Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED Parcel No: 00434600201300 Site Address: 18504 OLYMPIC VIEW DR EDMONDS,WA 98020- 2349 Subdivision: 005319, 005656, 004346 Lot: 0 Fire Sprinklers: Lot Area: Zoning: RS-12 Valuation: $2,852.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: DAVIS-DECK WA State Contractor L & I #: SNOWRRL882B4 Applied: 9/12/2023 Issued:10/1/2024 Final: Expiration Date: 10/1/2026 Issued by: NED CONTACTS mililimillimi NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT ESTER KATSAROS 5531 34TH AVE NE, SEATTLE WA (206)724-9415 ESTER@E-KARCHITECTURE.COM 98105 5531 34TH AVE NE, SEATTLE WA CONTACT EK ARCHITECTURE (206)724-9415 ester@e-karchitecture.com 98105 CONTRACTOR SNOWRIDGE REMODELING 19502 61ST AVE NE, KENMORE (425)941-1737 chuck@snowridgeremodeling.com LLC WA 98028 OWNER MARY L & TANDOO JAMES 18504 OLYMPIC VIEW DR, (206)755-9998 DAVIS EDMONDS WA 98020 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# BLD - RES VALUE BASED FEE 001.000.345.83.000.00 $189.00 $189.00 10/1/24 R40392 BLD - RES VALUE BASED REVIEW 001.000.345.83.000.00 $160.65 $160.65 9/13/23 R31324 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 9/13/23 R31324 PERMIT ENG - PEER REVIEW DEPOSIT 001.000.245.963 $750.00 $750.00 10/1/24 R40392 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 10/1/24 R40392 RES TOTALS: $1,151.15 $1,151.15 CONDITION TYPE STATUS NOTES Printed: Tuesday, October 01, 2024 3:00:31 PM 1 of 2 'RESIDENTIAL BLDG PermitCity • • • • 13 -,7 121 5th Ave N, Edmonds WA 98020D2023-1 www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-4 FRAMING B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 TESC AND MOBILIZE X-2 ENGINEERING FINAL NOTE TO INSPECTOR: CONFIRM NEW DECK IS PERVIOUS. Printed: Tuesday, October 01, 2024 3:00:31 PM 2 of 2