Building PermitType: COMMERCIAL BLDG Subtype: ACCESSORY STRUCTURE COM I Status: ISSUED
Parcel No: 27043100402800 Site Address: 24105 78TH PL W EDMONDS,WA 98026 Applied: 9/7/2023
Subdivision: LAKE MCALEER VILLA TRACTS, 005593, 004911 Lot: 0 Issued: 10/1/2024
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $58,456.26 Occupancy Type: Construction Type: Expiration Date: 10/1/2026
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED
Scope of Work: MATHAY PARK- COE- RESTROOM & SITE IMPROVEMENTS P/M SEP
I WA State Contractor L & I #: ACCORCL906CB I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
KYLE WOODS
700 MAIN STREET, EDMONDS
(425)599-3847
KYLE.WOODS@EDMONDSWA.GOV
WA 98020
CONTACT
CG ENGINEERING
250 4TH AVE S SUITE 200,
(425)778-8500
carmelg@cgengineering.com
EDMONDS WA 98020
CONTRACTOR
ACCORD CONTRACTORS LLC
15405 SE 37TH ST 100,
(425)754-6759
keith@accordcontractors.com
BELLEVUE WA 98006
250 5TH AVENUE N, EDMONDS
OWNER
EDMONDS CITY OF
WA 98020
DESCRIPTION
7COM
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
VALUE BASED FEE
001.000.345.83.000.00
$955.60
$955.60
9/30/24
R40372
BLD - COM VALUE BASED REVIEW
001.000.345.83.000.00
$812.26
$812.26
9/8/23
R31219
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
9/8/23
R31219
PERMIT
STATE BUILDING CODE SURCHARGE
001.000.237.150
$25.00
$25.00
9/30/24
R40372
-COM
TOTALS: $1,837.86
$1,837.86
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, October 01, 2024 6:54:53 AM 1 of 3
•MERCIAL BLDG PermitCity
• • • • -
•:0iBLD2023-1127,
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
LOT LINES STAKED
FOR
Lot line stakes must be in place at the time of foundation setback inspection.
NFORMATION
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
Printed: Tuesday, October 01, 2024 6:54:53 AM 2 of 3
•MMERCIAL BLDG Permit
City of Edmonds PERMIT NU
98020 1
. •.
INSPECTIONS•
INSPECTIONTYPE
INSPECTOR
•.
COMPLETED RESULT NOTES
A-1 BUILDING PRECON
B-2 FOOTINGS
X-3 BUILDING FINAL"
B-4 FRAMING
Please use this inspection for joining of the buildings
and other structural components to be inspected
prior to cover.
A-1 ENGINEERING PRECON
A-1 TESC AND MOBILIZE
E-4 WATER SERVICE LINE
X-2 ENGINEERING FINAL
E-3 STRM TIGHTLINE
E-3 STRM FOOTING DRAIN
Printed: Tuesday, October 01, 2024 6:54:53 AM 3 of 3