HomeMy WebLinkAbout2024-09-25 Planning Board PacketAgenda Edmonds Planning Board REGULAR MEETING BRACKETT ROOM 121 5TH AVE N, CITY HALL - 3RD FLOOR, EDMONDS, WA 98020 SEPTEMBER 25, 2024, 7:00 PM Edmonds Planning Board Agenda September 25, 2024 Page 1 REMOTE MEETING INFORMATION: Meeting Link:https://edmondswa- gov.zoom.us/s/87322872194?pwd=WFdxTWJIQmxITG9LZkc3K0huS0l4QT09 Meeting ID: 873 2287 2194 Passcode:007978 This is a Hybrid meeting: The meeting can be attended in-person or on-line. The physcial meeting location is at Edmonds City Hall 121 5th Avenue N., 3rd floor Brackett Rooom Or Telephone :US: +1 253 215 8782 LAND ACKNOWLEDGEMENT FOR INDIGENOUS PEOPLES We acknowledge the original inhabitants of this place, the Sdohobsh (Snohomish) people and their successors the Tulalip Tribes, who since time immemorial have hunted, fished, gathered, and taken care of these lands. We respect their sovereignty, their right to self-determination, and we honor their sacred spiritual connection with the land and water. 1. CALL TO ORDER 2. APPROVAL OF MINUTES A. Previous meeting minutes 3. ANNOUNCEMENT OF AGENDA 4. AUDIENCE COMMENTS For topics not scheduled for a public hearing. Please limit your comments to 3 minutes. 5. ADMINISTRATIVE REPORTS 6. PUBLIC HEARINGS A. 2025-2030 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) 7. UNFINISHED BUSINESS 8. NEW BUSINESS 9. SUBCOMMITTEE REPORT 10. PLANNING BOARD EXTENDED AGENDA A. Extended Agenda Edmonds Planning Board Agenda September 25, 2024 Page 2 11. PLANNING BOARD MEMBER COMMENTS 12. PLANNING BOARD CHAIR COMMENTS 13. ADJOURNMENT Planning Board Agenda Item Meeting Date: 09/25/2024 Previous meeting minutes Staff Lead: Mike Clugston Department: Planning & Development Prepared By: Michelle Martin Background/History N/A Staff Recommendation Review and approve previous meeting minutes. Narrative Planning Board Special and Regular Meeting minutes from 9/11/24 attached. Attachments: PB 09112024 Special Mtg PB 09112024 Regular Mtg 2.A Packet Pg. 3 Planning Board Special Meeting Minutes September 11, 2024 Page 1 of 2 DRAFT CITY OF EDMONDS PLANNING BOARD Minutes of Hybrid Special Meeting September 11, 2024 Chair Mitchell called the hybrid special meeting of the Edmonds Planning Board to order at 6:00 p.m. at Edmonds City Hall and on Zoom. LAND ACKNOWLEDGEMENT FOR INDIGENOUS PEOPLES The Land Acknowledgement was read by Board Member Li. Board Members Present Jeremy Mitchell, Chair Lauren Golembiewski, Vice Chair Judi Gladstone Lee Hankins Nick Maxwell Steven Li Jon Milkey Isaac Fortin, Student Rep. Board Members Absent George Bennett (alternate) (excused) Staff Present Mike Clugston, Acting Planning Manager Bertrand Hauss, Transportation Engineer Rob English, City Engineer Patrick Lynch, Transpo Group Paul Sharman, Transpo Group (remote) New board members Jon Milkey and Isaac Fortin introduced themselves. AUDIENCE COMMENTS None UNFINISHED BUSINESS A. Transportation Project List Presenters: Bertrand Hauss, Transportation Engineer; Rob English, City Engineer; Patrick Lynch, Transpo Group; Paul Sharman, Transpo (Remote) Transportation Engineer Bertrand Hauss gave an overview of the project schedule and the Transportation Plan public survey results. Paul Sharman from Transpo reviewed the goals of the Pedestrian & Bicycle network, the existing network, previous Comprehensive Plan projects, the forecast 2044 Multimodal Level of Service (MMLOS), and MMLOS & non-MMLOS Project Maps. 2.A.a Packet Pg. 4 At t a c h m e n t : P B 0 9 1 1 2 0 2 4 S p e c i a l M t g ( P r e v i o u s m e e t i n g m i n u t e s ) Planning Board Special Meeting Minutes September 11, 2024 Page 2 of 2 Staff responded to questions about consideration of centers and hubs with the planned network, standards for primary arterials, realistic projects given the City’s funding challenges, and coordination with Esperance. There were also questions regarding how LOS is measured and how project locations are factored into prioritization. Staff reviewed the Project Prioritization Framework to help determine the most important projects based on prioritization components such as safety and proximity to various locations/services as well as PSRC’s Opportunity Index (equity measure). There was some discussion about the relationship between prioritization and funding opportunities. Staff stressed that projects won’t necessarily get completed in priority order due to funding opportunities and availability, adjacent projects, or other projects in close proximity; however, prioritization helps to stratify the costs. Concerns were raised about the geographic disparity across the city. Staff hopes the prioritization process will be an objective scoring exercise to address this. There was a question about if feasibility factors into the prioritization. Staff explained it does not, but it would probably influence the cost. There was a recommendation to reach out to stakeholders in bicycling organizations like Cascade Bicycle Club to get their feedback on the plan. Staff is working with a local bicycling group to get their input. A board member asked about prioritization based on growth. Staff pointed to the criteria component of growth hubs and confirmed this is a consideration. Areas of growth, what the pressures are, and how the transportation system is reacting to it will be monitored over time to ensure that the prioritization makes sense. There was a caution about separating out the types of projects, noting the high number of pedestrian accidents over the past year and the need to prioritize pedestrian safety. There was a recommendation to prioritize at least one sidewalk on every street and fill in sidewalk gaps before prioritizing sidewalks on both sides of streets. Some corridors will be easier to implement than others because of right-of-way constraints. There was some question about if there is a proportionate relationship between funding and MMLOS project types (sidewalks, trails, bike lanes, roadway, multi-use paths). There was another recommendation to keep the project types separate so pedestrian projects don’t get lost in the mix. Staff reviewed next steps including a public open house on September 18, preliminary projects cost estimates, draft Transportation Document with draft Comprehensive Plan, and updated impact fees. Staff plans to come back to the Planning Board in November with a draft plan. PLANNING BOARD MEMBER COMMENTS None PLANNING BOARD CHAIR COMMENTS None ADJOURNMENT: The meeting was adjourned at 7:00 p.m. 2.A.a Packet Pg. 5 At t a c h m e n t : P B 0 9 1 1 2 0 2 4 S p e c i a l M t g ( P r e v i o u s m e e t i n g m i n u t e s ) Planning Board Regular Meeting Minutes September 11, 2024 Page 1 of 3 DRAFT CITY OF EDMONDS PLANNING BOARD Minutes of Hybrid Meeting September 11, 2024 Chair Mitchell called the hybrid meeting of the Edmonds Planning Board to order at 7:07 p.m. at Edmonds City Hall and on Zoom. LAND ACKNOWLEDGEMENT FOR INDIGENOUS PEOPLES The Land Acknowledgement was read by Board Member Hankins. Board members introduced themselves. Board Members Present Jeremy Mitchell, Chair Lauren Golembiewski, Vice Chair Judi Gladstone Lee Hankins Nick Maxwell Steven Li Jon Milkey Isaac Fortin, Student Rep. Board Members Absent George Bennett (alternate) Staff Present Mike Clugston, Acting Planning Manager Navyusha Pentakota, Urban Design Planner Angie Feser, Parks, Recreation, & Human Services Director Shannon Burley, Parks, Recreation, & Human Services Deputy Director Rob English, City Engineer READING/APPROVAL OF MINUTES MOTION MADE BY BOARD MEMBER HANKINS, SECONDED BY BOARD MEMBER MAXWELL, TO APPROVE THE MINUTES OF JULY 24, 2024 AS AMENDED. MOTION PASSED (5-0) WITH BOARD MEMBERS MILKEY AND GOLEMBIEWSKI ABSTAINING. MOTION MADE BY BOARD MEMBER GLADSTONE, SECONDED BY BOARD MEMBER HANKINS, TO APPROVE THE MINUTES OF AUGUST 28, 2024 AS PRESENTED. MOTION PASSED (6-0) WITH BOARD MEMBER MILKEY ABSTAINING. ANNOUNCEMENT OF AGENDA THERE WAS UNANIMOUS CONSENT TO APPROVE THE AGENDA AS PRESENTED. AUDIENCE COMMENTS Roger Pence requested that board members speak up so audience members can hear what is said. 2.A.b Packet Pg. 6 At t a c h m e n t : P B 0 9 1 1 2 0 2 4 R e g u l a r M t g ( P r e v i o u s m e e t i n g m i n u t e s ) Planning Board Regular Meeting Minutes September 11, 2024 Page 2 of 3 NEW BUSINESS A. Preliminary Waterfront Vision Design Concept Urban Design Planner Navyusha Pentakota made a presentation regarding the Edmonds Waterfront including a map of the key components, ongoing projects in the area, and recommendations from the 2022 City Council briefing. Results of a community design charette revealed a focus on connecting the marsh with all the surrounding greenspaces; elevating the pedestrian experience with parks, activity nodes, and downtown; having a stretch of activities along the waterfront; and prioritizing green space over vehicle space. Ms. Pentakota also reviewed community feedback related to the marsh and ecological functionality of the waterfront; climate resilience and sustainability; waterfront access and integration; managing parking; emergency access; and the significance of the underwater dive park. She presented a draft design concept and stressed that there is much work to be done including detailed conversations with the Port regarding their long-term plans, goals, and priorities. She reviewed key themes that were heard from the public. Next steps include collaboration with the Port; development of a waterfront plan, conducting transportation studies/analysis, conducting parking studies, developing a parking management plan, and planning for future joint public/private development. There was a question about a recommendation to include the waterfront commission’s plans in the Comprehensive Plan. Ms. Pentakota gave some background on this issue and noted they will be reworking the community vision with feedback from other stakeholders including the Port. A question was asked how detailed the emergency access portion would be. Ms. Pentakota explained the implementation would include some actions but how those are implemented cannot be answered at this stage. The Comprehensive Plan will include the concept that there are some issues that need to be examined. A caution was raised about how to plan for development in the waterfront area in light of the expected sea level rise and liquefaction risks from earthquakes. It was noted that they need to start with a clear vision of what the situation is. Staff explained that will be analyzed carefully in the future as part of the waterfront plan, but the Comprehensive Plan will just contain a high-level framework. Since the waterfront vision is not required for the Comprehensive Plan, there was a question if time would be better spent on other higher priority items. Questions and answers followed regarding studies that have been done on the marsh, the status of the Unocal property, and if this needs to be considered in the plan. B. 2025-2030 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) City Engineer Rob English, Director Angie Feser, and Deputy Director Burley made a presentation on the 2025- 2030 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP). City Engineer English reviewed the citywide project map, the summary project list, project sheets, and background on the Comprehensive Transportation Plan and the Storm and Surface Water Management Comprehensive Plan. He highlighted 2025- 2026 Pavement Preservation Projects and responded to questions about difference in overlay costs from 2025 and 2026 and the difference between the annual overlay program and specific overlay projects. He reviewed 2025-2026 Safety & Capacity Projects; Active Transportation Projects & Planning; Water Utility Projects; Stormwater Utility Projects; and Sewer Utility Projects. General clarification questions and answers occurred throughout the presentation. He displayed pie charts showing funding sources for projects in 2025, 2026, and the 2025-2030 period and discussed the 2025-2030 CIP/CFP schedule through the end of the year. There were additional questions about design engineering costs for the library project and a recommendation for a future project related to increasing stormwater infrastructure in the Deer Creek Basin. There was some 2.A.b Packet Pg. 7 At t a c h m e n t : P B 0 9 1 1 2 0 2 4 R e g u l a r M t g ( P r e v i o u s m e e t i n g m i n u t e s ) Planning Board Regular Meeting Minutes September 11, 2024 Page 3 of 3 discussion about the relationship between this work and the transportation project prioritization process that was discussed at the special meeting earlier tonight. There was a request to know more about the 2015 prioritization criteria. Mr. English indicated he would provide that. A question was raised about considerations for anticipated growth that were included in the CFP and/or the EIS process. Mr. English explained that the transportation project list that was presented earlier was coordinated with the two growth options that are being evaluated. He explained that Utilities would respond once a growth alternative has been selected. Director Feser introduced the Parks 2025-2030 CIP/CFP and the framework for how they come up with the projects. This includes department staff resources; opportunities that come up; and goals, objectives, and capital recommendations included in the 2022 Parks, Recreation & Open Space PROS Plan. She displayed graphics showing geographic distribution of 2025-2030 Parks CIP/CFP projects and revenue sources. She reviewed current/ongoing projects, programs, acquisitions, and changes to the CIP/CFP. There were questions related to having signage/QR code resources in languages other than English and sign color/design consistency. Due to time constraints, there was consensus to bring any additional questions to the next meeting or email staff in the interim. UNFINISHED BUSINESS A. Draft Recommendation on Green Building Incentives MOTION MADE BY BOARD MEMBER HANKINS, SECONDED BY BOARD MEMBER GOLEMBIEWSKI, TO APPROVE THE MEMO AS WRITTEN. MOTION PASSED (6-0) WITH BOARD MEMBER MILKEY ABSTAINING. PLANNING BOARD EXTENDED AGENDA Acting Planning Manager Clugston reviewed the extended agenda. Some items have shifted a bit and the CAO update has been removed from this year as staff learned it is not required this year. ADJOURNMENT: The meeting was adjourned at 9:14 p.m. 2.A.b Packet Pg. 8 At t a c h m e n t : P B 0 9 1 1 2 0 2 4 R e g u l a r M t g ( P r e v i o u s m e e t i n g m i n u t e s ) Planning Board Agenda Item Meeting Date: 09/25/2024 2025-2030 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) Staff Lead: Angie Feser Department: Parks, Recreation & Human Services Prepared By: Angie Feser Background/History The City’s Capital Facilities Plan (CFP) Element is updated annually and identifies capital projects for at least the next six years, which support the City’s Comprehensive Plan. CFP projects are capital improvement projects that expand existing facilities/infrastructure or provide new capital facilities to accommodate the City’s projected population growth in accordance with the Growth Management Act. Thus, capital projects that preserve existing capital facilities are not CFP projects. These preservation projects are part of the six-year capital improvement program (CIP) along with capital facility plan projects that encompass the projected expenditure needs for all city capital related projects. Both the Public Works and Parks & Recreation Departments presented their proposed 2026 - 2030 capital programs to the Planning Board on September 11, 2024. Next steps include Staff Recommendation Planning Board recommends the 2026 - 2030 Public Works and Parks & Recreation Capital Facilities Plan and Capital Improvement Program to the City Council with any suggested revisions. Narrative The 2025-2030 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) are being presented with project lists that identify Capital Facility projects and project information sheets for all projects and programs. The Public Works and Utilities Department proposed 2025-2030 CFP/CIP is included as Attachment 1. The Parks & Recreation proposed 2025-2030 CFP/CIP is included as Attachment 2. With the city transitioning to a biennium operating budget format, the years alternating operating budget adoption provide a better opportunity to review capital budgets in greater depth. Next year in 2025 there will be more time and staff capacity to review in detail, and incorporate, the 2024 Transportation Plan, the Storm and Surface Water Plan Update, as well as the 2024 Comprehensive Plan (including a Facilities Element). Recommendations from these three significant plans, which will not be completed for this year’s capital program review, will be instrumental in developing the 2026-2031 CFP/CIP Plans. Following the Planning Board’s action, the City Council will have a presentation of the full 2026-2030 capital program and hold a related Public Hearing in October prior to final approval and adoption. 6.A Packet Pg. 9 Attachments: Public Works and Utilities 2025-2030 CIP and CFP 2025-2030 Parks CIP_CFP DRAFT 2024.09.25 CFP-CIP PW and Parks PB Presentation 6.A Packet Pg. 10 PUBLIC WORKS 2025-2030 CAPITAL FACILITIES PLAN & CAPITAL IMPROVEMENT PROGRAM 6.A.a Packet Pg. 11 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) CONTENTS 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS TRANSPORTATION & UTILITY PROJECT MAP FACILITIES & WWTP PROJECT MAP TRANSPORTATION PRESERVATION/MAINTENANCE SAFETY/CAPACITY ANALYSIS NON-MOTORIZED TRANSPORTATION FERRY PROJECTS TRAFFIC CALMING TRAFFIC PLANNING GREEN STREETS WATER STORMWATER EDMONDS MARSH ESTUARY RESTORATION PERRINVILLE CREEK BASIN STORM DRAINAGE IMPROVEMENT ANNUALLY FUNDED COMPLIANCE RELATED SEWER FACILITIES WASTEWATER TREATMENT 6.A.a Packet Pg. 12 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) PWD-04 PWT-27 PWT-28 PWT-34 PWT-24 PWW-09 PWD-05 PWT-61 PWT-49 PWT-03 PWT-68 PWT-46 PWT-05 PWT-17 PWT-40 PWT-42 PWT-07 PWT-18 PWT-65 PWT-04 PWT-33 PWT-36 PWW-09 PWT-51 PWD-01 PWD-02 PWT-09 PWT-12 PWT-45 PWT-37 PWT-35 PWT-16 PWT-48 PWT-19 PWT-55 PWT-41 PWT-11 PWT-25 PWT-15 PWT-22PWT-20 PWT-08 PWT-21 PWT-29 PWT-20 PWT-14 PWT-13 PWT-30 PWT-47 PWT-32 PWT-31 PWT-06 PWT-23 PWT-64 PWT-50 PWS-11 PWT-06 PWD-07PWD-06PWT-26 PWD-22 PWT-10 PWT-43 Public Works & Utilities Department TRANSPORTATION & UTILITY PROJECTS MAP Projects Sewer Stormwater Street/Intersection Project Non-Motorized Transportation Project Water Sewer Street/Intersection Project Non-Motorized Transportation Project ¯ *Site specific projects only. Citywide/annual citywide projects not shown. ii 6.A.a Packet Pg. 13 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) PWP 0 WM ST AIN VES MAIN SUNSETA ED M O N D S W A Y N A V E ST 3RD MAIN ST AVE S 3 R 5T H A V E S Public Works & Utilities Department FACILITIES & WWTP PROJECTS MAP Projects Facilities WWTP ¯ *Site specific projects only. Citywide/annual citywide projects not shown. PWP-06 PWP-04 D PWF-07 PWF-01 PWF-16PWF-03 PWF-09PWF-10 PWF-13 - 5PWP-07 PWF-06 PWF-07 PWF-01PWF-09PWF-04 PWF-16PWF-03 PWF-05PWF-10PWP-06PWP-05PWP-04 PWF-23 PWF-11PWF-13PWP-07 PWF-22 PWF-17 PWF-18 PWF-16 PWF-02 PWF-08 PWF-12 PWF-11PWF-23 PWF-05 iii PWF-24 6.A.a Packet Pg. 14 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) TRANSPORTATION 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 1 6.A.a Packet Pg. 15 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) TRANSPORTATION #CFP Project DP 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total PRESERVATION/ MAINTENANCE PWT-01 Annual Street Preservation Program $1,801,800 $855,400 $2,630,000 $2,630,000 $2,630,000 $0 $10,547,200 $0 $10,547,200 PWT-04 Main St Overlay from 6th Ave to 8th Ave $642,020 $0 $0 $0 $0 $0 $642,020 $0 $642,020 PWT-05 Puget Dr @ OVD Signal Upgrades $0 $0 $0 $95,000 $526,000 $0 $621,000 $0 $621,000 PWT-06 Signal Upgrades - 100th Ave @ 238th St SW $0 $0 $0 $175,000 $820,000 $0 $995,000 $0 $995,000 PWT-07 Main St @ 3rd Signal Upgrades $0 $0 $0 $117,000 $406,000 $0 $523,000 $0 $523,000 PWT-61 Olympic View Dr Overlay - 196th / SR-524 to Talbot Rd $484,000 $963,700 $0 $0 $0 $0 $1,447,700 $0 $1,447,700 PWT-68 88th Avenue Overlay and Sidewalk Repair $1,180,000 $0 $0 $0 $0 $0 $1,180,000 $0 $1,180,000 SAFETY/ CAPACITY ANALYSIS PWT-08 228th St SW from Hwy 99 to 95th Pl W Corridor $0 $0 $0 $1,533,000 $2,650,000 $13,900,000 $18,083,000 $0 $18,083,000 PWT-09 Hwy 99 Revitalization & Gateway Project - Stage 2 $15,000 $0 $0 $0 $0 $0 $15,000 $0 $15,000 PWT-10 Hwy 99 Revitalization Project - Stage 3 $1,984,000 $1,683,000 $2,489,000 $10,000,000 $9,607,000 $0 $25,763,000 $0 $25,763,000 PWT-11 Hwy 99 Revitalization Project - Stage 4 $825,000 $1,620,000 $5,000,000 $4,955,000 $13,100,000 $10,000,000 $35,500,000 $0 $35,500,000 PWT-12 Hwy 99 Revitalization Project - Stage 5 $0 $0 $0 $530,000 $1,060,000 $2,090,000 $3,680,000 $46,293,000 $49,973,000 PWT-13 Hwy 99 Revitalization Project - Stage 6 $0 $0 $0 $0 $0 $0 $0 $22,500,000 $22,500,000 PWT-14 Hwy 99 Revitalization Project - Stage 7 $0 $0 $0 $0 $0 $0 $0 $42,900,000 $42,900,000 PWT-15 Hwy 99 Revitalization Project - Stage 8 $0 $0 $0 $0 $0 $0 $0 $37,500,000 $37,500,000 PWT-16 Hwy 99 Revitalization Project - Stage 9 $0 $0 $0 $0 $0 $0 $0 $22,500,000 $22,500,000 PWT-17  196th St SW / 88th Ave W - Intersection Improvements $0 $0 $0 $279,000 $252,000 $835,000 $1,366,000 $0 $1,366,000 2 6.A.a Packet Pg. 16 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) TRANSPORTATION #CFP Project DP 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total PWT-18 Main St @ 9th Ave Intersection Improvements $0 $0 $0 $210,000 $1,157,000 $0 $1,367,000 $0 $1,367,000 PWT-19  76th Ave W @ 220th St SW - Intersection Improvements $198,000 $1,488,500 $2,100,000 $3,370,000 $3,300,000 $0 $10,456,500 $0 $10,456,500 PWT-20 SR-104 Adaptive System - 236th to 226th $67,740 $0 $0 $3,515,000 $0 $0 $3,582,740 $0 $3,582,740 PWT-21  SR-104 @ 100th Ave W Intersection Improvements $0 $0 $0 $200,000 $1,350,000 $2,650,000 $4,200,000 $0 $4,200,000 PWT-22 SR-104 @ 95th Pl W Intersection Improvements $0 $0 $0 $45,000 $242,000 $0 $287,000 $0 $287,000 PWT-23  SR-104 @ 238th St SW Intersection Improvements $0 $0 $0 $241,000 $1,370,000 $0 $1,611,000 $0 $1,611,000 PWT-24  Olympic View Dr @ 76th Ave W Intersection Improvements $0 $0 $0 $0 $0 $0 $0 $1,428,000 $1,428,000 PWT-25 84th Ave W (212th St SW to 238th St SW)$0 $0 $0 $0 $0 $0 $0 $18,672,000 $18,672,000 PWT-26  SR-104 @ 76th Ave W Intersection Improvements $0 $0 $0 $0 $0 $0 $0 $3,630,000 $3,630,000 PWT-27  Olympic View Dr @ 174th St SW Intersection Improvements $0 $0 $0 $0 $0 $0 $0 $758,000 $758,000 PWT-28 175th St SW Slope Repair $0 $0 $0 $1,060,000 $0 $0 $1,060,000 $0 $1,060,000 PWT-59 Traffic Signal Program $30,280 $30,280 $0 $0 $0 $0 $60,560 $0 $60,560 PWT-70 Safety Action Plan $375,000 $0 $0 $0 $0 $0 $375,000 $0 $375,000 NON-MOTORIZED TRANSPORTATION PWT-29 232nd St SW Walkway from 100th Ave to SR-104 $0 $0 $0 $0 $284,000 $1,572,000 $1,856,000 $0 $1,856,000 PWT-30  236th St SW Walkway from Madrona Elem to 97th Ave W $0 $0 $0 $313,000 $1,794,000 $0 $2,107,000 $0 $2,107,000 PWT-31  236th St SW Walkway from Hwy 99 to 76th Ave W $0 $0 $0 $0 $0 $0 $0 $2,054,000 $2,054,000 PWT-32  84th Ave W Walkway from 238th St SW to 234th St SW $100,000 $0 $0 $625,000 $2,550,000 $0 $3,275,000 $0 $3,275,000 PWT-33  80th Ave W Walkway from 212th St SW to 206th St SW $0 $0 $0 $117,000 $127,000 $1,433,000 $1,677,000 $0 $1,677,000 3 6.A.a Packet Pg. 17 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) TRANSPORTATION #CFP Project DP 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total PWT-34  80th Ave W Walkway from 188th St SW to Olympic View Dr $0 $0 $0 $511,000 $1,962,000 $0 $2,473,000 $0 $2,473,000 PWT-35  218th St SW Walkway from 76th Ave W to 84th Ave W $0 $0 $0 $280,000 $1,563,000 $0 $1,843,000 $0 $1,843,000 PWT-36 Walnut St Walkway from 6th Ave S to 7th Ave S $0 $0 $0 $308,000 $0 $0 $308,000 $0 $308,000 PWT-37  216th St SW Walkway from Hwy 99 to 72nd Ave W $0 $0 $0 $233,000 $0 $0 $233,000 $0 $233,000 PWT-39 Citywide Bicycle Improvements Project $10,000 $0 $0 $0 $0 $0 $10,000 $0 $10,000 PWT-40  Maplewood Dr Walkway from Main St to 200th St SW $0 $0 $0 $233,000 $233,000 $2,662,000 $3,128,000 $0 $3,128,000 PWT-41  95th Pl W Walkway from 224th St SW to 220th St SW $0 $0 $0 $139,000 $775,000 $0 $914,000 $0 $914,000 PWT-43  SR-104 & 76th Non-Motorized Transportation Improvements $0 $0 $0 $277,000 $1,389,000 $0 $1,666,000 $0 $1,666,000 PWT-45  SR-104 Walkway HAWK to Pine/Pine from SR- 104 to 9th $0 $0 $0 $0 $0 $3,473,000 $3,473,000 $0 $3,473,000 PWT-46 191st St SW from 80th Ave W to 76th Ave W $0 $0 $0 $0 $0 $0 $0 $762,000 $762,000 PWT-47  104th Ave W / Robinhood Ln from 238th St to 106th Ave W $0 $0 $0 $0 $0 $0 $0 $1,192,000 $1,192,000 PWT-48 80th Ave W from 218th St SW to 220th St SW $0 $0 $0 $0 $0 $0 $0 $365,000 $365,000 PWT-49 84th Ave W from 188th St SW to 186th St SW $0 $0 $0 $0 $0 $0 $0 $369,000 $369,000 PWT-50 238th St SW from Hwy 99 to 76th Ave W $0 $0 $0 $211,000 $1,234,000 $0 $1,445,000 $0 $1,445,000 PWT-55 Elm Way Walkway from 8th Ave. S to 9th Ave. S $5,000 $0 $0 $0 $0 $0 $5,000 $0 $5,000 PWT-60 Pedestrian Safety Program $20,180 $20,180 $0 $0 $0 $0 $40,360 $0 $40,360 PWT-66 4th Avenue Cultural Corridor $0 $0 $0 $1,000,000 $1,000,000 $6,000,000 $8,000,000 $0 $8,000,000 FERRY RELATED PWT-51  Ferry Storage Improvements from Pine St to Dayton St $0 $0 $0 $403,000 $0 $0 $403,000 $0 $403,000 4 6.A.a Packet Pg. 18 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) TRANSPORTATION #CFP Project DP 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total TRAFFIC CALMING PWT-52 Traffic Calming Program $80,650 $80,650 $18,000 $18,000 $18,000 $18,000 $233,300 $270,000 $503,300 TRAFFIC PLANNING PWT-53 ADA Transition Plan (Right-of-Way) Update $0 $0 $0 $440,000 $0 $0 $440,000 $0 $440,000 PWT-54 Transportation Plan Update $35,000 $0 $0 $0 $0 $0 $35,000 $0 $35,000 GREEN STREETS PWT-64  Green Streets 236th St SW - 84th Ave W to Highway 99 $0 $0 $0 $0 $0 $0 $0 $3,710,000 $3,710,000 EXPENSE TOTAL $7,853,670 $6,741,710 $12,237,000 $34,063,000 $51,399,000 $44,633,000 $156,927,380 $204,903,000 $361,830,380 Funding Source 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total Federal Grants $1,351,200 $2,507,500 $4,463,000 $0 $0 $0 $8,321,700 $0 $8,321,700 Fund 112 - Street (Gas Tax & Multi-Modal) $168,595 $0 $0 $0 $0 $0 $168,595 $0 $168,595 Fund 125 - REET $836,465 $295,200 $750,000 $750,000 $750,000 $0 $3,381,665 $0 $3,381,665 Fund 126 - REET $2,037,610 $772,610 $768,000 $1,243,000 $768,000 $18,000 $5,607,220 $270,000 $5,877,220 Fund 421 - Water Utility $212,000 $194,400 $0 $0 $0 $0 $406,400 $0 $406,400 Fund 422 - Stormwater Utility $501,000 $6,500 $0 $0 $0 $0 $507,500 $0 $507,500 Fund 423 - Sewer Utility $236,800 $0 $0 $0 $0 $0 $236,800 $0 $236,800 State Grants $2,486,000 $2,683,000 $2,547,000 $10,000,000 $9,607,000 $0 $27,323,000 $0 $27,323,000 Traffic Impact Fees $24,000 $198,500 $283,500 $0 $0 $0 $506,000 $0 $506,000 Transportation Impact Fees $0 $84,000 $2,295,500 $475,000 $0 $0 $2,854,500 $0 $2,854,500 Unsecured Funding $0 $0 $1,130,000 $21,595,000 $40,274,000 $44,615,000 $107,614,000 $204,633,000 $312,247,000 FUNDING TOTAL $7,853,670 $6,741,710 $12,237,000 $34,063,000 $51,399,000 $44,633,000 $156,927,380 $204,903,000 $361,830,380 5 6.A.a Packet Pg. 19 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) Description Annual pavement preservation program to maintain City streets. $1,800,000 (2025) ANNUAL STREET PRESERVATION PROGRAM PWT-01 *includes prior year expenditures Maintains the City's pavement infrastructure and reduces the need for larger capital investment to rebuild City steets.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $110,000 $110,000 $130,000 $130,000 $130,000 $0 $0Design $1,691,800 $745,400 $2,500,000 $2,500,000 $2,500,000 $0 $0Construction $855,400 $2,630,000Expense Total $2,630,000 $2,630,000 $0$0$1,801,800 $732,500 $295,200 $750,000 $750,000 $750,000 $0 $0Fund 125 - REET $732,500 $377,800 $750,000 $750,000 $750,000 $0 $0Fund 126 - REET $200,000 $182,400 $0 $0 $0 $0 $0Fund 421 - Water Utility $136,800 $0 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $0 $0 $1,130,000 $1,130,000 $1,130,000 $0 $0Unsecured Funding $855,400 $2,630,000Funding Source Total $2,630,000 $2,630,000 $0$0$1,801,800 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 6 6.A.a Packet Pg. 20 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The project will provide a full-width grind and pavement overlay of Main St. from 6th Ave to 8th Ave. This project also includes upgrading all non-compliant ADA pedestrian curb ramps within the project limits, an eastbound bike lane and westbound bike sharrow markings. $1,700,000 MAIN ST OVERLAY FROM 6TH AVE TO 8TH AVE PWT-04 *includes prior year expenditures Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and bike safety on this segment of Main Street.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $642,020 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$642,020 $84,820 $0 $0 $0 $0 $0 $0Fund 125 - REET $557,200 $0 $0 $0 $0 $0 $0Federal Grants $0 $0Funding Source Total $0 $0 $0$0$642,020 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 7 6.A.a Packet Pg. 21 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The project will rebuild the existing traffic signal and remove the signal heads currently on span wire and install standard traffic signal poles with mast arms. Vehicle detention will also be upgraded as part of this project. $621,000 PUGET DR @ OVD SIGNAL UPGRADES PWT-05 *includes prior year expenditures This upgrade will provide safer roadway conditions since the hanging signal heads will be replaced with fixed signal heads on mast arms. The new vehicle detection will guarantee that all vehicles will be detected. Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $95,000 $0 $0 $0Design $0 $0 $0 $0 $526,000 $0 $0Construction $0 $0Expense Total $95,000 $526,000 $0$0$0 $0 $0 $0 $95,000 $526,000 $0 $0Unsecured Funding $0 $0Funding Source Total $95,000 $526,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 8 6.A.a Packet Pg. 22 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install new traffic signal and vehicle detection system. $995,000 SIGNAL UPGRADES - 100TH AVE @ 238TH ST SW PWT-06 *includes prior year expenditures The existing traffic signal is near the end of its anticipated service life.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $175,000 $0 $0 $0Design $0 $0 $0 $0 $820,000 $0 $0Construction $0 $0Expense Total $175,000 $820,000 $0$0$0 $0 $0 $0 $175,000 $820,000 $0 $0Unsecured Funding $0 $0Funding Source Total $175,000 $820,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 9 6.A.a Packet Pg. 23 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install new traffic signal and vehicle detection system. $523,000 MAIN ST @ 3RD SIGNAL UPGRADES PWT-07 *includes prior year expenditures The existing traffic signal is near the end of its anticipated service life.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $117,000 $0 $0 $0Design $0 $0 $0 $0 $406,000 $0 $0Construction $0 $0Expense Total $117,000 $406,000 $0$0$0 $0 $0 $0 $117,000 $406,000 $0 $0Unsecured Funding $0 $0Funding Source Total $117,000 $406,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 10 6.A.a Packet Pg. 24 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Pavement overlay along Olympic View Dr, from 196th St. SW / SR-524 to Talbot Road, along with ADA pedestrian curb ramp upgrades. $1,500,000 OLYMPIC VIEW DR OVERLAY - 196TH / SR- 524 TO TALBOT RD PWT-61 *includes prior year expenditures Improve pavement condition and improve accessibility for pedestrians of all abilities.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $100,000 $15,000 $0 $0 $0 $0 $0Design $384,000 $948,700 $0 $0 $0 $0 $0Construction $963,700 $0Expense Total $0 $0 $0$0$484,000 $484,000 $263,700 $0 $0 $0 $0 $0Fund 126 - REET $0 $700,000 $0 $0 $0 $0 $0Federal Grants $963,700 $0Funding Source Total $0 $0 $0$0$484,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 11 6.A.a Packet Pg. 25 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This project will resurface 88th Ave and improve the existing asphalt sidewalk on the east side of 88th Ave from 196th St SW to 185th Pl SW in the Seaview neighborhood. All City utilities along this section of 88th Ave have been upgraded in recent years and the street is ready to pave. The existing curb is in poor condition and varies in height. The project will install 6” concrete vertical curbs and repave the existing asphalt sidewalk. $1,180,000 88TH AVENUE OVERLAY AND SIDEWALK REPAIR PWT-68 *includes prior year expenditures Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $110,000 $0 $0 $0 $0 $0 $0Design $1,070,000 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$1,180,000 $585,000 $0 $0 $0 $0 $0 $0Fund 126 - REET $495,000 $0 $0 $0 $0 $0 $0Fund 422 - Stormwater Utility $100,000 $0 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $0 $0Funding Source Total $0 $0 $0$0$1,180,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 12 6.A.a Packet Pg. 26 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) SAFETY/ CAPACITY ANALYSIS 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 13 6.A.a Packet Pg. 27 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Widen 228th St. SW from Hwy. 99 to 95th Pl. W to three lanes (with center two-way left turn lane), with curb and gutter, sidewalk, and bike lanes. $18,083,000 228TH ST SW FROM HWY 99 TO 95TH PL W CORRIDOR PWT-08 *includes prior year expenditures This project would improve active transportation safety and traffic flows along this corridor. Community Transit will evaluate the possibility of creating a new east-west bus route along 228th St. SW, if this project moves forward (connecting Edmonds Transit Station to Mountlake Terrace Transit Station). Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $1,533,000 $1,590,000 $0 $0Design $0 $0 $0 $0 $1,060,000 $0 $0Right of Way $0 $0 $0 $0 $0 $13,900,000 $0Construction $0 $0Expense Total $1,533,000 $2,650,000 $0$13,900,000$0 $0 $0 $0 $1,533,000 $2,650,000 $13,900,000 $0Unsecured Funding $0 $0Funding Source Total $1,533,000 $2,650,000 $0$13,900,000$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 14 6.A.a Packet Pg. 28 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description In 2023, the project constructed landscaped center medians on Highway 99 from 244th St. SW to 212th St. SW, a HAWK signal ~ 600’ north of 234th St. SW, and gateway signs on both ends of the corridor. Plant establishment was completed in 2024. The project close-out will be completed in 2025. $9,400,000 HWY 99 REVITALIZATION & GATEWAY PROJECT - STAGE 2 PWT-09 *includes prior year expenditures The conversion of the center two-way left turn lane to a landscaped raised median will improve corridor safety along this Highway of Regional Significance (HRS), with an Average Daily Traffic (ADT) of ~ 35,000 vehicles per day. The new HAWK signal will provide a signalized pedestrian crossing between the existing traffic signals at 238th St and 228th St. Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $15,000 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$15,000 $15,000 $0 $0 $0 $0 $0 $0State Grants $0 $0Funding Source Total $0 $0 $0$0$15,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 15 6.A.a Packet Pg. 29 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The Stage 3 Highway 99 project limits are from 244th St SW to 238th St. SW. The project will provide new sidewalk, landscaped planter strips, street lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility improvements (with potential undergrounding of overhead utility lines). The project will also widen the intersection of Highway 99 and 238th St. SW to provide a second northbound left turn lane widen 238th St. from Highway 99 to 84th Ave. $27,500,000 HWY 99 REVITALIZATION PROJECT - STAGE 3 PWT-10 *includes prior year expenditures Improve aesthetics, safety, and user experience along this segment of the Hwy 99 corridor.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $1,100,000 $799,000 $257,000 $0 $0 $0 $0Design $884,000 $884,000 $2,232,000 $0 $0 $0 $0Right of Way $0 $0 $0 $10,000,000 $9,607,000 $0 $0Construction $1,683,000 $2,489,000Expense Total $10,000,000 $9,607,000 $0$0$1,984,000 $1,984,000 $1,683,000 $2,489,000 $10,000,000 $9,607,000 $0 $0State Grants $0 $0 $0 $0 $0 $0 $0Unsecured Funding $1,683,000 $2,489,000Funding Source Total $10,000,000 $9,607,000 $0$0$1,984,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 16 6.A.a Packet Pg. 30 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The Stage 4 Highway 99 project limits are from 224th St SW to 220th St. SW. The project will provide new sidewalk, landscaped planter strips, street lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility improvements (with potential undergrounding of overhead utility lines). The project will also widen the intersection of Highway 99 and 220th St. SW to provide a second left turn lane for the northbound, southbound, and westbound movements. $37,000,000 HWY 99 REVITALIZATION PROJECT - STAGE 4 PWT-11 *includes prior year expenditures Improve aesthetics, safety, and user experience. In addition, future economic development would be improved.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $825,000 $1,000,000 $1,000,000 $475,000 $0 $0 $0Design $0 $620,000 $4,000,000 $4,480,000 $0 $0 $0Right of Way $0 $0 $0 $0 $13,100,000 $10,000,000 $0Construction $1,620,000 $5,000,000Expense Total $4,955,000 $13,100,000 $0$10,000,000$825,000 $0 $84,000 $2,295,500 $475,000 $0 $0 $0Transportation Impact Fees $338,000 $536,000 $2,646,500 $0 $0 $0 $0Federal Grants $487,000 $1,000,000 $58,000 $0 $0 $0 $0State Grants $0 $0 $0 $4,480,000 $13,100,000 $10,000,000 $0Unsecured Funding $1,620,000 $5,000,000Funding Source Total $4,955,000 $13,100,000 $0$10,000,000$825,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 17 6.A.a Packet Pg. 31 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Along Hwy 99 from 216th St SW to 212th St. SW, the project will add a planter strip on both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. $49,700,000 HWY 99 REVITALIZATION PROJECT - STAGE 5 PWT-12 *includes prior year expenditures Improve aesthetics, safety, and user experience. In addition, future economic development will be improved along the corridor.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $530,000 $1,060,000 $1,590,000 $1,689,000Design $0 $0 $0 $0 $0 $500,000 $4,188,000Right of Way $0 $0 $0 $0 $0 $0 $40,416,000Construction $0 $0Expense Total $530,000 $1,060,000 $46,293,000$2,090,000$0 $0 $0 $0 $530,000 $1,060,000 $2,090,000 $46,293,000Unsecured Funding $0 $0Funding Source Total $530,000 $1,060,000 $46,293,000$2,090,000$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 18 6.A.a Packet Pg. 32 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Along Hwy 99 from 238th St. SW to 234th St. SW, the project will add a planter strip on both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. $22,500,000 HWY 99 REVITALIZATION PROJECT - STAGE 6 PWT-13 *includes prior year expenditures Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $22,500,000Design, ROW, and Construction $0 $0Expense Total $0 $0 $22,500,000$0$0 $0 $0 $0 $0 $0 $0 $22,500,000Unsecured Funding $0 $0Funding Source Total $0 $0 $22,500,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 19 6.A.a Packet Pg. 33 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Along Hwy 99 from 234th St. SW to 228th St. SW, the project will add a planter strip on both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. $42,900,000 HWY 99 REVITALIZATION PROJECT - STAGE 7 PWT-14 *includes prior year expenditures Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $42,900,000Design, ROW, and Construction $0 $0Expense Total $0 $0 $42,900,000$0$0 $0 $0 $0 $0 $0 $0 $42,900,000Unsecured Funding $0 $0Funding Source Total $0 $0 $42,900,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 20 6.A.a Packet Pg. 34 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Along Hwy 99 from 228th St. SW to 224th St. SW, the project will add a planter strip on both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. $37,500,000 HWY 99 REVITALIZATION PROJECT - STAGE 8 PWT-15 *includes prior year expenditures Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $37,500,000Design, ROW, and Construction $0 $0Expense Total $0 $0 $37,500,000$0$0 $0 $0 $0 $0 $0 $0 $37,500,000Unsecured Funding $0 $0Funding Source Total $0 $0 $37,500,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 21 6.A.a Packet Pg. 35 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Along Hwy 99 from approximately 500 feet north of 220th St. SW to 216th St. SW, the project will add a planter strip on both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. $22,500,000 HWY 99 REVITALIZATION PROJECT - STAGE 9 PWT-16 *includes prior year expenditures Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $22,500,000Design, ROW, and Construction $0 $0Expense Total $0 $0 $22,500,000$0$0 $0 $0 $0 $0 $0 $0 $22,500,000Unsecured Funding $0 $0Funding Source Total $0 $0 $22,500,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 22 6.A.a Packet Pg. 36 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install traffic signal at the intersection of 196th St. SW @ 88th Ave. W. The modeling in the 2009 Transportation Plan indicated that restricting northbound and southbound traffic to right-turn-only (prohibiting left-turn and through movements) would also address the deficiency identified at this location through 2025. This is same alternative as one concluded by consultant in 2007 study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The existing LOS is F (below City Standards: LOS D). This project was ranked #6 in the Roadway Project Priority in the 2015 Transportation Plan. $1,366,000 196TH ST SW / 88TH AVE W - INTERSECTION IMPROVEMENTS PWT-17 *includes prior year expenditures Improve traffic flow characteristics and safety at the intersection. The improvement would modify LOS to A, but increase the delay along 196th St. SW.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $279,000 $0 $0 $0Design $0 $0 $0 $0 $252,000 $0 $0Right of Way $0 $0 $0 $0 $0 $835,000 $0Construction $0 $0Expense Total $279,000 $252,000 $0$835,000$0 $0 $0 $0 $279,000 $252,000 $835,000 $0Unsecured Funding $0 $0Funding Source Total $279,000 $252,000 $0$835,000$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 23 6.A.a Packet Pg. 37 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Installation of a traffic signal or mini-roundabout. The project ranked #4 in the Roadway Project Priority of the 2015 Transportation Plan. The preliminary cost estimate for a new traffic signal is $1,290,000. A conceptual cost estimate for a mini- roundabout is $500,000. $1,367,000 MAIN ST @ 9TH AVE INTERSECTION IMPROVEMENTS PWT-18 *includes prior year expenditures The existing intersection is stop-controlled for all approaches and the projected intersection LOS in 2035 is LOS F (below the City’s concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $210,000 $0 $0 $0Design $0 $0 $0 $0 $1,157,000 $0 $0Construction $0 $0Expense Total $210,000 $1,157,000 $0$0$0 $0 $0 $0 $210,000 $1,157,000 $0 $0Unsecured Funding $0 $0Funding Source Total $210,000 $1,157,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 24 6.A.a Packet Pg. 38 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Reconfigure eastbound lanes to a left turn lane and through/ right turn lane. Add eastbound and westbound dedicated left turn lanes with a protected-permitted phase. Provide right turn overlap for westbound movement during southbound left turn phase. Additional improvements include wider sidewalk, bike lanes, street lighting, and various utility improvements (including potential conversion overhead utility lines to underground). ROADWAY PROJECT PRIORITY #1 in 2015 Transportation Plan . $11,000,000 76TH AVE W @ 220TH ST SW - INTERSECTION IMPROVEMENTS PWT-19 *includes prior year expenditures Reduce the intersection delay and improve the LOS. The projected LOS in 2050 would be improved from LOS F to LOS D. Improve active transportation conditions for pedestrians and bicycle riders. Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $198,000 $253,500 $100,000 $0 $0 $0 $0Design $0 $1,235,000 $2,000,000 $0 $0 $0 $0Right of Way $0 $0 $0 $3,370,000 $3,300,000 $0 $0Construction $1,488,500 $2,100,000Expense Total $3,370,000 $3,300,000 $0$0$198,000 $24,000 $198,500 $283,500 $0 $0 $0 $0Traffic Impact Fees $12,000 $12,000 $0 $0 $0 $0 $0Fund 421 - Water Utility $6,000 $6,500 $0 $0 $0 $0 $0Fund 422 - Stormwater Utility $156,000 $1,271,500 $1,816,500 $0 $0 $0 $0Federal Grants $0 $0 $0 $3,370,000 $3,300,000 $0 $0Unsecured Funding $1,488,500 $2,100,000Funding Source Total $3,370,000 $3,300,000 $0$0$198,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 25 6.A.a Packet Pg. 39 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The project will add a traffic signal adaptive system on a 1.25-mile segment of SR104 from 236th St to 226th St. The system will monitor and synchronize the timing of five existing signalized intersections (SR104 @ 236th St, SR104 @ 232nd St, SR104 @ 95th Pl, SR104 @ 100th Ave, SR104 @ 226th St) and improve traffic flows along SR104. $4,000,000 SR-104 ADAPTIVE SYSTEM - 236TH TO 226TH PWT-20 *includes prior year expenditures Improve traffic flows along this regional corridor with a current Average Daily Traffic (ADT) of ~ 25,000 vehicles per day.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $67,740 $0 $0 $0 $0 $0 $0Design $0 $0 $0 $3,515,000 $0 $0 $0Construction $0 $0Expense Total $3,515,000 $0 $0$0$67,740 $58,595 $0 $0 $0 $0 $0 $0Fund 112 - Street (Gas Tax & Multi-Modal) $9,145 $0 $0 $0 $0 $0 $0Fund 125 - REET $0 $0 $0 $475,000 $0 $0 $0Fund 126 - REET $0 $0 $0 $3,040,000 $0 $0 $0Unsecured Funding $0 $0Funding Source Total $3,515,000 $0 $0$0$67,740 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 26 6.A.a Packet Pg. 40 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Implement Westgate Circulation Access Plan, install mid-block pedestrian crossing along 100th Ave. W, improve safety to access the driveways within proximity to the intersection, and re-striping of 100th Ave. W with the potential addition of bike lanes. This project was identified in the SR-104 Completed Streets Corridor Analysis (completed in 2015). $4,200,000 SR-104 @ 100TH AVE W INTERSECTION IMPROVEMENTS PWT-21 *includes prior year expenditures Improve access and safety at the intersection and improve active transportation safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $200,000 $250,000 $0 $0Design $0 $0 $0 $0 $1,100,000 $0 $0Right of Way $0 $0 $0 $0 $0 $2,650,000 $0Construction $0 $0Expense Total $200,000 $1,350,000 $0$2,650,000$0 $0 $0 $0 $200,000 $1,350,000 $2,650,000 $0Unsecured Funding $0 $0Funding Source Total $200,000 $1,350,000 $0$2,650,000$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 27 6.A.a Packet Pg. 41 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Upgrade all ADA Curb Ramps; and add C-Curb for access management. This project was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015). $287,000 SR-104 @ 95TH PL W INTERSECTION IMPROVEMENTS PWT-22 *includes prior year expenditures Improve intersection safety for pedestrians and vehicles.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $45,000 $0 $0 $0Design $0 $0 $0 $0 $242,000 $0 $0Construction $0 $0Expense Total $45,000 $242,000 $0$0$0 $0 $0 $0 $45,000 $242,000 $0 $0Unsecured Funding $0 $0Funding Source Total $45,000 $242,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 28 6.A.a Packet Pg. 42 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install traffic signal. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). $1,611,000 SR-104 @ 238TH ST SW INTERSECTION IMPROVEMENTS PWT-23 *includes prior year expenditures Improve vehicular and pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $241,000 $0 $0 $0Design $0 $0 $0 $0 $1,370,000 $0 $0Construction $0 $0Expense Total $241,000 $1,370,000 $0$0$0 $0 $0 $0 $241,000 $1,370,000 $0 $0Unsecured Funding $0 $0Funding Source Total $241,000 $1,370,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 29 6.A.a Packet Pg. 43 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install traffic signal (the intersection currently stop controlled for all movements). (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #11). $1,428,000 OLYMPIC VIEW DR @ 76TH AVE W INTERSECTION IMPROVEMENTS PWT-24 *includes prior year expenditures The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2035, which is below the City’s concurrency standards (LOS D). The project will improve the Level of Service to LOS B. Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $244,000Design $0 $0 $0 $0 $0 $0 $0Right of Way $0 $0 $0 $0 $0 $0 $1,184,000Construction $0 $0Expense Total $0 $0 $1,428,000$0$0 $0 $0 $0 $0 $0 $0 $1,428,000Unsecured Funding $0 $0Funding Source Total $0 $0 $1,428,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 30 6.A.a Packet Pg. 44 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Widen 84th Ave. W to (3) lanes with curb, gutter, bike lanes, and sidewalk on each side of the street. (part of this project was ranked #6 in the Long Walkway list of the 2015 Transportation Plan). $18,672,000 84TH AVE W (212TH ST SW TO 238TH ST SW) PWT-25 *includes prior year expenditures Improve traffic flow, access and active transportation uses by installing a center two way left turn lane, sidewalks, bike lanes and street lighting.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $2,380,000Design $0 $0 $0 $0 $0 $0 $0Right of Way $0 $0 $0 $0 $0 $0 $16,292,000Construction $0 $0Expense Total $0 $0 $18,672,000$0$0 $0 $0 $0 $0 $0 $0 $18,672,000Unsecured Funding $0 $0Funding Source Total $0 $0 $18,672,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 31 6.A.a Packet Pg. 45 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Add a second westbound left turn lane along SR-104. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). $3,630,000 SR-104 @ 76TH AVE W INTERSECTION IMPROVEMENTS PWT-26 *includes prior year expenditures Improve access, safety and delay at the intersection.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $541,000Design $0 $0 $0 $0 $0 $0 $0Right of Way $0 $0 $0 $0 $0 $0 $3,089,000Construction $0 $0Expense Total $0 $0 $3,630,000$0$0 $0 $0 $0 $0 $0 $0 $3,630,000Unsecured Funding $0 $0Funding Source Total $0 $0 $3,630,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 32 6.A.a Packet Pg. 46 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Widen Olympic View Dr. to add a northbound left turn lane for 50’ storage length. Shift the northbound lanes to the east to provide an acceleration lane for eastbound left turns. Install traffic signal to increase the LOS and reduce intersection delay. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #13) $758,000 OLYMPIC VIEW DR @ 174TH ST SW INTERSECTION IMPROVEMENTS PWT-27 *includes prior year expenditures Improve intersection efficiency and safety of drivers accessing either street.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $127,000Design $0 $0 $0 $0 $0 $0 $0Right of Way $0 $0 $0 $0 $0 $0 $631,000Construction $0 $0Expense Total $0 $0 $758,000$0$0 $0 $0 $0 $0 $0 $0 $758,000Unsecured Funding $0 $0Funding Source Total $0 $0 $758,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 33 6.A.a Packet Pg. 47 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The project will stabilize the roadway subgrade and embankment and rebuild the damaged pavement on 175th St. SW. $1,060,000 175TH ST SW SLOPE REPAIR PWT-28 *includes prior year expenditures Repair roadway and stabilize slope embankment.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $0Design $0 $0 $0 $0 $0 $0 $0Right of Way $0 $0 $0 $1,060,000 $0 $0 $0Construction $0 $0Expense Total $1,060,000 $0 $0$0$0 $0 $0 $0 $1,060,000 $0 $0 $0Unsecured Funding $0 $0Funding Source Total $1,060,000 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 34 6.A.a Packet Pg. 48 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This program started in 2019 and will provide new signal upgrades, such as vehicle detection at intersections, new vehicle/pedestrian head equipment and other signal- related upgrades. These improvements will improve the safety of the City’s transportation system. $30,280 TRAFFIC SIGNAL PROGRAM PWT-59 *includes prior year expenditures Improve reliability of traffic signal operation.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $1,000 $1,000 $0 $0 $0 $0 $0Design $29,280 $29,280 $0 $0 $0 $0 $0Construction $30,280 $0Expense Total $0 $0 $0$0$30,280 $30,280 $30,280 $0 $0 $0 $0 $0Fund 126 - REET $30,280 $0Funding Source Total $0 $0 $0$0$30,280 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 35 6.A.a Packet Pg. 49 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description A comprehensive safety plan aimed at reducing and eliminating serious-injury and fatal crashes affecting all roadway users. In order to qualify for future Infrastructure Implementation Grant or Planning / Demonstration Grant (through Safe Streets for All / SS4A0, the projec needs to be identified in this plan. $375,000 SAFETY ACTION PLAN PWT-70 *includes prior year expenditures Complete this document so safety projects for all modes of transportation can be completed (by securing future grants).Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $375,000 $0 $0 $0 $0 $0 $0Design $0 $0Expense Total $0 $0 $0$0$375,000 $300,000 $0 $0 $0 $0 $0 $0Federal Grants $75,000 $0 $0 $0 $0 $0 $0Fund 112 - Street (Gas Tax & Multi-Modal) $0 $0Funding Source Total $0 $0 $0$0$375,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 36 6.A.a Packet Pg. 50 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) NON-MOTORIZED TRANSPORTATION 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 37 6.A.a Packet Pg. 51 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk along 232nd St. SW from 100th Ave. W to SR-104. This project ranked #3 in the Long Walkway List of 2015 Transportation Plan. $1,856,000 232ND ST SW WALKWAY FROM 100TH AVE TO SR-104 PWT-29 *includes prior year expenditures This project would improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $284,000 $0 $0Design $0 $0 $0 $0 $0 $1,572,000 $0Construction $0 $0Expense Total $0 $284,000 $0$1,572,000$0 $0 $0 $0 $0 $284,000 $1,572,000 $0Unsecured Funding $0 $0Funding Source Total $0 $284,000 $0$1,572,000$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 38 6.A.a Packet Pg. 52 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk with curb and gutter along 236nd St. SW from Madrona Elementary to 97th Ave. W. This project ranked #4 in Long Walkway list of the 2015 Transportation Plan. $2,107,000 236TH ST SW WALKWAY FROM MADRONA ELEM TO 97TH AVE W PWT-30 *includes prior year expenditures This project would improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $313,000 $0 $0 $0Design $0 $0 $0 $0 $1,794,000 $0 $0Construction $0 $0Expense Total $313,000 $1,794,000 $0$0$0 $0 $0 $0 $313,000 $1,794,000 $0 $0Unsecured Funding $0 $0Funding Source Total $313,000 $1,794,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 39 6.A.a Packet Pg. 53 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk along 236th St. SW from Hwy 99 to 76th Ave. W. This project ranked #10 in Long Walkway List of the 2015 Transportation Plan. $2,054,000 236TH ST SW WALKWAY FROM HWY 99 TO 76TH AVE W PWT-31 *includes prior year expenditures This project would improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $293,000Design $0 $0 $0 $0 $0 $0 $0Right of Way $0 $0 $0 $0 $0 $0 $1,761,000Construction $0 $0Expense Total $0 $0 $2,054,000$0$0 $0 $0 $0 $0 $0 $0 $2,054,000Unsecured Funding $0 $0Funding Source Total $0 $0 $2,054,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 40 6.A.a Packet Pg. 54 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The walkway project proposed approximately 1,000 LF of new sidewalk on the east side of 84th Ave W with ADA compliant pedestrian curb ramps. $3,325,000 84TH AVE W WALKWAY FROM 238TH ST SW TO 234TH ST SW PWT-32 *includes prior year expenditures This project would improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $100,000 $0 $0 $296,000 $0 $0 $0Design $0 $0 $0 $329,000 $0 $0 $0ROW $0 $0 $0 $0 $2,550,000 $0 $0Construction $0 $0Expense Total $625,000 $2,550,000 $0$0$100,000 $100,000 $0 $0 $0 $0 $0 $0Fund 126 - REET $0 $0 $0 $625,000 $2,550,000 $0 $0Unsecured Funding $0 $0Funding Source Total $625,000 $2,550,000 $0$0$100,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 41 6.A.a Packet Pg. 55 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk along 80th Ave. W from 206th St. SW to 212th St. SW with curb and gutter. This project ranked #1 in Long Walkway List of the 2015 Transportation Plan. $1,677,000 80TH AVE W WALKWAY FROM 212TH ST SW TO 206TH ST SW PWT-33 *includes prior year expenditures The improvements will improve active transportation safety (including for school kids due to proximity of several schools).Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $117,000 $127,000 $0 $0Design $0 $0 $0 $0 $0 $1,433,000 $0Construction $0 $0Expense Total $117,000 $127,000 $0$1,433,000$0 $0 $0 $0 $117,000 $127,000 $1,433,000 $0Unsecured Funding $0 $0Funding Source Total $117,000 $127,000 $0$1,433,000$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 42 6.A.a Packet Pg. 56 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk along 80th Ave. W from 188th St. SW to OVD. This project ranked #13 in Long Walkway List of the 2015 Transportation Plan. $2,473,000 80TH AVE W WALKWAY FROM 188TH ST SW TO OLYMPIC VIEW DR PWT-34 *includes prior year expenditures This project would improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $511,000 $0 $0 $0Design $0 $0 $0 $0 $1,962,000 $0 $0Construction $0 $0Expense Total $511,000 $1,962,000 $0$0$0 $0 $0 $0 $511,000 $1,962,000 $0 $0Unsecured Funding $0 $0Funding Source Total $511,000 $1,962,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 43 6.A.a Packet Pg. 57 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk along 218th St. SW from 76th Ave. W to 84th Ave. W with curb and gutter. This project ranked #2 in Long Walkway List of the 2015 Transportation Plan. $1,843,000 218TH ST SW WALKWAY FROM 76TH AVE W TO 84TH AVE W PWT-35 *includes prior year expenditures The improvements will improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $280,000 $0 $0 $0Design $0 $0 $0 $0 $1,563,000 $0 $0Construction $0 $0Expense Total $280,000 $1,563,000 $0$0$0 $0 $0 $0 $280,000 $1,563,000 $0 $0Unsecured Funding $0 $0Funding Source Total $280,000 $1,563,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 44 6.A.a Packet Pg. 58 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk on the south side of Walnut St. from 6th Ave. S to 7th Ave. S. This project is ranked #9 in the Short Walkway List (from 2015 Transportation Plan). $308,000 WALNUT ST WALKWAY FROM 6TH AVE S TO 7TH AVE S PWT-36 *includes prior year expenditures This project will improve pedestrian safety along this stretch.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $53,000 $0 $0 $0Design $0 $0 $0 $255,000 $0 $0 $0Construction $0 $0Expense Total $308,000 $0 $0$0$0 $0 $0 $0 $308,000 $0 $0 $0Unsecured Funding $0 $0Funding Source Total $308,000 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 45 6.A.a Packet Pg. 59 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install 150’ sidewalk on north side of 216th St. SW from Hwy. 99 to 72nd Ave. W (completing a missing link on north side of 216th St. SW). This project is ranked #3 in the Short Walkway List (from 2015 Transportation Plan). $233,000 216TH ST SW WALKWAY FROM HWY 99 TO 72ND AVE W PWT-37 *includes prior year expenditures To provide a safe and desirable walking route.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $35,000 $0 $0 $0Design $0 $0 $0 $198,000 $0 $0 $0Construction $0 $0Expense Total $233,000 $0 $0$0$0 $0 $0 $0 $233,000 $0 $0 $0Unsecured Funding $0 $0Funding Source Total $233,000 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 46 6.A.a Packet Pg. 60 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The project will add bike lanes or sharrows on the following streets: • 100th Ave/9th Ave from 244th St to Walnut St • Walnut/Bowdoin Way from 9th Ave to 84th Ave • 228th St. from 76th Ave to 80th Ave • Bike sharrows on 80th Ave from 228th St. to 220th St. Pedestrian crossing improvements including curb ramps, rectangular rapid flashing beacons (RRFB) and signing will be installed at 100th Ave & 224th St, 9th Ave & Pine St, Bowdoin Way& 96th Ave and Bowdoin Way & Pioneer Way. The project is currently in the construction phase and completion will be subject to available weather in Fall 2023. Staff assumes grant funds will be spent in 2023. Project close-out is scheduled for 2025. $2,800,000 CITYWIDE BICYCLE IMPROVEMENTS PROJECT PWT-39 *includes prior year expenditures This project will create new bike connections to various destination points throughout the City (such as schools, parks, Downtown, Sound Transit Station). Sound Transit awarded the grant to fund improvements that will provide more convenient access so that more people can use Sound Transit services. Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $10,000 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$10,000 $10,000 $0 $0 $0 $0 $0 $0Fund 125 - REET $0 $0Funding Source Total $0 $0 $0$0$10,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 47 6.A.a Packet Pg. 61 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Construct sidewalk on Maplewood Dr. from Main St. to 200th St. SW (~ 2,700’). A sidewalk currently exists on 200th St. SW from Main St. to 76th Ave. W, adjacent to Maplewood Elementary School (rated #18 in the Long Walkway list of the 2015 Transportation Plan). $3,128,000 MAPLEWOOD DR WALKWAY FROM MAIN ST TO 200TH ST SW PWT-40 *includes prior year expenditures Create pedestrian connection between Maplewood Elementary School on 200th St. SW and Main St., by encouraging kids to use non-motorized transportation to walk to / from school. Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $233,000 $233,000 $0 $0Design $0 $0 $0 $0 $0 $2,662,000 $0Construction $0 $0Expense Total $233,000 $233,000 $0$2,662,000$0 $0 $0 $0 $233,000 $233,000 $2,662,000 $0Unsecured Funding $0 $0Funding Source Total $233,000 $233,000 $0$2,662,000$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 48 6.A.a Packet Pg. 62 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk along 95th Pl. W from 224th St. SW to 220th St. SW with curb and gutter. This project ranked #8 in the Long Walkway List of the 2015 Transportation Plan. $914,000 95TH PL W WALKWAY FROM 224TH ST SW TO 220TH ST SW PWT-41 *includes prior year expenditures This project would improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $139,000 $0 $0 $0Design $0 $0 $0 $0 $775,000 $0 $0Construction $0 $0Expense Total $139,000 $775,000 $0$0$0 $0 $0 $0 $139,000 $775,000 $0 $0Unsecured Funding $0 $0Funding Source Total $139,000 $775,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 49 6.A.a Packet Pg. 63 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Extend bike lanes within proximity of the intersection in northbound and southbound directions. Install APS on all corners and new ADA curb ramps. $1,666,000 SR-104 & 76TH NON- MOTORIZED TRANSPORTATION IMPROVEMENTS PWT-43 *includes prior year expenditures Improve active transportation safety along this section of the Interurban Trail and across SR-104.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $277,000 $0 $0 $0Design $0 $0 $0 $0 $1,389,000 $0 $0Construction $0 $0Expense Total $277,000 $1,389,000 $0$0$0 $0 $0 $0 $277,000 $1,389,000 $0 $0Unsecured Funding $0 $0Funding Source Total $277,000 $1,389,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 50 6.A.a Packet Pg. 64 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Installation of sidewalk with ADA curb ramps along SR-104 from the HAWK signal to Pine St and along Pine St from SR-104 to 9th Ave S $3,473,000 SR-104 WALKWAY HAWK TO PINE/PINE FROM SR-104 TO 9TH PWT-45 *includes prior year expenditures This project will improve pedestrian connectivity between the residential areas along 3rd Ave. S to Downtown Edmonds and City Park.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $579,000 $0Design $0 $0 $0 $0 $0 $2,894,000 $0Construction $0 $0Expense Total $0 $0 $0$3,473,000$0 $0 $0 $0 $0 $0 $3,473,000 $0Unsecured Funding $0 $0Funding Source Total $0 $0 $0$3,473,000$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 51 6.A.a Packet Pg. 65 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk along 191th St. SW from 80th Ave. W to 76th Ave., with curb and gutter. This project ranked #8 in Long Walkway List of the 2015 Transportation Plan. $762,000 191ST ST SW FROM 80TH AVE W TO 76TH AVE W PWT-46 *includes prior year expenditures This project would improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $762,000Design, ROW, and Construction $0 $0Expense Total $0 $0 $762,000$0$0 $0 $0 $0 $0 $0 $0 $762,000Unsecured Funding $0 $0Funding Source Total $0 $0 $762,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 52 6.A.a Packet Pg. 66 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk along 104th Ave. W from 238th ST. SW to 106th Ave. W, with curb and gutter. This project ranked #10 in the Long Walkway List of the 2015 Transportation Plan. $1,192,000 104TH AVE W / ROBINHOOD LN FROM 238TH ST TO 106TH AVE W PWT-47 *includes prior year expenditures This project would improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $1,192,000Design, ROW, and Construction $0 $0Expense Total $0 $0 $1,192,000$0$0 $0 $0 $0 $0 $0 $0 $1,192,000Unsecured Funding $0 $0Funding Source Total $0 $0 $1,192,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 53 6.A.a Packet Pg. 67 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk along 80th Ave. W from 218th ST. SW to 220th ST. SW, with curb and gutter. This project ranked #7 in the Short Walkway List of the 2015 Transportation Plan. $365,000 80TH AVE W FROM 218TH ST SW TO 220TH ST SW PWT-48 *includes prior year expenditures This project would improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $365,000Design, ROW, and Construction $0 $0Expense Total $0 $0 $365,000$0$0 $0 $0 $0 $0 $0 $0 $365,000Unsecured Funding $0 $0Funding Source Total $0 $0 $365,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 54 6.A.a Packet Pg. 68 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk along 84th Ave. W from 188th St. SW to 186th St. SW., with curb and gutter. This project ranked #5 in Short Walkway List of the 2015 Transportation Plan. $369,000 84TH AVE W FROM 188TH ST SW TO 186TH ST SW PWT-49 *includes prior year expenditures This project would improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $369,000Design, ROW, and Construction $0 $0Expense Total $0 $0 $369,000$0$0 $0 $0 $0 $0 $0 $0 $369,000Unsecured Funding $0 $0Funding Source Total $0 $0 $369,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 55 6.A.a Packet Pg. 69 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install sidewalk along 238th St. SW from Hwy 99 to 76th Ave. W. This project ranked #10 in Long Walkway List of the 2015 Transportation Plan. $1,445,000 238TH ST SW FROM HWY 99 TO 76TH AVE W PWT-50 *includes prior year expenditures This project would improve pedestrian safety.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $211,000 $0 $0 $0Design $0 $0 $0 $0 $1,234,000 $0 $0Construction $0 $0Expense Total $211,000 $1,234,000 $0$0$0 $0 $0 $0 $211,000 $1,234,000 $0 $0Unsecured Funding $0 $0Funding Source Total $211,000 $1,234,000 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 56 6.A.a Packet Pg. 70 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The walkway project is ranked #6 on the short walkway list from the 2015 Transportation Plan. The project constructed approximately 700 feet of new sidewalk, six pedestrian curb ramps and modify the existing stormwater system on Elm Way between 8th Ave. S and 9th Ave. S. Project close-out in 2025. $1,000,000 ELM WAY WALKWAY FROM 8TH AVE. S TO 9TH AVE. S PWT-55 *includes prior year expenditures The project will improve pedestrian safety and provide a missing link of sidewalk on Elm Way between 8th Ave and 9th Ave.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $5,000 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$5,000 $5,000 $0 $0 $0 $0 $0 $0Fund 126 - REET $0 $0Funding Source Total $0 $0 $0$0$5,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 57 6.A.a Packet Pg. 71 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This program started in 2019 and will provide pedestrian safety improvements, such as additional signage / stripng, flashing LED’s around stop signs, or other improvements. These improvements will improve the safety of the City’s transportation system. $20,180 PEDESTRIAN SAFETY PROGRAM PWT-60 *includes prior year expenditures Improve safety at pedestrian crossings.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $1,000 $1,000 $0 $0 $0 $0 $0Design $19,180 $19,180 $0 $0 $0 $0 $0Construction $20,180 $0Expense Total $0 $0 $0$0$20,180 $20,180 $20,180 $0 $0 $0 $0 $0Fund 126 - REET $20,180 $0Funding Source Total $0 $0 $0$0$20,180 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 58 6.A.a Packet Pg. 72 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Final design of 4th Avenue Cultural Corridor to include site design and construction documents for a safe, pedestrian friendly, and art enhanced corridor in the public right of way which provides a strong visual connection along 4th Avenue N between Main Street and Edmonds Center for the Arts. Interim work on this project since the concept was developed includes a 2015 temporary light artwork “Luminous Forest”, as well as preliminary design development through 2020-21. Funding for this project has not been secured at this time. The 4th Avenue Cultural Corridor Project is managed by the Community Services/Economic Development Department. $9,206,600 4TH AVENUE CULTURAL CORRIDOR PWT-66 *includes prior year expenditures The corridor improvements in the public right of way will encourage pedestrian traffic and provide a strong visual connection between the ECA and downtown retail. Improvements will enhance connectivity as an attractive walking corridor and contribute to the economic vitality in downtown. The project has been supported by the community in the 2014 Community Cultural Plan and in the goals and priorities for the State certified Creative District. This project is supported by the 2022 Parks, Recreation and Open Space (PROS) Plan. Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $1,000,000 $500,000 $0 $0Design $0 $0 $0 $0 $500,000 $0 $0Right of Way $0 $0 $0 $0 $0 $6,000,000 $0Construction $0 $0Expense Total $1,000,000 $1,000,000 $0$6,000,000$0 $0 $0 $0 $1,000,000 $1,000,000 $6,000,000 $0Unsecured Funding $0 $0Funding Source Total $1,000,000 $1,000,000 $0$6,000,000$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 59 6.A.a Packet Pg. 73 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) FERRY RELATED 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 60 6.A.a Packet Pg. 74 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Modify existing lane channelization on SR104 to add vehicle storage for ferry users. $403,000 FERRY STORAGE IMPROVEMENTS FROM PINE ST TO DAYTON ST PWT-51 *includes prior year expenditures Reduce conflicts between ferry storage and access to local driveways.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $61,000 $0 $0 $0Design $0 $0 $0 $342,000 $0 $0 $0Construction $0 $0Expense Total $403,000 $0 $0$0$0 $0 $0 $0 $403,000 $0 $0 $0Unsecured Funding $0 $0Funding Source Total $403,000 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 61 6.A.a Packet Pg. 75 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) TRAFFIC CALMING 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 62 6.A.a Packet Pg. 76 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Install traffic calming devices along selected stretches throughout the City with speeding issues (through completion of detailed evaluation). This ongoing annual program started in 2015 and is included in the City's 6-year Transportation Improvement Program (TIP) and Capital Improvement Program (CIP). $80,650 TRAFFIC CALMING PROGRAM PWT-52 *includes prior year expenditures Reduce vehicle speeds on City streets that qualify under the City's Traffic Calming Policy.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $10,000 $10,000 $1,000 $1,000 $1,000 $1,000 $15,000Design $70,650 $70,650 $17,000 $17,000 $17,000 $17,000 $255,000Construction $80,650 $18,000Expense Total $18,000 $18,000 $270,000$18,000$80,650 $80,650 $80,650 $18,000 $18,000 $18,000 $18,000 $270,000Fund 126 - REET $80,650 $18,000Funding Source Total $18,000 $18,000 $270,000$18,000$80,650 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 63 6.A.a Packet Pg. 77 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) TRAFFIC PLANNING 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 64 6.A.a Packet Pg. 78 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The 2017 Transition Plan completed an ADA evaluation and prioritization of the City’s street right-of-way. This decision package will update the 2017 plan and expand the evaluation to include City Buildings and Parks facilities. The Plan will inventory physical barriers preventing accessibility and develop actions and preliminary cost estimates to address ADA non-compliance. $440,000 ADA TRANSITION PLAN (RIGHT-OF-WAY) UPDATE PWT-53 *includes prior year expenditures Inventories and prioritizes ADA issues in the City right of way, as well as City buildings and parks facilities.Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $440,000 $0 $0 $0Design $0 $0Expense Total $440,000 $0 $0$0$0 $0 $0 $0 $440,000 $0 $0 $0Unsecured Funding $0 $0Funding Source Total $440,000 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 65 6.A.a Packet Pg. 79 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The Transportation Plan serves as the transportation element of the City’s Comprehensive Plan and is being updated in coordination with the 2024 Comprehensive Plan Update. The plan was last updated in 2015. The Transportation Plan Update will be completed in Fall 2024. The funding in 2025 will develop the new multi-modal impact fee and provide staff training on implementing the program on private development projects. $406,000 TRANSPORTATION PLAN UPDATE PWT-54 *includes prior year expenditures Based upon existing and projected future land use and travel patterns, the Transportation Plan describes roadway pedestrian, bicycle and transit infrastructure and services and provides an assessment of existing and projected future transportation needs. The Plan will establish the transportation priorities and guides the development of the six-year Transportation Improvement Program (TIP), Capital Improvement Program (CIP), Capital Facilities Plan (CFP) and introduce Multimodal Level of Service (MMLOS). Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $35,000 $0 $0 $0 $0 $0 $0Planning $0 $0Expense Total $0 $0 $0$0$35,000 $35,000 $0 $0 $0 $0 $0 $0Fund 112 - Street (Gas Tax & Multi-Modal) $0 $0Funding Source Total $0 $0 $0$0$35,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 66 6.A.a Packet Pg. 80 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) GREEN STREETS 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 67 6.A.a Packet Pg. 81 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The City of Edmonds proposes the development of this project to demonstrate how green infrastructure can both address stormwater flows and enhance the streetscapes to benefit the Hwy 99 neighborhood and the downtown core. This project includes the following elements: • Roadway narrowing to reduce traffic speeds and to reduce impervious surface (vehicular capacity retained) •Sidewalks and planting strips added •Bioretention cells collect runoff from the road through curb cuts •Bioretention cells collect runoff directly from sidewalks • Public private partnership potential with Housing Hope and Terrace Place developments. $3,710,000 GREEN STREETS 236TH ST SW - 84TH AVE W TO HIGHWAY 99 PWT-64 *includes prior year expenditures Incorporating green streets into the urban fabric of the City of Edmonds is intended to demonstrate how trees, vegetation, engineered green stormwater solutions, physical and visual narrowing of vehicular lane widths, and shortening pedestrian crossings with curb bulbs help to slow traffic, ameliorate climate change impacts, and reinforce desired land use and transportation patterns on appropriate street rights-of-way. This project is intended to increase the livability of a diverse, growing city. Benefit Estimated Project Cost PUBLIC WORKS - TRANSPORTATION Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $371,000Design $0 $0 $0 $0 $0 $0 $3,339,000Construction $0 $0Expense Total $0 $0 $3,710,000$0$0 $0 $0 $0 $0 $0 $0 $3,710,000Unsecured Funding $0 $0Funding Source Total $0 $0 $3,710,000$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 68 6.A.a Packet Pg. 82 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) WATER 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 69 6.A.a Packet Pg. 83 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) WATER #CFP Project DP 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total PWW-01 Annual Waterline Overlay (2024)$500 $0 $0 $0 $0 $0 $500 $0 $500 PWW-02 2027 Water Comprehensive Plan Update $0 $150,000 $350,000 $0 $0 $0 $500,000 $0 $500,000 PWW-03 Phase 14 Annual Replacement Program (2024) $15,000 $0 $0 $0 $0 $0 $15,000 $0 $15,000 PWW-04 Phase 15 Annual Replacement Program (2025) $3,576,100 $0 $0 $0 $0 $0 $3,576,100 $0 $3,576,100 PWW-05 Phase 16 Annual Replacement Program (2026) $547,000 $3,289,000 $0 $0 $0 $0 $3,836,000 $0 $3,836,000 PWW-06 Phase 17 Annual Replacement Program (2027)$0 $569,000 $3,966,000 $0 $0 $0 $4,535,000 $0 $4,535,000 PWW-07 Phase 18 Annual Replacement Program (2028)$0 $0 $592,000 $4,124,000 $0 $0 $4,716,000 $0 $4,716,000 PWW-08 Phase 19 Annual Replacement Program (2029)$0 $0 $0 $616,000 $4,289,000 $0 $4,905,000 $0 $4,905,000 PWW-10 Phase 20 Annual Replacement Program (2030)$0 $0 $0 $0 $641,000 $4,460,000 $5,101,000 $0 $5,101,000 PWW-11 Yost & Seaview Reservoir Repairs & Upgrades $4,760,000 $3,850,000 $0 $0 $0 $0 $8,610,000 $0 $8,610,000 PWW-20 Phase 21 Annual Replacement Program (2031)$0 $0 $0 $0 $0 $666,000 $666,000 $4,638,000 $5,304,000 EXPENSE TOTAL $8,898,600 $7,858,000 $4,908,000 $4,740,000 $4,930,000 $5,126,000 $36,460,600 $4,638,000 $41,098,600 Funding Source 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total Fund 421 - Water Utility $8,898,600 $7,858,000 $4,908,000 $4,740,000 $4,930,000 $5,126,000 $36,460,600 $4,638,000 $41,098,600 FUNDING TOTAL $8,898,600 $7,858,000 $4,908,000 $4,740,000 $4,930,000 $5,126,000 $36,460,600 $4,638,000 $41,098,600 70 6.A.a Packet Pg. 84 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) Description Road pavement overlays will cover areas of roadways that were excavated and patched in previous years as part of the Waterline Replacement Projects. $295,000 (2024) ANNUAL WATERLINE OVERLAY (2024) PWW-01 *includes prior year expenditures Improve overall pavement condition in locations that were excavated and patched due to the Annual Waterline Replacement Projects.Benefit Estimated Project Cost PUBLIC WORKS - WATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $500 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$500 $500 $0 $0 $0 $0 $0 $0Fund 421 - Water Utility $0 $0Funding Source Total $0 $0 $0$0$500 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 71 6.A.a Packet Pg. 85 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The existing water comprehensive plan was last updated in 2017 and is required to be updated by the State Dept of Health (DOH) every 10 years. This project would be a comprehensive evaluation of the City’s drinking water system, its replacement program and its operations and with include recommendations for improvements or adjustments and recommended priorities for selecting future capital maintenance projects. $500,000 2027 WATER COMPREHENSIVE PLAN UPDATE PWW-02 *includes prior year expenditures Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of breakages and leakage, improve fire flows, and decrease overall day to day maintenance costs. Benefit Estimated Project Cost PUBLIC WORKS - WATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $150,000 $350,000 $0 $0 $0 $0Design $150,000 $350,000Expense Total $0 $0 $0$0$0 $0 $150,000 $350,000 $0 $0 $0 $0Fund 421 - Water Utility $150,000 $350,000Funding Source Total $0 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 72 6.A.a Packet Pg. 86 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Per the approved 2017 Water Comprehensive Plan, the projects will replace/maintain pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase flow or pressure, or more prone to breakage due to its material properties. $4.2 to $9.2 million/year PHASE 14-35 WATER REPLACEMENT PROJECTS (2024-45) PWW-03-09 *includes prior year expenditures Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of breakages and leakage, improve fire flows, and decrease overall day to day maintenance costs. Benefit Estimated Project Cost PUBLIC WORKS - WATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $547,000 $569,000 $592,000 $616,000 $641,000 $666,000 $13,873,000Design $3,666,000 $3,813,000 $3,966,000 $4,124,000 $4,289,000 $4,460,000 $92,891,000Construction $4,382,000 $4,558,000Expense Total $4,740,000 $4,930,000 $106,764,000$5,126,000$4,213,000 $4,213,000 $4,382,000 $4,558,000 $4,740,000 $4,930,000 $5,126,000 $106,764,000Fund 421 - Water Utility $4,382,000 $4,558,000Funding Source Total $4,740,000 $4,930,000 $106,764,000$5,126,000$4,213,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 73 6.A.a Packet Pg. 87 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This work is being done to provide structural upgrades, repair leakages, and upgrades to our two underground potable water storage reservoirs. Preliminary findings completed in early 2023 were used to determine order of magnitude/preliminary costs and next steps for the now planned repairs and upgrades project. The Yost Reservoir report shows that it will need a major structural and seismic retrofit, plus repairs to address leakage from the reservoir. The report for the Seaview Reservoir shows similar issues as the Yost Reservoir, with a less serious leakage issue. $9,659,000 YOST & SEAVIEW RESERVOIR REPAIRS & UPGRADES PWW-11 *includes prior year expenditures Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of leakage, retrofit structures so that they meet current structural codes to improve their resiliency during earthquakes, and decrease overall day to day maintenance costs. Benefit Estimated Project Cost PUBLIC WORKS - WATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $260,000 $0 $0 $0 $0 $0 $0Design $4,500,000 $3,850,000 $0 $0 $0 $0 $0Construction $3,850,000 $0Expense Total $0 $0 $0$0$4,760,000 $4,760,000 $3,850,000 $0 $0 $0 $0 $0Fund 421 - Water Utility $3,850,000 $0Funding Source Total $0 $0 $0$0$4,760,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 74 6.A.a Packet Pg. 88 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) STORMWATER 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 75 6.A.a Packet Pg. 89 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) STORMWATER # CFP Project DP 2025 2026 2027 2028 2029 $2,030 2025-31 Total 2031-45 Grand Total PWD-11 Phase 4 Storm Maintenance Project (2024)$10,000 $0 $0 $0 $0 $0 $10,000 $0 $10,000 PWD-12 Phase 5 Storm Maintenance Project (2025)$1,597,000 $0 $0 $0 $0 $0 $1,597,000 $0 $1,597,000 PWD-13 Phase 6 Storm Maintenance Project (2026)$249,000 $981,000 $0 $0 $0 $0 $1,230,000 $0 $1,230,000 PWD-14 Phase 7 Storm Maintenance Project (2027)$0 $351,000 $1,825,000 $0 $0 $0 $2,176,000 $0 $2,176,000 PWD-15 Phase 8 Storm Maintenance Project (2028)$0 $0 $365,000 $1,898,000 $0 $0 $2,263,000 $0 $2,263,000 PWD-16 Phase 9 Storm Maintenance Project (2029)$0 $0 $0 $380,000 $1,974,000 $0 $2,354,000 $0 $2,354,000 PWD-18 Phase 10 Annual Storm Replacement (2030)$0 $0 $0 $0 $395,000 $2,053,000 $2,448,000 $0 $2,448,000 PWD-19 Annual SD Overlays (2024)$500 $0 $0 $0 $0 $0 $500 $0 $500 PWD-22 7317 Lake Ballinger Way Floodplain Purchase & Structure Removal $256,000 $5,000 $0 $0 $0 $0 $261,000 $0 $261,000 EDMONDS MARSH ESTUARY RESTORATION PWD-01 Edmonds Marsh Water Quality Improvements (phase 1) $321,928 $0 $0 $0 $0 $0 $321,928 $0 $321,928 PWD-05 Edmonds Marsh Water Quality Improvements (phase 2) $386,708 $0 $0 $0 $0 $0 $386,708 $0 $386,708 PWD-24 Edmonds Marsh Estuary Planning Study $89,000 $0 $0 $0 $0 $0 $89,000 $0 $89,000 PERRINVILLE CREEK BASIN PWD-03 Perrinville Creek Flow Management Projects $104,000 $108,000 $112,000 $116,000 $120,000 $125,000 $685,000 $2,641,000 $3,326,000 PWD-04 Lower Perrinville Creek Restoration Project $350,000 $1,520,000 $2,122,500 $0 $0 $0 $3,992,500 $0 $3,992,500 PWD-23 Perrinville Creek Basin Analysis Update $468,343 $0 $0 $0 $0 $0 $468,343 $0 $468,343 STORM DRAINAGE IMPROVEMENT PWD-07 Phase 11 Annual Storm Replacement (2031)$0 $0 $0 $0 $0 $411,000 $411,000 $2,135,000 $2,546,000 76 6.A.a Packet Pg. 90 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) STORMWATER # CFP Project DP 2025 2026 2027 2028 2029 $2,030 2025-31 Total 2031-45 Grand Total COMPLIANCE RELATED PWD-17 Storm and Surface Water Comprehensive Plan $213,000 $0 $0 $0 $0 $0 $213,000 $0 $213,000 ANNUAL TOTAL $4,045,479 $2,965,000 $4,424,500 $2,394,000 $2,489,000 $2,589,000 $18,906,979 $4,776,000 $23,682,979 Funding Source 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total Citizen Cash Donation $25,000 $0 $0 $0 $0 $0 $25,000 $0 $25,000 City of Lynnwood $30,086 $0 $0 $0 $0 $0 $30,086 $0 $30,086 Federal Grants $35,000 $0 $0 $0 $0 $0 $35,000 $0 $35,000 Fund 422 - Stormwater Utility $3,081,476 $1,825,000 $2,832,625 $2,394,000 $2,489,000 $2,589,000 $15,211,101 $4,776,000 $19,987,101 Marsh Preservation Fund $29,000 $0 $0 $0 $0 $0 $29,000 $0 $29,000 Secured Grants $582,417 $0 $0 $0 $0 $0 $582,417 $0 $582,417 Unsecured Grants $262,500 $1,140,000 $1,591,875 $0 $0 $0 $2,994,375 $0 $2,994,375 FUNDING TOTAL $4,045,479 $2,965,000 $4,424,500 $2,394,000 $2,489,000 $2,589,000 $18,906,979 $4,776,000 $23,682,979 77 6.A.a Packet Pg. 91 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) Description Annual storm drain replacement/maintenance projects. Projects propose to replace or rehab storm drain infrastructure in several locations throughout the City. Locations of work identified by City crews and staff via firsthand knowledge or video inspection results. Much of Edmonds stormwater infrastructure is past its useful lifespan and requires routine replacement or repair to preserve the function of the storm drain system. Failure to conduct annual maintenance projects will increase chances of storm drain system failures. $2.0 to $4.4 million/year PHASE 4-25 STORM MAINTENANCE PROJECTS (2025-45) PWD-11-16,18 *includes prior year expenditures Improve system reliability and capacity, decrease breakages, and decrease overall day to day maintenance costs.Benefit Estimated Project Cost PUBLIC WORKS - STORMWATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $337,000 $351,000 $365,000 $380,000 $395,000 $411,000 $8,539,000Design $1,687,000 $1,755,000 $1,825,000 $1,898,000 $1,974,000 $2,053,000 $42,741,000Construction $2,106,000 $2,190,000Expense Total $2,278,000 $2,369,000 $51,280,000$2,464,000$2,024,000 $2,024,000 $2,106,000 $2,190,000 $2,278,000 $2,369,000 $2,464,000 $51,280,000Fund 422 - Stormwater Utility $2,106,000 $2,190,000Funding Source Total $2,278,000 $2,369,000 $51,280,000$2,464,000$2,024,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 78 6.A.a Packet Pg. 92 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Road pavement overlays to cover areas of roadways that were excavated and patched in previous years as part of the Annual Storm Maintenance Projects. $35,000 (2024) ANNUAL SD OVERLAYS (2024) PWD-19 *includes prior year expenditures Improve overall pavement condition in locations that were excavated and patched due to the Annual Storm Replacement Projects.Benefit Estimated Project Cost PUBLIC WORKS - STORMWATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $500 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$500 $500 $0 $0 $0 $0 $0 $0Fund 422 - Stormwater Utility $0 $0Funding Source Total $0 $0 $0$0$500 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 79 6.A.a Packet Pg. 93 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The project purchases an existing single family residential property in 2023 located within the Lake Ballinger flood plain. The City secured a $500,000 Department of Ecology grant to aid in this process. The home is the lowest property on the lake and is badly damaged from previous flooding to the point it is generally uninhabitable. The City intends to remove the home and any pollution generating surfaces from the site in 2024 as part of the initial 2023 purchase. The grant has restrictions that prevent this parcel to be used for public use. After demolition of the structures and impervious surfaces, the planned site use would be for public utility benefit only. Because the City storm drain line for SR-104 cuts through in an easement immediately adjacent to this parcel, the City plans to pursue a future project to split appropriate flows from the City storm drain system and provide water quality treatment to the maximum extent feasible. The future project would provide water quality treatment for a very heavily trafficked highway (SR-104) and would make significant improvement in water quality to Lake Ballinger and its downstream course to Lake Washington via McAleer Creek. $940,000 7317 LAKE BALLINGER WAY FLOODPLAIN PURCHASE & STRUCTURE REMOVAL PWD-22 *includes prior year expenditures Improve the health and water quality of Lake Ballinger by removing hard surfaces and a home that is generally uninhabitable. Project will also provide a future location to treat stormwater runoff from portions SR-104. Benefit Estimated Project Cost PUBLIC WORKS - STORMWATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $43,000 $0 $0 $0 $0 $0 $0Design $213,000 $5,000 $0 $0 $0 $0 $0Construction $5,000 $0Expense Total $0 $0 $0$0$256,000 $256,000 $5,000 $0 $0 $0 $0 $0Fund 422 - Stormwater Utility $5,000 $0Funding Source Total $0 $0 $0$0$256,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 80 6.A.a Packet Pg. 94 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) EDMONDS MARSH ESTUARY RESTORATION 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 81 6.A.a Packet Pg. 95 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The project will be improving water quality of stormwater runoff by replacing existing catch basins along the west side of SR-104 funded via a DOE grant. The catch basins will be replaced with catch basins that include water filter cartridges. Staff proposes this effort in order to provide water quality mitigation for all discharges that directly enter the marsh from these locations. $418,000 EDMONDS MARSH WATER QUALITY IMPROVEMENTS (PHASE 1) PWD-01 *includes prior year expenditures Improve water quality of stormwater discharging into the Edmonds Marsh from the west portions of SR-104 located near the marsh. The improvements will provide better habitat for the return of salmon to the marsh. Benefit Estimated Project Cost PUBLIC WORKS - STORMWATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $321,928 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$321,928 $80,482 $0 $0 $0 $0 $0 $0Fund 422 - Stormwater Utility $241,446 $0 $0 $0 $0 $0 $0Secured Grants $0 $0Funding Source Total $0 $0 $0$0$321,928 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 82 6.A.a Packet Pg. 96 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The project will be improving water quality of stormwater runoff by replacing existing catch basins along the east side of SR-104 via a state funded appropriation. The catch basins will be replaced with catch basins that include water filter cartridges. Staff proposes this effort in order to provide water quality mitigation for all discharges that directly enter the marsh from these locations. $458,000 EDMONDS MARSH WATER QUALITY IMPROVEMENTS (PHASE 2) PWD-05 *includes prior year expenditures Improve water quality of stormwater discharging into the Edmonds Marsh from the west portions of SR-104 located near the marsh. The improvements will provide better habitat for the return of salmon to the marsh. Benefit Estimated Project Cost PUBLIC WORKS - STORMWATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $39,868 $0 $0 $0 $0 $0 $0Design $346,840 $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$386,708 $386,708 $0 $0 $0 $0 $0 $0Fund 422 - Stormwater Utility $0 $0 $0 $0 $0 $0 $0ARPA Funds $0 $0 $0 $0 $0 $0 $0Secured Grants $0 $0 $0 $0 $0 $0 $0Unsecured Grants $0 $0Funding Source Total $0 $0 $0$0$386,708 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 83 6.A.a Packet Pg. 97 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This study will include completing a gap analysis of existin data, hydrologic evaulation, hydraulic modeling, listing restoration alternatives, minimizing the potential for exposure to contamination, listing permits and approvals required for restoration, evaluating project land purchase and restoration funding options, identifying a process that defines community goals for the marsh, and producing scoping documents that list the tasks required to complete the restoration plan. $204,000 EDMONDS MARSH ESTUARY PLANNING STUDY PWD-24 *includes prior year expenditures Aid for future planning of Marsh Restoration.Benefit Estimated Project Cost PUBLIC WORKS - STORMWATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $89,000 $0 $0 $0 $0 $0 $0Design $0 $0Expense Total $0 $0 $0$0$89,000 $35,000 $0 $0 $0 $0 $0 $0Federal Grants $29,000 $0 $0 $0 $0 $0 $0Marsh Preservation Fund $25,000 $0 $0 $0 $0 $0 $0Citizen Cash Donation $0 $0Funding Source Total $0 $0 $0$0$89,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 84 6.A.a Packet Pg. 98 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) PERRINVILLE CREEK BASIN 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 85 6.A.a Packet Pg. 99 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Reducing scouring flows to reduce sediments load in Perrinville Creek was identified in a previous basin report completed in 2015 as a critical element of restoring this creek which has been significantly impacted by urban development. The projects funded by this program are incremental steps toward recovering this stream run as adequate fish habitat. These efforts have become even more critical given recent challenges around the Perrinville Creek outfall area. This program is a fund for implementing projects within the Perrinville Creek basin to reduce scour flows in the creek. It allows staff flexibility to respond to ad-hoc opportunities such as rain garden cluster projects, or ensure matching funds are available for chasing grant applications for flow reductions projects. $100,000 to $229,000 per year PERRINVILLE CREEK FLOW MANAGEMENT PROJECTS PWD-03 *includes prior year expenditures The project will reduce peak flows in Perrinville creek, improve fish passage and decrease creek bed scour during peak flow events.Benefit Estimated Project Cost PUBLIC WORKS - STORMWATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $10,400 $10,800 $11,200 $11,600 $12,000 $12,500 $300,000Design $93,600 $97,200 $100,800 $104,400 $108,000 $112,500 $2,341,000Construction $108,000 $112,000Expense Total $116,000 $120,000 $2,641,000$125,000$104,000 $104,000 $108,000 $112,000 $116,000 $120,000 $125,000 $2,641,000Fund 422 - Stormwater Utility $108,000 $112,000Funding Source Total $116,000 $120,000 $2,641,000$125,000$104,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 86 6.A.a Packet Pg. 100 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The purpose of this project is to improve the environmental health of the creek necessary to support fish habitat, and to restore the storm water capacity. The project consists of the modifications to three structures that currently prevent fish passage and are undersized for the flows on the creek, (1) the culvert at the BNSF track, remove and replace with a fish-friendly culvert or bridge with adequate flow capacity, which will be led and funded by BNSF and the Tulalip Tribes using grant funds, (2) return flow to the creek between the high flow bypass structure and the BNSF culvert by blocking the structure and restoring creek capacity and (3) culvert at Talbot Road, will be removed and replaced with a fish-friendly culvert or bridge that provides adequate fish passage and storm water flow capacity. This project will increase the resiliency of the watershed by building the structures that mimic the natural channel performance necessary for fish habitat and stormwater flow capacity. The project also includes time and effort to research and apply for supplemental/additional funding sources for construction of the Edmonds portions of the work (Items 2 & 3). Due to the project complexity and number of stakeholders, the planning and design phase is estimated to be 2-years. $4,500,000 LOWER PERRINVILLE CREEK RESTORATION PROJECT PWD-04 *includes prior year expenditures The project will reduce City maintenance needs in the future and improve fish passage.Benefit Estimated Project Cost PUBLIC WORKS - STORMWATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $350,000 $450,000 $0 $0 $0 $0 $0Design $0 $1,070,000 $2,122,500 $0 $0 $0 $0Construction $1,520,000 $2,122,500Expense Total $0 $0 $0$0$350,000 $87,500 $380,000 $530,625 $0 $0 $0 $0Fund 422 - Stormwater Utility $262,500 $1,140,000 $1,591,875 $0 $0 $0 $0Unsecured Grants $1,520,000 $2,122,500Funding Source Total $0 $0 $0$0$350,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 87 6.A.a Packet Pg. 101 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description City of Edmonds and Lynnwood joint project to supplement/update the Perrinville Creek 2015 basin analysis that determined possible locations for projects that would help decrease the peak storm flows during high rain events. Project will be updated to reflect projects completed and also determine if there are other locations within the basin to aid in the reduction of peak flows in the basin. $649,200 PERRINVILLE CREEK BASIN ANALYSIS UPDATE PWD-23 *includes prior year expenditures Improve overall basin and stream health, by using green stormwater infrastructure methods. This will make it so that rainfall is not simply collected and conveyed downstream and instead behaves as close as possible to natural conditions. This includes infiltrating rainfall runoff as close as possible to where it fell. This will also decrease stream peak flows, which will decrease stream erosion and improve the overall stream habitat for aquatic life. Benefit Estimated Project Cost PUBLIC WORKS - STORMWATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $468,343 $0 $0 $0 $0 $0 $0Design $0 $0Expense Total $0 $0 $0$0$468,343 $97,286 $0 $0 $0 $0 $0 $0Fund 422 - Stormwater Utility $340,971 $0 $0 $0 $0 $0 $0Secured Grants $30,086 $0 $0 $0 $0 $0 $0City of Lynnwood $0 $0Funding Source Total $0 $0 $0$0$468,343 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 88 6.A.a Packet Pg. 102 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) COMPLIANCE RELATED 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 89 6.A.a Packet Pg. 103 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The City of Edmonds (City) owns and operates an extensive system of drainage pipes, ditches, and other assets to convey stormwater runoff into streams, lakes, and Puget Sound to prevent and minimize damage to private property, streets, and other infrastructure. The City is faced with the challenge of conveying this runoff safely and cost-effectively while preventing or minimizing the adverse impacts of high flows (erosion, flooding, and sediment deposition) and of stormwater pollutants on water quality and aquatic habitat. In addition, recent state and federal stormwater regulations make it technically and financially challenging to address these issues while balancing utility ratepayer costs. To proactively address these challenges and remain in compliance with the State-mandated National Pollutant Discharge Elimination System Western Washington Phase II Municipal Stormwater Permit (NPDES Phase II permit) and other increasing regulatory requirements, the City is updating its current comprehensive storm and surface water management plan. This permit has and will continue to have a significant impact on the workload and operational budget of both the Engineering Division and the Storm Crews within the Public Works Department. Per the State Department of Ecology, the plan will also include the work findings from their required (Stormwater Management Action Plan) SMAP process of City drainage watersheds. Project will also include recommendations for stormwater utilities rates to be adjusted at the discretion of Council. $733,000 STORM AND SURFACE WATER COMPREHENSIVE PLAN PWD-17 *includes prior year expenditures A holistic summary of the City’s Stormwater system with recommended priorities for selecting future capital maintenance and improvements projects.Benefit Estimated Project Cost PUBLIC WORKS - STORMWATER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $213,000 $0 $0 $0 $0 $0 $0Design $0 $0Expense Total $0 $0 $0$0$213,000 $213,000 $0 $0 $0 $0 $0 $0Fund 422 - Stormwater Utility $0 $0Funding Source Total $0 $0 $0$0$213,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 90 6.A.a Packet Pg. 104 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) SEWER 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 91 6.A.a Packet Pg. 105 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) SEWER #CFP Project DP 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total PWS-01 Annual Sanitary Sewer Replacement Overlays (2024)$500 $0 $0 $0 $0 $0 $500 $0 $500 PWS-02 2027 Sanitary Sewer Comprehensive Plan Update $0 $150,000 $350,000 $0 $0 $0 $500,000 $0 $500,000 PWS-03 Phase 11 Sewer Replacement (2024)$10,000 $0 $0 $0 $0 $0 $10,000 $0 $10,000 PWS-04 Phase 12 Sewer Replacement (2025)$2,302,000 $0 $0 $0 $0 $0 $2,302,000 $0 $2,302,000 PWS-05 Phase 13 Sewer Replacement (2026)$378,000 $2,126,000 $0 $0 $0 $0 $2,504,000 $0 $2,504,000 PWS-06 Phase 14 Sewer Replacement (2027)$0 $393,000 $2,210,000 $0 $0 $0 $2,603,000 $0 $2,603,000 PWS-07 Phase 15 Sewer Replacement (2028)$0 $0 $409,000 $2,299,000 $0 $0 $2,708,000 $0 $2,708,000 PWS-08 Phase 16 Sewer Replacement (2029)$0 $0 $0 $425,000 $2,391,000 $0 $2,816,000 $0 $2,816,000 PWS-10 Annual Citywide CIPP Sewer Rehabilitation $0 $0 $587,000 $611,000 $636,000 $662,000 $2,496,000 $13,735,000 $16,231,000 PWS-12 Phase 17 Sewer Replacement (2030)$0 $0 $0 $0 $0 $460,000 $460,000 $2,586,000 $3,046,000 PWS-13 Phase 18 Sewer Replacement (2031)$0 $0 $0 $0 $0 $0 $0 $0 $0 EXPENSE TOTAL $2,690,500 $2,669,000 $3,556,000 $3,335,000 $3,027,000 $1,122,000 $16,399,500 $16,321,000 $32,720,500 Funding Source 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total Fund 423 - Sewer Utility $2,690,500 $2,669,000 $3,556,000 $3,335,000 $3,027,000 $1,122,000 $16,389,500 $16,321,000 $32,710,500 FUNDING TOTAL $2,690,500 $2,669,000 $3,556,000 $3,335,000 $3,027,000 $1,122,000 $16,389,500 $16,321,000 $32,710,500 92 6.A.a Packet Pg. 106 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) Description Road pavement overlays to cover areas of roadways that were excavated and patched in previous years as part of the Sanitary Sewer Replacement Projects. $30,000 ANNUAL SANITARY SEWER REPLACEMENT OVERLAYS (2024) PWS-01 *includes prior year expenditures Improve overall pavement condition in locations that were excavated and patched due to Sanitary Sewer Replacement Projects.Benefit Estimated Project Cost PUBLIC WORKS - SEWER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $500 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$500 $500 $0 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $0 $0Funding Source Total $0 $0 $0$0$500 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 93 6.A.a Packet Pg. 107 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The existing sewer comprehensive plan was last updated in 2013 and is in need of an update. This project would be a comprehensive evaluation of the City’s sewer system, its replacement program and operations, with recommendations for improvements or adjustments and recommended priorities for selecting future capital maintenance projects. $500,000 2027 SANITARY SEWER COMPREHENSIVE PLAN UPDATE PWS-02 *includes prior year expenditures Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs.Benefit Estimated Project Cost PUBLIC WORKS - SEWER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $150,000 $350,000 $0 $0 $0 $0Design $150,000 $350,000Expense Total $0 $0 $0$0$0 $0 $150,000 $350,000 $0 $0 $0 $0Fund 423 - Sewer Utility $150,000 $350,000Funding Source Total $0 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 94 6.A.a Packet Pg. 108 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Per the approved 2013 Sewer Comprehensive Plan, the projects will replace/rehab pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase capacity, or more prone to breakage due to its material properties. $2.7 to $5.3 million/year PHASE 11-30 SEWER REPLACEMENT (2025- 45) PWS-03-09 *includes prior year expenditures Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs.Benefit Estimated Project Cost PUBLIC WORKS - SEWER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $378,000 $393,000 $409,000 $425,000 $442,000 $460,000 $9,568,000Design $2,312,000 $2,126,000 $2,210,000 $2,299,000 $2,391,000 $2,487,000 $51,780,000Construction $2,519,000 $2,619,000Expense Total $2,724,000 $2,833,000 $61,348,000$2,947,000$2,690,000 $2,690,000 $2,519,000 $2,619,000 $2,724,000 $2,833,000 $2,947,000 $61,348,000Fund 423 - Sewer Utility $2,519,000 $2,619,000Funding Source Total $2,724,000 $2,833,000 $61,348,000$2,947,000$2,690,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 95 6.A.a Packet Pg. 109 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Per the approved 2013 Sewer Comprehensive plan and current video inspections of sewer mains, the project will line existing sewer mains that are subject root intrusion, infiltration and inflow, and damage that can be repaired by this trenchless method. 2025 and 2026 funds will be combined with the Annual Sewer Replacement Program. This is because the annual replacement rehab program for these years will be focusing on pipe lining as well thereby requiring only 1 design and 1 construction contract to administer. $587,000 to $662,000/year ANNUAL CITYWIDE CIPP SEWER REHABILITATION PWS-10 *includes prior year expenditures Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs.Benefit Estimated Project Cost PUBLIC WORKS - SEWER Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $88,000 $92,000 $96,000 $100,000 $2,070,000Design $0 $0 $0 $0 $0 $0 $0Right of Way $0 $0 $499,000 $519,000 $540,000 $562,000 $11,665,000Construction $0 $587,000Expense Total $611,000 $636,000 $13,735,000$662,000$0 $0 $0 $587,000 $611,000 $636,000 $662,000 $13,735,000Fund 423 - Sewer Utility $0 $587,000Funding Source Total $611,000 $636,000 $13,735,000$662,000$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 96 6.A.a Packet Pg. 110 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) FACILITIES 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 97 6.A.a Packet Pg. 111 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) FACILITIES #CFP Project DP 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total PWF-01 Boys and Girls Club $27,733 $37,453 $32,077 $15,101 $20,000 $0 $132,364 $0 $132,364 PWF-02 Cemetery Building $8,414 $3,377 $818 $1,000 $5,000 $2,500 $21,109 $0 $21,109 PWF-03 City Hall $25,000 $25,000 $258,628 $150,949 $65,000 $50,000 $574,577 $0 $574,577 PWF-04 Fishing Pier/Beach Ranger Station $2,918 $5,628 $1,043 $1,500 $3,000 $5,000 $19,089 $0 $19,089 PWF-05 Frances Anderson Center $20,000 $30,000 $98,892 $385,274 $113,029 $80,000 $727,195 $0 $727,195 PWF-06 Fire Station 16 $35,000 $40,000 $69,388 $30,107 $31,631 $35,000 $241,126 $0 $241,126 PWF-07 Fire Station 17 $30,000 $25,000 $221,922 $27,575 $122,245 $45,000 $471,742 $0 $471,742 PWF-08 Fire Station 20 $5,000 $5,500 $94,248 $69,782 $23,765 $20,000 $218,295 $0 $218,295 PWF-09 Historic Log Cabin $1,000 $30,000 $6,469 $1,500 $2,000 $1,500 $42,469 $0 $42,469 PWF-10 Historical Museum $3,000 $45,000 $10,000 $4,621 $10,199 $5,000 $77,820 $0 $77,820 PWF-11 Library $160,000 $100,000 $53,325 $45,038 $35,000 $25,000 $418,363 $0 $418,363 PWF-12 Meadowdale Club House $7,985 $4,446 $1,159 $5,000 $5,000 $5,000 $28,590 $0 $28,590 PWF-13 Old Public Works $25,000 $25,000 $25,000 $25,000 $24,519 $25,000 $149,519 $0 $149,519 PWF-14 Parks Maintenance Building $9,349 $5,177 $69,228 $20,000 $10,000 $10,000 $123,754 $0 $123,754 PWF-15 Public Safety $50,000 $10,000 $55,169 $151,481 $515,071 $80,000 $861,721 $0 $861,721 PWF-16 Public Works O&M $524,000 $1,017,000 $80,315 $79,348 $43,821 $50,000 $1,794,484 $0 $1,794,484 PWF-17 Wade James Theater $3,000 $45,000 $43,880 $115,734 $21,872 $25,000 $254,486 $0 $254,486 PWF-18 Yost Pool House $5,000 $8,409 $19,127 $30,389 $30,000 $25,000 $117,925 $0 $117,925 PWF-23 Library Plaza Deck Waterproofing Project $0 $0 $0 $0 $0 $4,900,000 $4,900,000 $0 $4,900,000 EXPENSE TOTAL $942,399 $1,461,990 $1,140,688 $1,159,399 $1,081,152 $5,389,000 $11,174,628 $0 $11,174,628 98 6.A.a Packet Pg. 112 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) FACILITIES Funding Source 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total Fund 016 (2021 Facilities Bond)$450,000 $350,000 $0 $0 $0 $0 $800,000 $0 $800,000 Fund 016 (non-bond)$93,399 $134,813 $151,159 $70,949 $0 $0 $450,320 $0 $450,320 Fund 421 - Water Utility $133,000 $324,000 $0 $0 $0 $0 $457,000 $0 $457,000 Fund 422 - Stormwater Utility $133,000 $324,000 $0 $0 $0 $0 $457,000 $0 $457,000 Fund 423 - Sewer Utility $133,000 $324,000 $0 $0 $0 $0 $457,000 $0 $457,000 Unsecured Funding $0 $5,177 $989,529 $1,088,450 $1,081,152 $5,389,000 $8,553,308 $0 $8,553,308 FUNDING TOTAL $942,399 $1,461,990 $1,140,688 $1,159,399 $1,081,152 $5,389,000 $11,174,628 $0 $11,174,628 99 6.A.a Packet Pg. 113 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) Description This building built in 1900 was the original field house for Edmonds High School. The property is located at Civic Field and not part of the large Civic Field Park restoration project. The building is solely operated by the Snohomish County Boys and Girls Club in partnership with the City’s Parks and Recreation department. The building has sustained some interior settling that will require immediate repair to back hallway floors and the back stairway. It has significant need for major renovations if it is expected to be in operation for another 10 years. Renovation and deferred maintenance may eclipse the building value in its current location. Floor stabilization work was completed, and building is now on a run to fail model waiting replacement of building through a private public partnership. Building will be maintained in operational readiness to support the Boys and Girls Club, until their new building is constructed. Projects: Exterior plumbing access, Window replacement, Roof replacement, Siding replacement, ADA Access, Plumbing replacement, Front entry door replacement, Fire Alarm System new installation, Fire Sprinkler updates, Baseboard heating replacement If the Boys and Girls Club builds a new facility in the future, then maintenance funding programmed for the building will be adjusted to align with the project schedule. $27,733 (2025) BOYS AND GIRLS CLUB PWF-01 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $27,733 $37,453 $32,077 $15,101 $20,000 $0 $0Construction\Professional Services $37,453 $32,077Expense Total $15,101 $20,000 $0$0$27,733 $27,733 $37,453 $0 $0 $0 $0 $0Fund 016 (non-bond) $0 $0 $32,077 $15,101 $20,000 $0 $0Unsecured Funding $37,453 $32,077Funding Source Total $15,101 $20,000 $0$0$27,733 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 100 6.A.a Packet Pg. 114 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This small structure houses the Edmonds Cemetery funerary services and the cemetery Sextant office. The building is in relatively good condition and has little deferred maintenance backlog. Minor security and communications updates will be needed as technology dictates. Projects: Minor repair and maintenance $8,414 (2025) CEMETERY BUILDING PWF-02 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $8,414 $3,377 $818 $1,000 $5,000 $2,500 $0Construction\Professional Services $3,377 $818Expense Total $1,000 $5,000 $0$2,500$8,414 $8,414 $3,377 $0 $0 $0 $0 $0Fund 016 (non-bond) $0 $0 $818 $1,000 $5,000 $2,500 $0Unsecured Funding $3,377 $818Funding Source Total $1,000 $5,000 $0$2,500$8,414 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 101 6.A.a Packet Pg. 115 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description City Hall was built in 1979 and was operated as a private business office center until the City purchased and renovated the building in the 1990s. The City has operated Edmonds City Hall from this location since the renovations were completed. The building is in near original condition and needs substantial repair and maintenance. Projects: All Mechanical, Electrical and Plumbing systems need replacement, Restroom remodels w/gender neutral consideration, Center Stairway Code updates and replacement, Lobby remodel, Entry Awning re-glazing, Interior Painting, ADA accessibility improvements. $25,000 (2025) CITY HALL PWF-03 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $25,000 $25,000 $258,628 $150,949 $65,000 $50,000 $0Construction\Professional Services $25,000 $258,628Expense Total $150,949 $65,000 $0$50,000$25,000 $25,000 $25,000 $0 $0 $0 $0 $0Fund 016 (2021 Facilities Bond) $0 $0 $150,000 $70,949 $0 $0 $0Fund 016 (non-bond) $0 $0 $108,628 $80,000 $65,000 $50,000 $0Unsecured Funding $25,000 $258,628Funding Source Total $150,949 $65,000 $0$50,000$25,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 102 6.A.a Packet Pg. 116 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The Pier was recently renovated and is generally in good condition. The Beach Ranger Office is a 1200 square foot office and restroom facility located near the east end of the pier. There are season programs and visitor support functions that operate out of this facility. Projects: Electrical panel clean up and safety inspection, minor repairs, and maintenance, Beach Ranger Station/restroom roof replacement. $2,971 (2025) FISHING PIER/BEACH RANGER STATION PWF-04 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $2,918 $5,628 $1,043 $1,500 $3,000 $5,000 $0Construction\Professional Services $5,628 $1,043Expense Total $1,500 $3,000 $0$5,000$2,918 $2,918 $5,628 $0 $0 $0 $0 $0Fund 016 (non-bond) $0 $0 $1,043 $1,500 $3,000 $5,000 $0Unsecured Funding $5,628 $1,043Funding Source Total $1,500 $3,000 $0$5,000$2,918 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 103 6.A.a Packet Pg. 117 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The Frances Anderson Center serves as the City’s main recreation center offering arts, athletic and cultural programing year round. Due to the age and high usage of the building there are many building systems that are in need of replacement or restoration. Projects: Replacement of Heating Boilers with Electric alternatives that will add ventilation, cooling and heating Investment grade audit approved by City Council, Replacement of all exterior doors scheduled for 2024/25, ADA accessible door closures, Plumbing drainage collector, Restroom remodels (w/ gender neutral consideration), Replacement of all plumbing fixtures, Addition of building security card readers, Building HVAC controls to maximize efficiency, Fire Sprinkler replacement, and clean building act compliance efforts will be addresses by IGA.) $20,000 (2025) FRANCES ANDERSON CENTER PWF-05 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $20,000 $30,000 $98,892 $385,274 $113,029 $80,000 $0Construction\Professional Services $30,000 $98,892Expense Total $385,274 $113,029 $0$80,000$20,000 $20,000 $30,000 $0 $0 $0 $0 $0Fund 016 (2021 Facilities Bond) $0 $0 $98,892 $385,274 $113,029 $80,000 $0Unsecured Funding $30,000 $98,892Funding Source Total $385,274 $113,029 $0$80,000$20,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 104 6.A.a Packet Pg. 118 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This facility is operated by South Snohomish County Fire and Rescue and was built in 2003 and has a building area of 10,700 square feet. The building is in fair condition and will require some infrastructure updates or replacements to remain operationally ready for the needs of the City. Projects: Roll-up Bay door controller replacements, HVAC unit assessment, Gutter replacement, interior coatings updates. $35000 (2025) FIRE STATION 16 PWF-06 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $35,000 $40,000 $69,388 $30,107 $31,631 $35,000 $0Construction\Professional Services $40,000 $69,388Expense Total $30,107 $31,631 $0$35,000$35,000 $35,000 $40,000 $0 $0 $0 $0 $0Fund 016 (2021 Facilities Bond) $0 $0 $69,388 $30,107 $31,631 $35,000 $0Unsecured Funding $40,000 $69,388Funding Source Total $30,107 $31,631 $0$35,000$35,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 105 6.A.a Packet Pg. 119 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This building is operated by South Snohomish County Fire and Rescue, was built in 1999 and has a building area of 9,800 square feet. This building has had some updates but will need some infrastructure upgrades to remain operationally ready. Projects: Bay Door assessment, Electrical infrastructure updates, roof soffit enclosure, interior painting. $30,000 (2025) FIRE STATION 17 PWF-07 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $30,000 $25,000 $221,922 $27,575 $122,245 $45,000 $0Construction\Professional Services $25,000 $221,922Expense Total $27,575 $122,245 $0$45,000$30,000 $30,000 $25,000 $0 $0 $0 $0 $0Fund 016 (2021 Facilities Bond) $0 $0 $221,922 $27,575 $122,245 $45,000 $0Unsecured Funding $25,000 $221,922Funding Source Total $27,575 $122,245 $0$45,000$30,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 106 6.A.a Packet Pg. 120 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This building is the eldest of the City's three fire stations and is operated by South County Fire and Rescue. This station serves Esperance and supports the other two fire stations in Edmonds. The building is 6400 square feet and was built in 1990. The building has had significant updates to the exterior envelope and is in need of interior and HVAC system updates. Projects: interior painting, restroom fixture replacement $5000 (2025) FIRE STATION 20 PWF-08 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $5,000 $5,500 $94,248 $69,782 $23,765 $20,000 $0Construction\Professional Services $5,500 $94,248Expense Total $69,782 $23,765 $0$20,000$5,000 $5,000 $5,500 $0 $0 $0 $0 $0Fund 016 (non-bond) $0 $0 $94,248 $69,782 $23,765 $20,000 $0Unsecured Funding $5,500 $94,248Funding Source Total $69,782 $23,765 $0$20,000$5,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 107 6.A.a Packet Pg. 121 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This Historic log cabin is home to the Edmonds Chamber of Commerce visitor center, the structure was a purpose built cabin from the turn of the century. The structure is professionally maintained on a three year cycle by a log cabin specialist and requires only minor maintenance and upkeep annually. Projects: new thick cut shingle replacement, chinking of exterior log finish, interior lighting. $1000 (2025) HISTORIC LOG CABIN PWF-09 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $1,000 $30,000 $6,469 $1,500 $2,000 $1,500 $0Construction\Professional Services $30,000 $6,469Expense Total $1,500 $2,000 $0$1,500$1,000 $0 $30,000 $0 $0 $0 $0 $0Fund 016 (2021 Facilities Bond) $1,000 $0 $0 $0 $0 $0 $0Fund 016 (non-bond) $0 $0 $6,469 $1,500 $2,000 $1,500 $0Unsecured Funding $30,000 $6,469Funding Source Total $1,500 $2,000 $0$1,500$1,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 108 6.A.a Packet Pg. 122 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The 110-year-old original Carnegie Library building is home to the Edmonds Museum. The building is on the State of Washington Historic registry and has been well maintained over the last several years. Buildings of this age require specialized maintenance and coordination with the state historic architect to maintain the historic status. Structural stabilization, weatherproofing, and updating the restroom to meet ADA compliance are the most significant priorities to maintain this facility. Projects: minor structural reinforcement, entry façade masonry repair, lower entry restoration $3000 (2025) HISTORICAL MUSEUM PWF-10 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $3,000 $45,000 $10,000 $4,621 $10,199 $5,000 $0Construction\Professional Services $45,000 $10,000Expense Total $4,621 $10,199 $0$5,000$3,000 $0 $45,000 $0 $0 $0 $0 $0Fund 016 (2021 Facilities Bond) $3,000 $0 $0 $0 $0 $0 $0Fund 016 (non-bond) $0 $0 $10,000 $4,621 $10,199 $5,000 $0Unsecured Funding $45,000 $10,000Funding Source Total $4,621 $10,199 $0$5,000$3,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 109 6.A.a Packet Pg. 123 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The Edmonds Library is operated by the Sno-Isle Library system with exception of the Second floor Plaza room rental space. The library is a 19,000 square foot building built in 1982. The building hosts special event rentals and daily Library programming and community services. This is one of the City’s most heavily used buildings by the public and has significant deferred maintenance needs, including the building façade, roof and plaza deck waterproofing. Projects: window replacement, ADA access device upgrades or replacement, gender inclusive public restroom creation, Plaza Room restroom/changing facilities, Plaza Room A/V installation, building masonry restoration or building cladding, exterior stairway restoration, HVAC ventilation fan assessment, building breezeway remodel, flood damage restoration, and plaza level green roof now on CIP. $160,000 (2025) LIBRARY PWF-11 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $160,000 $100,000 $53,325 $45,038 $35,000 $25,000 $0Construction\Professional Services $100,000 $53,325Expense Total $45,038 $35,000 $0$25,000$160,000 $160,000 $100,000 $0 $0 $0 $0 $0Fund 016 (2021 Facilities Bond) $0 $0 $53,325 $45,038 $35,000 $25,000 $0Unsecured Funding $100,000 $53,325Funding Source Total $45,038 $35,000 $0$25,000$160,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 110 6.A.a Packet Pg. 124 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This 4000 square foot facility was built in 1965 as a community theater facility and later was transformed into the Meadowdale community club house. The building is currently owned and maintained by the City of Edmonds and houses the City operated Meadowdale pre-school and the 1500 square foot Meadowdale club house rental facility. This facility while dated has been well maintained and only requires minor maintenance and repairs. Projects: minor maintenance and repairs, interior flooring and painting, and bath fixture replacement. $7,985 (2025) MEADOWDALE CLUB HOUSE PWF-12 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $7,985 $4,446 $1,159 $5,000 $5,000 $5,000 $0Construction\Professional Services $4,446 $1,159Expense Total $5,000 $5,000 $0$5,000$7,985 $7,985 $4,446 $1,159 $0 $0 $0 $0Fund 016 (non-bond) $0 $0 $0 $5,000 $5,000 $5,000 $0Unsecured Funding $4,446 $1,159Funding Source Total $5,000 $5,000 $0$5,000$7,985 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 111 6.A.a Packet Pg. 125 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This facility was built in 1965 to house the City’s Public Works Department, the building was converted in 1995 to tenant space and City storage, as well as Edmonds Police large evidence storage. This is a vital piece of property adjacent to the Waste Water Treatment Plant, and could be converted for utility use if regulatory requirements dictate. Building is primarily used as storage and will need some updates to maintain current operational readiness. Projects: HVAC updates, roll-up door replacement, security camera system. $25000 (2025) OLD PUBLIC WORKS PWF-13 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $25,000 $25,000 $25,000 $25,000 $24,519 $25,000 $0Construction\Professional Services $25,000 $25,000Expense Total $25,000 $24,519 $0$25,000$25,000 $25,000 $25,000 $0 $0 $0 $0 $0Fund 016 (non-bond) $0 $0 $25,000 $25,000 $24,519 $25,000 $0Unsecured Funding $25,000 $25,000Funding Source Total $25,000 $24,519 $0$25,000$25,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 112 6.A.a Packet Pg. 126 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This facility was built in 1967 by Ed Huntley who at the time was the City Facilities supervisor. The 4800 square foot facility now houses all City Facility Operations staff(11) and all of Park and Rec Parks Maintenance Staff(12+ seasonal help) This Facility is home to the City Carpentry Shop, Key Shop, City Flower program, Parks engine repair shop and Parks and Facilities maintenance supply storage as well as Parks and Facilities Manager offices. This Facility is near end of life and is undersized to support the departmental staffing that are assigned to this facility. Projects: maintenance and repair to maintain operational capacity, ADA restroom updates, shop floor replacement, Pine St. facility exit, exterior painting. $9,349 (2025) PARKS MAINTENANCE BUILDING PWF-14 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $9,349 $5,177 $69,228 $20,000 $10,000 $10,000 $0Construction\Professional Services $5,177 $69,228Expense Total $20,000 $10,000 $0$10,000$9,349 $9,349 $0 $0 $0 $0 $0 $0Fund 016 (non-bond) $0 $5,177 $69,228 $20,000 $10,000 $10,000 $0Unsecured Funding $5,177 $69,228Funding Source Total $20,000 $10,000 $0$10,000$9,349 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 113 6.A.a Packet Pg. 127 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The Public Safety building houses Edmonds Police Department, Edmonds Municipal Court and the City Council Chambers. The building was built in 1999 encompassing 30,000 square feet of office, court and municipal government uses. The building houses one of the City emergency operations centers, large police training, simulator facilities and evidence processing and storage. The building has had minimal system updates over it’s life and has a significant amount of deferred maintenance and should be retrofitted with new fire sprinklers. Projects: air handler and outdoor ventilation unit replacements, new solar plant installation, parking lot reconfiguration to meet current usage, fire sprinkler installation, interior hallway renovation and painting, sleeping room remodel and gender specific/neutral accommodations, gender inclusive public restrooms, operable windows is specific locations, courts flat roof replacement. $50000 (2025) PUBLIC SAFETY PWF-15 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $50,000 $10,000 $55,169 $151,481 $515,071 $80,000 $0Construction\Professional Services $10,000 $55,169Expense Total $151,481 $515,071 $0$80,000$50,000 $50,000 $10,000 $0 $0 $0 $0 $0Fund 016 (2021 Facilities Bond) $0 $0 $55,169 $151,481 $515,071 $80,000 $0Unsecured Funding $10,000 $55,169Funding Source Total $151,481 $515,071 $0$80,000$50,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 114 6.A.a Packet Pg. 128 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This building built in 1995 houses four Public Works divisions and the auxiliary City Emergency Operations Center. This building is 28,000 square feet and is capable of operations 24/7 during weather emergencies and natural disasters. The building has significant deferred maintenance needs and infrastructure updates. Projects: vehicle yard leveling, HVAC unit replacements, roof system for material bunkers, ventilation fan replacements, fire alarm system replacement, lobby remodel, restroom remodel with gender inclusivity considerations, electric vehicle charging and maintenance infrastructure, emergency communications updates, interior hallway flooring thresholds, utility bay HVAC replacement, water main replacement (building connection). $125000 (2025) PUBLIC WORKS O&M PWF-16 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $524,000 $1,017,000 $80,315 $79,348 $43,821 $50,000 $0Construction\Professional Services $1,017,000 $80,315Expense Total $79,348 $43,821 $0$50,000$524,000 $125,000 $45,000 $0 $0 $0 $0 $0Fund 016 (2021 Facilities Bond) $0 $0 $80,315 $79,348 $43,821 $50,000 $0Unsecured Funding $133,000 $324,000 $0 $0 $0 $0 $0Fund 421 - Water Utility $133,000 $324,000 $0 $0 $0 $0 $0Fund 422 - Stormwater Utility $133,000 $324,000 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $1,017,000 $80,315Funding Source Total $79,348 $43,821 $0$50,000$524,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 115 6.A.a Packet Pg. 129 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This community theater was built by the Driftwood Players theater group in 1967 and was deeded to City ownership at a later date. The facility is 6,300 square feet in size and houses the Driftwood Players theatrical performances and City meetings. The City’s maintenance responsibilities are limited to large infrastructure, parking lot, roofing, and grounds. Projects: parking lot repair and recoating, minor repair, and maintenance. $3000 (2025) WADE JAMES THEATER PWF-17 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $3,000 $45,000 $43,880 $115,734 $21,872 $25,000 $0Construction\Professional Services $45,000 $43,880Expense Total $115,734 $21,872 $0$25,000$3,000 $0 $0 $0 $0 $0 $0 $0Fund 016 (2021 Facilities Bond) $3,000 $45,000 $0 $0 $0 $0 $0Fund 016 (non-bond) $0 $0 $43,880 $115,734 $21,872 $25,000 $0Unsecured Funding $45,000 $43,880Funding Source Total $115,734 $21,872 $0$25,000$3,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 116 6.A.a Packet Pg. 130 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description This recreational facility houses the City’s aquatic programing and some Parks and Recreation programs. Built in 1971 the pool house historically was only operated seasonally. The tenant run aquatic programing is currently expanding to year round lap and team aquatic activities and will continue to support summer open swim programing. The facility requires minimal maintenance to remain operational and is subject to tenant lease terms of use. Projects: security updates, roof replacement, gutter replacement, plumbing fixture updates, exterior door replacements, operational repair and maintenance to accommodate 365 operations. $5000 (2025) YOST POOL HOUSE PWF-18 *includes prior year expenditures Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $5,000 $8,409 $19,127 $30,389 $30,000 $25,000 $0Construction\Professional Services $8,409 $19,127Expense Total $30,389 $30,000 $0$25,000$5,000 $5,000 $0 $0 $0 $0 $0 $0Fund 016 (2021 Facilities Bond) $0 $8,409 $0 $0 $0 $0 $0Fund 016 (non-bond) $0 $0 $19,127 $30,389 $30,000 $25,000 $0Unsecured Funding $8,409 $19,127Funding Source Total $30,389 $30,000 $0$25,000$5,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 117 6.A.a Packet Pg. 131 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The Library Plaza Deck is essentially a green roof on the second floor of the Edmonds Sno-Isle Library. The deck surface was waterproofed and remodeled in 2003, since that project continuous water intrusion has occurred through the waterproof membrane. This water intrusion has been successfully mitigated over the years and has not been deemed a project of significance previously. In 2018 Western Specialty Contractors inspected the water intrusion and offered an initial ROM price to demolish and waterproof the existing plaza deck. Rebuilding the plaza deck and replacement of landscape, planters, grass, pavement, flashing and hand railings would be a separate construction project. The Parks Director in 2018 offered an estimate to replace landscaping and irrigations systems. In 2021 a draft structural report was performed by MLA Engineering to discover any structural consequences from the years of water intrusion, building was deemed structurally sound and water intrusion not factoring in to building structural stability. $4,900,000 (2030) LIBRARY PLAZA DECK WATERPROOFING PROJECT PWF-23 *includes prior year expenditures Maintaining building in operational and safe condition, in order to maintain partnership with Sno-Isle Library system. Preservation of the City’s physical assets in appropriate condition vs. the age of the facility and historic capital investment. Benefit Estimated Project Cost PUBLIC WORKS - FACILITIES Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $4,900,000 $0Construction\Professional Services $0 $0Expense Total $0 $0 $0$4,900,000$0 $0 $0 $0 $0 $0 $4,900,000 $0Unsecured Funding $0 $0Funding Source Total $0 $0 $0$4,900,000$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 118 6.A.a Packet Pg. 132 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) WASTEWATER TREATMENT PLANT 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 119 6.A.a Packet Pg. 133 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) WASTEWATER TREATEMENT PLANT #CFP Project DP 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total PWP-01 WWTP Annual Capital Replacement In-House Projects $500,000 $500,000 $1,000,000 $1,250,000 $1,250,000 $0 $4,500,000 $0 $4,500,000 PWP-04 Nutrient Removal Project $750,000 $750,000 $20,000,000 $20,000,000 $0 $0 $41,500,000 $0 $41,500,000 PWP-10 VFD Upgrades $250,000 $250,000 $0 $0 $0 $0 $500,000 $0 $500,000 PWP-12 Primary Clarifier 3 Rehab $950,000 $0 $0 $0 $0 $0 $950,000 $0 $950,000 PWP-13 ODS (Primary Sludge) Pump Replacement $0 $350,000 $250,000 $0 $0 $0 $600,000 $0 $600,000 PWP-14 Chlorine Contact Channel Sluice Gates Replacement $0 $0 $0 $375,000 $0 $0 $375,000 $0 $375,000 PWP-15 Screw Press Feed System Rehab $150,000 $0 $0 $0 $0 $0 $150,000 $0 $150,000 PWP-16 NPW Pumping System Improvements $75,000 $0 $0 $0 $0 $0 $75,000 $0 $75,000 PWP-17 600 Bldg Air Quality Evaluation $50,000 $0 $0 $0 $0 $0 $50,000 $0 $50,000 PWP-18 LPA Blower 303 Rehab $35,000 $0 $0 $0 $0 $0 $35,000 $0 $35,000 PWP-19 600 Bldg Electrical Rehab $0 $250,000 $0 $0 $0 $0 $250,000 $0 $250,000 PWP-20 600 Bldg Air Quality Rehab/Upgrade $0 $250,000 $200,000 $0 $0 $0 $450,000 $0 $450,000 PWP-21 Secondary Clarifier 2 Rehab $0 $500,000 $0 $0 $0 $0 $500,000 $0 $500,000 EXPENSE TOTAL $2,760,000 $2,850,000 $21,450,000 $21,625,000 $1,250,000 $0 $49,935,000 $0 $49,935,000 Funding Source 2025 2026 2027 2028 2029 2030 2025-31 Total 2031-45 Grand Total City of Shoreline $261,924 $270,465 $2,035,605 $2,052,212 $118,625 $0 $4,738,831 $0 $4,738,831 Fund 423 - Sewer Utility $1,401,805 $1,447,515 $10,894,455 $10,983,338 $634,875 $0 $25,361,988 $0 $25,361,988 Mountlake Terrace $639,492 $660,345 $4,969,965 $5,010,513 $289,625 $0 $11,569,940 $0 $11,569,940 Olympic View Water Sewer District $456,779 $471,675 $3,549,975 $3,578,937 $206,875 $0 $8,264,241 $0 $8,264,241 FUNDING TOTAL $2,760,000 $2,850,000 $21,450,000 $21,625,000 $1,250,000 $0 $49,935,000 $0 $49,935,000 120 6.A.a Packet Pg. 134 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) Description The WWTP Annual Capital Replacement In-House Projects is intended to maintain infrastructure and equipment to ensure that the treatment plant is well maintained. $500,000 (2024) WWTP ANNUAL CAPITAL REPLACEMENT IN- HOUSE PROJECTS PWP-01 *includes prior year expenditures This project ensures that critical infrastructure is maintained and equipment is replaced in order to reduce risk to the City.Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $100,000 $100,000 $200,000 $250,000 $250,000 $0 $0Design $400,000 $400,000 $800,000 $1,000,000 $1,000,000 $0 $0Construction $500,000 $1,000,000Expense Total $1,250,000 $1,250,000 $0$0$500,000 $253,950 $253,950 $507,900 $634,875 $634,875 $0 $0Fund 423 - Sewer Utility $115,850 $115,850 $231,700 $289,625 $289,625 $0 $0Mountlake Terrace $82,750 $82,750 $165,500 $206,875 $206,875 $0 $0Olympic View Water Sewer District $47,450 $47,450 $94,900 $118,625 $118,625 $0 $0City of Shoreline $500,000 $1,000,000Funding Source Total $1,250,000 $1,250,000 $0$0$500,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 121 6.A.a Packet Pg. 135 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The WA Dept of Ecology has imposed the Puget Sound Nutrient General Permit upon us. It is anticipated that our current process will not be able to meet these new permit requirements. This decision package will allow us to team with an engineering firm to study our current process and design a solution that will allow our plant to meet the new PSNGP requirements as well as accommodate projected service area growth over the next decade. $41,850,000 NUTRIENT REMOVAL PROJECT PWP-04 *includes prior year expenditures To meet new permit requirements and increase capacity for projected 20-year service area expansion.Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $750,000 $750,000 $0 $0 $0 $0 $0Design $0 $0 $20,000,000 $20,000,000 $0 $0 $0Construction $750,000 $20,000,000Expense Total $20,000,000 $0 $0$0$750,000 $380,925 $380,925 $10,158,000 $10,158,000 $0 $0 $0Fund 423 - Sewer Utility $173,775 $173,775 $4,634,000 $4,634,000 $0 $0 $0Mountlake Terrace $124,125 $124,125 $3,310,000 $3,310,000 $0 $0 $0Olympic View Water Sewer District $71,175 $71,175 $1,898,000 $1,898,000 $0 $0 $0City of Shoreline $750,000 $20,000,000Funding Source Total $20,000,000 $0 $0$0$750,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 122 6.A.a Packet Pg. 136 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The WWTP has several VFD's (variable frequency drives) on various critical equipment influent pumps, effluent pumps, RAS/WAS pumps, aeration blowers, etc. These VFD's have an expected useful life of 15-20 years. Several of the VFD's here at the plant range in age between 20-30 years old. There have already bees some failures and replacements made. These outdated VFD's need to be replaced to avoid a catastrophic failure event that could happen to these weakened state VFD's for any number of reasons, including abrupt starting and stopping due to power bumps/loss, switching from grid to generator power supply or just a parts failure. If multiple critical components fail simultaneously, then the plant may lose it's ability to treat wastewater that meets NPDES permit requirements resulting in pollution of our receiving waters and possible fines by our governing agency. $250,000 VFD UPGRADES PWP-10 *includes prior year expenditures To keep critical equipment reliable and in working condition.Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $50,000 $50,000 $0 $0 $0 $0 $0Design $200,000 $200,000 $0 $0 $0 $0 $0Construction $250,000 $0Expense Total $0 $0 $0$0$250,000 $126,975 $126,975 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $57,925 $57,925 $0 $0 $0 $0 $0Mountlake Terrace $41,375 $41,375 $0 $0 $0 $0 $0Olympic View Water Sewer District $23,725 $23,725 $0 $0 $0 $0 $0City of Shoreline $250,000 $0Funding Source Total $0 $0 $0$0$250,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 123 6.A.a Packet Pg. 137 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Primary Clarifier #3 (dual drive) cages, center columns, feedwells, corner sweeps, weirs, counterweights, skimming devices and rake arms need replacement due to severe corrosion. The steel is in a highly corrosive environment and has not been replaced since the original construction approximately 30 years ago. The limited access will require that pieces be assembled inside the tank. The concrete structure also needs to be inspected and repaired as needed as corrosion of the concrete in spots has led to exposed rebar and may have compromised the structural integrity of the clarifier. $950,000 PRIMARY CLARIFIER 3 REHAB PWP-12 *includes prior year expenditures Improve reliability of critical infrastructure as it is approaching a state of imminent failure. Ensure WWTP’s ability to treat wastewater up to its rated capacity and meet discharge permit requirements. Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $150,000 $0 $0 $0 $0 $0 $0Design $800,000 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$950,000 $482,505 $0 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $220,115 $0 $0 $0 $0 $0 $0Mountlake Terrace $157,225 $0 $0 $0 $0 $0 $0Olympic View Water Sewer District $90,155 $0 $0 $0 $0 $0 $0City of Shoreline $0 $0Funding Source Total $0 $0 $0$0$950,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 124 6.A.a Packet Pg. 138 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description The ODS pumps are over 30 years old and are at the end of their useful life. The maintenance, reliability and efficiency of the primary sludge pumping system would be greatly improved by replacing the current diaphragm pumps with progressive cavity pumps. During this pump replacement, piping modifications would also be done to allow pumps to support more than one clarifier, improving system redundancy along with reliability. $600,000 ODS (PRIMARY SLUDGE) PUMP REPLACEMENT PWP-13 *includes prior year expenditures Improve reliability, redundancy and efficiency of the primary sludge and scum pumps by replacing 30+ year old pumps and improving piping system.Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $100,000 $0 $0 $0 $0 $0Design $0 $250,000 $250,000 $0 $0 $0 $0Construction $350,000 $250,000Expense Total $0 $0 $0$0$0 $0 $177,765 $126,975 $0 $0 $0 $0Fund 423 - Sewer Utility $0 $81,095 $57,925 $0 $0 $0 $0Mountlake Terrace $0 $57,925 $41,375 $0 $0 $0 $0Olympic View Water Sewer District $0 $33,215 $23,725 $0 $0 $0 $0City of Shoreline $350,000 $250,000Funding Source Total $0 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 125 6.A.a Packet Pg. 139 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Replace two gate valves and actuators at the inlets of the two chlorine contact channels. These gates have repeatedly failed. Repair is often expensive and time consuming, as access is an issue, so it is necessary to rent scaffolding and other equipment to make repairs. When a gate fails, it effectively cuts the disinfection capacity of the plant in half. These are critical pieces of equipment and need to be replaced with a different technology to improve performance and reliability. $375,000 CHLORINE CONTACT CHANNEL SLUICE GATES REPLACEMENT PWP-14 *includes prior year expenditures To replace problematic, yet critical valves with more reliable technology that helps to ensure disinfection system functionality and the ability to continue to meet NPDES discharge permit requirements. Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $75,000 $0 $0 $0Design $0 $0 $0 $300,000 $0 $0 $0Construction $0 $0Expense Total $375,000 $0 $0$0$0 $0 $0 $0 $190,463 $0 $0 $0Fund 423 - Sewer Utility $0 $0 $0 $86,888 $0 $0 $0Mountlake Terrace $0 $0 $0 $62,062 $0 $0 $0Olympic View Water Sewer District $0 $0 $0 $35,587 $0 $0 $0City of Shoreline $0 $0Funding Source Total $375,000 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 126 6.A.a Packet Pg. 140 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Replace two sludge feed pumps and three polymer pumps that are reaching the end of their useful life and are often down for repairs. $150,000 SCREW PRESS FEED SYSTEM REHAB PWP-15 *includes prior year expenditures Replacing these pumps allows for consistent and reliable operation of the sludge dewatering system which supplies dewatered biosolids to the new gasification system.Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $150,000 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$150,000 $76,185 $0 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $34,755 $0 $0 $0 $0 $0 $0Mountlake Terrace $24,825 $0 $0 $0 $0 $0 $0Olympic View Water Sewer District $14,235 $0 $0 $0 $0 $0 $0City of Shoreline $0 $0Funding Source Total $0 $0 $0$0$150,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 127 6.A.a Packet Pg. 141 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Relocate one NPW pump, replace one NPW pump and modify piping as needed to achieve system functionality. $75,000 NPW PUMPING SYSTEM IMPROVEMENTS PWP-16 *includes prior year expenditures Current NPW system in non-functional as currently built. Only current one pump provides the needed system pressure to allow the standby generator to function. In the event of that pump failing, the standby generator (which is required as a backup power source per our NPDES permit) is not operable. This project will allow for much needed NPW redundancy. Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $75,000 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$75,000 $38,093 $0 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $17,378 $0 $0 $0 $0 $0 $0Mountlake Terrace $12,412 $0 $0 $0 $0 $0 $0Olympic View Water Sewer District $7,118 $0 $0 $0 $0 $0 $0City of Shoreline $0 $0Funding Source Total $0 $0 $0$0$75,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 128 6.A.a Packet Pg. 142 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Evaluate the AQ issues within the 600 bldg with a focus on the lower level where H2S gas appears to be accumulating at levels that are high enough to do damage to sensitive electronic equipment such as VFD's, control boards and relay switches. These electronic failures cause shutdowns in the primary sludge pumping system, high pressure plant aie system and sludge dewatering system. $50,000 600 BLDG AIR QUALITY EVALUATION PWP-17 *includes prior year expenditures After rehab/upgrade project is complete (2026-part 2 of this project), it will improve performance and reliability as well as lowering operational and maintenance costs for the systems mentioned above. Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $50,000 $0 $0 $0 $0 $0 $0Design $0 $0Expense Total $0 $0 $0$0$50,000 $25,395 $0 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $11,585 $0 $0 $0 $0 $0 $0Mountlake Terrace $8,275 $0 $0 $0 $0 $0 $0Olympic View Water Sewer District $4,745 $0 $0 $0 $0 $0 $0City of Shoreline $0 $0Funding Source Total $0 $0 $0$0$50,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 129 6.A.a Packet Pg. 143 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Blower is currently running at 75% capacity as it is at the end of it's useful life (30,000 hrs, put in service in 2017) and is due for a rebuild. $35,000 LPA BLOWER 303 REHAB PWP-18 *includes prior year expenditures As this is our medium sized blower, it allows for more efficient and cost-saving operation of the LPA system.Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $35,000 $0 $0 $0 $0 $0 $0Construction $0 $0Expense Total $0 $0 $0$0$35,000 $17,777 $0 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $8,110 $0 $0 $0 $0 $0 $0Mountlake Terrace $5,792 $0 $0 $0 $0 $0 $0Olympic View Water Sewer District $3,322 $0 $0 $0 $0 $0 $0City of Shoreline $0 $0Funding Source Total $0 $0 $0$0$35,000 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 130 6.A.a Packet Pg. 144 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Both the high and low voltage electrical systems are in a degraded state and have funtionality issues during periods of high demand, often resulting in equipment failure due to MCC or breaker failures. This is a critical system and is at the end of it's useful life, being well over thirty years old. $250,000 600 BLDG ELECTRICAL REHAB PWP-19 *includes prior year expenditures Rehab of the 600 bldg electrical system will result in a tremendous increase in the reliability of the critical systems within the 600 bldg including sludge dewatering, primary sludge pumping, high-pressure air, chemical disinfection pumps and several others. Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $50,000 $0 $0 $0 $0 $0Design $0 $200,000 $0 $0 $0 $0 $0Construction $250,000 $0Expense Total $0 $0 $0$0$0 $0 $126,975 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $0 $57,925 $0 $0 $0 $0 $0Mountlake Terrace $0 $41,375 $0 $0 $0 $0 $0Olympic View Water Sewer District $0 $23,725 $0 $0 $0 $0 $0City of Shoreline $250,000 $0Funding Source Total $0 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 131 6.A.a Packet Pg. 145 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Perform AQ system repairs and modifications from the prior years' AQ Evaluation Project to resolve the AQ issues within the 600 bldg with a focus on the lower level where H2S gas appears to be accumulating at levels that are high enough to do damage to sensitive electronic equipment such as VFD's, control boards and relay switches. These electronic failures cause shutdowns in the primary sludge pumping system, high pressure plant aie system and sludge dewatering system. $250,000 600 BLDG AIR QUALITY REHAB/UPGRADE PWP-20 *includes prior year expenditures Improve performance and reliability as well as lowering operational and maintenance costs for the systems mentioned above.Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $50,000 $0 $0 $0 $0 $0Design $0 $200,000 $200,000 $0 $0 $0 $0Construction $250,000 $200,000Expense Total $0 $0 $0$0$0 $0 $126,975 $101,580 $0 $0 $0 $0Fund 423 - Sewer Utility $0 $57,925 $46,340 $0 $0 $0 $0Mountlake Terrace $0 $41,375 $33,100 $0 $0 $0 $0Olympic View Water Sewer District $0 $23,725 $18,980 $0 $0 $0 $0City of Shoreline $250,000 $200,000Funding Source Total $0 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 132 6.A.a Packet Pg. 146 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Description Secondary Clarifier 2 has reached the end of useful life as it's components are over 30 years old and need to be replaced. Clarifier drive, drive motor and steel structure have corroded and need repair or replacement. Concrete needs to be evaluated and repaired if necessary. $450,000 SECONDARY CLARIFIER 2 REHAB PWP-21 *includes prior year expenditures This will increase reliability/redundancy in the secondary system and help ensure the final effluent meets NPDES discharge permit standards.Benefit Estimated Project Cost PUBLIC WORKS - TREATMENT PLANT Budget DRAFT v2.0 Project Cost 2025 2026 2027 2028 2029 2030 2031-45 $0 $50,000 $0 $0 $0 $0 $0Design $0 $450,000 $0 $0 $0 $0 $0Construction $500,000 $0Expense Total $0 $0 $0$0$0 $0 $253,950 $0 $0 $0 $0 $0Fund 423 - Sewer Utility $0 $115,850 $0 $0 $0 $0 $0Mountlake Terrace $0 $82,750 $0 $0 $0 $0 $0Olympic View Water Sewer District $0 $47,450 $0 $0 $0 $0 $0City of Shoreline $500,000 $0Funding Source Total $0 $0 $0$0$0 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM | CAPITAL IMPROVEMENTS PROJECTS 133 6.A.a Packet Pg. 147 At t a c h m e n t : P u b l i c W o r k s a n d U t i l i t i e s 2 0 2 5 - 2 0 3 0 C I P a n d C F P ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) 2025-2030 PROPOSED CAPITAL FACILITIES PLAN & CAPITAL IMPROVEMENT PROGRAM DRAFT SEPTEMBER 2024 6.A.b Packet Pg. 148 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 1 Table of Contents Director’s Letter ................................................................ 2 CIP/CFP Worksheets ....................................................... 3-6 Project Distribution Map ................................................. 7 Project Descriptions ...................................................... 8-26 Program Descriptions ................................................... 27-29 Acquisition Descriptions ............................................... 30-31 Fund Detail ..................................................................... 32 Fund 332 (Capital Const. & Impact Fee) Detail ............ 33-34 Fund 125 (REET II) Detail ................................................ 35 Fund 126 (REET I) Detail ................................................. 36 Fund 143 (Tree) Detail .................................................... 37 Fund 137 (Cemetery) Detail ........................................... 38 Annual Project Comparison ............................................ 39 6.A.b Packet Pg. 149 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 2 September 30, 2024 Members of the City Council, Parks & Planning Board, Staff and Citizens of Edmonds, The Parks, Recreation & Human Services Department presents the City of Edmonds Parks 6-year Parks Capital Improvement Program (CIP) and Capital Facilities Plan (CFP). The CIP/CFP serve as a planning guide identifying parks capital projects and related funding sources. It reflects the priorities established in the 2022 Parks, Recreation and Open Space (PROS) Plan priorities as well as unforeseen opportunities and demands. The CIP/CFP is updated annually through a public process including presentations and Public Hearings hosted by both the Parks & Planning Board and the City Council during the budget process. Highlights of the 2024 parks capital project accomplishments through August include: 1.Acquisition of the Mee property expands the Mathay Ballinger Park by 50% and the purchase and related costs were 80% grant funded ($880,000 grant). 2.Demolition of unusable structures, removal of invasive plants and site security of the 1-acre parcel donated by Shirley Johnson adjacent to Yost was completed. 3.Improvements to the McAleer Lake Ballinger Access area. 4.Installation of automated door locks on all park restrooms to decrease damage and vandalism. 5.Standardization of park entry signage. 6.Replacement of the outdoor shower, an additional foot wash station and installation of ADA compliant water bottle filler to replace a non-working drinking fountain. The remaining 2024 capital projects in process include: 1.Improvements continue at Mathay Ballinger Park with installation of a permanent restroom and remaining improvements including ADA accessible pathway, parking improvement, picnic shelter and additional park amenities. 2.Completing open space improvements to meet a 2008 State of Washington grant non-compliance issue. 3.Installation of “No Boating” buoys along the Waterfront as resulting from US Coast Guard audit. Currently, the focus of our capital work is on deferred maintenance throughout the city’s existing parks system and recreation facilities. With an aging system and lack of adequate asset management through Edmonds’ parks and facilities, amenities are reaching the end of their useful life and require significant repairs or replacement. Some of which require significant permitting due to proximity to salmon-bearing waterways. Another priority in our capital work is addressing ADA accessibility compliance issues both during renovation and repair work as well as stand-alone new projects to address the issue. Ensuring our parks, trails, open spaces and recreation facilities and amenities are inclusive and welcoming and equitability available to all Edmond’s residents and visitors is an emphasis of all our parks capital work. Your Parks, Recreation & Human Services Department strives to keep our parks safe, accessible, and enjoyable for all and we are proud to continue to implement the parks capital program to better serve the Edmonds community. Sincerely, Angie Feser, Edmonds Parks, Recreation & Human Services Director 425-771-0256 Angie.Feser@EdmondsWA.gov 6.A.b Packet Pg. 150 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) 2025‐2030 SIX‐YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN CFP Project  #Project Site &  Description 2025 2026 2027 2028 2029 2030 6‐Year Total R19 Shell Creek Restoration Phase 2 Project to provide improved environmental health and erosion control of Shell  Creek in Yost Park, may include trail,  bridge and boardwalk repair or relocation.  380,000$       ‐$                ‐$                ‐$                ‐$                ‐$                380,000$          D19 Lake Ballinger Park Mountlake Terrace ILA *CARRYFORWARD* Funding to support City of Mountlake Terrace Ballinger Park Phase III  Development.  Payment due upon completion of project.  200,000$       ‐$                ‐$                ‐$                ‐$                ‐$                200,000$          D8 Columbarium Expansion ‐ Phase II Expansion of the current columbarium. Funding provided through the Cemetery  Trust Fund 137.  175,000$       ‐$                ‐$                ‐$                ‐$                ‐$                175,000$          X P2 D13 Mee Property  Master plan and future development providing expansion of the Mathay  Ballinger neighborhood park. Property purchased in 2024.  80,000$          ‐$                250,000$       ‐$                ‐$                ‐$                330,000$          X P5 Johnson Property Master plan for future use and expansion of Yost Park. Site development not  included in estimate. Demolition, debris removal and site security completed in  2023.   ‐$                100,000$        ‐$                 ‐$                 ‐$                 ‐$                100,000$          X P1 D2 Parks & Facilities Maintenance and Operations Building Replace and/or renovate Parks & Facilities Maintenance Shop located in City  Park. Preliminary design in 2026.  ‐$                250,000$       875,500$       4,700,000$     ‐$                 ‐$                5,825,500$       D21      R20 Marsh Boardwalk Replacement Renovation and replacement of northwest Edmonds Marsh boardwalk to include  ADA upgrades.  ‐$                75,000$          750,000$       ‐$                ‐$                ‐$                825,000$          R11 Yost Pool Upgrades & Renovation Repairs and renovations of 50+ year old pool as needed to include a complete  replaster of the pool. ‐$                ‐$                350,000$       ‐$                ‐$                ‐$                350,000$          X D20 Woodway Campus Athletic Complex ‐ Phase I ‐ Lighting In cooperation with the Edmonds School District, complete a community park  and athletic complex at Former Woodway High School to include lighting and  future construction of two additional fields. ‐$                ‐$                1,500,000$    ‐$                ‐$                ‐$                1,500,000$       Project Type: A: Acquisition ‐ R: Replacement/Upgrade ‐ P: Master Planning ‐ D: Development (new) Costs inflated at 3% per year Page 3 Page 3 6.A.b Packet Pg. 151 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l 2025‐2030 SIX‐YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN CFP Project  #Project Site &  Description 2025 2026 2027 2028 2029 2030 6‐Year Total R8 Sierra Park Replacement of a 25+ year old playground and related improvements to included  ADA compliance.  ‐$                ‐$                50,000$          350,000$       ‐$                ‐$                400,000$          D10 D11 D12 Pine Street Park Park enhancements to include the addition of a small shelter with picnic tables,  canopy shade trees and a paved connecting pathway.  ‐$                 ‐$                 ‐$                100,000$       60,000$          200,000$       360,000$          R12 Maplewood Hill Park Replacement of a nearly 40 year old playground for improved play experience  and ADA compliance.  ‐$                ‐$                ‐$                50,000$          350,000$       ‐$                400,000$          X P6 D15 Neighborhood Park SR99 Master plan and development of a new neighborhood park in Southeast  Edmonds (funding is in Parkland Acquisition program for purchase). ‐$                ‐$                ‐$                ‐$                80,000$          850,000$       930,000$          D16 D17 R14 Elm Street Park Park enhancements to include the addition of a nature playground, small shelter  with picnic tables, habitat restoration and possible addition of a dog park. ‐$                 ‐$                 ‐$                 ‐$                105,000$       385,000$       490,000$          X P7 D18 Neighborhood Park SE 2 Master plan and development of a new neighborhood park in Southeast  Edmonds (funding is in Parkland Acquisition program for purchase).  ‐$                ‐$                ‐$                ‐$                ‐$                82,000$          82,000$            X R15 Pool Replacement Replacement of the existing Yost pool due to end of life cycle. Design, location,  and funding TBD and consideration of possible partnerships.  ‐$                 ‐$                 ‐$                 ‐$                 ‐$                24,000,000$  24,000,000$    X P4 D9 D1 Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Master Plan development and implementation of the Edmonds Marsh to  daylight the waterway connection of Puget Sound to the Edmonds Marsh and  two fresh water creeks providing restoration of fresh water/salt water estuary  and natural tidal exchange. (All expenses are TBD per Council direction in  December 2022). Property acquisition identified in Parkland Acquisition program.  TBDTBDTBDTBDTBDTBD ‐$                  835,000$       425,000$       3,775,500$    5,200,000$    595,000$       25,517,000$  36,347,500$    Project Type: A: Acquisition ‐ R: Replacement/Upgrade ‐ P: Master Planning ‐ D: Development (new) Costs inflated at 3% per year (A)SUBTOTAL PARKS CIP/CFP PROJECTS Page 4 6.A.b Packet Pg. 152 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l 2025‐2030 SIX‐YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN Project  #PARKS CIP PROGRAMS 2025 2026 2027 2028 2029 2030 6‐Year Total R17 Citywide Park Improvements / Capital Replacement Program Ongoing program of funding allocation for regular, major and deferred  maintenance, repair and replacement of parks amenities, structures and  equipment.  450,000$       450,000$       450,000$       450,000$       450,000$       450,000$       2,700,000$       R16 ADA Improvements & Replacement Ongoing replacement or improvements to meet ADA standards within park  system.  (Example is  of the Seaview Park restroom replacement and  improvements to pathway).  ‐$                200,000$       300,000$       ‐$                ‐$                ‐$                500,000$          Debt Service and Interfund Transfers Debt service on Civic Park $1.6M bond (2021), Marina Beach Acquisition and  Interfund transfers to Engineering for Capital Project Support.  412,518$       416,188$       410,438$       416,350$       407,912$       414,225$       2,477,630$       862,518$       1,066,188$    1,160,438$    866,350$       857,912$       864,225$       5,677,630$      Project  #PARKLAND ACQUISITION 2025 2026 2027 2028 2029 2030 6‐Year Total X A3 Neighborhood Park SR99 Acquisition of parkland near SR 99 to fill park system gaps. ‐$                ‐$                ‐$                900,000$       ‐$                ‐$                900,000$          X A4 Neighborhood Park SE 2 Acquisition of parkland in South Edmonds to fill park system gaps.‐$                ‐$                ‐$                ‐$                900,000$       ‐$                900,000$          X A1 Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Acquisition of the Unocal property in support of greater Edmonds Marsh  restoration project.  TBDTBDTBDTBDTBDTBD ‐$                  ‐$                ‐$                ‐$                900,000$       900,000$       ‐$                1,800,000$      1,697,518$    1,491,188$    4,935,938$    6,966,350$    2,352,912$    26,381,225$  43,825,130$    (C)SUBTOTAL ‐ PARKLAND ACQUISITION Costs inflated at 3% per year Project Type: A: Acquisition ‐ R: Replacement/Upgrade ‐ P: Master Planning ‐ D: Development (new) (B)SUBTOTAL ‐ PARKS CIP PROGRAMS (D)TOTAL PARKS CIP/CFP EXPENDITURES (A+B+C) Costs inflated at 3% per year Page 5 6.A.b Packet Pg. 153 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l 2025‐2030 SIX‐YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN PARKS CIP REVENUE 2025 2026 2027 2028 2029 2030 6‐Year Total Real Estate Excise Tax (REET) I ‐ Fund 126 512,518$       516,188$       510,438$       516,350$       507,912$       514,225$        $     3,077,630  Real Estate Excise Tax (REET) II ‐ Fund 125  $    1,110,000  $    1,075,000  $    1,150,000  $       950,000  $       910,000  $       950,000  $     6,145,000  Park Impact Fees  ‐ Fund 332‐100  $       200,000  $       200,000  $       200,000  $       200,000  $       200,000  $       200,000  $     1,200,000  Tree Fund 143 ‐ Land Acquisition  $         84,192  $         60,419  $         58,419  $         61,140  $         63,997  $         56,997  $        385,163  Cemetery Trust Fund 137 ‐ Columbarium Expansion  $       175,000  $        175,000  Investment Interest (3%) $           7,870  $           8,220  $         35,132  $         34,363  $         46,081  $         54,385  $        186,051  Donations  $‐     $‐     $‐     $‐     $‐     $‐     $‐    Bond Proceeds  $‐     $‐     $‐     $‐     $‐     $‐     $‐    Secured Grants  $‐     $‐     $‐     $‐     $‐     $‐     $‐    Unsecured Grants/Funding ‐ non‐land acquisition  $‐     $‐     $    3,125,000  $    4,700,000  $         55,000  $  24,167,000  $   32,047,000  2,089,580$    1,859,827$    5,078,988$    6,461,853$    1,782,990$    25,942,607$  43,215,844$    2025 2026 2027 2028 2029 2030 (F) Beginning Fund Balance 1,458,932$    1,846,994$    2,211,633$    2,350,684$    1,842,187$    1,268,265$     (E) Revenue 2,089,580$    1,859,827$    5,078,988$    6,461,853$    1,782,990$    25,942,607$   (D) Expenditures 1,701,518$    1,495,188$    4,939,938$    6,970,350$    2,356,912$    26,385,225$   1,846,994$    2,211,633$    2,350,684$    1,842,187$    1,268,265$    825,647$        Restricted Land Acquisition Funds: 1,352,583$   1,509,002$   1,663,421$   920,561$       180,557$       333,554$        Available Funding (assuming $200K in PIF + Interest): 494,411$       702,631$       687,263$       921,626$       1,087,707$   492,093$        (G)Ending Fund Balance (F+E‐D) (E)TOTAL PARKS CIP REVENUE Parks Fund 6‐Year Overview Page 6 6.A.b Packet Pg. 154 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l D19 R19 D20 D21R20 D13P2 D6 P1D2 P4D1D9A1 D10D11D12 D16D17 R14 D8 R11R15 P5 R12 R8 ¯ DRAFT August 2024 Parks & Recreation 2025 - 2030 PARKS PROJECTS Projects 2025 2026-2030 P2,D13D6D19D8R19P5R11D10, D11, D12R8R12P4, D9, D1D16, D17, R14P1, D2R15A1D20D21, R20 R17A3, P6, D15A4, P7, D18R16 Mee PropertyMathay Ballinger ParkLake Ballinger Park (MLT)Columbarium Expansion - Phase IIShell Creek RestorationJohnson PropertyYost Pool RepairPine Street ParkSierra ParkMaplewood Hill ParkEdmonds Marsh RestorationElm Street ParkParks Maintenance BuildingPool ReplacementEdmonds Marsh RestorationWoodway Campus Athletic ComplexMarsh Boardwalk Replacement * Non-site specific projectsCitywide Park ImprovementsNeighborhood Park SR99Neighborhood Park SE 2ADA Improvements & Replacement Page 7 6.A.b Packet Pg. 155 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 8 2025-2030 Parks Capital Improvement Program & Capital Facilities Plan PROJECTS 6.A.b Packet Pg. 156 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 9 Parks & Recreation Shell Creek Restoration Phase 2 – R19 Shell Creek Valley, Yost Park Project Summary: The goal of this project is the restoration of the northern portion of Yost Park and may include habitat and environmental protection and enhancement, mitigation opportunities, bridge, trail and boardwalk replacement/relocation and concrete structure removal or modification. After completion of the Existing Conditions Analysis, funding is needed for the next phase which includes scope of work development and may include architecture, engineering and ecological design, document development to support and start the permit process and potential construction estimates. Project Justification: The 45-acre Yost Park, containing a portion of Shell Creek, is experiencing environmental degradation to the creek’s ecosystem and the bridges are nearing end of life cycle. Shell Creek is identified as a salmon-bearing stream and erosion and silting issues within Yost Park impact stream bed conditions and spawning habitat within the park and downstream. This erosion has caused the closure of a pedestrian bridge in the upper creek corridor, resulting in significant impact to trail users by lack of ability to cross the creek to access both sides of the park. Additional pedestrian bridges are deteriorating and will require replacement or repair. 2022 Parks, Recreation & Open Space (PROS) Plan - Goal 3: Parks, Trails & Open Space, Objectives 3.7, 3.8 and 3.9; Goal 4: Waterfront Use & Access, Objectives 4.2 and 4.4; Goal 5: Natural Resource & Habitat Conservation Objectives, 5.1, 5.3 and 5.4; Goal 6: Climate Change, Adaptation & Resiliency, Objective 6.5; and Goal 9: Park Operations & Administration Objectives 9.1 and 9.2. PROS Plan Recommendations 3.1, 3.10. 5.2 and 6.2. Estimated Cost: Phase 1 - $250,000 & Phase 2 - $380,000 = $630,000 total 2025 2026 2027 2028 2029 2030 Total Construction (R19) – Bridge, Trail, Stream $380,000 $380,000 Total Expenses $380,000 $380,000 Real Estate Excise Tax II – Fund 125 $380,000 $380,000 Total Revenue $380,000 $630,000 Unsecured Funding $0 $0 6.A.b Packet Pg. 157 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 10 Parks & Recreation Lake Ballinger Park/Mountlake Terrace ILA – D19 Lake Ballinger Park, City of Mountlake Terrace Project Summary: Through an Interlocal Agreement (ILA) with the City of Mountlake Terrace, the City of Edmonds will support the construction of the planned improvements in the northwest area of Lake Ballinger Park including a pedestrian entry, pathways and access to Lake Ballinger. The ILA was executed in 2023, with the project underway and payment is due upon completion. Project Justification: This western boundary of the park is Edmonds city limits, and these improvements will provide better access to Lake Ballinger Park for Edmonds residents. The revenue contribution supports the construction of the improvements which will benefit the City of Edmonds. This project is supported by the 2022 Parks, Recreation and Open Space (PROS) Plan including a goal, three objectives and three recommendations. PROS Goal 3, Objectives 3.2, 3.8 and 3.11. Recommendation 1.2 Expand partnerships and agreements with other nearby jurisdictions. Recommendation 3.6 Explore options for access to Lake Ballinger with the City of Mountlake Terrace to include possible joint development and consideration of a fishing pier. Recommendation 5.2 Repair and improve or extend trails and boardwalks to allow improved public access to natural areas for nature/wildlife viewing, hiking and outdoor experience. Estimated Cost: $200,000 2025 2026 2027 2028 2029 2030 Total Construction (D19) – ILA $200,000 $200,000 Total Expenses $200,000 $200,000 Real Estate Excise Tax II - Fund 125 $200,000 $200,000 Total Revenue $200,000 $200,000 Unsecured Funding $0 $0 6.A.b Packet Pg. 158 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 11 Parks & Recreation Columbarium Expansion Phase 2 – D8 820 15th St SW, Edmonds Memorial Cemetery Project Summary: Expansion of the existing Edmonds Memorial Cemetery Columbarium. Funding is provided through the Cemetery Trust Fund 137 which is designated for capital projects such as this. This accumulated fund balance is generated from revenue collected through ongoing cemetery sales and services. Project Justification: As the existing columbarium continues to fill up, it is appropriate to begin planning for the Phase 2 expansion to accommodate additional inurnments. The project design was developed with the original design and therefore, could be relatively simple to implement. Estimated Cost: $159,100 2025 2026 2027 2028 2029 2030 Total Construction (D8) – Columbarium Expansion $159,100 $159,100 Total Expenses $159,100 $159,100 Fund Balance Cemetery Trust – Fund 137 $159,100 $159,100 Total Revenue $159,100 $159,100 Unsecured Funding $0 $0 6.A.b Packet Pg. 159 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 12 Parks & Recreation Mee Property – P2, D13 24024 76th Ave. Project Summary: This project is the Master Planning process supporting development of the recently acquired Mee Property adjacent to and expanding Mathay Ballinger Park. This planning effort is the next step to providing improvements to expand the adjacent park and address park services gap and inequities in geographic distribution in underserved areas of Edmonds. The Master Plan relies on community engagement and will be developed in collaboration with Edmonds community. Opening this property to the public requires site improvements determined by a community-based Master Plan. Project Justification: The addition of new parkland and amenities is supported by the 2022 Parks, Recreation and Open Space (PROS) Plan including Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8, 3.9 and 3.10; Goal 5, Objectives 5.1, 5.3, and 5.4; and Goal 6, Objectives 6.1, 6.3, and 6.4. Recommendations include 6.2 which supports development of a new park and recommendations 3.2 and 3.5. Estimated Cost: $330,000 2025 2026 2027 2028 2029 2030 Total Planning – Neighborhood Park SE 1 (P2) $80,000 $80,000 Construction – Neighborhood Park SE 1 (D13) $250,000 $250,000 Total Expenses $80,000 $250,000 $330,000 Real Estate Excise Tax II - Fund 125 $80,000 $80,000 Park Impact Fees – Fund 332-100 $250,000 $250,000 Total Revenue $80,000 $250,000 $330,000 Unsecured Funding $0 $0 $0 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Need image of Mee property 6.A.b Packet Pg. 160 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 13 Parks & Recreation Johnson Property - P5 9309 Bowdoin Way Project Summary: This project is for the first phase of design including a Master Plan for the 1-acre property donated by Shirley Johnson in 2021. The house, outbuildings and invasive plants material were removed in 2023 and the site is currently secured with fencing. The master planning process uses a combination of park system-wide goals (PROS Plan), property opportunities and constraints, property donation conditions and community input on future design and usage for the space as well as providing documentation for grant opportunities for future improvements. Project Justification: This project is supported by five goals and 11 related objectives and a recommendation of the 2022 Parks, Recreation and Open Space (PROS) Plan. They include Goal 1, Objective 1.1; Goal 3, Objectives 3.7, 3.8 and 3.10; Goal 5, Objective 5.1; Goal 6, Objectives 6.1, 6.4 and 6.5; Goal 9, Objectives 9.1, 9.3 and 9.5 support this project. In addition, Plan Recommendation 3.1 - Maintain, renovate, or replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety applies to this work. Estimated Cost: $100,000 2025 2026 2027 2028 2029 2030 Total Planning & Design (P5) $100,000 $100,000 Total Expenses $100,000 $100,000 Real Estate Excise Tax II - Fund 125 $100,000 $100,000 Total Revenue $100,000 $100,000 Unsecured Funding $0 $0 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) 6.A.b Packet Pg. 161 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 14 Parks & Recreation Parks & Facilities Maintenance Building - P1 & D2 600 3rd Avenue South, City Park Project Summary: Replacement of 40+ year old Parks and Facilities Maintenance building and renovation of the yard area in City Park. Currently undersized to accommodate staff, vehicles and equipment, mechanical workspaces and employee facilities and the facility is reaching the end of its useful life. Project Justification: Parks and Facilities Divisions have long outgrown this existing facility and need additional work areas and fixed equipment storage to more efficiently maintain City parks and Capital facilities. The city’s small equipment repair garage is used as the Park Maintenance locker room, daily meeting room, computer access (two for 17 FTEs) and work preparation space. It is insufficient for work efficiency and creates a conflicting workspace of small machinery repair and gathering space. This project is supported by a Goals and three Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan including Goal 9, Objectives 9.1, 9.3 and 9.9. Estimated Cost: $5,825,000 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) 2025 2026 2027 2028 2029 2030 Total Planning & Design (P1) $250,000 $875,000 $1,125,000 Construction (D2) $4,700,000 $4,700,000 Total Expenses $250,000 $875,000 $4,700,000 $5,825,000 Real Estate Excise Tax II - Fund 125 $250,000 $250,000 Bond Proceeds Operating Contribution – General Fund Park Donations Total Revenue $250,000 $250,000 Unsecured Funding $0 ($875,000) ($4,700,000) ($5,575,000) 6.A.b Packet Pg. 162 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 15 Parks & Recreation Marsh Boardwalk Replacement – D21, R20 180 West Dayton, Edmonds Marsh Project Summary: Initial work for repair and possible replacement of the failing Marsh Boardwalk. Work may include evaluation of existing structure, architecture and engineering design for repair or replacement, development of construction drawings and the start of a complex permitting process. Project Justification: The deck of the wooden boardwalk is nearing the end of its useful life and the supporting structure and footings may be starting to settle into the underlying marsh. If this repair/replacement is not completed, there may need to be closed to the public due to unsafe surface conditions and trip hazards. 2022 Parks, Recreation & Open Space (PROS) Plan - Goal 3: Parks, Trails & Open Space, Objectives 3.4, 3.7, 3.8 and 3.9; Goal 4: Waterfront Use & Access, Objectives 4.2 and 4.4; Goal 5: Natural Resource & Habitat Conservation Objectives, 5.1, 5.3 and 5.4; Goal 6: Climate Change, Adaptation & Resiliency, Objective 6.1, 6.4 and 6.5; and Goal 9: Park Operations & Administration Objectives 9.1 and 9.5. PROS Plan Recommendations 3.1 and 3.10, 5.2 and 6.2. Estimated Cost: $825,000 2025 2026 2027 2028 2029 2030 Total Planning & Design (D21) $75,000 $75,000 Construction (R20) $750,000 $750,000 Total Expenses $75,000 $750,000 $825,000 Real Estate Excise Tax II - Fund 125 $75,000 $75,000 Total Revenue $75,000 $75,000 Unsecured Funding $0 ($750,000) ($750,000) 6.A.b Packet Pg. 163 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 16 Parks & Recreation Yost Pool Upgrades & Renovation - R11 96th Ave W & Bowdoin Way, Yost Park Project Summary: Future pool repair and maintenance to include a full replaster project. Project Justification: The outdoor Yost Pool, built in the early 1970’s, is more than 50 years old and has numerous maintenance needs to enable the pool to remain operational and meet safety requirements. These repairs and amenity replacements are supported in the 2022 Parks, Recreation and Open Space (PROS) Plan including Goal 1, Objective 1.4; Goal 2, Objective 2.1, Goal 3, Objectives 3.6, 3.8 and 3.9; Goal 4, Objective 4.4; Goal 6, Objective 6.3; Goal 7, Objectives 7.2 and 7.4; Goal 9, Objectives 9.1 and 9.5 and Recommendation 3.1, and 6.2. Estimated Cost: $350,000 2025 2026 2027 2028 2029 2030 Total Construction (R11) $350,000 $350,000 Total Expenses $350,000 $350,000 Real Estate Excise Tax II - Fund 125 $350,000 $350,000 Total Revenue $350,000 $350,000 Unsecured Funding $0 $0 6.A.b Packet Pg. 164 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 17 Parks & Recreation Woodway Campus Athletic Complex Phase 1 Lighting – D20 23200 100th Ave. W Project Summary: This project consists of two components: Phase 1 lighting addition, Phase 2 renovation of existing underdeveloped athletic field and would be coordinated with the property owner, Edmonds School District. Project Justification: By adding lighting to the renovated Phase 1 year-round field, usage of the multi-use facility would significantly increase. Phase 2 would renovate a currently poorly maintained and underutilized large athletic field to provide community significantly more multi-sport use of an existing facility. This Athletic Complex serves a densely populated area of more than 150,000 residents within 5-mile radius. Future maintenance costs could be offset by user fees. Phase I without lighting installation was completed in 2015 for $4.2M, Phase II estimated at $6-8M with funding and timing undetermined. This partnership improvement is supported by a Recommendation, 2 Goals and 5 Objectives in the 2022 PROS Plan including Recommendation 3.2 “expand partnerships and agreements with Edmonds School District…to provide public access and opportunities for outdoor recreation”. And PROS Plan Goal 3, Objectives 3.3, 3.9, 3.10 and 3.11; and Goal 9, Objective 9.4. Estimated Cost: Phase 1 Lighting: $1,500,000; Phase 2: $6 – 8M 2025 2026 2027 2028 2029 2030 Total Construction (D20) - Lighting $1,500,000 $1,500,000 Total Expenses $1,500,000 $1,500,000 Real Estate Excise Tax II - Fund 125 Park Impact Fees – Fund 332-100 Total Revenue $0 $0 Unsecured Funding ($1,500,000) ($1,500,000) *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Phase 2 Phase 1 6.A.b Packet Pg. 165 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 18 Parks & Recreation Sierra Park – R8 81st Ave W & 190th St SW Project Summary: Replacement of the playground and fall surfacing at Sierra Park. The playground is 27 years old and is currently the smallest and most limited playground in the park system. The new playground will be ADA accessible and could be an inclusive level design. Project Justification: These improvements are supported by three Goals and Objectives and two Recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan. The improvement project is supported by Goal 1, Objective 1.1; Goal 3, Objective 3.8, Goal 9, Objective 9.1 and Recommendation 3.1. In addition, Recommendation 3.4 states “replace the playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park”. Estimated Cost: $400,000 2025 2026 2027 2028 2029 2030 Total Construction (R8) – Playground Replacement $50,000 $350,000 $400,000 Total Expenses $50,000 $350,000 $400,000 Real Estate Excise Tax II - Fund 125 $50,000 $350,000 $400,000 Total Revenue $50,000 $350,000 $400,000 Unsecured Funding $0 $0 $0 6.A.b Packet Pg. 166 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 19 Parks & Recreation Pine Street Park - D10, D11 & D12 6th and Pine Street Project Summary: Park improvements to include the addition of a small shelter with picnic tables, canopy shade trees and a paved interior connecting pathway. Project Justification: These improvements are supported by 2 Recommendations, 2 Goals and 2 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.5 is to add amenities to existing parks, such as picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park and paved pathway connections in Mathay Ballinger Park and Pine Street Park. PROS Plan Goal 3, Objective 3.8; Goal 9, Objective 9.1 and Recommendation 6.2 also align with these improvements. Estimated Cost: $360,000 2025 2026 2027 2028 2029 2030 Total Construction (D10) – Shelter w/Picnic Tables $100,000 $100,000 Construction (D11) – Paved Pathway $35,000 $200,000 $235,000 Construction (D12) – Canopy Shade Trees $25,000 $25,000 Total Expenses $100,000 $60,000 $200,000 $360,000 Real Estate Excise Tax II - Fund 125 $100,000 $60,000 $200,000 $360,000 Total Revenue $100,000 $60,000 $200,000 $360,000 Unsecured Funding $0 $0 $0 $0 6.A.b Packet Pg. 167 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 20 Parks & Recreation Maplewood Hill Park – R12 19800 89th Pl W Project Summary: Replacement of the existing playground installed in 1985. This playground is 38 years old and is the oldest in the park system. Project Justification: This improvement is supported by three Goals and Objectives as well as two Recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan. PROS Plan Goal 1, Objective 1.1; Goal 3, Objective 3.8; Goal 9, Objective 9.1 and Recommendation 3.1 also align with this improvement. Recommendation 3.4 specifically states “replace the playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park”. Estimated Cost: $400,000 2025 2026 2027 2028 2029 2030 Total Construction (R12) – Playground Replacement $50,000 $350,000 $400,000 Total Expenses $50,000 $350,000 $400,000 Real Estate Excise Tax II - Fund 125 $50,000 $350,000 $400,000 Total Revenue $50,000 $350,000 $400,000 Unsecured Funding $0 $0 6.A.b Packet Pg. 168 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 21 Parks & Recreation Neighborhood Park SR 99 – P6 & D15 Project Summary: Design and development of an additional neighborhood park in the SR 99 area to address an existing gap in park services and inequities in parkland distribution. Once an acquisition has been authorized (see Land Acquisition Section for details) a Master Plan should be developed in collaboration with the surrounding community. Eventual development of the park will be based on the Master Plan. Project Justification: The addition of a new park is supported by three Goals and 11 Objectives two recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan. PROS Plan Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 also align with the development of a new park. Recommendation 1 states “to fill the park system gaps…1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor”. Estimated Cost: $930,000 + Parkland Acquisition 2025 2026 2027 2028 2029 2030 Total Planning – Neighborhood Park SR99 (P6) $80,000 $80,000 Construction – Neighborhood Park SR 99 (D15) $850,000 $850,000 Total Expenses $80,000 $850,000 $930,000 Real Estate Excise Tax II - Fund 125 Park Impact Fees – Fund 332-100 $80,000 $850,000 $930,000 Total Revenue $80,000 $850,000 $930,000 Unsecured Funding *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) 6.A.b Packet Pg. 169 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 22 Parks & Recreation Elm Street Park - D16, D17 & R14 7th & Elm Street Project Summary: Park enhancements to include the addition of a nature playground, small shelter with picnic tables, habitat restoration and public process to consider possible off-leash dog park area. Project Justification: These improvements are supported by two Goals and Objectives and two Recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan. PROS Plan Goal 6, Objective 6.5; Goal 9, Objective 9.1; and Recommendation 3.5 support these improvements. Recommendation 3.1 is to “add amenities to existing parks, such as picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park”. Estimated Cost: $490,000 2025 2026 2027 2028 2029 2030 Total Construction (R14) – Habitat Restoration $55,000 $55,000 Construction (D16) – Nature Play & Dog park $50,000 $300,000 $350,000 Construction (D17) – Shelter w/Picnic Tables $85,000 $85,000 Total Expenses $105,000 $385,000 $490,000 Real Estate Excise Tax II - Fund 125 $50,000 $300,000 $350,000 Total Revenue $50,000 $300,000 $350,000 Unsecured Funding (55,000) ($85,000) ($140,000) 6.A.b Packet Pg. 170 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 23 Parks & Recreation Neighborhood Park SE 2 – P7, D18 Project Summary: Design and future development of an additional neighborhood park in the SE Edmonds area to address an existing gap in park services and inequities in parkland distribution. Once an acquisition (see Land Acquisition Section for details) has been authorized a Master Plan will be developed in collaboration with the surrounding community. Development of the park will be based on the Master Plan. Project Justification: The addition of a new park is supported by three Goals and 11 Objectives and two Recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan including Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 support the development of a new park. Recommendation 1 states “to fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor”. Estimated Cost: $82,000 + Parkland Acquisition 2025 2026 2027 2028 2029 2030 Total Planning – Neighborhood Park SE 2 (P7) $82,000 $82,000 Construction – Neighborhood Park SE 2 (D18) Total Expenses $82,000 $82,000 Real Estate Excise Tax II - Fund 125 Total Revenue Unsecured Funding ($82,000) ($82,000) *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) 6.A.b Packet Pg. 171 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 24 Parks & Recreation Yost Pool Replacement – R15 96th Ave W & Bowdoin Way, Yost Park Project Summary: Yost Pool was built nearly 50 years ago and continues to provide recreational opportunities for many residents and visitors. In addition to teaching youth lifesaving water safety, the pool serves as an opportunity for community members of all ages to lead healthy and active lifestyles. Funding for this project has not been identified, may need partnerships and would likely require voter approval. Project Justification: Replacing Yost Pool is supported by four Goals and six Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan lists Goal 1, Objective 1.1; Goal 3, Objectives 3.7, 3.8 and 3.9; Goal 7, Objective 7.4; Goal 9, Objective 9.1 and Recommendations 3.1, 4.1, 4.2 and 6.2. Recommendation 4 actually states “replace Yost Pool”. Estimated Cost: $24,000,000 2025 2026 2027 2028 2029 2030 Total Planning & Construction (R15) $24,000,000 $24,000,000 Total Expenses $24,000,000 $24,000,000 Real Estate Excise Tax II - Fund 125 Fund 332 Balance + Park Impact Fees Secured Grants Bonds Total Revenue $0 $0 Unsecured Funding ($24,000,000) ($24,000,000) *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) 6.A.b Packet Pg. 172 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 25 Parks & Recreation Edmonds Marsh-Estuary Expansion & Restoration - A1, P4, D9 & D1 Edmonds Marsh - City of Edmonds Marsh, Marina Beach Park and property owned by Unocal (Chevron) Project Summary: Reconnect the Puget Sound with the Edmonds Marsh near-shore estuary by restoring the natural tidal exchange. This project will impact the existing Marina Beach Park and its proposed renovation including daylighting of Willow Creek within the park and the Edmonds Marsh. In addition, this project encompasses the possible acquisition or use of the adjacent 21-acre parcel known as the Unocal property to support a larger estuary restoration project. Once acquired, an integrated restoration plan can be developed to restore functioning conditions of the tidal wetland for salmon recovery, wildlife conservation and improved public access for recreational use, environmental education and wildlife viewing. Project Justification: The marsh estuary restoration project will allow for and provide a natural tidal exchange, allow salmon to again migrate into Willow Creek, support migratory birds and waterfowl, provide a natural redistribution of saltwater-freshwater flora and fauna and address sea level rise impacts. This project is supported by 3 Recommendations, 5 Goals and 8 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 2.2 – Expand the Edmonds Marsh/Estuary to include the Unocal property. Develop funding strategy for purchase of the Unocal property or negotiate with the State of Washington to have the property become part of the Edmonds Marsh/Estuary. PROS Plan Goal 1, Objective 1.1; Goal 4, Objective 4.3; Goal 5, Objectives 5.1, 5.3 and 5.4; Goal 6, Objective 6.5 and 6.7; Goal 9, Objective 9.1; Recommendation 2.1 and 3.11 also align with this project. Estimated Cost: TBD Acquisition and Planning + Restoration + Marina Beach Park renovation Continued on next page. 6.A.b Packet Pg. 173 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 26 Edmonds Marsh-Estuary Expansion & Restoration– continued. 2025 2026 2027 2028 2029 2030 Total Land Acquisition (A1) TBD TBD TBD TBD TBD TBD TBD Master Plan (P4) TBD TBD TBD TBD TBD TBD TBD Master Plan Implementation (D9) TBD TBD TBD TBD TBD TBD TBD Restoration (D1) - TBD TBD TBD TBD TBD TBD TBD TBD Total Expenses TBD TBD TBD TBD TBD TBD TBD Real Estate Excise Tax II - Fund 125 Real Estate Excise Tax I – Fund 126 Fund 332 Balance + Park Impact Fees Bond Proceeds Secured Grants Tree Fund 143 – Land Acquisition Park Donations Operating Contribution – General Fund Stormwater – Fund 422 Total Revenue TBD TBD TBD TBD TBD TBD TBD Unsecured Funding TBD TBD TBD TBD TBD TBD TBD Project Accounting #M070 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Expense estimates and funding sources changed to TBD per Council direction December 2022. 6.A.b Packet Pg. 174 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 27 2024-2029 Parks Capital Improvement & Capital Facilities Plan PROGRAMS 6.A.b Packet Pg. 175 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 28 Parks & Recreation Citywide Park Improvements / Capital Replacement Program - R17 Project Summary: The 2022 Parks, Recreation & Open Space (PROS) plan identified a significant list of deferred park maintenance projects. With the addition of a Parks Capital Project Manager, hired in 2022 and the Job Order Contracting program, the Parks Department will continue to make progress on the numerous system-wide repairs, renovations and replacements of an aging parks infrastructure and ADA accessibility. Project Justification: Insufficiently maintained parks and related assets lead to higher deferred maintenance costs, increased City liability and decreased level of service and community satisfaction. This program is supported by six Goals and 21 Objectives and five Recommendations in the 2022 Parks, Recreation and Opens Space (PROS) Plan. These include Goal 2, Objectives 2.1 and 2.3; Goal 3, Objectives 3.6, 3.7, 3.8 and 3.9; Goal 4, Objectives 4.1, 4.2, and 4.4; Goal 5, Objectives 5.1, 5.3, and 5.4; Goal 6, Objectives 6.1, 6.3, 6.4, 6.5 and 6.7; and Goal 9, Objectives 9.1, 9.2, 9.3 and 9.9. Recommendation 3.1 is “Maintain, renovate, or replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety” and additional recommendations are found in 3.7, 6.2, 6.3 and 6.4. Estimated Cost: $2,700,000 (6-year total) 2025 2026 2027 2028 2029 2030 Total Repair & Maintenance $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $1,800,000 Professional Services $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $900,000 Total Expenses $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,700,000 Real Estate Excise Tax II - Fund 125 $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,700,000 Total Revenue $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,700,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $0 6.A.b Packet Pg. 176 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 29 Parks & Recreation ADA Improvements / Replacement – R16 Project Summary: Systemic accessibility installations, upgrades, replacements and or renovations are needed throughout the City of Edmonds parks, open spaces, trails and recreation facilities and amenities. Examples of projects include Seaview Park restroom access and pathway to the playground, ADA compliant access in the Marina Beach Park dog park and Edmonds Marsh viewing pier and platform and among other numerous projects throughout the city parks and city-owned public spaces. This funding to be used for professional design, permits and arranging construction of these projects. Project Justification: In addition to building code compliance and ADA requirements, these improvements are supported by three goals and objectives and three recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan. Included are Goal 2, Objective 2.1; Goal 3, Objectives 3.3, 3.7, 3.8 and 3,9; and Goal 9, Objective 9.1. Recommendations 3.1 “ensuring public accessibility” and 6.2 includes “improvements to park facilities to conform with American with Disabilities Act (ADA) and ensure universal accessibility”. In addition, recommendation 6.3 is to replace or renovate restrooms at Olympic Beach, Seaview Park and Brackett's Landing North. Estimated Cost: $500,000 2025 2026 2027 2028 2029 2030 Total Construction (R16) $200,000 $300,000 $500,000 Total Expenses $200,000 $300,000 $500,000 Real Estate Excise Tax II - Fund 125 $200,000 $300,000 $500,000 Total Revenue $200,000 $300,000 $500,000 Unsecured Funding $0 $0 $0 6.A.b Packet Pg. 177 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 30 2024-2029 Parks Capital Improvement & Capital Facilities Plan PARKLAND ACQUISITION 6.A.b Packet Pg. 178 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 31 Parks & Recreation Parkland Acquisition – Neighborhood Park SR 99 & SE 2 - A3 & A4 Project Summary: Acquisition of parkland that will benefit the Edmond community and support the priorities identified in the PROS Plan. Currently, $1,140,625 is reserved for parkland and open space acquisition. These funds were accumulated from 2019 through 2024. There is no specific request to purchase a particular parcel as opportunities are somewhat limited in a mostly built-out city, but staff continues to search for, develop and negotiate opportunities. Project Justification: Parkland acquisitions are supported by two Goals and five Objectives (land purchase only, see previous projects for development) and a Recommendation in the 2022 Parks, Recreation & Open Space (PROS) Plan. Those include Goal 2, Objective 2.1; Goal 3, Objectives 3.1, 3.2, 3.3 and 3.9 also support the acquisition of parkland. Recommendation 1 is to “Fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor”. Estimated Cost: $1,800,000 2025 2026 2027 2028 2029 2030 Total Acquisition – Neighborhood Park SR99 (A3) $900,000 $900,000 Acquisition – Neighborhood Park SE 2 (A4) $900,000 $900,000 Total Expenses $900,000 $900,000 $1,800,000 Real Estate Excise Tax I - Fund 126 $900,000 $700,000 $1,600,000 Tree Fund 143 - land acquisition - TBD $200,000 $200,000 Snohomish County Conservation Futures Total Revenue $900,000 $900,000 $1,800,000 $0 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) 6.A.b Packet Pg. 179 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Page 32 2024-2029 Parks Capital Improvement & Capital Facilities Plan FUND DETAIL 6.A.b Packet Pg. 180 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l I m p r o v e m e n t P r o g r a m ( C I P ) ) Fund 332 Fund 332 Expenditures 2025 2026 2027 2028 2029 2030 6‐Year Total D9 Edmonds Marsh Estuary Restoration (Master Plan Implementation) $‐    D1 Edmonds Marsh Estuary Restoration (Restoration) $‐    R14 Elm Street Park Habitat Restoration  $        55,000  $        55,000  D17 Elm Street Park (Shelter w/Picnic Tables) $        85,000  $        85,000  R20 Marsh Boardwalk Replacement  $      750,000  $      750,000  D13 Mee Property  (Park Development) $      250,000  $      250,000  D15 Neighborhood Park ‐ SR99 (Park Development) $        80,000  $      850,000  $      930,000  D18 Neighborhood Park ‐ SE2 (Park Development)82,000$          $        82,000  R15 Pool Replacement 24,000,000$  $ 24,000,000  P1 Parks Facilities M&O Building (Design) $      875,500  $      875,500  D2 Parks Facilities M&O Building (Construction) $   4,700,000  $   4,700,000  D20 Woodway Campus Athletic Complex ‐ Phase I ‐ Lighting  $   1,500,000  $   1,500,000  ‐$               ‐$               3,375,500$   4,700,000$   135,000$      25,017,000$ 33,227,500$  Fund 332 Revenue 2025 2026 2027 2028 2029 2030 6‐Year Total Park Impact Fees (Fund 332‐100) $      200,000  $      200,000  $      200,000  $      200,000  $      200,000  $      200,000  $   1,200,000  Miscellaneous Park Donations  $‐    Bond Proceeds  $‐    Park Impact Fees ‐ Mee Property (Park Development) $      250,000  $      250,000  Park Impact Fees ‐ Neighborhood Park SR99 (Development) $        80,000  $      850,000  $      930,000  Unsecured Funding ‐ Woodway Campus Athletic Complex Phase I  $   1,500,000  $   1,500,000  Unsecured Grants ‐ Marsh Estuary Restoration  $‐    Unsecured Grants ‐ Elm Street Park Habitat Restoration & Shelter  $        55,000  $        85,000  $      140,000  Unsecured Grants ‐ Neighborhood Park SE 2 (Development) $        82,000  $        82,000  Unsecured Funding (Bonds, Levy, Misc.) Pool Replacement  $ 24,000,000  $ 24,000,000  Unsecured Funding Park Facilities M&O Building  $      875,000  $   4,700,000  $   5,575,000  Unsecured Grants ‐ Marsh Walkway Replacement  $      750,000  $      750,000  200,000$      200,000$      3,575,000$   4,900,000$   335,000$      25,217,000$ 37,357,000$  2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance (332)106,309$       110,729$       115,349$       120,617$       126,648$       132,980$        (F) Investment Interest (5%)4,420$           4,620$           5,767$           6,031$           6,332$           6,649$            (D) Revenue ‐ Non Park Impact Fees ‐$               ‐$               3,375,000$   4,700,000$   135,000$       25,017,000$  (C) Expenditures ‐$               ‐$               3,375,500$   4,700,000$   135,000$       25,017,000$  110,729$      115,349$      120,617$      126,648$      132,980$      139,629$       Costs inflated at 3% per year (C) TOTAL Fund 332 Expenditures (D) TOTAL Fund 332 Revenue Fund 332 Parks Fund 6‐Year Overview (H) Ending Fund Balance (E+F+D‐C) Page 33 6.A.b Packet Pg. 181 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l Fund 332 2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance (332‐100) ‐ Park Impact Fees 180,232$       383,682$       587,282$       566,646$       794,978$       954,727$        (F) Investment Interest (5%)3,450$           3,600$           29,364$         28,332$         39,749$         47,736$          (D) Revenue ‐ Park Impact Fees Only 200,000$       200,000$       200,000$       200,000$       200,000$       200,000$        (C) Expenditures ‐$               ‐$               250,000$       ‐$               80,000$         850,000$        383,682$      587,282$      566,646$      794,978$      954,727$      352,464$       Project Type:  A Acquisition P Master Planning D Development ‐ New R Replacement / Upgrade (I) Ending Fund Balance (E+F+D‐C) Fund 332‐100 Fund Park Impact Fee 6‐Year Overview Page 34 6.A.b Packet Pg. 182 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l REET II Fund 125 REET II (Fund 125) Expenditures 2025 2026 2027 2028 2029 2030 6‐Year Total P4 Edmonds Marsh Estuary Restoration (Master Plan) $‐    D16 Elm Street Park (Nature Playground & Dog Park) $         50,000  $       300,000  $       350,000  P5 Johnson Property (Master Plan) $       100,000  $       100,000  R12 Maplewood Hill Park (Playground Replacement) $         50,000  $       350,000  $       400,000  R20 Marsh Boardwalk Replacement (Design) $         75,000  $         75,000  D19 Mountlake Terrace ILA (Lake Ballinger Park)* $       200,000  $       200,000  P2 Mee Property ‐ (Master Plan) $         80,000  $         80,000  P1 Parks Facilities M&O Building (Design) $       250,000  $       250,000  D10 Pine Street Park (Shelter w/Picnic Tables) $       100,000  $       100,000  D11 Pine Street Park (Paved Connecting Pathway) $         35,000  $       200,000  $       235,000  D12 Pine Street Park (Canopy Shade Trees) $         25,000  $         25,000  R19 Shell Creek Restoration Phase 2 (Yost Park) $       380,000  $       380,000  R8 Sierra Park (Playground Replacement) $         50,000  $       350,000  $       400,000  R11 Yost Pool Upgrades & Renovation  $       350,000  $       350,000  R16 ADA Improvements (Seaview Restroom & Pathway) $       200,000  $       300,000  $       500,000  R17 Citywide Park Improvements / Capital Replacement Program 450,000$       450,000$       450,000$       450,000$       450,000$       450,000$        $    2,700,000  1,110,000$   1,075,000$    1,150,000$    950,000$       910,000$       950,000$       6,145,000$     REET II (Fund 125) Revenue 2025 2026 2027 2028 2029 2030 6‐Year Total Real Estate Excise Tax (REET) II ‐ Fund 125  $   1,110,000  $    1,075,000  $    1,150,000  $       950,000  $       910,000  $       950,000  $    6,145,000  1,110,000$   1,075,000$    1,150,000$    950,000$       910,000$       950,000$       6,145,000$     2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance ‐$                ‐$                ‐$                ‐$                ‐$                ‐$                 (D) Revenue 1,110,000$   1,075,000$    1,150,000$    950,000$       910,000$       950,000$        (C) Expenditures 1,110,000$   1,075,000$    1,150,000$    950,000$       910,000$       950,000$        ‐$                ‐$                ‐$                ‐$                ‐$                ‐$                 (C) TOTAL PARKS REET II (Fund 125) Expenditures (D) TOTAL PARKS REET I (Fund 126) Revenue REET II (Fund 125) Parks Fund 6‐Year Overview (G) Ending Fund Balance (E+D‐C) Costs inflated at 3% per year *Project added via Council amendment in 2023 Page 35 6.A.b Packet Pg. 183 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l REET I Fund 126 REET I (Fund 126) Expenditures 2025 2026 2027 2028 2029 2030 6‐Year Total A1 Edmonds Marsh Estuary Restoration (Acquisition) $‐    A2 Neighborhood Park ‐ SE1 (Acquisition) $‐    A3 Neighborhood Park ‐ SR99 (Acquisition) $        900,000  $       900,000  A4 Neighborhood Park ‐ SE2 (Acquisition) $        700,000  $       700,000  Debt Interest & Principal (Civic & Marina Beach) $        412,518  $        416,188  $        410,438  $        416,350  $        407,912  $        414,225  $   2,477,630  412,518$        416,188$        410,438$        1,316,350$     1,107,912$     414,225$         $   4,077,630  REET I (Fund 126) Revenue 2025 2026 2027 2028 2029 2030 6‐Year Total Real Estate Excise Tax (REET) I ‐ Fund 126 ‐ Land Acquisition  $        100,000  $        100,000  $        100,000  $        100,000  $        100,000  $        100,000  $       600,000  Real Estate Excise Tax (REET) I ‐ Fund 126 ‐ Debt Interest & Principal  $        412,518  $        416,188  $        410,438  $        416,350  $        407,912  $        414,225  $   2,477,630  512,518$        516,188$        510,438$        516,350$        507,912$        514,225$        3,077,630$    2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance 1,140,625$     1,240,625$     1,340,625$     1,440,625$     640,625$        40,625$            (D) Revenue 512,518$        516,188$        510,438$        516,350$        507,912$        514,225$         (C) Expenditures 412,518$        416,188$        410,438$        1,316,350$     1,107,912$     414,225$         1,240,625$     1,340,625$     1,440,625$     640,625$        40,625$           140,625$         (C) TOTAL PARKS REET I (Fund 126) Expenditures (D) TOTAL PARKS REET I (Fund 126) Revenue REET I  (Fund 126) Parks Fund 6‐Year Overview (G) Ending Fund Balance (E+D‐C) Costs inflated at 3% per year Page 36 6.A.b Packet Pg. 184 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l TREE Fund 143 TREE (Fund 143) Expenditures 2025 2026 2027 2028 2029 2030 6‐Year Total Park and Open Space Acquisition Program  $‐    Mee Property Acquisition  $‐    A4 Neighborhood Park ‐ SE2 (Acquisition)200,000$        $       200,000  Tree Board Supplies and Minute Taker 4,000$            4,000$            4,000$            4,000$            4,000$            4,000$             $         24,000  4,000$            4,000$            4,000$            4,000$            204,000$       4,000$            224,000$        TREE (Fund 143) Revenue 2025 2026 2027 2028 2029 2030 6‐Year Total Tree ‐ Fund 143  $         70,152  $         45,749  $         50,000  $         50,000  $         50,000  $         50,000  $       315,901  Investment Interest (@5%) $         14,040  $         14,670  $           8,419  $         11,140  $         13,997  $           6,997  $         69,262  84,192$         60,419$         58,419$         61,140$         63,997$         56,997$         385,163$        2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance 31,766$         111,958$       168,377$       222,796$       279,936$       139,932$        (D) Revenue 84,192$         60,419$         58,419$         61,140$         63,997$         56,997$          (C) Expenditures 4,000$            4,000$            4,000$            4,000$            204,000$       4,000$             111,958$       168,377$       222,796$       279,936$       139,932$       192,929$        (C) TOTAL TREE (Fund 143) Expenditures (D) TOTAL TREE (Fund 143) Revenue TREE (Fund 143) 6‐Year Overview (G) Ending Fund Balance (E+D‐C) Costs inflated at 3% per year Page 37 6.A.b Packet Pg. 185 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l CEMETERY Trust Fund 137 CEMETERY Trust (Fund 137) Expenditures 2025 2026 2027 2028 2029 2030 6‐Year Total D8 Columbarium Expansion ‐ Phase II 175,000$        $      175,000  Repair & Maintenance 25,000$         25,000$         25,000$         25,000$         25,000$         25,000$          $      150,000  200,000$       25,000$         25,000$         25,000$         25,000$         25,000$         325,000$        CEMETERY Trust (Fund 137) Revenue 2025 2026 2027 2028 2029 2030 6‐Year Total Cemetery Trust ‐ Fund 137 Investment Interest (@5%) $         77,880  $         81,400  $         70,091  $         73,145  $         76,352  $         79,720  $      458,588  Cemetery Trust ‐ Fund 137 Sales Revenue  $         18,540  $         19,096  $         16,000  $         16,000  $         16,000  $         16,000  $      101,636  96,420$         100,496$       86,091$         89,145$         92,352$         95,720$         560,224$        2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance 1,429,895$   1,326,315$   1,401,811$   1,462,902$   1,527,047$   1,594,399$    (D) Revenue 96,420$         100,496$       86,091$         89,145$         92,352$         95,720$          (C) Expenditures 200,000$       25,000$         25,000$         25,000$         25,000$         25,000$          1,326,315$   1,401,811$   1,462,902$   1,527,047$   1,594,399$   1,665,119$    (C) TOTAL CEMETERY Trust(Fund 137) Expenditures (D) TOTAL CEMETERY Trust (Fund 137) Revenue CEMETERY Trust (Fund 137) 6‐Year Overview (G) Ending Fund Balance (E+D‐C) Costs inflated at 3% per year Page 38 6.A.b Packet Pg. 186 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l PARKS CIP / CFP COMPARISON 2025 ‐ 30 vs. 2024‐29 Type PROJECT NAME CFP DESCRIPTION Parks ADA Improvements & Replacement Ongoing replacement or improvements to meet ADA Standards. Parks Marsh Boardwalk Replacement Renovation and replacement of NW Edmonds Marsh Boardwalk to include ADA upgrades. Parks Mee Property Master Plan X Was part of Parkland Acquisition, now stand alone project.  Type PROJECT NAME CFP DESCRIPTION Parks Interurban Trail Extension Removed due to lack of available funding.  Parks Mathay Ballinger Park Project completion scheduled for 2024. Parks Neighborhood Park SE 1Mee Property Purchased in 2024. Master Plan listed above as new item.  Parks Olympic Beach Park Restroom Interior renovation completed.  Parks Parkland Acquisition Support Removed, will be requested if/when potential acquisition is identified. Parks Signage & Wayfinding Project completion scheduled for 2024. Parks Waterfront Walkway (missing link) Removed due to lack of available funding and other capital priorities.  Parks Yost Park Playground Improvements Project expenses deemed replacement as not feasible at this time. Type PROJECT NAME CFP CHANGE Parks Elm Street Park Improvements Moved to 2029‐30 vs. 2028‐29. Parks Johnson Property Master Plan X Expenditure estimate updated to reflect more current pricing. Parks Lake Ballinger Park Mountlake Terrace ILA ILA completed in 2023; payment due upon construction completion estimated for 2025, carryforward. Parks Maplewood Hill Park Improvements Moved to 2028‐29 vs. 2027. Parks Neighborhood Park SE 2 X Acquisition moved to 2029 vs. 2026 and Master Plan moved to 2030 vs. 2027. Parks Neighborhood Park SR 99 X Acquisition moved to 2028 vs. 2025 and Master Plan/Construction moved to 2029‐30 vs. 2026‐27. Parks Parks & Facilities Maintenance Building X Construction shifted to 2028 vs. 2027; preliminary design funded via REET Fund 125. Parks Pine Street Park Improvements Moved to 2028, 29 & 30 vs. 2025‐26. Parks Pool Replacement X Moved to 2030 vs. 2029. Parks Seaview Park Restroom Replacement Moved into ADA Improvements & Replacement Program 2026‐2027 vs. 2028. Parks Sierra Park Improvements Moved to 2027‐28 vs. 2026. Parks Woodway Campus Athletic Complex Phase 1XMoved to 2027 vs. 2025 due to required ESD partnership development and coordination.  Parks Yost Pool Upgrades & Renovation Moved to 2027 vs. 2025. Parks Yost Pool Replacement XReplacement of existing pool ‐ moved to 2030 vs. 2029. PROJECTS REVISED PROJECTS ADDED PROJECTS REMOVED Page 39 6.A.b Packet Pg. 187 At t a c h m e n t : 2 0 2 5 - 2 0 3 0 P a r k s C I P _ C F P D R A F T ( 2 0 2 5 - 2 0 3 0 C a p i t a l F a c i l i t i e s P l a n ( C F P ) a n d C a p i t a l Public Works & Utilities Parks & Recreation 2025-2030 CIP/CFP Planning Board Public Hearing September 25, 2024 PARKS, RECREATION AND HUMAN SERVICES 6.A.c Packet Pg. 188 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Public Works & UtilitiesCapital Facilities Plan (CFP) & Capital Improvement Program (CIP) Planning Board – September 25, 2024 Rob English, City Engineer 6.A.c Packet Pg. 189 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Public Works & Utilities 2025-2030 CFP & CIP Combined CFP & CIP Document •Transportation •Utilities •Water •Stormwater •Sewer •Facilities •Wastewater Treatment Plant 3 6.A.c Packet Pg. 190 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Transportation 2025-26 Pavement Preservation Projects 4 Project Funding 2025 2026 2025 Annual Overlay Program REET/Utility $1,719,200 2026 Annual Overlay Program REET/Utility $82,600 $773,250 2027 Annual Overlay Program REET/Utility $82,600 88th Ave Overlay & Sidewalk Repair REET/Utility $1,180,000 Olympic View Dr Overlay REET/Fed $484,000 $963,700 Main St. Overlay REET/Fed/State $642,020 Water, Storm & Sewer Overlay Cl-Out Utility $1,500 6.A.c Packet Pg. 191 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Transportation 2025-26 Safety & Capacity Projects 5 Project Funding 2025 2026 Hwy 99 Stage 3 (244th St – 238th St)State/Utility $1,984,200 $1,683,000 Hwy 99 Stage 4 (224th St – 220th St)State/Fed/TIF $825,000 $1,620,000 76th Ave/220th St Intersection Improv Fed/TIF/Utility $198,000 $1,488,500 SR-104 Adaptive System Fed/REET $67,740 Traffic Signal Program REET $30,280 $30,280 Safety Action Plan Fed/Gas Tax $375,000 6.A.c Packet Pg. 192 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Transportation 2025-26 Active Transportation Projects & Planning 6 Project Funding 2025 2026 Transportation Plan Update Gas Tax $35,000 Traffic Calming Program REET $80,650 $80,650 Pedestrian Safety Program REET $20,180 $20,180 84th Ave Walkway (238th St–234th St)REET $100,000 Citywide Bikelane/Elm Way Walkway REET $15,000 6.A.c Packet Pg. 193 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Public Works & Utilities – Utilities 2025-26 Water Utility 7 Project Funding 2025 2026 2024 Water Replacement Utility $15,000 2025 Water Replacement Utility $3,533,000 2026 Water Replacement Utility $547,000 $3,289,000 2027 Water Replacement Utility $569,000 Yost & Seaview Reservoirs Utility $4,760,000 $3,850,000 2027 Water Comprehensive Plan Update Utility $150,000 6.A.c Packet Pg. 194 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Utilities 2025-26 Stormwater Utility 8 Project Funding 2025 2026 2024 Storm Replacement Utility $10,000 2025 Storm Replacement Utility $1,597,000 2026 Storm Replacement Utility $249,000 $981,000 2027 Storm Replacement Utility $351,000 Storm & Surface Water Comp Plan Utility $213,000 Lake Ballinger Property Utility $256,000 $5,000 Perrinville Funding 2025 2026 Lower Restoration Utility $350,000 $1,520,000 Flow Management Projects Utility $104,000 $108,000 Basin Analysis Update State/Utility $461,767 Edmonds Marsh Funding 2025 2026 Planning Study Fed/Utility $89,000 Water Quality Phases 1 & 2 State/Utility $708,636 6.A.c Packet Pg. 195 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Utilities 2025-26 Sewer Utility 9 Project Funding 2025 2026 2024 Sewer Replacement Utility $10,000 2025 Sewer Replacement Utility $2,302,000 2026 Sewer Replacement Utility $378,000 $2,126,000 2027 Sewer Replacement Utility $393,000 2027 Sewer Comprehensive Plan Update Utility $150,000 6.A.c Packet Pg. 196 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l 10 Project Funding 2025 2026 WWTP Annual Capital Replacements Utility/WWTP Partners $100,000 Nutrient Removal Project Utility/WWTP Partners $100,000 $650,000 VFD Upgrades Utility/WWTP Partners $250,000 $250,000 NPW Pumping System Improvements Utility/WWTP Partners $75,000 Screw Press Feed System Rehab Utility/WWTP Partners $150,000 600 Bldg Air Quality Evaluation Utility/WWTP Partners $50,000 Blower 303 Rehab Utility/WWTP Partners $35,000 ODS(Primary Sludge)Pump Replace Utility/WWTP Partners $350,000 600 Bldg Electrical System Rehab Utility/WWTP Partners $250,000 600 Bldg Air Quality Rehab/Upgrade Utility/WWTP Partners $250,000 Secondary Clarifier 2 Rehab Utility/WWTP Partners $450,000 Utilities 2025-26 Wastewater Treatment Plant 6.A.c Packet Pg. 197 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Parks & Recreation Parks 2025-2030 CIP / CFP Summary PARKS, RECREATION AND HUMAN SERVICES 6.A.c Packet Pg. 198 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Parks & Recreation Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) Angie Feser, Director & Shannon Burley, Deputy Director 6.A.c Packet Pg. 199 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Parks 2025-2030 CIP / CFP - Projects CFP Project #Project Site & Description 2025 2026 2027 2028 2029 2030 6-Year Total R19 Shell Creek Restoration Phase 2 Project to provide improved environmental health and erosion control of Shell Creek in Yost Park, may include trail, bridge and boardwalk repair or relocation. 380,000$ -$ -$ -$ -$ -$ 380,000$ D19 Lake Ballinger Park Mountlake Terrace ILA *CARRYFORWARD* Funding to support City of Mountlake Terrace Ballinger Park Phase III Development. Payment due upon completion of project. 200,000$ -$ -$ -$ -$ -$ 200,000$ D8 Columbarium Expansion - Phase II Expansion of the current columbarium. Funding provided through the Cemetery Trust Fund 137. 175,000$ -$ -$ -$ -$ -$ 175,000$ X P2 D13 Mee Property Master plan and future development providing expansion of the Mathay Ballinger neighborhood park. Property purchased in 2024. 80,000$ -$ 250,000$ -$ -$ -$ 330,000$ X P5 Johnson Property Master plan for future use and expansion of Yost Park. Site development not included in estimate. Demolition, debris removal and site security completed in 2023. -$ 100,000$ -$ -$ -$ -$ 100,000$ X P1 D2 Parks & Facilities Maintenance and Operations Building Replace and/or renovate Parks & Facilities Maintenance Shop located in City Park. Preliminary design in 2026. -$ 250,000$ 875,500$ 4,700,000$ -$ -$ 5,825,500$ D21 R20 Marsh Boardwalk Replacement Renovation and replacement of northwest Edmonds Marsh boardwalk to include ADA upgrades. -$ 75,000$ 750,000$ -$ -$ -$ 825,000$ R11 Yost Pool Upgrades & Renovation Repairs and renovations of 50+ year old pool as needed to include a complete replaster of the pool. -$ -$ 350,000$ -$ -$ -$ 350,000$ X D20 Woodway Campus Athletic Complex - Phase I - Lighting In cooperation with the Edmonds School District, complete a community park and athletic complex at Former Woodway High School to include lighting and future construction of two additional fields. -$ -$ 1,500,000$ -$ -$ -$ 1,500,000$ Costs inflated at 3% per year 6.A.c Packet Pg. 200 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Parks 2024-2029 CIP / CFP - Projects CFP Project #Project Site & Description 2025 2026 2027 2028 2029 2030 6-Year Total R8 Sierra Park Replacement of a 25+ year old playground and related improvements to included ADA compliance. -$ -$ 50,000$ 350,000$ -$ -$ 400,000$ D10 D11 D12 Pine Street Park Park enhancements to include the addition of a small shelter with picnic tables, canopy shade trees and a paved connecting pathway. -$ -$ -$ 100,000$ 60,000$ 200,000$ 360,000$ R12 Maplewood Hill Park Replacement of a nearly 40 year old playground for improved play experience and ADA compliance. -$ -$ -$ 50,000$ 350,000$ -$ 400,000$ X P6 D15 Neighborhood Park SR99 Master plan and development of a new neighborhood park in Southeast Edmonds (funding is in Parkland Acquisition program for purchase). -$ -$ -$ -$ 80,000$ 850,000$ 930,000$ D16 D17 R14 Elm Street Park Park enhancements to include the addition of a nature playground, small shelter with picnic tables, habitat restoration and possible addition of a dog park. -$ -$ -$ -$ 105,000$ 385,000$ 490,000$ X P7 D18 Neighborhood Park SE 2 Master plan and development of a new neighborhood park in Southeast Edmonds (funding is in Parkland Acquisition program for purchase). -$ -$ -$ -$ -$ 82,000$ 82,000$ X R15 Pool Replacement Replacement of the existing Yost pool due to end of life cycle. Design, location, and funding TBD and consideration of possible partnerships. -$ -$ -$ -$ -$ 24,000,000$ 24,000,000$ X P4 D9 D1 Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Master Plan development and implementation of the Edmonds Marsh to daylight the waterway connection of Puget Sound to the Edmonds Marsh and two fresh water creeks providing restoration of fresh water/salt water estuary and natural tidal exchange. (All expenses are TBD per Council direction in December 2022). Property acquisition identified in Parkland Acquisition program. TBD TBD TBD TBD TBD TBD -$ 835,000$ 425,000$ 3,775,500$ 5,200,000$ 595,000$ 25,517,000$ 36,347,500$ Costs inflated at 3% per year (A) SUBTOTAL PARKS CIP/CFP PROJECTS 6.A.c Packet Pg. 201 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Parks 2025-2030 CIP / CFP – Programs (not site specific) Project #PARKS CIP PROGRAMS 2025 2026 2027 2028 2029 2030 6-Year Total R17 Citywide Park Improvements / Capital Replacement Program Ongoing program of funding allocation for regular, major and deferred maintenance, repair and replacement of parks amenities, structures and equipment. 450,000$ 450,000$ 450,000$ 450,000$ 450,000$ 450,000$ 2,700,000$ R16 ADA Improvements & Replacement Ongoing replacement or improvements to meet ADA standards within park system. (Example is of the Seaview Park restroom replacement and improvements to pathway). -$ 200,000$ 300,000$ -$ -$ -$ 500,000$ Debt Service and Interfund Transfers Debt service on Civic Park $1.6M bond (2021), Marina Beach Acquisition and Interfund transfers to Engineering for Capital Project Support. 412,518$ 416,188$ 410,438$ 416,350$ 407,912$ 414,225$ 2,477,630$ 862,518$ 1,066,188$ 1,160,438$ 866,350$ 857,912$ 864,225$ 5,677,630$ (B) SUBTOTAL - PARKS CIP PROGRAMS 6.A.c Packet Pg. 202 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Parks 2025-2030 CIP / CFP – Parkland Acquisition Project #PARKLAND ACQUISITION 2025 2026 2027 2028 2029 2030 6-Year Total A3 Neighborhood Park SR99 Acquisition of parkland near SR 99 to fill park system gaps. -$ -$ -$ 900,000$ -$ -$ 900,000$ A4 Neighborhood Park SE 2 Acquisition of parkland in South Edmonds to fill park system gaps.-$ -$ -$ -$ 900,000$ -$ 900,000$ A1 Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Acquisition of the Unocal property in support of greater Edmonds Marsh restoration project. TBD TBD TBD TBD TBD TBD -$ -$ -$ -$ 900,000$ 900,000$ -$ 1,800,000$ (C) SUBTOTAL - PARKLAND ACQUISITION 6.A.c Packet Pg. 203 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Changes to CIP/CFPTypePROJECT NAME CFP DESCRIPTION Parks ADA Improvements & Replacement Ongoing replacement or improvements to meet ADA Standards. Parks Marsh Boardwalk Replacement Renovation and replacement of NW Edmonds Marsh Boardwalk to include ADA upgrades. Parks Mee Property Master Plan X Was part of Parkland Acquisition, now stand alone project. Type PROJECT NAME CFP DESCRIPTION Parks Interurban Trail Extension Removed due to lack of available funding. Parks Mathay Ballinger Park Project completion scheduled for 2024. Parks Neighborhood Park SE 1 Mee Property Purchased in 2024. Master Plan listed above as new item. Parks Olympic Beach Park Restroom Interior renovation completed. Parks Parkland Acquisition Support Removed, will be requested if/when potential acquisition is identified. Parks Signage & Wayfinding Project completion scheduled for 2024. Parks Waterfront Walkway (missing link)Removed due to lack of available funding and other capital priorities. Parks Yost Park Playground Improvements Project expenses deemed replacement as not feasible at this time. Type PROJECT NAME CFP CHANGE Parks Elm Street Park Improvements Moved to 2029-30 vs. 2028-29. Parks Johnson Property Master Plan X Expenditure estimate updated to reflect more current pricing. Parks Lake Ballinger Park Mountlake Terrace ILA ILA completed in 2023; payment due upon construction completion estimated for 2025, carryforward. Parks Maplewood Hill Park Improvements Moved to 2028-29 vs. 2027. Parks Neighborhood Park SE 2 X Acquisition moved to 2029 vs. 2026 and Master Plan moved to 2030 vs. 2027. Parks Neighborhood Park SR 99 X Acquisition moved to 2028 vs. 2025 and Master Plan/Construction moved to 2029-30 vs. 2026-27. Parks Parks & Facilities Maintenance Building X Construction shifted to 2028 vs. 2027; preliminary design funded via REET Fund 125. Parks Pine Street Park Improvements Moved to 2028, 29 & 30 vs. 2025-26. Parks Pool Replacement X Moved to 2030 vs. 2029. Parks Seaview Park Restroom Replacement Moved into ADA Improvements & Replacement Program 2026-2027 vs. 2028. Parks Sierra Park Improvements Moved to 2027-28 vs. 2026. Parks Woodway Campus Athletic Complex Phase 1 X Moved to 2027 vs. 2025 due to required ESD partnership development and coordination. Parks Yost Pool Upgrades & Renovation Moved to 2027 vs. 2025. Parks Yost Pool Replacement X Replacement of existing pool - moved to 2030 vs. 2029. PROJECTS REVISED PROJECTS ADDED PROJECTS REMOVED 6.A.c Packet Pg. 204 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Questions/Discussion 6.A.c Packet Pg. 205 At t a c h m e n t : 2 0 2 4 . 0 9 . 2 5 C F P - C I P P W a n d P a r k s P B P r e s e n t a t i o n ( 2 0 2 5 - 2 0 3 0 C a p i t a l Planning Board Agenda Item Meeting Date: 09/25/2024 Extended Agenda Staff Lead: Michael Clugston Department: Planning Division Prepared By: Michael Clugston Background/History N/A Staff Recommendation Discuss the attached extended agenda. Narrative To accommodate the revised comp plan timeline, there are two new special meetings scheduled: October 30 and November 25. Each would be 7-9 PM in the Brackett Room and with a remote option. As a result of the updated schedule, the regular October 9 meeting currently has no items - staff is working on revisions to other parts of the work program fill that in and better balance future meetings. Attachments: September 25 Extended Agenda 10.A Packet Pg. 206 .12 - J u n 26 - J u n 10 - J u l 24 - J u l 6- A u g 14 - A u g 20 - A u g 28 - A u g 11 - S e p 25 - S e p 9- O c t 23 - O c t 30 - O c t 13 - N o v 25 - N o v 27 - N o v 11 - D e c 16 - D e c 25 - D e c 1/ 8 / 2 0 2 5 22 - J a n 28 - J a n 12 - F e b 26 - F e b 12 - M a r 26 - M a r 2- A p r 23 - A p r Comprehensive Plan Transportation D/R D/R Land Use D/R D/R D/R Housing D/R D/R D/R Waterfront Vision - Preliminary Concept B DEIS - Comments, Summary & Responses B Staff's Preferred Alternative D/R Preferred Alternative (PB Recommendation)D/R Final Draft Plan Review D/R Final Draft Plan (PB Recommendation)D/R Code Updates Green Building Incentives PH D/R Climate Legislative Package I PH Land use permit timelines (SB 5290 - end 2024)R PH Middle Housing (HB 1110 - mid 2025) I D/R D/R PH Design standards and processes (HB 1293 - mid 2025), including multfamily design standards I D/R PH CAO Update (RCW 36.70A.130 - end 2025) Tree Code Update Long Range Capital Improvement Program/Capital Facilties Plan I PH Tree Canopy Policy D/R Administrative Site specific rezone request PH Election of Officers D/R Planning & Development Annual Work Plan B Annual Retreat I Planning Board report to City Council D/R B Parks, Recreation & Human Services Report R B KEY I- Introduction & Discussion Future Items Special Meetings/Presentations PH- Public Hearing Neighborhood Center/Hub Plans October 30 and November 25 are special meetings for Comp Plan D/R- Discussion/Recommendation Code Modernization Projects:December 16, 2024 is a special meeting (if needed) B- Briefing/Q&A 1. Unified Development Code (late 2025 - 2026)January 28, 2025 is a presentation to Council R- Report with no briefing/presentation Comp Plan Implementation Regular meeting cancelled Highway 99 Community Renewal Program Planning Board Extended Agenda - September 25, 2024 10.A.a Packet Pg. 207 At t a c h m e n t : S e p t e m b e r 2 5 E x t e n d e d A g e n d a ( E x t e n d e d A g e n d a )