Loading...
Building PermitType: FILL GRADE Subtype: COMMERCIAL FILL AND GRADE I Status: ISSUED Parcel No: 00434202600101 Subdivision: Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 306 DALEY ST EDMONDS,WA 98020 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: FILL GRADE -CIVIL WORK FOR 4 SFR-TOWNHOMES 310 DALEY PROJECT Applied: 6/14/2024 Issued:9/26/2024 Final: Expiration Date: 9/26/2026 Issued by: BAC I WA State Contractor L & I #: SEATTLH822JB I CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT JACOB YOUNG 10 DRAVUS STREET, SEATTLE (206)535-7908 JYOUNG@COLLABORATIVECO.COM WA 98109 CONTACT CITIZEN DESIGN 10 DRAVUS STREET, SEATTLE (206)535-7908 jyoung@collaborativeco.com COLLABORATIVE WA 98109 PO BOX 1478, EDMONDS WA CONTRACTOR SEATTLE LUXURY HOMES, LLC 98020 1516 9TH AVE N, EDMONDS WA OWNER AUGUSTUS J BUKOWSKI 98020 I 10 •' • DESCRIPTION 79�/11/2024: ACCOUNT AMOUNT PAID PAID DATE RECEIPT # No grading fee. Move 001.000.322.10.000.00 $40.00 $40.00 6/18/24 R37956 to another bars number. CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 6/18/24 R37956 PERMIT ENG - INSPECTIONS AT 3.3 PERCENT 001.000.345.83.400.00 $6,647.79 $6,647.79 9/26/24 R40280 ENG - INSPECTIONS AT 3.3 PERCENT 001.000.345.83.400.00 $40.00 $40.00 9/11/24 R39925 ENG - PEER REVIEW DEPOSIT 001.000.245.963 $2,000.00 $2,000.00 7/8/24 R38414 ENG - PEER REVIEW DEPOSIT 001.000.245.963 $2,000.00 $2,000.00 7/17/24 R38646 ENG - PEER REVIEW DEPOSIT 001.000.245.963 $1,192.50 $1,192.50 8/27/24 R39623 ENG - PEER REVIEW DEPOSIT 001.000.245.963 $1,533.75 $1,533.75 9/26/24 R40280 GRADING PERMIT BASE 001.000.322.10.000.00 $40.00 $40.00 6/18/24 R37956 STATE BUILDING CODE SURCHARGE 001.000.237.150 $25.00 $25.00 6/18/24 R37956 - COM TOTALS: $13,564.04 $13,564.04 CONDITIONS CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL O 48 Working hours notice is required when requesting your FINAL engineering inspection. ORMATION Printed: Thursday, September 26, 2024 3:21:13 PM 1 of 3 GRADEFILL Permit PERMIT NUM City of Edmonds www.edmondswa.gov • It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. FOR INSP PRIOR TO BACKFILL Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. FOR RESTORE LANDSCAPE Restore landscape to like or better conditions NFORMATION ROW COMPACTION TEST O Right of way compaction tests are required per City standards. ORMATION SEWER AND WATER FOR MAINTAIN 10 FEET OF SEPARATION BETWEEN THE SANITARY SIDE SEWER AND THE SEPARATION INFORMATION WATER SERVICE LINE. FOR Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Handout E71 SEWER ASBUILT INFORMATION for requirements. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. A Special Inspection agreement is required for this project. It is the owner/contractors SPECIAL INSPECTIONS FOR responsibility to ensure inspections take place and that reports are provided to the ENGINEERING INFORMATION Engineering Division on a weekly basis at Engineeringpermits@edmondswa.gov. STORM COVENANT FOR A stormwater covenant shall be approved for recording prior to project final approval. NFORMATION FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES A-1 ENGINEERING PRECON A-1 TESC AND MOBILIZE E-3 STRM TIGHTLINE E-5 DRIVEWAY SLOPE E-7 DRY UTILITY LOCATION E-8 BOND RELEASE E-9 COMPOST AMEND E-9 FIRE AND AID SIGN E-9 PROJECT ASBUILTS Printed: Thursday, September 26, 2024 3:21:13 PM 2 of 3 FILL GRADE 6 Permit �, - City of • • • gw . •. • E-5 ENG SPECIAL Special Inspections: INSPECTION STORMWATER PUMP PUMP FLOW THROTTLING SYSTEM BIORETENTION DETENTION VAULT E-3 STRM MGMT FACILITY NOTE TO INSPECTOR: SPECIAL INSPECTIONS REQUIRED FOR VAULT AND PUMP X-2 ENGINEERING FINAL E-3 STRM FOOTING DRAIN NOTE TO INSPECTOR: PLANS CALL FOR FOOTING DRAIN PUMP STATION Printed: Thursday, September 26, 2024 3:21:13 PM 3 of 3