; ".'�' :' •' . ' .' ' :'' - 4 �- S'. �. "•;: "-;.�."f~ Seattle, WA 98144 (206)707-9937 Inverters: (2)- Tesla Powerwall PV 11.5 kW ti - _, �! �`.'•.:t'i.... ,�., may.•`•• _'�� • . pa Racking Rail- XR100 Mount- Halo Ultragrip t r • • �• 1 r A 'T7_ �• ✓ t•• � THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT Table of Contents ■ •' �M � ♦ a ��•( CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS vi - - DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. Detail Page(s): AO- Cover Page > Al- Site Overview ' a N �..... U = Q o �' o A2- Roof Layout y °�C��00 50 M 2 °' ' Q> A3- Racking V N 0) 4- O� vi U O 0 _ �MM E 0 0 O Electrical Page(s): a L Ln E Ln w E1.1- Electrical One -Line -- K o E1.2- Electrical Schedule 40 E2- Electrical Calculations i~ �� / •� ' A'. E3- Stringing = Net Meter f- ., REVISIONS Rev. #: Date: �• 1 -« , - ' As -Built Pages(s): G1- Roof As -Built _ G2- Electrical As -Built Designed by: Thomas N Project Manager: O ,11&a iLVL1 •J� ;•p. �. �� _' "' ,,� „- AJ Mullen (615) 761-8685 G3- Micro Optimizer Map • Current Date:Sep 13, 2024 G4- Placard General Notes: AO Cover Page G5- Equipment BOM Required Setbacks from Ridge: 181. Max. Mount Spacing: Portrait/Landscape 72" Roof Type: Comp. shingle Roof Slope: 300 Array Tilt : Flush Array Azimuth(s): 269-, 359° Roof Area: 4077ft.2 Array Area 521ft.2 Array to Roof Coverage 13% Module and Rail Selection Guidl (25) REC 420AA Pure 2 Mount: Iron Ridge QM HUG - Halo Ultragrip Clamp Zone "A" Clamp Zone "B" Mods per Row (2)Rows, (6)Portrait (1)Row, (5)Landscape (2)Rows, (4)Landscape A" B11 I I AnC)uT1a 3.9-9.85" 15.75-20.90" Rail typel+ rail tyK (2)14' (2) split 17' (4)17' (4)14' A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. a U o _ Q z N � C c 0 � >Q M Oo — Q + M 0 M � > U (300 M M aC) .. 0 w Ln 0 REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: A3 Mullen (615)761-8685 Current Date:Sep 13, 2024 A2 Roof Layout Net Meter Site Conditions: Wind Exposure "B" WindSpeed 110 mph Roof Type: Composition Snowload- 25 PSF Roof Pitch: 300 Z-3-7r Z-2 Z-2 Z-3-a,K Z-2 Module Type: 1 (25)- REC 420AA Pure 2 Pitch: 1 300 Portrait orientation Landscape orientation Halo Ultragrip Deck mounting spans - Halo Ultragrip Deck mounting spans - Zone Max span Zone Max span Z-1 52" Z-1 72" Z-2 521' Z-2 721' Z-3 52" Z-3 721' cantilever- 12" (24" if rafter mounting) cantilever- 12" (24" if rafter mounting) Rafter mounting span- 72" zones 1-3 both Portrait and Landscape if attaching to both rafters and deck, the deck mounting span needs to apply to both sides of the deck mount. **Deck Mounting spans dependent on site conditions, roof slope and module size. ** Z- Z-2 Z-2 Z-2 Z-2 — Z-1— 1�4 ---] - Z-1--� 2714 HUG mount Sample Attachment Plan (For demonstration purposes) Mounting across shingle step is if shingle step over 1/8" okay if 1/8" thickness or less install on the flat areas Gable Roof a� "a�aI Roof Zones Hipped Roof a� � a 3 2 3 3 2 3 2 1 2 2 1 2 3 2 3 3 2 3 to a_ 3Y22 3 2 11 2 2 3 2 3 a = 3 feet A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. a U O _ Q z N � C c oo) >Q M Oo — Q +M 0M�> U N as IN U (300 M M E aC) 0 Lu Ln O REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: A3 Mullen (615)761-8685 Current Date:Sep 13, 2024 A3 Racking Halo PV --— — — — — — I String 1 v 7 modules N String 2 U 6 modules r--—————— — — — — — I String 4 N U 6 modules String 5 n F 6 modules A Stora e A MPPT 1 ry MPPT 2 MPPT 3 MPPT 4 POWERWALL 3 1707000-xx-y MPPT 5 MPPT 6 MPPT 1 iv MPPT 2 MPPT 3 MPPT 4 POWERWALL 3 1707000-xx-y MPPT 5 MPPT 6 Battery Disconnect �4 Located within 10' of net meter i i I A 125A/2p I 60A/2 r — — I I I I 60A/2 A I I I I I I I I I I I I p I I L---� Battery combiner panel Bus Rating: 125A ■ A & R Scope Existing or Others Scope Design Notes 1- 30A low -voltage disconnect to act as external RSD initiation device 2- 3- 4- 5- AC Disconnect, Located within 10' of net meter A Service entrance conductors 1/0 CU XHHW-2 (L1 & L2) #1 CU XHHW-2 (N) TESLA Gateway3 with 200A Internal Panelboard Battery OCPD:125A NEC 705.12(B)(3)(3) Co -located with Net ME 125A I I � I — I 1/0 CU XHHW-2 (L (Ll & L2) I #1 CU XHHW-2 (N) #6 CU THWN-2 (EGC) Protected Loads Panel (Existing) Main Service Panel (1ph 240V Service) Main Breaker: N/A Bus Rating: 125A CL200 Net Meter Meter Main (1ph 240V Service) Main Breaker: 125A, 70A Bus Rating: N/A A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. U O = Q a' fu N z o 00 __ 0 0 ON > O O r1r) 4- W 0 a Q V N O N �., O� • to 'F U > U _ M M E L 0 O 'Ln O O E Y N W Ln O rl REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: A3 Mullen (615)761-8685 Current Date:Sep 13, 2024 E1.1 Electrical One -line PV 0 Equipment Schedule Ref. Category Equipment QTY 1 Modules REC 420AA Pure 2 25 2 RSD Tesla MCI-1 8 3 Jbox JBox 2 0 Iconductor Schedule I nverter Specs Watts LW-1 Output L&I AC Voltage #of Inverters OCPD Branch 1-Tesla Powerwall 3(170700 11500 48 240 2 60 ****N/A**** 0 0 0 0 0 ****N/A**** 0 0 0 0 0 Module Specs Watts (w) I Imp I Vmp I Voc I Isc REC 420AA Pure 2 420 9.96 42.2 49.1 10.74 Temp. Adjusted 0 0 37.6 52.9 0 MLPE or RSD? Tesla MCI-1 Summary Distance (ft) Current @125% Operating Voltage Voltage Drop V. Drop (total) A (2)#10 CU, (1)#6 EGC, PV Wire 600V, AIR 50 16.78A 263V 0.47% 0.94% B (4)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min) 50 16.78A 263V 0.47% Storage 0 � Equipment Schedule Ref. Category Equipment QTY 1 Gateway Tesla Backup Gateway3: Service Rated 1 Breakers 125A Main Breaker (Eaton CSR2125N) 1 2 Battery Tesla Powerwall 3, 13.5 kWh 2 3 Loadcenters MLO, 125A, 240V, 1ph, Nema 3R, Surface, 4 space (min.) 1 Breakers 2p60A, 2p60A, 2p125A 4 Disconnect 30A 240V 2 Pole I General Duty, No Fuse, Lockable AC Disconnect 1 5 Disconnect 200A 600V 2 Pole I Heavy Duty, No Fuse, Lockable AC Disconnect 1 ElectricalWork Tesla Wall Charger Install (wired to 60A breaker) 1 0 lConductor Schedule Inverter Specs Watts ll Output AC voltage # of Inverters OCPD u 1-TeslaPowerwa113(170700 11500 48 240 2 60 Summary Distance (ft) Current @125% Operating Voltage Voltage Drop V. Drop (total) A (4)#6 CU, (2)#6 N, (1)#10 EGC, THWN-2, & com wire, 1.25"EMT(min) 10 60A 240V 0.20% 0.32% B (2)#1 CU, (1)#1 N, (1)#6 EGC, THWN-2, & com wire, 1.5"EMT(min) 10 120A 240V 0.12% General Notes: Utility: SnoPUD 1. EGC Where exposed to physical damage will be #6AWG Bare CU 2. If installing conduit on the roof, maintain greater than 7/8" above the surface 3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC Disconnect 4. For supply side taps, a #6 GEC (min.) will be run separately from the disconnect and connected to the grounding electrode with an irreversible crimp &ffl. A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. a U 0 _ Q z N � 0 c oo) >Q M Oo — Q + M 0 M _ > U N IN -, U (300 _M M rn laC) 0 -0 Lu Ln 0 ,--I REVISIONS Rev. #: IDate: rA3 igned by: Thomas N ect Manager: ullen 5)761-8685 Current Date:Sep 13, 2024 E1.2 Electrical Schedule Inverter Specs xx-y) ****N/A**** ****N/A**** REC 420AA Pure 2 Temp. Adjusted MLPE or RSD? Equipment Mppt Input Module # Modules per String # Strings # of Mods per grout # of Mods/inverter # of Inverters Total # of Modules I nverter Mppt Input Amperage (Im Max Voltage(D Max Amps (DC PV Electrical Calculations Watts Output # of OCPD Total AC Comb. EGC AC Voltage u Inverters Branch out.(A) OCPD AC 11500 48.00 240 2 60 0 0.00 0 0 0 96.0 125 #6 0 0.00 0 0 0 Watts EGC Imp Vmp Voc Isc Temp. Coef V(oc) DC 420 9.96 42.2 49.1 10.74 -0.24 #10 37.6 52.9 Interconnection Calcs Main Breaker 200 Bus Bar 200 Max PV OCD AI lowed 40 PV OCPD Device Used 125 Tap or Breaker? Tap Site Conditions ASHRAE Site: Seattle Low Temp (°F) 19 High 21/oTemp ('F) 84 High 0.4%Temp (`F) 91 Tesla MCI-1 Max Array Power(STC): 10.5kW DC Max Continuous AC Power: 23kW AC 1-Tesla Powerwall 3(1707000-xx-y) 1-Tesla Powerwall 3(1707000-xx-y) ****N/A**** 1 2 3 1 4 5 = 6 1 2 3 1 4 1 5 6 1 2 3 1 4 5 6 REC 420AA Pure 2 REC 420AA Pure 2 ****SELECT**** 7 6 0 0 0 0 6 6 0 0 0 0 0 0 0 0 0 0 1 1 0 O 0 0 1 1 0 0 0 0 0 0 0 0 0 0 7 6 0 0 0 0 6 6 0 0 0 0 0 0 0 0 0 0 13 12 0 1 1 0 25 Array Specs (Adjusted for Temperature) 1-Tesla Po werwall 3 (170 7000-xx-y) 1-Tesla Powerwa113(1707000-xx-y) ****N/A**** 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 9.96 9.96 0.00 0.00 0.00 0.00 9.96 9.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 263.2 225.6 0.0 0.0 0.0 0.0 225.6 225.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 370.3 317.4 0.0 0.0 0.0 0.0 1 317.4 317.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.74 10.74 0.00 0.00 0.00 0.00 10.74 10.74 0.00 0.00 0.00 0.00 1 0.00 0.00 0.00 0.00 0.00 0.00 Ref. Conductor Description Distance AL CU Wire Gauge (QTY) Phase Neutral Neutral EGC (AWE) Wire Type Conduit Min. Conduit 90'C Rating Temp Correct. Fill berate Derated 75'C Rating Current Operating Voltage Drop Conductors AWG (QTy) Type Ampacity 125% Voltage A String to Jbox 50 Cu #10 2 N/A N/A #6 PV Wire 600V AIR N/A 40 1 100% 40.00 35 16.8 263 0.47% B Jbox to Inverter 50 Cu #10 4 N/A N/A #10 THWN-2 EMT 0.75" 40 1 80% 32.00 35 16.8 263 0.47% C D E F G H I J DC Voltage Drop 0.94% AC Voltage Drop 0.00% &ffl. A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. d U 0 _> Q z N 00 � > o M OO S < + M 0 M U N ON 4 U (300 M M E a>) 0 W Ln O REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: a Drop 0.94% (6 Mullen Total Voltage p 15)761-8685 Current Date:Sep 13, 2024 E2 Electrical Calculations Typical Placards A) NEC 2023 690.13 & 692.17 B) NEC 2023 705.12 (13)(3)(2) C) Utility Requirement D) Utility Requirement (Utility -Owned) D) A&R Solar Requirement (Customer - Owned) E) A&R Solar Requirement * if combiner used F) NEC 2023 690.13 (B) I) NEC 2023 690.31 (D)(2) K) NEC 2023 690.13 (B) SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SOLAR ELECTRIC PV PANELS SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY L) NEC 2023 690.12 (D) Located on or no more than 3' from the service disconnecting means to which the PV system is connected O) A&R Solar Requirement * if multiple inverters IAWARNING DUAL POWER SOURCEI SECOND SOURCE IS PHOTOVOLTAIC SYSTEM P) NEC 2023 705.12(C) & 690.59 ` • D• NOT INSTALL ADDITIONAL LOADS IN THIS PANEL R) AHJ Requirement * if combiner used S) NEC 2023 230.85(E)(1) T) NEC 2023 230.85(E)(3) Custom Placards �„��� A&RSOLAR 3211 Martin Luther King Jr Way S. PLACARD SPECS CITY Seattle, WA 98144 (206)707-9937 NEC 690.54 Letter Height: 1/8" &X AC OUTPUT CURRENT: 48.0 A AC Inverter 1 Backfeed Maintain 1/4" border i • . • Red / White Breaker NEC 690.53 Letter Height: 1/8" 1-Tesl a Pow erwal I THIS DRAWING CONSTITUTES THE DC Maintain 1/4" border 1 1 3(1707000-xx-y) CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CIRCUITAX OF CONFER ANY RIGHT IN OR LICENSE TO USE IT Red/ White (Inverter 1) OR THE INFORMATION DISCLOSED HEREIN NOR ANY GHT TO REPRODUCE THIS DC • • �. DRAWING ORIANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. NEC 690.54 Letter Height: 1/8" (1) for each PV load • . Maintain 1/4" border 3 center, • L Disconnect, MSP/ Red/ White uostrea m load centers. NEC 690.54 i Letter Height: 1/8" 4X AC OUTPUT CURRENT: 48.0 A AC Maintain 1/4" border 1 inverter 2 Backfeed U O i VOLTAGE:Breaker Red /White i Q T-1 N O z 00 NEC 690.53 C •-i M MAX DC • L Letter Height: 1/8" • 1-Testa Pow erwal1 C O cn O O� C� j Q Q L Maintain 1/4" border 1 3(1707000-xx-y) W N CIRCUIT OF Red / White (Inverter 2) a) O _0 DC TO DC CONVERTER N/A A DC Oo U 0 O O �O w Lq O REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: AJ Mullen (615)761-8685 Current Date:Sep 13, 2024 G4 Placards J) NEC 2023 690.12 (D)(2) &A'AI P A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. a U = Q o � Oo V N ''�U 1_0 a Ln 0 O .� No z oo c � M 0M >Q — a 0) 4- _ ) Li �MM_0 00 O Ln Ln E w REVISIONS Designed by: Thomas N Project Manager: AJ Mullen (615)761-8685 Current Date:Sep 13, 2024 G5 Equipment BOM Purchasing BOM Category Equipment QTY Notes Modules REC 420AA Pure 2 25 RSD Tesla MCI-1 8 Jbox JBox 2 RSD MCI's 4 extra MCI's (2 per inverter) IronRidge Racking BOM XR100 Black,l7' 6 XR100 Black 12 Kit, XR100 Bonded Splice BOSS 10 Universal Module Clamp, Black 40 End Fastening Object ,Black 20 Grounding Lug, Low Profile 5 Square -Bolt Bonding Attachment Hardware 59 1/4 x 3/4 Microinverter Bonding Hardware, T-Bolt 8 End Caps, 10 sets(package) XR100 1 IronRidge QM HUG- Halo Ultragrip ,Black (Spacing: 52") 59 Fastener: RD-1430-01-M1 (6 /mount) 354 System Weights Racking Weight: 280.1(Ibs) Scone of Work Site: ffl. _ ' A&RSO�A� System Size: ._ 27 kW DC �• • 3211 Martin Luther King Jr Way S. ' • f , • 1 `. . s? �• Seattle, WA 98144 (206)707-9937 - ` *''C;-- Batteries: (2) - Powerwall 3 - �� • ' ^" ' �► s THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT - • A •i Table of Contents ■ - OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT REPRODUCE THIS •s• PA DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. O N ,--i O Detail Page(s): - N • AO- Cover Page 1. r r, .. o r�'z00 orn oa — o > 0) 4- _M Ln ' E (DOO O LOB N _0 Electrical Page(s): w E1- Electrical One -Line 1 • •v `j __ r Net Meter ~ k � _ � •� _ REVISIONS Rev. #: Date: "' As -Built Pa es s : ''"�� •� G1- Storage As -Built •` ' j _ . _ G2- Placards Designed by: Thomas N Project Manager: - - - •' t�.,'.-•i3:�X�'ir'_t•�-�•.�•_��:-.r•._ AJ Mullen (615)761-8685 G3-Storage Commisioning Current Date:Sep 13, 2024 General Notes: AO Cover Page Standard Storage Placards Label Location: (BLC) Label Location: (GP) Label Location: (BLC) Label Location: (BLC,MSP,NM) NEC 705.12(C) For storage only projects Label Location: (TG if outside, service disconnect breaker if TG is inside) NEC 230.85 BLC - Backup Load Center GP - Generation Panel MSP - Main Service Panel NM - Net Meter TG - Tesla Gateway Label Location: (BLC,MSP,NM) NEC 705.12(C) For PV+storage projects Label Location: (BLC) NEC 705.12(B)(3)(3) Label Location: (TG) Label Location: (GP) Label Location: (Battery breaker or battery disconnect) NEC 706.15(C) Custom Storage Placards CAUTION: MULTIPLE SOURCES OF POWER SOLAR PV INSTALLED BY A&R SOLAR: (206)-707-9937 POWER TO THIS SERVICE IS ALSO SUPPLIED FROM SOLAR PV AND ENERGY STORAGE SOURCES WITH DISCONNECTS LOCATED AS SHOWN: N Directory Placard Qty: 1 AR AND uHiTERY AC DISCONNECTS &*41. A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. 0 _ ,-1 0 �z()o 0 0 O� > 01 p 0 Q¢ V 0 � (D00 M rn 0 LOB a L `^ E N -0 LU REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: AJ Mullen (615)761-8685 Current Date:Sep 13, 2024 G2 Placards .Y AC NECT LAR AC :ONNECT a CAUTION: POWER TO THIS SERVICE IS ALSO SUPPLIED FROM SOLAR PV AND ENERGY STORAGE SYSTEM SOURCES WITH DISCONNECTS LOCATED AS SHOWN: Goal: Use Snipping Tool Stay within box, 5.75" x 4" open in Paint and save as BMP 5 3/4" Residential Example ....................................................................................................................................................................... CAUTION: MULTIPLE SOURCES OF POWER SOLAR PV INSTALLED BY A&R SOLAR: (206)-707-9937 POWER TO THIS SERVICE IS ALSO SUPPLIED FROM SOLAR PV AND ENERGY STORAGE SOURCES WITH DISCONNECTS LOCATED AS SHOWN: SOLAR AND N NET METER BATTERY AC DISCONNECTS .....................................................................................................................................................................: w w ry H 07 BATTERY AC DISCONNECT SOLAR AC DISCONNECT SOLAR I ARRAY FOR PG E : DRIVEWAY CAUTION: POWER TO THIS SERVICE IS ALSO SUPPLIED FROM SOLAR PV AND ENERGY STORAGE SYSTEM SOURCES WITH SEPARATE DISCONNECTS. BOTH DISCONNECTS MUST BE OPERATED TO ISOLATE SOLAR PV AND ENERGY STORAGE SYSTEMS. DISCONNECTS LOCATED AS SHOWN: