Loading...
Building PermitType: COMMERCIAL BLDG Subtype: TOWNHOMES 3 OR MORE I Status: ISSUED Parcel No: 00434202600101 Site Address: 308 DALEY ST LOT B EDMONDS,WA 98020 Applied: 9/30/2022 Subdivision: Lot: 0 Issued: 9/26/2024 Fire Sprinklers: Yes Lot Area: Zoning: Final: Valuation: $227,743.95 Occupancy Type: R-3 Construction Type: VB Expiration Date: 9/26/2026 Code Edition: 2018 No. Stories: 3 # of Dwelling Units: 1 Issued by: BAC Scope of Work: 4 UNIT TOWNHOME, MECH INCL, PLB SEP (310 DALEY PROJECT) #B I WA State Contractor L & I #: SEATTLH822JB I CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT JACOB YOUNG 10 DRAVUS STREET, SEATTLE (206)535-7908 JYOUNG@COLLABORATIVECO.COM WA 98109 CONTACT CITIZEN DESIGN 10 DRAVUS STREET, SEATTLE (206)535-7908 jyoung@collaborativeco.com COLLABORATIVE WA 98109 PO BOX 1478, EDMONDS WA CONTRACTOR SEATTLE LUXURY HOMES, LLC 98020 1516 9TH AVE N, EDMONDS WA OWNER AUGUSTUS J BUKOWSKI 98020 I 10 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # AC OR HEAT PUMP - 1.75 BTU OR 001.000.345.83.000.00 $57.00 $57.00 9/26/24 R40280 LESS APPLIANCE VENT 001.000.345.83.000.00 $34.00 $34.00 9/26/24 R40280 BLD - COM - PERMIT - VALUATION 001.000.345.83.000.00 $2,221.60 $2,221.60 9/26/24 R40280 BASED BLD - COM - PLAN REVIEW 001.000.345.83.000.00 $305.66 $305.66 9/26/24 R40280 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/15/22 R24473 PER PERMIT FAN CONNECTED TO A SINGLE 001.000.345.83.000.00 $85.00 $85.00 9/26/24 R40280 DUCT MECHANICAL BASE PERMIT FEE 001.000.322.10.000.00 $57.00 $57.00 9/26/24 R40280 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $1,582.70 $1,582.70 11/15/22 R24473 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 9/26/24 R40280 TRANSPORTATION IMPACT - 001.000.345.83.400.00 $120.00 $120.00 9/26/24 R40280 ADMIN - COM-MF - 3.1.23 TRANSPORTATION IMPACT FEE - 112.502.345.86.000.00 $2,477.41 $2,477.41 9/26/24 R40280 COM TOTALS: $6,986.87 $6,986.87 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, September 26, 2024 1:32:37 PM 1 of 4 •MERCIAL BLDG PermitCity • • • • - •:0iBLD2022-1325 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at DEMOLITION REQUIREMENTS FOR property line. Water Service must be disconnected from Water Meter and or hose bib INFORMATION with AVB installed. Dump at approved dump site only. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION ELEVATION CERTIFICATE FOR INFORMATION FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. HOSE BIBBS O Hose Bibbs are required to have a permanently affixed anti -siphon device installed. ORMATION LOT LINES STAKED FOR Lot line stakes must be in place at the time of foundation setback inspection. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Printed: Thursday, September 26, 2024 1:32:37 PM 2 of 4 • •:� i 1 Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 6 inches high with a .75inch min stroke width on a contrasting background. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. REQUIRED SPECIAL FOR INSPECTIONS INFORMATION FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. SPECIAL INSPECTION REPORTS FOR Submit all special inspection reports to the City Building Official on a weekly basis. NFORMATION Installer shall provide the manufacturer installation, operating instructions, and a whole WHOLE HOUSE FAN FOR house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" A-1 BUILDING PRECON B-1 SETBACKS B-2 FOOTINGS B-2 FOUNDATION WALL B-2 SLAB INSULATION B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN Printed: Thursday, September 26, 2024 1:32:37 PM 3 of 4 •M MERCIAL BLDG PermitCity • • • • - Edmonds98020 1 . •. B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR B-4 SHOWER PAN B-5 BLDG SPECIAL INSPECTION B-5 INSULATION ENERGY X-3 BUILDING FINAL" A-1 TESC AND MOBILIZE E-3 STRM COVENANT E-3 STRM TIGHTLINE X-2 ENGINEERING FINAL Printed: Thursday, September 26, 2024 1:32:37 PM 4 of 4