Loading...
2024-10-08 Council Special Packet41 OE LUMG do Agenda Edmonds City Council SPECIAL MEETING NOTICE COUNCIL CHAMBERS 250 5TH AVE NORTH, EDMONDS, WA 98020 OCTOBER 8, 2024, 5:00 PM PERSONS WISHING TO JOIN THIS MEETING VIRTUALLY IN LIEU OF IN -PERSON ATTENDANCE CAN CLICK ON OR PASTE THE FOLLOWING ZOOM MEETING LINK INTO A WEB BROWSER USING A COMPUTER OR SMART PHONE: HTTPS:HZOOM. US/J/95798484261 OR JOIN BY PHONE: US: +1 253 215 8782 WEBINAR ID: 957 9848 4261 1. CALL TO ORDER 2. COUNCIL BUSINESS 1. 2025-2030 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) (90 min) ADJOURNMENT 6:30 PM Edmonds City Council Agenda October 8, 2024 Page 1 2.1 City Council Agenda Item Meeting Date: 10/8/2024 2025-2030 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) Staff Lead: Angie Feser and Rob English Department: Parks, Recreation & Human Services Preparer: Angie Feser Background/History The City's Capital Facilities Plan (CFP) Element is updated annually and identifies capital projects for at least the next six years, which support the City's Comprehensive Plan. CFP projects are capital improvement projects that expand existing facilities/infrastructure or provide new capital facilities to accommodate the City's projected population growth in accordance with the Growth Management Act. Thus, capital projects that preserve existing capital facilities are not classified as CFP projects. These preservation and maintenance projects are part of the six -year capital improvement program (CIP). The two capital project components combine to encompass the estimated funding expenditure needs for all city capital related projects. Public Works capital work includes the city's Transportation, Utilities and Facilities programs and the Parks & Recreation encompasses the city's parkland and recreation amenities and facilities located within those park sites. Both the Public Works and Parks & Recreation Departments presented their proposed 2026 - 2030 capital programs to the Planning Board on September 11, 2024 and as well as a Public Hearing on September 29, 2024. The Planning Board recommends to City Council to adopt the CFP/CIP as presented. Staff Recommendation This is the detailed and in-depth presentation of city's Public Works and Parks & Recreation CFP/CIP to the City Council. No action is requested. Narrative The 2025-2030 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) identify Capital Facility projects including geographic distribution and location and information sheets with estimated expenditures and funding sources. The Public Works and Utilities Department proposed 2025-2030 CFP/CIP is included as Attachment 1. The Parks & Recreation proposed 2025-2030 CFP/CIP is included as Attachment 2. The third attachment is the Powerpoint presentation to be shared with Council by staff at the October 8th meeting. It will be a detailed presentation reviewing the individual projects. A public hearing is scheduled for two weeks later on October 22, 2024 and that is slated to be only a summary presentation of the capital program and plans. The second presentation for the public hearing is not required to be as detailed as the first one and this will be a change in Edmonds' traditional practice. The October 8th presentation at the City Packet Pg. 2 2.1 Council meeting will be live streamed and recorded for public viewing before the October 22nd public hearing. With the city transitioning to a biennium operating budget format, the years alternating operating budget adoption provide a better opportunity to review capital budgets in greater depth. Next year in 2025 there will be more time and staff capacity to review in detail, and incorporate, the 2024 Transportation Plan, the Storm and Surface Water Plan Update, as well as the 2024 Comprehensive Plan (including a Facilities Element). In addition, the city's 2025-2026 operating budget will be adopted and in place. Recommendations from these three significant plans, which will not be completed for this year's capital program review, plus having an establish operating budget will be instrumental in developing the 2026-2031 CFP/CIP Plans. Attachments: Presentation - Public Works and Parks CFP-CIP CC 10.08.2024 2025-2030 Public Works CIP CFP DRAFT 2025-2030 Parks CIP CFP DRAFT Packet Pg. 3 2.1.a Public Works & Utilities Parks & Recreation 2025-2030 CIP/CFP City Council Presentation October 8, 2024 Packet Pg. 4 2.1.a Public Works &Utilities Capital Facilities Plan (CFP) & Capital Improvement Program F. City Council — October 8, 2024 (CIP) LO m �a r .Q U 0 M 0 N LO N 0 FIL Packet Pg. 5 Public Works & Utilities 2025-2030 CFP & CIP Combined CFP & CIP Document • Transportation • Utilities • Water • Stormwater • Sewer • Facilities • Wastewater Treatment Plant Packet Pg. 6 2.1.a Public Works & Utilities CFP & CIP Citywide Project Maps PWW-09 P' 1 PWT-a -PWT-17 P'A'T 24 -05 IT 44 PWT p3 PWT 4G do[ Packet Pg. 7 CFP&CIP For P r Capital Nu Facilities Project 202 'ect List Decisic Budget N Amount SPORTATION PRESERVATION/ MAINTENANCE PWT-01 Annual Street Preservation Program PWT-04 Main St Overlay from 6th Ave to 8th Ave PWT-05 Puget Dr @ OVD Signal Upgrades PWT-06 Signal Upgrades -100th Ave @ 238th St SW PWT-07 Main St @ 3rd Signal Upgrades Olympic View Dr Overlay -196th / SR-524 to PWT-61 Talbot Rd PWT-68 88th Avenue Overlay and Sidewalk Repair SAFETY1 CAPACITY ANALYSIS PWT-08 228th St SW from Hwy 99 to 95th PI W Corridor $1,801,800 $855,400 $2,630,000 $2,630,000 $2,630,000 $642,020 $0 $0 $0 $0 $0 $0 $0 $95,000 $526,000 $0 $0 $0 $175,000 $820,000 $0 $0 $0 $117,000 $406,000 $484,000 $963,700 $0 $0 $0 $1,180,000 $0 $0 $0 $0 $0 $10,547,200 $0 $642,020 $0 $621,000 $0 $995,000 $0 $523,000 $0 $1,447,700 $0 $1,180,000 $0 $0 $0 $1,533,000 $2,650,000 $13,900,000 $18,083,000 N d LL c4 r Q U O M O N LO N O N $0 $10,54, Y i a u- $0 $641 w i L cc $0 $62' a c �a $0 $99! Y i L 0 $0 $52i $0 $1,44, a $0 $1,18( 21 2 r c m 0 a� L a $0 $18,08: c m 5 E c� Q Packet Pg. 8 2.1.a Public Works & Utilities CFP & CIP Project Sheets P`T-01 ANNUAL STREET PRESERVATION PROGRAM Benefit Maintains the City's pavement infrastructure anc reduces air aced b, larger capital investment to rebuild City steets. Description Annual pavement preservation program to maintain City streets. Estimated Project Cost $1 800.000 (2025) �rr.�aer poor year eeu�res Budget Protect Cost 2025 2026 M7 2028 2029 2030 2031-45 Design S110.OW S110.W0 $130.W0 $130.000 $130000 50 $� Consuucuon S7691800 $745.400 S2500.000 $2,500.000 $2.500,000 s0 $C Expense Total $1,801,800 $855,400 $2,630,000 $2,630,000 $2,630,000 SO $0 Fund 125-REET S732500 $295.2D0 $750.DD0 $750000 $750,000 $0 $0 Fund 126-FEET S732.SW S377.800 $750.000 S750.W0 S750,000 $o $o Fund 421-Water Miry MODO $182400 $0 $0 s0 So $o Fund 423 - Sewer Utility S136.8W $0 $0 $0 SO SO $0 Unsecured Funding so $0 S1.1300W S1.130000 $1130.W0 So So Funding Source Total $1,801,800 $855,400 $2,630,000 $2,630,000 $2,630,000 $0 SO N d w .0 CIO LL C. CIO 0 M O N LO N 0 • 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS _ 2 Packet Pg. 9 N d r Public Works Comprehensive Plan Updates CU LL Transportation & Stormwater/Surface WaterM CU 0 N LO N O P.�..� e, FEHR�'PEERS N .... Comprehensive _ A(Yrnondsme,..... �.� C He d _ STORM AND SURFACE WATER MANAGEMENT e o s COMPREHENSIVE PLAN WORK N op O C City of Edmonds PROGRESS U Of EI)4f _ V CL v� LL C _ City of Edmonds Public Works Department/Engineering Division y W Y L 11 — .2 l>w -- _ Approved by City Council on July 6, 2010 a 0 r CU r c g o \ N to d October 2010 sell 14 E t v R Q Packet Pg. 10 Transportation 2025-26 Pavement Preservation Projects 2025 Annual Overlay Program 2026 Annual Overlay Program 2027 Annual Overlay Program 881" Ave Overlay & Sidewalk Repair Olympic View Dr Overlay Main St. Overlay Water, Storm & Sewer Overlay CI -Out REET/Utility $1,719,200 REET/Utility $82,600 $773,250 REET/Utility $82,600 REET/Utility $1,180,000 REET/Fed $484,000 $963,700 REET/Fed/State $642,020 Utility $1,500 e N d r CU Lh aF N N �j tic. i x9° a) Packet Pg. 11 Transportation 2025-26 Safety &Capacity Projects Hwy 99 Stage 3 (244t" St — 2381" St) Hwy 99 Stage 4 (224t" St — 22011 St) 76th Ave/220t" St Intersection Improv SR-104 Adaptive System Traffic Signal Program Safety Action Plan State/Utility State/Fed/TI F Fed/TIF/Utility Fed/Gas Tax $1,984,200 $825,000 $198,000 $67,740 $30,280 $375,000 $1, 683,000 $1,620,000 $1,488,500 Packet Pg. 12 2.1.a Transportation 2025-26 Active Transportation Projects & Planning Transportation Plan Update Traffic Calming Program Pedestrian Safety Program 84t" Ave Walkway (238t" St-234t" St) Citywide Bikelane/Elm Way Walkway Gas Tax $35,000 REET $80,650 $80,650 REST $20180 $20180I REET $100,000 REET $15,000 M 0 N Ln - O N Packet Pg. 13 2.1.a Public Works & Utilities — Utilities •� r 1r'' i- �+! 2025-26 Water Utility. a T I 2024 Water Replacement Utility $15 000 o 2025 Water Replacement 2026 Water Replacement 2027 Water Replacement Utility $3,533,000 Utility $547,000 Utility $3,289,000 $569,000 Yost & Seaview Reservoirs Utility $4,760,000 $3,850,000 2027 Water Comprehensive Plan Update Utility $150,000 w wff-al® %"= N d w .0 tU U- CU U 0 M 0 N LO N 0 FSI- L1 Packet Pg. 14 Utilities 2025-26 Stormwater Utility 2024 Storm Replacement Utility $10,000 2025 Storm Replacement Utility $1,597,000 2026 Storm Replacement Utility $249,000 $981,000 2027 Storm Replacement Utility $351 000 Storm & Surface Water Comp Plan Utility $213, 000 r Lake Ballinger Property Utility $256,000 $5,000 Lower Restoration Flow Management Projects Basin Analysis Update j. Utility $350,000 $1,520,000 Utility $104,000 $108,000 .Q Utility $461,767, PlanningStud Grant/Utility ,.: Y Y $89,000 Water Quality Phases 1 & 2 Grant/Utility $708 636 LO N O N N O N CO - ' O — CD ci V a V i CL v, Y M Packet Pg. 15 Utilities 2025-26 Sewer Utility 2024 Sewer Replacement 2025 Sewer Replacement 2026 Sewer Replacement 2027 Sewer Replacement 2027 Sewer Comprehensive Plan Update $10,000 $2,302,000 $378,000 $2,126,000 $393,000 �. $150,000�� N d w .0 Cu LL Q Cu O N LO N O N_ l 4 O N O O r O U LL U W Cu L O a W� _ /n m 1. t ea w a Packet Pg. 16 2.1.a Utilities 2025-26 Wastewater Treatment Plant WWTP Annual Capital Replacements Utility/WWTP Partners $100,000 Nutrient Removal Project Utility/WWTP Partners $100,000 VFD Upgrades Utility/WWTP Partners $250,000 NPW Pumping System Improvements Screw Press Feed System Rehab 600 Bldg Air Quality Evaluation Blower 303 Rehab ODS(Primary Sludge)Pump Replace 600 Bldg Electrical System Rehab 600 Bldg Air Quality Rehab/Upgrade Secondary Clarifier 2 Rehab Utility/WWTP Partners $75 000 Utility/WWTP Partners $150 000 Utility/WWTP Partners $50,000 Utility/WWTP Partners $35,000 Utility/WWTP Partners Utility/WWTP Partners Utility/WWTP Partners Utility/WWTP Partners $650,000 $250,000 $350,000 $250,000 $250,000 $450,000 m LL CL M 0 M O N LC� N O N 3 E' r a Packet Pg. 17 2.1.a Public Works & Utilities — Facilities • Boys & Girls Club • Cemetery Building • Historic Museum • Library • City Hall • Meadowdale Club House • Fishing Pier • Old Public Works • Frances Anderson Center • Parks Maintenance Bldg • Fire Station 16 • Fire Station 17 • Fire Station 20 • Historic Log Cabin • Public Safety • Public Works O&M • Wade James Theater • Yost Pool House N d LL c o a Q Packet Pg. 18 2.1.a Fund 016 (bond and non - bond) $543,399 2% Transportation Impact Fees $24,000 0% Other Citizen Cash Donation $84,086 City of Lynnwood 0% Marsh Preservation Fund Fund 112 - Street $168,595 1% WWTP Partners $373,995 2% N Packet Pg. 19 2.1.a Fund 016 (bond and non -bond) $484,813 2% Transportation Impact Fees $282,500 1% WWTP Partners $1,082,620 5% REET $1,068,260 4% Packet Pg. 20 2.1.a WWTP Par $9,194,! 3% Transportation Impact Fees $3,360,500 1% REET N d w .0 Cu LL w Q Cu U 0 M 0 N LO N 0 N Packet Pg. 21 2.1.a Questions N d r cu LL f6 r� .Q f6 U O M O N 6 N O N It N O N O O O U U U a U- U N L a c cu L 2O 7 2 a Packet Pg. 22 2.1.a Parks & Recreation Parks 2025-2030 CIP / CFP Angie Feser, Director & Shannon Burley, Deputy Director September 11, 2024 N d w .0 LL r� Q CU U 0 M 0 N LO N 0 N Packet Pg. 23 2.1.a Parks 2025-2030 CIP / UP Overview Revenue Sources Current/Ongoing Projects 2025 & 2026 Capital Plan • Projects • Programs • Acquisition Changes Packet Pg. 24 2.1.a 2025-2030 Parks CIP / CFP- Framework 1. 2. 3. Department Staff Resources Opportunities 2022 Parks, Recreation & Open Space (PROS) Plan Goals & Objectives 1. Engagement 2. Diversity, Equity & Inclusion 3. Parks, Trails & Open Space 4. Waterfront Use & Access 5. Natural Resource & Habitat Conservation 6. Climate Change, Adaptation & Resiliency 7. Recreation Programs & Facilities 8. Cultural Services 9. Park Operations & Administration DDrIC Di"n G2 - Obj 2.6 G3 - Obj 3.8, 3.10, 3.11 G7 - Obj 7.2 Rec. - 1.2, 6.2 Capital Recommendations 1. Acquisition to Fill Park System Gaps 2. Open Space & Conservation Acquisitions 3. Park Development & Enhancements 4. Yost Pool Replacement 5. Trail Connections 6. ADA, Accessibility & Other User Convenience Enhancements to d r CU LL f6 r� .Q CU U 0 M O N LO N O N It N 0 N 00 0 0 U U U a U- U N a CU L Q a c 0 r A& a c Z V R r+ Q Packet Pg. 25 2.1.a 2025 - 2030 Parks CIP / CFP Geographic Distribution P2, D13 Mee Property D6 Mathay Ballinger Park D39 Lake Ballinger Park IMLTI DB Columbarium Expansion -Phase ll R19 Shell Creek Restoration P5 Johnson Property RI Yost Pool Repair D10, D31, D12 Pine Street Park RB Sierra Park R12 Maplewootl Hill Park P4, D9, DI Edmonds Marsh R—Aion D16, D37, R14 Elm Street Park P1, Dl Pa rks Maintenance B111,11 g R35 Pool Replacement Al Etlmontls Marsh Restoraion D20 W dway Campus Athletic Complex D211 R20 Marsh Boardwalk Replacement * Non -site specific projects R17 Citywide Park Improvements P2, D13 Neighborhood Park SE1 A3, Ph, D15 Neighborhootl Park S R99 A4, P7, D18 PlOghborhootl Park SE R16 ADA lmprovemen6& Replacement P4 p'� ®D1 D9 R8 R11 R19 R15® • D18 D12 ®PS 0G R14 ®Di6 D17 ._..—._.._.._.._.._ D8 0 — i L:.J7 P2 D13 D6 Site specific projects only. Citywide/annual projects not shown. DRAFT Auqust 2024 * Non -site specific projects R17 Citywide Park Improvements P2, D13 Neighborhood Park SE 1 A3, P6, D1S Neighborhood Park SR99 A4, P7, D18 Neighborhood Park SE 2 R16 ADA Improvements & Replacement Color Key 2025 Projects 2026 - 2030 Projects �A of EQ_4 N d LL c4 r Q U 0 M O N LO N O rl Ict N 0 O U U a_ U d LL U N L a _ i 0 3 a 0 C d a 0 E L V c4 rr Q Packet Pg. 26 2.1.a Parks 2025-2030 CIP / CFP - Format A: Acquisition P: Planning D: Developmer R: Replacemen Upgrade O@ ED,Vf w Packet Pg. 27 2.1.a Parks 2025-2030 CIP / CFP - Funding Sources PARKS CIP REVENUE 2025 2026 2027 2028 2029 2030 6-Year Total Real Estate Excise Tax (REET) I - Fund 126 $ 512,518 $ 516,188 $ 510,438 $ 516,350 $ 507,912 $ 514,225 $ 3,077,630 Real Estate Excise Tax (REET) II - Fund 125 $ 1,110,000 $ 1,075,000 $ 1,150,000 $ 950,000 $ 910,000 $ 950,000 $ 6,145,000 Park Impact Fees - Fund 332-100 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,200,000 Tree Fund 143 - Land Acquisition $ 70,152 $ 45,749 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 315,901 Cemetery Trust Fund 137 - Columbarium Expansion $ 175,000 $ 175,000 Investment Interest (3%) $ 7,870 $ 8,220 $ 35,132 $ 34,363 $ 46,081 $ 54,385 $ 186,051 Donations $ - $ - $ - $ - $ - $ $ - Bond Proceeds $ $ $ - $ $ $ $ Secured Grants $ - $ $ $ $ - $ $ - Unsecured Grants/Funding - non -land acquisition $ $ $ 3,125,000 $ 4,700,000 $ 55,000 $ 24,167,000 $ 32,047,000 (E) TOTAL PARKS CIP REVENUE $ 2,075,540 $ 1,845,157 $ 5,070,569 $ 6,450,713 $ 1,768,993 $ 25,935,610 $ 43,146,582 Parks Fund 6-Year Overview 2025 2026 2027 2028 2029 2030 (F) Beginning Fund Balance $ 1,458,932 $ 1,846,994 $ 2,211,633 $ 2,350,684 $ 1,842,187 $ 1,268,265 (E) Revenue $ 2,075,540 $ 1,845,157 $ 5,070,569 $ 6,450,713 $ 1,768,993 $ 25,935,610 (D) Expenditures $ 1,701,518 $ 1,495,188 $ 4,939,938 $ 6,970,350 $ 2,556,912 $ 26,385,225 (G) Ending Fund Balance (F+E-D) $ 1,832,954 $ 2,196,963 $ 2,342,265 $ 1,831,047 $ 1,054,268 $ 818,650 Packet Pg. 28 2.1.a Current/Ongoing Capital Projects - Mathay Ballinger Park Improvements ' e ►ts^y1lq��] -_7 1' 4° AN 'o . ----- ----- a • Permanent Restro, • Water fountain • Improved Parking • ADA accessible pat to playground and Interurban trail • Large Picnic Shelte • Landscaping • Benches 2t: m a_ r Q M U O M O N L0 N O N Packet Pg. 29 2.1.a Current/Ongoing Capital Projects - N d w .0 I HUMAN SERVICES U_ Q CU U 0 M 0 City -Wide Improvements/Deferred MaintenanceLO CN 01 • Main Street/Shell Creek Property public access N • 00 Automated door locks all park restrooms (6) o 0 • Brackett's Landing North • Bottle filler (replaced failed drinking fountain) a • ADA Access to bottle filler a • Improvements for security/decrease vandalism Lu-, • Signage (variety) • Puget Sound "No boating" buoys • Five — Corner Hanging Baskets (9) Installation CU L Q • Civic Park • Landscape Plant Warranty issues a • Grant close-out _ • Wavy Walk retrofit D v � L a E■ t ea w Q Packet Pg. 30 2.1.a C.1 A RECREATION LL , r� CU Current/Ongoing Pro'ects M O Signage & Wayfinding In N O N _ NO DOGS NO DOGS NO DOGS NO DOGS ALLOWED ALLOWED ALLOWED ALLOWED ON PLAYGROUND ON BEACH ON PLAYFIELDS ON COURTS To L M .r�More MorEV L To Learn q Visit o To Learn as in V �o�reV�sit • O NO E-BIKES ON TRACK SURFACE b ALL DOGS MUST BE ON A LEASH PER EMC 5.0= 5.000 111 14 TO LEARR MOflE,VIRR: :ntry Sign Standardization Ves/Enforcement :ducation )afety ksset and wildlife protection HELP US PROTECT OUR DIVERS AND WILDLIFE EDMONDS MARINE SANCTUARY NO FISHING NO DOGS NO WATERCRAFT 0 ,.:...,wl ®EDMONDS . Packet Pg. 31 2.1.a Current/Ongoing Capital Projects - Mee Property Acquisition Expands MBP by 50% Access from 761" Ave House/outbuilding —to be removed 80% grant funded ($880,000) • Purchase price ($925,000) Related costs Packet Pg. 32 2.1.a PARKS, RECREATIONAND HUMAN SERVICES r Current/OngoingCapital - M Sierra Park Expansion/Alderwood District Acquisition • 0.38-acre • Ballfield encroachment • Snohomish County Conservation Futures Grant (10C • Board approved • County Council - December Baseball Field Baseball Fence Packet Pg. 33 2.1.a Parks & Recreation Parks 2025-2030 CIP / UP PROJECTS Packet Pg. 34 2.1.a Shell Creek Restoration Phase 2 - x19 loran S, '' , I Existing Conditions Area ; Approximate Project Outline ` - B6 BS ,' C-A NM lmp ,`7' • Existing Conditions Analysis ($250,000) - 2024 Restoration work - 2025 Estimated Cost $630,000 PROS Plan G3 - Obj 3.7, 3.8, 3.9 G4 - Obj 4.2, 4.4 G5 - Obj S.1, 5.3, 5.4 G6 - Obj 6.5 G9 - Obj 9.1, 9.2 m u_ r Q CD M O N LO N O N Packet Pg. 35 2.1.a Ballinger Park/Mountlake Terrace ILA- D19 Improved Park Entry . Pro; csod Cho us;,",C', OF 6 ft Wood Chips Path 6 It Gravel Path r Boardwalk & Viewing Platform lftvAlp a _ Lake Ballinger • Interlocal agreement to support development of Phase 3 which includes improved access for Edmonds residents • Estimated Cost $200,000 PROS Plan G3 — Obj. 3.2, 3.8, 3.11 G5 — Obj 5.2 Rec. — 3.6 rn m U- r Q CD M O N tO N O N Packet Pg. 36 2.1.a Columbarium Expansion Phase 2 - Ds Cemetery Fund 137 (Restricted) • Estimated Cost $159,100 `yOf Hpy�o�9 m U- r Q CD M O N LO N O N Packet Pg. 37 2.1.a Mee Property - P2, D13 2025 20261 128 2029 2030 Planning— Mee Property (P2) $80,000 $80 Construction — Mee Property (D13) $250,000 $250 Total Expenses $80,000 $250,000 $330 Real Estate Excise Tax II - Fund 125 $80,000 $80 Park Impact Fees — Fund 332-100 $250,000 $250 Total Revenue Unsecured Funding $80,000 $0 $250,000 $0 $330 • Master Plan - 2026 • Construction - 2027 • Estimated Total Cost $330,000 vanc vin„ G1— Obi. 1.1 G2 — Obi. 2.1, 2.3 G3 — Obi. 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8, 3.9, 3.1 G5 — Obi 5.1, 5.3 G6 — Obj 6.1, 6.3, 6.4 Rec.— 3.2,3.5&6.2 Packet Pg. 38 2.1.a Johnson Property - P5 2025 ,. 2027 2028 2029 2030 Tot; Planning & Design $100,000 $100 Total Expenses $100,000 $100 Real Estate Excise Tax II - Fund 125 $100,000 $100 Total Revenue Unsecured Funding $100,000 $0 $100 Master Plan — 2026 Estimated Cost $100,000 G1— Obj. 1.1 G3 — Obi. 3.7, 3.8, 3.10 G5— Obi 5.1 G6 — Obj 6.1, 6.4, 6.5 G9 — Obj 9.1, 9.3, 9.5 Rec. — 3.1 Packet Pg. 39 2.1.a Parks &Facilities Maintenance Building - Pi & D2 N , i 2025 20261 128 2029 2030 Tota Planning & Design (P1) $250,000 $875,000 $1,125 Construction (D2) $4,700,000 $4,700 Total Expenses $250,000 $875,000 $4,700,000 $5,825 Real Estate Excise Tax II - Fund 125 $100,000 $250 Bond Proceeds Operating Contribution — General Fund Park Donations Total Revenue $250,000 $250 Unsecured Funding $0 00000,000 Feasibility Study update and planning Design and permitting Construction Estimated Cost $5,825,000 PROS Plan G9 — Obj 9.1, 9.3, 9.9 Packet Pg. 40 2.1.a Marsh Boardwalk Replacement - D21 & R20 A ► -- ti - =-- --- -- -- T N d w r SERVICES 2025 2026I I28 2029 2030 Planning & Design (D21) $75,000 $75 Construction (R20) $750,000 $750 Total Expenses $75,000 $750,000 $825 Real Estate Excise Tax II - Fund 125 $75,000 $75 Total Revenue 1 1 $75,000 1 1 1 1 1 $75 Unsecured Funding I ($750,000) 1 • Planning, design and permitting • Bid and construction • Estimated Cost $825,000 vanc vi"n G3 — Obi 3.4, 3.7, 3.8, 3.9 G4 — Obj. 4.2, 4.4 G5 — Obi. 5.1, 5.3, 5.4 G6 — Obi. 6.1, 6.4, 6.5 G9 — Obj 9.1, 9.5 Rec. 3.1, 3.10 & 6.2 CL la U 0 M O N LO N O N Iq N O N U rn L a- c 0 a c 0 w pF 1:U-b C a k4E c I r, R Q Packet Pg. 41 2.1.a Parks 2025-2030 CIP / CFP - Projects Costs inflated at 3% per year CFP Project# Project Site & Description 2025 2026 2027 2028 2029 2030 6-Year Total Shell Creek Restoration Phase 2 R19 Project to provide improved environmental health and erosion control of Shell $ 380,000 $ $ $ $ $ $ 380,000 Creek in Yost Park, may include trail, bridge and boardwalk repair or relocation. Lake Ballinger Park Mountlake Terrace ILA *CARRYFORWARD* D19 Funding to support City of Mountlake Terrace Ballinger Park Phase III $ 200,000 $ $ $ $ $ $ 200,000 Development. Payment due upon completion of project. Columbarium Expansion - Phase II D8 Expansion of the current columbarium. Funding provided through the Cemetery $ 175,000 $ $ $ $ $ $ 175,000 Trust Fund 137. Mee Property X Master plan and future development providing expansion of the Mathay Ballinger $ 80,000 $ - $ 250,000 $ $ $ $ 330,000 D13 neighborhood park. Property purchased in 2024. Johnson Property X Master plan for future use and expansion of Yost Park. Site development not $ $ 100,000 $ $ $ $ $ 100,000 P5 included in estimate. Demolition, debris removal and site security completed in - 2023. Parks & Facilities Maintenance and Operations Building X Pi Replace and/or renovate Parks & Facilities Maintenance Shop located in City Park. $ $ 250,000 $ 875,500 $ 4,700,000 $ $ $ 5,825,500 D2 Preliminary design in 2026. Marsh Boardwalk Replacement D21 Renovation and replacement of northwest Edmonds Marsh boardwalk to include $ $ 75,000 $ 750,000 $ $ $ $ 825,000 R20 ADA upgrades. Yost Pool Upgrades & Renovation R11 Repairs and renovations of 50+year old pool as needed to include a complete $ $ - $ 350,000 $ $ $ $ 350,000 replaster of the pool. Woodway Campus Athletic Complex - Phase I - Lighting X D20 In cooperation with the Edmonds School District, complete a community park and $ $ $ 1,500,000 $ $ $ $ 1,500,000 athletic complex at Former Woodway High School to include lighting and future construction of two additional fields. N d r CU LL CL CU U 0 M O N L0 N O N Iq N O N O O O T— U U U Ii LL U N a C CU N Y I.- 0 V a c O r a Packet Pg. 42 2.1.a Parks 2024-2029 CIP / UP - Projects Costs inflated at 3% per year CFP Project # Project Site & Description 2025 2026 2027 2028 2029 2030 6-Year Total Sierra Park R8 Replacement of a 25+ year old playground and related improvements to included $ $ $ 50,000 $ 350,000 $ - $ - $ 400,000 ADA compliance. D10 Pine Street Park D11 Park enhancements to include the addition of a small shelter with picnic tables, $ $ $ - $ 100,000 $ 60,000 $ 200,000 $ 360,000 D12 canopy shade trees and a paved connecting pathway. Maplewood Hill Park R12 Replacement of a nearly 40 year old playground for improved play experience and $ $ $ $ 50,000 $ 350,000 $ - $ 400,000 ADA compliance. Neighborhood Park SR99 X D15 Master plan and development of a new neighborhood park in Southeast Edmonds $ $ $ $ - $ 80,000 $ 850,000 $ 930,000 (funding is in Parkland Acquisition program for purchase). D16 Elm Street Park D17 Park enhancements to include the addition of a nature playground, small shelter $ $ $ $ $ 105,000 $ 385,000 $ 490,000 R14 with picnic tables, habitat restoration and possible addition of a dog park. Neighborhood Park SE 2 X Master plan and development of a new neighborhood park in Southeast $ $ $ $ $ - $ 82,000 $ 82,000 D18 Edmonds (funding is in Parkland Acquisition program for purchase). Pool Replacement X R15 Replacement of the existing Yost pool due to end of life cycle. Design, location, $ $ $ $ $ - $ 24,000,000 $ 24,000,000 and funding TBD and consideration of possible partnerships. Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Master Plan development and implementation of the Edmonds Marsh to daylight X P4 D9 the waterway connection of Puget Sound to the Edmonds Marsh and two fresh TBD TBD TBD TBD TBD TBD $ water creeks providing restoration of fresh water/salt water estuary and natural D1 tidal exchange. (All expenses are TBD per Council direction in December 2022). Property acquisition identified in Parkland Acquisition program. (A) SUBTOTAL PARKS CIP/CFP PROJECTS $ 835,000 $ 425,000 $ 3,775,500 $ 5,200,000 $ 595,000 $ 25,517,000 $ 36,347,500 N d r CO LL CL CO U 0 M O N LO N O N N O N 00 0 O i a .i c O r OF EDMo c a+ Q Packet Pg. 43 2.1.a Parks & Recreation Parks 2025-2030 CIP / UP PROGRAMS Packet Pg. 44 2.1.a Citywide Park Improvements / Capital Replacement 1511, � ti N d w r J SERVICES 0. la U - R17 N LO N O N Repair & Maintenance 2025 $300,000 20261 $300,000 $300,000 128 $300,000 2029 $300,000 2030. $300,000 $1,800,000 Professional Services $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $900,000 Total Expenses $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 Real Estate Excise Tax II - Fund 125 $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 Total Revenue 1 $450,000 1 $450,000 1 $450,000 1 $450,000 1 $450,000 1 $450,000 1 $450,000 • Ongoing expenditure • Backlog of 50+ Projects • Small Capital Projects and Deferred Maintenance • Estimated Total Cost $2,700,000 PROS Plan G2 - Obj 2.1, 2.3 G3 - Obj 3.6, 3.7, 3.8, 3.9 G4 - Obj 4.1, 4.2, 4.4 G5 - Obj. 5.1, 5.3, 5.4 G6 - Obj. 6.1, 6.3, 6.4, 6.5, 6.7 G9 - Obj 9.1, 9.2, 9.3, 9.9 Rec. 3.1, 3.7, 6.2, 6.3 & 6.4 N O N 00 O 0 U U U a IL U _ 0 of Eb,ll Oy = N v d L a E 0 R Q Packet Pg. 45 2.1.a ADA Improvements /Replacement - R16 2025 ,. 2027 2028 2029 Construction (R16) 1 1 $200,000 1 $300,000 1 1 1 $500 Total Expenses 1 1 $200,000 1 $300,000 1 1 1 $500 Real Estate Excise Tax II - Fund 125 1 1 $200,000 1 $300,000 1 1 1 $500 Total Revenue Unsecured Funding I$200,000 $0 $300,000I $0 1 $500 • Various projects throughout system • Design and permit - 2026 • Bid and construction - 2027 • Estimated Cost $500,000 PROS Plan G2—Obj2.1 G3 — Obj 3.3, 3.7, 3.8, 3.9 G9 — Obj 9.1 Rec. 3.1 Packet Pg. 46 2.1.a Parks 2025-2030 CIP / UP - Programs (not site specific) Project # PARKS CIP PROGRAMS 2025 2026 2027 2028 2029 2030 6-Year Total Citywide Park Improvements / Capital Replacement Program R17 Ongoing program of funding allocation for regular, major and deferred $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 2,700,000 maintenance, repair and replacement of parks amenities, structures and equipment. ADA Improvements & Replacement R16 Ongoing replacement or improvements to meet ADA standards within park $ $ 200,000 $ 300,000 $ $ $ $ 500,000 system. (Example is of the Seaview Park restroom replacement and - - - - improvements to pathway). Debt Service and Interfund Transfers Debt service on Civic Park $1.6M bond (2021), Marina Beach Acquisition and $ 412,518 $ 416,188 $ 410,438 $ 416,350 $ 407,912 $ 414,225 $ 2,477,630 Interfund transfers to Engineering for Capital Project Support. (B) SUBTOTAL - PARKS CIP PROGRAMS $ 862,518 $ 1,066,188 $ 1,160,438 $ 866,350 $ 857,912 $ 864,225 $ 5,677,630 N d ILL c4 r CL U 0 M O N u7 N O N Packet Pg. 47 2.1.a Parks & Recreation Parks 2025-2030 CIP / CFP PARKLAND ACQUISITIONS Packet Pg. 48 2.1.a Parks 2 0 2 5 - 2 0 3 0 C I P / C FP - Parkland Acquisition Project # PARKLAND ACQUISITION 2025 2026 2027 2028 2029 2030 6-Year Total A3 Neighborhood Park SR99 $ $ $ $ 900,000 $ - $ $ 900,000 Acquisition of parkland near SR 99 to fill park system gaps. A4 Neighborhood Park SE 2 $ $ $ $ - $ 900,000 $ $ 900,000 Acquisition of parkland in South Edmonds to fill park system gaps. Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Al Acquisition of the Unocal property in support of greater Edmonds Marsh TBD TBD TBD TBD TBD TBD $ - restoration project. (C) SUBTOTAL - PARKLAND ACQUISITION $ $ $ $ 900,000 $ 900,000 $ $ 1,800,000 N d LL c4 r Q U 0 M O N u7 N O N Packet Pg. 49 2.1.a Changes to CIP/CFP PROJECTS ADDED Type PROJECT NAME CFP DESCRIPTION Parks ADA Improvements & Replacement Ongoing replacement or improvements to meet ADA Standards. Parks Marsh Boardwalk Replacement Renovation and replacement of NW Edmonds Marsh Boardwalk to include ADA upgrades. Parks Mee Property Master Plan X Was part of Parkland Acquisition, now stand alone project. PROJECTS REMOVED Type PROJECT NAME CFP DESCRIPTION Parks Interurban Trail Extension Removed due to lack of available funding. Parks Mathay Ballinger Park Project completion scheduled for 2024. Parks Neighborhood Park SE 1 Mee Property Purchased in 2024. Master Plan listed above as new item. Parks Olympic Beach Park Restroom Interior renovation completed. Parks Parkland Acquisition Support Removed, will be requested if/when potential acquisition is identified. Parks Signage & Wayfinding Project completion scheduled for 2024. Parks Waterfront Walkway (missing link) Removed due to lack of available funding and other capital priorities. Parks Yost Park Playground Improvements Project expenses deemed replacement as not feasible at this time. PROJECTS REVISED Type PROJECT NAME CFP CHANGE Parks Elm Street Park Improvements Moved to 2029-30 vs. 2028-29. Parks Johnson Property Master Plan X Expenditure estimate updated to reflect more current pricing. Parks Lake Ballinger Park Mountlake Terrace ILA ILA completed in 2023; payment due upon construction completion estimated for 2025, carryforward. Parks Maplewood Hill Park Improvements Moved to 2028-29 vs. 2027. Parks Neighborhood Park SE 2 X Acquisition moved to 2029 vs. 2026 and Master Plan moved to 2030 vs. 2027. Parks Neighborhood Park SR 99 X Acquisition moved to 2028 vs. 2025 and Master Plan/Construction moved to 2029-30 vs. 2026-27. Parks Parks & Facilities Maintenance Building X Construction shifted to 2028 vs. 2027; preliminary design funded via REET Fund 125. Parks Pine Street Park Improvements Moved to 2028, 29 & 30 vs. 2025-26. Parks Pool Replacement X Moved to 2030 vs. 2029. Parks Seaview Park Restroom Replacement Moved into ADA Improvements & Replacement Program 2026-2027 vs. 2028. Parks Sierra Park Improvements Moved to 2027-28 vs. 2026. Parks Woodway Campus Athletic Complex Phase 1 X Moved to 2027 vs. 2025 due to required ESD partnership development and coordination. Parks Yost Pool Upgrades & Renovation I Moved to 2027 vs. 2025. Parks Yost Pool Replacement X Replacement of existing pool - moved to 2030 vs. 2029. ' 04 Packet Pg. 50 2.1.a 2025-2030 CIP/CFP Schedule July • City staff begins development of capital budgets August • Submit proposed Capital budget to Finance • Prepare draft CFP and CIP September • Planning Board Presentation (September IItn) • Planning Board Public Hearing (September 25tn) October • City Council Presentation (October 8tn) • City Council Public Hearing (October 22nd) November • Adopt CFP w/ Budget (November 26tn) N d w .0 CU LL r� Q CU U 0 M 0 N LO N 0 N 52 Packet Pg. 51 2.1.a Questi, ons? 4 ow Packet Pg. 52 E Packet Pg. 53 TRANSPORTATION & UTILITY PROJECT MAP iii FACILITIES & WWTP PROJECT MAP iv TRANSPORTATION 1 PRESERVATION/MAINTENANCE 6 SAFETY/CAPACITY ANALYSIS 14 NON -MOTORIZED TRANSPORTATION 38 FERRY PROJECTS 61 TRAFFIC CALMING 63 TRAFFIC PLANNING 65 GREEN STREETS 68 WATER 70 STORMWATER 76 EDMONDS MARSH ESTUARY RESTORATION 81 PERRINVILLE CREEK BASIN 85 STORM DRAINAGE IMPROVEMENT 89 COMPLIANCE RELATED 91 SEWER 93 FACILITIES 99 WASTEWATER TREATMENT 121 CFP/CIP COMPARISION 2024-2025 138 Packet Pg. 54 PWT-03 M42 rw i-ui PWW-02 rWS�02 PW�T-70 PWT- PWT-65 NWT-04:=l M. PWTPWT -36.0= • I D\A1"� � PWT c • r•vv A",TPW D-05 mPWT-09 PWT-45 P PWT-19 WT-12 r ' PWT-35 PWT-3an,iPWT-16 1 �� PWT-48 pWT-11 C PWT-25 PWT-15 PWT-20 PWT-22 PWT-08 PWT-21 P T-j • A _ P1NT=30 PWTI20 PWT-13 PWT-14 PWT-47 P.WT K, �1 = WT-06 I PWT-�3 PWTi64 PWT-5 WE , PWT-06 PWS-11 RW07 * Site specific projects only. Citywide/annual PWT-10 PWT-26 P 2024 citywide projects not shown. PWT-43 • Packet Pg. 55 PWF-07"PWF'-01 ==� ' y� PWF-09 04 PWF-03 111'0 PW Fr1w pW j 1MM1,WF-1 °' 0�' 00 F-23 PW�PWF-18 PWF 137-7 i 49 P �F=22 = � . V L� �111111 �Cwl �� , �Itir L� I r C IL lid PWF-08 I * Site specific projects only. Citywide/annual citywide projects no sown: Packet Pg. 56 V. TRANSPORTATIO f ~ •16 rill InJ 64i 4 j 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS TRANSPORTATION PRESERVATION/ MAINTENANCE PWT-01 Annual Street Preservation Program PWT-04 Main St Overlay from 6th Ave to 8th Ave PWT-05 Puget Dr @ OVD Signal Upgrades PWT-06 Signal Upgrades -100th Ave @ 238th St SW PWT-07 Main St @ 3rd Signal Upgrades PWT-61 Olympic View Dr Overlay -196th / SR-524 to Talbot Rd PWT-68 88th Avenue Overlay and Sidewalk Repair SAFETY/ CAPACITY ANALYSIS PWT-08 ✓ 228th St SW from Hwy 99 to 95th PI W Corridor PWT-09 Hwy 99 Revitalization & Gateway Project - Stage 2 PWT-10 ✓ Hwy 99 Revitalization Project - Stage 3 PWT-11 ✓ Hwy 99 Revitalization Project - Stage 4 PWT-12 ✓ Hwy 99 Revitalization Project - Stage 5 PWT-13 ✓ Hwy 99 Revitalization Project - Stage 6 PWT-14 ✓ Hwy 99 Revitalization Project - Stage 7 PWT-15 ✓ Hwy 99 Revitalization Project - Stage 8 PWT-16 ✓ Hwy 99 Revitalization Project - Stage 9 PWT-17 / 196th St SW / 88th Ave W - Intersection Improvements TotalQ co tU c $1,801,800 $855,850 $2,630,000 $2,630,000 $2,630,000 $2,630,000 $13,177,650 $39,450,000 $52,627,6 a U- U $642,020 $0 $0 $0 $0 $0 $642,020 $0 $642,0 c M a $0 $0 $0 $95,000 $526,000 $0 $621,000 $0 $621,0 w 2 $0 $0 $0 $175,000 $820,000 $0 $995,000 $0 $995,0 LL $0 $0 $0 $117,000 $406,000 $0 $523,000 $0 $523,0 a $484,000 $963,700 $0 $0 $0 $0 $1,447,700 $0 $1,447,7 c M O $1,180,000 $0 $0 $0 $0 $0 $1,180,000 $0 $1,180,0LO N O N LL $0 $0 $0 $1,533,000 $2,650,000 $13,900,000 $18,083,000 $0 $18,083,0 0 a $15,000 $0 $0 $0 $0 $0 $15,000 $0 $15,0 v a $1,984,000 $1,683,000 $2,489,000 $10,000,000 $9,607,000 $0 $25,763,000 $0 $25,763,0 v $825,000 $1,620,000 $5,000,000 $4,955,000 $13,100,000 $10,000,000 $35,500,000 $0 $35,500,0 0 2 $0 $0 $0 $530,000 $1,060,000 $2,090,000 $3,680,000 $46,293,000 $49,973,0 M a $0 $0 $0 $0 $0 $0 $0 $22,500,000 $22,500,0 M 0 N $0 $0 $0 $0 $0 $0 $0 $42,900,000 $42,900,0 N 0 N $0 $0 $0 $0 $0 $0 $0 $37,500,000 $37,500,0 E $0 $0 $0 $0 $0 $0 $0 $22,500,000 $22,500,0 $0 $0 $0 $279,000 $252,000 $835,000 $1,366,000 $0 $1,366,Ouuu Packet Pg. 58 TRANSPORTATION PWT-18 ✓ Main St @ 9th Ave Intersection Improvements PWT-19 ,/ 76th Ave W @ 220th St SW - Intersection Improvements PWT-20 SR-104 Adaptive System - 236th to 226th PWT-21 ✓ SR-104 @ 100th Ave W Intersection Improvements PWT-22 ✓ SR-104 @ 95th PI W Intersection Improvements PWT-23 ✓ SR-104 @ 238th St SW Intersection Improvements PWT-24 ✓ Olympic View Dr @ 76th Ave W Intersection Improvements PWT-25 ✓ 84th Ave W (212th St SW to 238th St SW) PWT-26 ✓ SR-104 @ 76th Ave W Intersection Improvements PWT-27 ✓ Olympic View Dr @ 174th St SW Intersection Improvements PWT-28 175th St SW Slope Repair PWT-59 Traffic Signal Program PWT-70 Safety Action Plan NON -MOTORIZED TRANSPORTATION PWT-29 ✓ 232nd St SW Walkway from 100th Ave to SR-104 PWT-30 ,/ 236th St SW Walkway from Madrona Elem to 97th Ave W PWT-31 ✓ 236th St SW Walkway from Hwy 99 to 76th Ave W PWT-32 ,/ 84th Ave W Walkway from 238th St SW to 234th St SW PWT-33 ✓ 80th Ave W Walkway from 212th St SW to 206th St SW 2025 2026 2027 2028 2029 2030 zuzb-3u 2031-45 Grand Tot Total U. $0 $0 $0 $210,000 $1,157,000 $0 $1,367,000 $0 $1,367,0 c $198,000 $1,488,500 $2,100,000 $3,370,000 $3,300,000 $0 $10,456,500 $0 $10,456,5 ii U- U $67,740 $0 $0 $3,515,000 $0 $0 $3,582,740 $0 $3,582,7 c 2 a $0 $0 $0 $200,000 $1,350,000 $2,650,000 $4,200,000 $0 $4,200,0 r $0 $0 $0 $45,000 $242,000 $0 $287,000 $0 $287,0 0 LL $0 $0 $0 $241,000 $1,370,000 $0 $1,611,000 $0 $1,611,0 a $0 $0 $0 $0 $0 $0 $0 $1,428,000 $1,428,0 c M O $0 $0 $0 $0 $0 $0 $0 $18,672,000 $18,672,0 ,Nn N O $0 $0 $0 $0 $0 $0 $0 $3,630,000 $3,630,0 v u- $0 $0 $0 $0 $0 $0 $0 $758,000 $758,0 G $0 $0 $0 $1,060,000 $0 $0 $1,060,000 $0 a $1,060,0 v a $30,280 $30,280 $0 $0 $0 $0 $60,560 $0 $60,5 cU $375,000 $0 $0 $0 $0 $0 $375,000 $0 L $375,0 0 2 a $0 $0 $0 $0 $284,000 $1,572,000 $1,856,000 $0 $1,856,0 M 0 N $0 $0 $0 $313,000 $1,794,000 $0 $2,107,000 $0 $2,107,0 N O N $0 $0 $0 $0 $0 $0 $0 $2,054,000 $2,054,0 = m E $100,000 $0 $0 $625,000 $2,550,000 $0 $3,275,000 $0 $3,275,0 $0 $0 $0 $117,000 $127,000 $1,433,000 $1,677,000 $0 .r $1,677,Ouuu Packet Pg. 59 TRANSPORTATION PWT-34 ✓ 80th Ave W Walkway from 188th St SW to Olympic $0 $0 View Dr PWT-35 ✓ 218th St SW Walkway from 76th Ave W to 84th Ave W $0 $0 PWT-36 ✓ Walnut St Walkway from 6th Ave S to 7th Ave S $0 $0 PWT-37 ✓ 216th St SW Walkway from Hwy 99 to 72nd Ave W $0 $0 PWT-39 ✓ Citywide Bicycle Improvements Project $10,000 $0 PWT-40 ✓ Maplewood Dr Walkway from Main St to 200th St SW $0 $0 PWT-41 ✓ 95th PI W Walkway from 224th St SW to 220th St SW $0 $0 PWT-43 ✓ SR-104 & 76th Non -Motorized Transportation $0 $0 Improvements PWT-45 ✓ SR-104 Walkway HAWK to Pine/Pine from SR-104 to $0 $0 9th PWT-46 ✓ 191st St SW from 80th Ave W to 76th Ave W $0 $0 PWT-47 ✓ 104th Ave W I Robinhood Ln from 238th St to 106th $0 $0 Ave W PWT-48 ✓ 80th Ave W from 218th St SW to 220th St SW $0 $0 PWT-49 ✓ 84th Ave W from 188th St SW to 186th St SW $0 $0 PWT-50 ✓ 238th St SW from Hwy 99 to 76th Ave W $0 $0 PWT-55 ✓ Elm Way Walkway from 8th Ave. S to 9th Ave. S $5,000 $0 PWT-60 Pedestrian Safety Program $20,180 $20,180 PWT-66 4th Avenue Cultural Corridor $0 $0 FERRY RELATED PWT-51 Ferry Storage Improvements from Pine St to Dayton $0 $0 St 2028 2029 2030 ZUZ5-3U 2031-45 Grand Tot Total IN $0 $511,000 $1,962,000 $0 $2,473,000 $0 $2,473,0 a M $0 $280,000 $1,563,000 $0 $1,843,000 $0 $1,843,0 a U_ U $0 $308,000 $0 $0 $308,000 $0 $308,0 = a $0 $233,000 $0 $0 $233,000 $0 $233,0 m r $0 $0 $0 $0 $10,000 $0 $10,0 0 LL $0 $233,000 $233,000 $2,662,000 $3,128,000 $0 $3,128,0 a $0 $139,000 $775,000 $0 $914,000 $0 $914,0 c M O $0 $277,000 $1,389,000 $0 $1,666,000 $0 $1,666,0 ,Nn $0 $0 $0 $3,473,000 $3,473,000 $0 N O $3,473,0 v LL $0 $0 $0 $0 $0 $762,000 $762,0 G $0 $0 $0 $0 $0 $1,192,000 $1,192,0 v a $0 $0 $0 $0 $0 $365,000 $365,0 cU L $0 $0 $0 $0 $0 $369,000 $369,0 0- 2 $0 $211,000 $1,234,000 $0 $1,445,000 $0 $1,445,0.0 a $0 $0 $0 $0 $5,000 $0 $5,0 M 0 N $0 $0 $0 $0 $40,360 $0 $40,3 N O N $0 $1,000,000 $1,000,000 $6,000,000 $8,000,000 $0 $8,000,0 c m E r $0 $403,000 $0 $0 $403,000 r $0 $403,0uua Packet Pg. 60 1 TRANSPORTATION I 1 Project1 2026 2027 20281' 20302031-45 Grand Tot & Total a M U TRAFFIC CALMING PWT-52 Traffic Calming Program $80,650 $80,650 $22,000 $22,000 $22,000 $22,000 $249,300 $330,000 $579,3 li LL U TRAFFIC PLANNING M a PWT-53 ADA Transition Plan (Right -of -Way) Update $0 $0 $0 $440,000 $0 $0 $440,000 $0 $440,0 r PWT-54 Transportation Plan Update $35,000 $0 $0 $0 $0 $0 $35,000 $0 $35,0 LL /=1?FFAI CTRFFTC Q PWT 64 / Green Streets 236th St SW - 84th Ave W to ci Highway 99 $0 $0 $0 $0 $0 $3,710,000 $3,710,000 $0 $3,710,0 M EXPENSE TOTAL $7,853,670 $6,742,160 $12,241,000 $34,067,000 $51,403,000 $50,977,000 $163,283,830 $240,703,000 $403,986,8 N uO N O N Funding Source 20252026 2027 20281' 2030 1 1 Total 1 • Tot LL Q Federal Grants $1,351,200 $2,507,500 $4,463,000 $0 $0 $0 $8,321,700 $0 $8,321,7 a LL Fund 112 - Street (Gas Tax & Multi -Modal) $168,595 $0 $0 $0 $0 $0 $168,595 $0 $168,5 U IL Fund 125 - REET $836,465 $295,200 $750,000 $750,000 $750,000 $750,000 $4,131,665 $11,250,000 $15,381,6 ) Y L Fund 126 - REET $2,037,610 $773,060 $772,000 $1,247,000 $772,000 $772,000 $6,373,670 $11,580,000 $17,953,6 0 Fund 421 - Water Utility $212,000 $194,400 $0 $0 $0 $0 $406,400 $0 $406,4 Fund 422 - Stormwater Utility $501,000 $6,500 $0 $0 $0 $0 $507,500 $0 $507,5 c M Fund 423 - Sewer Utility $236,800 $0 $0 $0 $0 $0 $236,800 $0 $236,8 N In N State Grants $2,486,000 $2,683,000 $2,547,000 $10,000,000 $9,607,000 $0 $27,323,000 $0 $27,323,0 N Transportation Impact Fees $24,000 $282,500 $2,579,000 $475,000 $0 $0 $3,360,500 $0 r $3,360,5 E Unsecured Funding $0 $0 $1,130,000 $21,595,000 $40,274,000 $49,455,000 $112,454,000 $217,873,000 $330,327,0 FUNDING TOTAL $7,853,670 $6,742,160 $12,241,000 $34,067,000 $51,403,000 $50,977,000 $163,283,830 $240,703,000 $403,986,8 Q Packet Pg. 61 w PRESERVATION/ MAINTENANCI i�wz • � �+� � � �h' '_' :_mac_ •� Tr 4 _ jfr �' ~ it ~ .b _ �, �- .c: � - -fir • . _ ' i 1 F 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS PWT-01 ANNUAL STREET PRESERVATION PROGRAM Benefit Description Estimated Project Cost 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 125 - REET Fund 126 - REET Fund 421 - Water Utility Fund 423 - Sewer Utility Unsecured Funding Funding Source Total s 0 Maintains the City's pavement infrastructure and reduces the need for larger capital investment to rebuild City steets. Annual pavement preservation program to maintain City streets. $1,800,000 (2025) 2025 2026 2027 2028 2029 2030 2031-45 $110,000 $110,000 $130,000 $130,000 $130,000 $130,000 $1,950,000 $1,691,800 $745,850 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $37,500,000 $1,801,800 $855,850 $2,630,000 $2,630,000 $2,630,000 $2,630,000 $39,450,000 $732,500 $295,200 $750,000 $750,000 $750,000 $750,000 $11,250,000 $732,500 $378,250 $750,000 $750,000 $750,000 $750,000 $11,250,000 $200,000 $182,400 $0 $0 $0 $0 $0 $136,800 $0 $0 $0 $0 $0 $0 $0 $0 $1,130,000 $1,130,000 $1,130,000 $1,130,000 $16,950,000 $1,801,800 $855,850 $2,630,000 $2,630,000 $2,630,000 $2,630,000 $39,450,000 Packet Pg. 63 PWT-04 MAIN ST OVERLAY r eee�" ` i rJim J �. FROM 6TH AVE TO 8TH AVE ie NJ odmr 11. •i J m a, a IUhAM�SjT a Z 0 2 DAYTON ST Benefit Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and bik, safety on this segment of Main Street. Description The project will provide a full -width grind and pavement overlay of Main St. from 6th Ave to 8th Ave. This project also includes upgrading all non -compliant ADA pedestrian curb ramps within the project limits, an eastbound bike lane and westboun bike sharrow markings. Estimated Project Cost $1,700,000 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction $642,020 $0 $0 $0 $0 $0 $0 Expense Total $642,020 $0 $0 $0 $0 $0 $0 Fund 125 - REET $84,820 $0 $0 $0 $0 $0 $0 Federal Grants $557,200 $0 $0 $0 $0 $0 $0 Funding Source Total $642,020 $0 $0 $0 $0 $0 $0 Packet Pg. 64 PWT-05 Jilt PUGET DR @ OVD SIGNAL UPGRADES puw,l of PUGET DR w 2 > w a C Q .. Edmonds a Elementary 1 01 } f J /St. Peters O Lutheran Church f Benefit This upgrade will provide safer roadway conditions since the hanging signal heads wil be replaced with fixed signal heads on mast arms. The new vehicle detection will y guarantee that all vehicles will be detected. Description The project will rebuild the existing traffic signal and remove the signal heads currentl c on span wire and install standard traffic signal poles with mast arms. Vehicle detentio L will also be upgraded as part of this project. ; Estimated Project Cost $621,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $95,000 $0 $0 $0 $0 $0 $0 $0 $526,000 $0 $0 $0 $0 $0 $95,000 $526,000 $0 $0 $0 $0 $0 $95,000 $526,000 $0 $0 $0 $0 $0 $95,000 $526,000 $0 $0 Packet Pg. 65 PWT-06 SIGNAL UPGRADES - IOOTH AVE @ 238TH ST SW 4 iickmen Perk ■' ZAP a Edmonds Memorial , :emetery Faith Community - 1 Church _ • (� T < o m '7L Ak �r M 1Wi 3 237th PI SWT 1 0 Wood L a '; 4%+ Ilia Elemer 73Rth St SW f s a: Soft w A, l 3 ''SSW SW n� a ; c ?39th 1 + - t Benefit The existing traffic signal is near the end of its anticipated service life. Description Install new traffic signal and vehicle detection system. Estimated Project Cost $995,000 Includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 I $0 $0 $0 $175,000 $0 $0 $0 $0 $0 $0 $0 $820,000 $0 $0 I $0 $0 $0 $175,000 $820,000 $0 $0 $0 $0 $0 $175,000 $820,000 $0 $0 $0 $0 $0 $175,000 $820,000 $0 $0 Packet Pg. 66 PWT-07 MAIN ST @ 3RD SIGNAL UPGRADES 3racketts Post Sr >outh o„ - �: Office Railroad Station � 6 Edmonds Po e��St n7 and Municil r C b` Court Veten £ �P Mini Park • Edmonds Centennial PI i City Hall Plaza ` Q S Fountain MAIN ST / S s Benefit The existing traffic signal is near the end of its anticipated service life. Description Install new traffic signal and vehicle detection system. Estimated Project Cost $523,000 *includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $117,000 $0 $0 $0 $0 $0 $0 $0 $406,000 $0 $0 I $0 $0 $0 $117,000 $406,000 $0 $0 $0 $0 $0 $117,000 $406,000 $0 $0 $0 $0 $0 $117,000 $406,000 $0 $0 Packet Pg. 67 PWT-61 OLYMPIC VIEW DR OVERLAY - 196TH / SR- 524 TO TALBOT RD a OLYMOC V'0 � 3 of ymp c Benefit Improve pavement condition and improve accessibility for pedestrians of all abilities. Description Pavement overlay along Olympic View Dr, from 196th St. SW / SR-524 to Talbot Roa along with ADA pedestrian curb ramp upgrades. Estimated Project Cost $1,500,000 "includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 126 - REET Federal Grants Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $100,000 $15,000 $0 $0 $0 $0 $0 $384,000 $948,700 $0 $0 $0 $0 $0 $484,000 $963,700 $0 $0 $0 $0 $0 $484,000 $263,700 $0 $0 $0 $0 $0 $0 $700,000 $0 $0 $0 $0 $0 $484,000 $963,700 $0 $0 $0 $0 $0 Packet Pg. 68 PWT-68 88TH AVENUE OVERLAY AND SIDEWALK REPAIR J 2 0��2> GET Benefit Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and pedestrian safety. Description This project will resurface 88th Ave and improve the existing asphalt sidewalk on the east side of 88th Ave from 196th St SW to 185th PI SW in the Seaview neighborhood All City utilities along this section of 88th Ave have been upgraded in recent years an( the street is ready to pave. The existing curb is in poor condition and varies in height. The project will install 6" concrete vertical curbs and repave the existing asphalt sidewalk. Estimated Project Cost $1,180,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 126 - REET Fund 422 - Stormwater Utility Fund 423 - Sewer Utility Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $110,000 $0 $0 $0 $0 $0 $0 $1,070,000 $0 $0 $0 $0 $0 $0 $1,180,000 $0 $0 $0 $0 $0 $0 $585,000 $0 $0 $0 $0 $0 $0 $495,000 $0 $0 $0 $0 $0 $0 $100,000 $0 $0 $0 $0 $0 $0 $1,180,000 $0 $0 $0 $0 $0 $0 Packet Pg. 69 I SAFETY/ CAPACITY ANALYSI .=-;..ow if - _- 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS PWT-08 228TH ST SW FROM HWY 99 TO 95TH PL W CORRIDOR .� __.V ---. 1 • : - .— ESPERANCE _22Gn St SW 224th st .22IttrS1'SW a j i �- ,y 1 �` i•l t �i,':�::S�v ° 1 r i i' �.'[ r-r ai • 6i 1 �• -�. � 1.i a 1 Li` . i � � i�- • L A l a i r`1 r_ 3 • r. -o.. ry, 1 i „'u,a A-.... r,y-'r r L.. s _ .�F: • �: i3i !' ram. iaJ.rf� a���.• PrN a.:S.'.:- <' agar �. 22Mn S. SW 22Nh S1 Sw a r ~ �S: ik �i..l 4Lmi imi i i,JwI!�6�'•:-4•1 d fib;• -r R " Pt�SW'3` V NW3NNNNNhWJNJL2-28TH ST O +I,.' r Q •.' • = .. y 3 - 230th S1 SW It,. S 9L - •,�a.is± • - ear l I.�.we Ai 03. - U }t f a. ard I♦ fyy J� ei -� • r 5 ie.. -I� �'•'�i 1S I"I _ r 1 a' ]alyr 4. Benefit This project would improve active transportation safety and traffic flows along this corridor. Community Transit will evaluate the possibility of creating a new east -west bi route along 228th St. SW, if this project moves forward (connecting Edmonds Transit Station to Mountlake Terrace Transit Station). Description Widen 228th St. SW from Hwy. 99 to 95th PI. W to three lanes (with center two-way left turn lane), with curb and gutter, sidewalk, and bike lanes. The section of 228th St SW between 92nd Ave W and 80th Ave W is within Snohomish County. Estimated Project Cost $18,083,000 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $0 $0 $1,533,000 $1,590,000 $0 $0 Right of Way $0 $0 $0 $0 $1,060,000 $0 $0 Construction $0 $0 $0 $0 $0 $13,900,000 $0 Expense Total $0 $0 $0 $1,533,000 $2,650,000 $13,900,000 $0 Unsecured Funding $0 $0 $0 $1,533,000 $2,650,000 $13,900,000 $0 Funding Source Total $0 $0 $0 $1,533,000 $2,650,000 $13,900,000 $0 Packet Pg. 71 PWT-09 HWY 99 REVITALIZATION & GATEWAY PROJECT - STAG E 2 N N N a a a 3 3 0 �p5 � SAP ` O r O 3 I Benefit The conversion of the center two-way left turn lane to a landscaped raised median wil improve corridor safety along this Highway of Regional Significance (HRS), with an Average Daily Traffic (ADT) of - 35,000 vehicles per day. The new HAWK signal will provide a signalized pedestrian crossing between the existing traffic signals at 238th and 228th St. 3 a 212TH 51 SIV U = 0 3 � ~ N o N > 3 220TH ST SW 3 0 r a 3 m Q 2 = 228TH T SW m a 3 N m � Q 236TH ST SW� i Description In 2023, the project constructed landscaped center medians on Highway 99 from 244 St. SW to 212th St. SW, a HAWK signal - 600' north of 234th St. SW, and gateway signs on both ends of the corridor. Plant establishment was completed in 2024. The project close-out will be completed in 2025. Estimated Project Cost $9,400,000 *includes prior year expenditures Budget Project Cost Construction Expense Total State Grants Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $15,000 $0 $0 $0 $0 $0 $0 $15,000 $0 $0 $0 $0 $0 $0 $15,000 $0 $0 $0 $0 $0 $0 $15,000 $0 $0 $0 $0 $0 $0 Packet Pg. 72 PWT-10 HWY 99 REVITALIZATION PROJECT - STAGE 3 's a F Benefit Improve aesthetics, safety, and user experience along this segment of the Hwy 99 corridor. Description The Stage 3 Highway 99 project limits are from 244th St SW to —400 feet north of 238th St. SW. The project will provide new sidewalk, landscaped planter strips, stree lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility i improvements (including undergrounding of overhead utility lines). The project will al: widen the intersection of Highway 99 and 238th St. SW to provide a second northbound left turn lane widen 238th St. from Highway 99 to 84th Ave. Estimated Project Cost $27,500,000 'includes prior year expenditures Budget Project Cost Design Right of Way Construction Expense Total State Grants Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $1,100,000 $799,000 $257,000 $0 $0 $0 $0 $884,000 $884,000 $2,232,000 $0 $0 $0 $0 $0 $0 $0 $10,000,000 $9,607,000 $0 $0 $1,984,000 $1,683,000 $2,489,000 $10,000,000 $9,607,000 $0 $0 $1,984,000 $1,683,000 $2,489,000 $10,000,000 $9,607,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,984,000 $1,683,000 $2,489,000 $10,000,000 $9,607,000 $0 $0 Packet Pg. 73 PWT-11 9,hs'W a I'-StS� 3� HWY 99 - , a � 3 220TH ST SW� T', REVITALIZATIONPROJECT - STAGE 4 IL 5il,n 3 �W— 3222nd St SW > y� �,� M �� F ZO Y 22211d S, Esperance , r - .o g Q 3 Park n ' ■ LU Inactive�T' i• r Z C223rd-St-SWu School Site r!�1•"fi O m a-s, SW Esperance PrL ■ �. am st sw'. I . r r Baptist i <- -rw zza, • ■ Church c f Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved. Description The Stage 4 Highway 99 project limits are from 224th St SW to —800 feet north of 220th St. SW. The project will provide new sidewalk, landscaped planter strips, stree lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility improvements (including undergrounding of overhead utility lines). The project will al" widen the intersection of Highway 99 and 220th St. SW to provide a second left turn lane for the northbound, southbound, and westbound movements. Estimated Project Cost $37,000,000 Includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $825,000 $1,000,000 $1,000,000 $475,000 $0 $0 $0 Right of Way $0 $620,000 $4,000,000 $4,480,000 $0 $0 $0 Construction $0 $0 $0 $0 $13,100,000 $10,000,000 $0 Expense Total $825,000 $1,620,000 $5,000,000 $4,955,000 $13,100,000 $10,000,000 $0 Transportation Impact Fees $0 $84,000 $2,295,500 $475,000 $0 $0 $0 Federal Grants $338,000 $536,000 $2,646,500 $0 $0 $0 $0 State Grants $487,000 $1,000,000 $58,000 $0 $0 $0 $0 Unsecured Funding $0 $0 $0 $4,480,000 $13,100,000 $10,000,000 $0 Funding Source Total $825,000 $1,620,000 $5,000,000 $4,955,000 $13,100,000 $10,000,000 $0 Packet Pg. 74 PWT-12 HWY 99 REVITALIZATION PROJECT - STAGE 5 - _ Edmonds Public Works M~ 'am mpg F5.4 Swedish Edmond•. xiem si sw I Benefit Improve aesthetics, safety, and user experience. In addition, future economic development will be improved along the corridor. Description Along Hwy 99 from 216th St SW to 212th St. SW, the project will add a planter strip c both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Estimated Project Cost $49,700,000 'includes prior year expenditures Budget Project Cost Design Right of Way Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $530,000 $1,060,000 $1,590,000 $1,689,000 $0 $0 $0 $0 $0 $500,000 $4,188,000 $0 $0 $0 $0 $0 $0 $40,416,000 $0 $0 $0 $530,000 $1,060,000 $2,090,000 $46,293,000 $0 $0 $0 $530,000 $1,060,000 $2,090,000 $46,293,000 $0 $0 $0 $530,000 $1,060,000 $2,090,000 $46,293,000 Packet Pg. 75 PWT-13 .!I .�. I I � , �i,. _. " 11:5rtnAM<t HWY 99 M 1'i REVITALIZATION Christ � 32- � Lutheren 3 Perk end Church PROJECT - STAGE 6 a Ride m .'38TH ST SW I Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Description Along Hwy 99 from 238th St. SW to 234th St. SW, the project will add a planter strip both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Estimated Project Cost $22,500,000 'includes prior year expenditures Budget Project Cost Design, ROW, and Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $22,500,000 $0 $0 $0 $0 $0 $0 $22,500,000 $0 $0 $0 $0 $0 $0 $22,500,000 $0 $0 $0 $0 $0 $0 $22,500,000 Packet Pg. 76 PWT-14 HWY 99 REVITALIZATION PROJECT - STAGE 7 ESPE-RAN CE Puu Water Tenka .'28 TH Sr Shy SubStation x LDS 1291th St Church �r [mot• �•- � 3■ � W Ethiopian r•n►I. ;�. C, Orthodox Saint i—a r23 Sr`sw F H Michael Church _ 3i. 1a' 1 a] 7n1 m I tee• _ ac > i . IV N41."i.., •♦-]♦•-'>tl O Nile Count,; ri�ya-i �!� ~ / * Club Golf � ai Course SW Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Description Along Hwy 99 from 234th St. SW to 228th St. SW, the project will add a planter strip 1 both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Estimated Project Cost $42,900,000 'includes prior year expenditures Budget Project Cost Design, ROW, and Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $42,900,000 $0 $0 $0 $0 $0 $0 $42,900,000 $0 $0 $0 $0 $0 $0 $42,900,000 $0 $0 $0 $0 $0 $0 $42,900,000 Packet Pg. 77 PWT-15 HWY 99 REVITALIZATION PROJECT - STAGE 8 Unitarian Esperance Inactive Church ;3,-2SeiMsnS: Park School SiteWe +� Esperance ~� .8 � • Baptist - Ir I S 1 r church i -111 1 zxrn w SW' 1 • •3 . r` 225th M SW lam f < S ~, "" 226th St SW .3�-•imp 5 ��< _1 � r. J a L � r t y !� Lrai'' 3 � •-fir _ 77RTH ST SW LDS Church EDMONDS w MOUNTLAKE Z o PUD Sub 226 TH PL S Station 4 Nile Country Club Golf I Cour— Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Description Along Hwy 99 from 228th St. SW to 224th St. SW, the project will add a planter strip I both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Estimated Project Cost $37,500,000 'includes prior year expenditures Budget Project Cost Design, ROW, and Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $37,500,000 $0 $0 $0 $0 $0 $0 $37,500,000 $0 $0 $0 $0 $0 $0 $37,500,000 $0 $0 $0 $0 $0 $0 $37,500,000 Packet Pg. 78 PWT-16 HWY 99 REVITALIZATION PROJECT - STAGE 9 Swedish Edmonds I Bth St sw- 216th St SW 6- Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. c Description Along Hwy 99 from approximately 500 feet north of 220th St. SW to 216th St. SW, thi project will add a planter strip on both sides of the street, new street lighting, better i stormwater management, targeted utility replacements, potential undergrounding of i overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Estimated Project Cost $22,500,000 'includes prior year expenditures Budget Project Cost Design, ROW, and Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $22,500,000 $0 $0 $0 $0 $0 $0 $22,500,000 $0 $0 $0 $0 $0 $0 $22,500,000 $0 $0 $0 $0 $0 $0 $22,500,000 Packet Pg. 79 PWT-17 196TH ST SW / 88TH AVE W - INTERSECTION IMPROVEMENTS a t94n N Sw Ins- r Y* Seventh Day t T 4 yy 4. Fire Adventist Station 16 V � � ,o Church Meplew Presbytt 196TH ST SW Chur, PUD Sub • AC Station � Q �R = Maplewood � Hill Perk co W I Benefit Improve traffic flow characteristics and safety at the intersection. The improvement would modify LOS to A, but increase the delay along 196th St. SW. Description Install traffic signal at the intersection of 196th St. SW @ 88th Ave. W. The modeling the 2009 Transportation Plan indicated that restricting northbound and southbound traffic to right -turn -only (prohibiting left -turn and through movements) would also address the deficiency identified at this location through 2025. This is same alternativ as one concluded by consultant in 2007 study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The existing LOS is F (below City Standards: LOS D). This project was ranked #6 in the Roadway Project Priority in the 2015 Transportatior Plan. Estimated Project Cost $1,366,000 "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $0 $0 $279,000 $0 $0 $0 Right of Way $0 $0 $0 $0 $252,000 $0 $0 Construction $0 $0 $0 $0 $0 $835,000 $0 Expense Total $0 $0 $0 $279,000 $252,000 $835,000 $0 Unsecured Funding $0 $0 $0 $279,000 $252,000 $835,000 $0 Funding Source Total $0 $0 $0 $279,000 $252,000 $835,000 $0 Packet Pg. 80 Civic '1n ".-n 9bud tdnmids PWT-18 Playfieldt ; Z Perk UJ MAIN ST @ 9TH AVE z Ali #'o~ _ a Bell St ¢ Q E L� INTERSECTION 01 Sno-Isle MAIN ST IMPROVEMENTS Library • Anderson Frances Anderson Center to Center Field W Yost Park Ch Ch I Benefit The existing intersection is stop -controlled for all approaches and the projected intersection LOS in 2035 is LOS F (below the City's concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. Description Installation of a traffic signal or mini -roundabout. The project ranked #4 in the Roadway Project Priority of the 2015 Transportation Plan. The preliminary cost estimate for a new traffic signal is $1,290,000. A conceptual cost estimate for a mini - roundabout is $500,000. Estimated Project Cost $1,367,000 *includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $210,000 $0 $0 $0 $0 $0 $0 $0 $1,157,000 $0 $0 $0 $0 $0 $210,000 $1,157,000 $0 $0 $0 $0 $0 $210,000 $1,157,000 $0 $0 $0 $0 $0 $210,000 $1,157,000 $0 $0 Packet Pg. 81 PWT-19 MW 76TH AVE W @ 220TH ST SW - INTERSECTION IMPROVEMENTS _ 220TH ST SW Benefit Reduce the intersection delay and improve the LOS. The projected LOS in 2050 woul be improved from LOS F to LOS D. Improve active transportation conditions for pedestrians and bicycle riders. a 1t _ P V'RV N 'a I � Jra � ML, • •' L .' $' • i i ♦ � ■ a L to ■ yy L PIP mS ~ I'. CCDCOAAIrC Description Reconfigure eastbound lanes to a left turn lane and through/ right turn lane. Add eastbound and westbound dedicated left turn lanes with a protected -permitted phase. Provide right turn overlap for westbound movement during southbound left turn phasE Additional improvements include wider sidewalk, bike lanes, street lighting, and variot utility improvements (including conversion overhead utility lines to underground). ROADWAY PROJECT PRIORITY #1 in 2015 Transportation Plan . Estimated Project Cost $11,000,000 *includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $198,000 $253,500 $100,000 $0 $0 $0 $0 Right of Way $0 $1,235,000 $2,000,000 $0 $0 $0 $0 Construction $0 $0 $0 $3,370,000 $3,300,000 $0 $0 Expense Total $198,000 $1,488,500 $2,100,000 $3,370,000 $3,300,000 $0 $0 Transportation Impact Fees $24,000 $198,500 $283,500 $0 $0 $0 $0 Fund 421 - Water Utility $12,000 $12,000 $0 $0 $0 $0 $0 Fund 422 - Stormwater Utility $6,000 $6,500 $0 $0 $0 $0 $0 Federal Grants $156,000 $1,271,500 $1,816,500 $0 $0 $0 $0 Unsecured Funding $0 $0 $0 $3,370,000 $3,300,000 $0 $0 Funding Source Total $198,000 $1,488,500 $2,100,000 $3,370,000 $3,300,000 $0 $0 Packet Pg. 82 PWT-20 SR-104 ADAPTIVE SYSTEM - 236TH TO 226TH rtlgpq,r.n A ;T SW Benefit Improve traffic flows along this regional corridor with a current Average Daily Traffic (ADT) of 25,000 vehicles per day. Description The project will add a traffic signal adaptive system on a 1.25-mile segment of SR104 from 236th St to 226th St. The system will monitor and synchronize the timing of fivE i existing signalized intersections (SR104 @ 236th St, SR104 @ 232nd St, SR104 @ 95th PI, SR104 @ 100th Ave, SR104 @ 226th St) and improve traffic flows along SR104. Estimated Project Cost $4,000,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 112 - Street (Gas Tax & Multi -Modal) Fund 125 - REET Fund 126 - REET Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $67,740 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,515,000 $0 $0 $0 $67,740 $0 $0 $3,515,000 $0 $0 $0 $58,595 $0 $0 $0 $0 $0 $0 $9,145 $0 $0 $0 $0 $0 $0 $0 $0 $0 $475,000 $0 $0 $0 $0 $0 $0 $3,040,000 $0 $0 $0 $67,740 $0 $0 $3,515,000 $0 $0 $0 Packet Pg. 83 PWT-21 SR-104 @ 100TH AVE W INTERSECTION IMPROVEMENTS SW i Sherwood ' Elementary PUD Su • EDMONDS WAY stetlo' 3 w > I Q 2 h- 0 0 I Benefit Improve access and safety at the intersection and improve active transportation safeb Description Implement Westgate Circulation Access Plan, install mid -block pedestrian crossing along 100th Ave. W, improve safety to access the driveways within proximity to the intersection, and re -striping of 100th Ave. W with the potential addition of bike lanes This project was identified in the SR-104 Completed Streets Corridor Analysis (completed in 2015). Estimated Project Cost $4,200,000 'includes prior year expenditures Budget Project Cost Design Right of Way Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $200,000 $250,000 $0 $0 $0 $0 $0 $0 $1,100,000 $0 $0 $0 $0 $0 $0 $0 $2,650,000 $0 $0 $0 $0 $200,000 $1,350,000 $2,650,000 $0 $0 $0 $0 $200,000 $1,350,000 $2,650,000 $0 $0 $0 $0 $200,000 $1,350,000 $2,650,000 $0 Packet Pg. 84 PWT-22 SR-104 @ 95TH PL W 227th INTERSECTION _ 228th St 228TH ST SW IMPROVEMENTS : AaMEN `py Westgate a C7 Chapel c } a PUD Sub .v_ l--F fi M. I Station Benefit Improve intersection safety for pedestrians and vehicles. Description Upgrade all ADA Curb Ramps; and add C-Curb for access management. This project was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015). - Estimated Project Cost $287,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $45,000 $0 $0 $0 $0 $0 $0 $0 $242,000 $0 $0 $0 $0 $0 $45,000 $242,000 $0 $0 $0 $0 $0 $45,000 $242,000 $0 $0 $0 $0 $0 $45,000 $242,000 $0 $0 Packet Pg. 85 PWT-23 SR-104 @a 238TH ST SW INTERSECTION IMPROVEMENTS _ o Madrona School - 238TH ST SW i 'y0'51 G Korean Presbyterian Church Benefit Improve vehicular and pedestrian safety. = Description Install traffic signal. This project was identified in the SR-104 Complete Street Corridl Analysis (completed in 2015). z Estimated Project Cost $1,611,000 Ll 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $241,000 $0 $0 $0 $0 $0 $0 $0 $1,370,000 $0 $0 $0 $0 $0 $241,000 $1,370,000 $0 $0 $0 $0 $0 $241,000 $1,370,000 $0 $0 $0 $0 $0 $241,000 $1,370,000 $0 $0 Packet Pg. 86 PWT-24 a 'IL YC,aqean I� 3 ♦ �+� f � OLYMPIC VIEW DR @ m 184th st SV.w i� -i 76TH AVE W " Office P°=t = Jr 1841hP1SW r F l F. ` Tp Seeview Park — ,p f� INTERSECTION - 0 £DMONDS ��NN►�/OOD OLy IMPROVEMENTS 0 MP%114 Lynndale Park wO� Pow , I Benefit The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2035, which is below the City's concurrency standards (LOS D). The project will improve the Level of Service to LOS B. Description Install traffic signal (the intersection currently stop controlled for all movements) (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #11). Estimated Project Cost $1,428,000 'includes prior year expenditures Budget Project Cost Design Right of Way Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $244,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,184,000 $0 $0 $0 $0 $0 $0 $1,428,000 $0 $0 $0 $0 $0 $0 $1,428,000 $0 $0 $0 $0 $0 $0 $1,428,000 Packet Pg. 87 PWT-25 - � Q 2121"S 'sw- - 84TH AVE W (212TH ST C C U Q N P 22°TH ST SW SW TO 238TH ST SW) 3 3 3 3 a o 228TH ST SW 3 228TH ST3� a I as F4 n � A 236TH ST' I Benefit Improve traffic flow, access and active transportation uses by installing a center two way left turn lane, sidewalks, bike lanes and street lighting. Description Widen 84th Ave. W to (3) lanes with curb, gutter, bike lanes, and sidewalk on each side of the street. (part of this project was ranked #6 in the Long Walkway list of the 2015 Transportation Plan). Estimated Project Cost $18,672,000 'includes prior year expenditures Budget Project Cost Design Right of Way Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $2,380,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $16,292,000 $0 $0 $0 $0 $0 $0 $18,672,000 $0 $0 $0 $0 $0 $0 $18,672,000 $0 $0 $0 $0 $0 $0 $18,672,000 Packet Pg. 88 PWT-26 Seattle W _ Lake llti SR-104 a@ 76TH AVE W F° Church Q Ballinger INTERSECTION ModU, 410WA c IMPROVEMENTS �9N 205TH ST r♦ _ - z N 205TH ST I �LU ti > .: wtH vi A� �04TH PL Q z y 0 Q I O LL I ` 203% PL 7 LU N 20,,% I a � j 3 , Benefit Improve access, safety and delay at the intersection. Description Add a second westbound left turn lane along SR-104. This project was identified in ti SR-104 Complete Street Corridor Analysis (completed in 2015). Estimated Project Cost $3,630,000 'includes prior year expenditures Budget Project Cost Design Right of Way Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $541,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,089,000 $0 $0 $0 $0 $0 $0 $3,630,000 $0 $0 $0 $0 $0 $0 $3,630,000 $0 $0 $0 $0 $0 $0 $3,630,000 Packet Pg. 89 PWT-27 OLYMPIC VIEW DR @ 174TH ST SW INTERSECTION IMPROVEMENTS St. Thomas Moore School • � D A' fw � a : o p 1 �j $ 176th St S4'J Improve intersection efficiency and safety of drivers accessing either street. Benefit M � f F'90 o� 0 <F BEACII 0 172nd PI `''�' 'w r[na St SW - -A % 172nd Sr SW O \¢ 7 Olympic o�aa �3rd St SW 173rd 5! View Open caa Space I-3rd PI SW 0 Warn St sw 3 Ap Description Widen Olympic View Dr. to add a northbound left turn lane for 50' storage length. Shi the northbound lanes to the east to provide an acceleration lane for eastbound left turns. Install traffic signal to increase the LOS and reduce intersection delay. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #13) Estimated Project Cost $758,000 'includes prior year expenditures Budget Project Cost Design Right of Way Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $127,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $631,000 $0 $0 $0 $0 $0 $0 $758,000 $0 $0 $0 $0 $0 $0 $758,000 $0 $0 $0 $0 $0 $0 $758,000 Packet Pg. 90 PWT-28 175TH ST SW SLOPE REPAIR % 6 a* - M"M Ian s t Braemar L w > I C a f i Snohomish I County Perk I 1 7 Benefit Repair roadway and stabilize slope embankment. Description The project will stabilize the roadway subgrade and embankment and rebuild the damaged pavement on 175th St. SW. Estimated Project Cost $1,060,000 'includes prior year expenditures Budget Project Cost Design Right of Way Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,060,000 $0 $0 $0 $0 $0 $0 $1,060,000 $0 $0 $0 $0 $0 $0 $1,060,000 $0 $0 $0 $0 $0 $0 $1,060,000 $0 $0 $0 Packet Pg. 91 PWT-59 TRAFFIC SIGNAL PROGRAM Benefit Improve reliability of traffic signal operation. Description This program started in 2019 and will provide new signal upgrades, such as vehicle detection at intersections, new vehicle/pedestrian head equipment and other signal - related upgrades. These improvements will improve the safety of the City's transportation system. Estimated Project Cost $30,280 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 126 - REET Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $1,000 $1,000 $0 $0 $0 $0 $0 $29,280 $29,280 $0 $0 $0 $0 $0 $30,280 $30,280 $0 $0 $0 $0 $0 $30,280 $30,280 $0 $0 $0 $0 $0 $30,280 $30,280 $0 $0 $0 $0 $0 Packet Pg. 92 PWT-70 SAFETY ACTION PLAN Benefit FOR Complete this document so safety projects for all modes of transportation can be completed (by securing future grants). Description A comprehensive safety plan aimed at reducing and eliminating serious -injury and fat crashes affecting all roadway users. In order to qualify for future Infrastructure i Implementation Grant or Planning / Demonstration Grant (through Safe Streets for Al SS4A0, the projec needs to be identified in this plan. Estimated Project Cost $375,000 'includes prior year expenditures Budget Project Cost Design Expense Total Federal Grants Fund 112 - Street (Gas Tax & Multi -Modal) Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $375,000 $0 $0 $0 $0 $0 $0 $375,000 $0 $0 $0 $0 $0 $0 $300,000 $0 $0 $0 $0 $0 $0 $75,000 $0 $0 $0 $0 $0 $0 $375,000 $0 $0 $0 $0 $0 $0 Packet Pg. 93 NON -MOTORIZED TRANSPORTATIO1 10 voolo,"Aot oil .x 1 , 1 _ Q y ',ham 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS PWT_29 EDh10NDS WAY I PUD Sub Westgate Station 232ND ST SW WALKWAY FROM 100TH AVE TO SR-104 3 Salem Edmonds > Lutheran Heights < Church x K-'12 0 Scriber Lake High School Benefit This project would improve pedestrian safety. Description Install sidewalk along 232nd St. SW from 100th Ave. W to SR-104. This project rankE #3 in the Long Walkway List of 2015 Transportation Plan. Estimated Project Cost $1,856,000 *includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $284,000 $0 $0 $0 $0 $0 $0 $0 $1,572,000 $0 $0 $0 $0 $0 $284,000 $1,572,000 $0 $0 $0 $0 $0 $284,000 $1,572,000 $0 $0 $0 $0 $0 $284,000 $1,572,000 $0 Packet Pg. 95 PWT-30 236TH ST SW WALKWAY FROM - MADRONA ELEM TO - 97TH AVE W Elementary maarona This project would improve pedestrian safety. Benefit ; y Description Install sidewalk with curb and gutter along 236nd St. SW from Madrona Elementary tc 97th Ave. W. This project ranked #4 in Long Walkway list of the 2015 Transportation Plan. Estimated Project Cost $2,107,000 `includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $313,000 $0 $0 $0 $0 $0 $0 $0 $1,794,000 $0 $0 $0 $0 $0 $313,000 $1,794,000 $0 $0 $0 $0 $0 $313,000 $1,794,000 $0 $0 $0 $0 $0 $313,000 $1,794,000 $0 $0 Packet Pg. 96 PWT-31 236TH ST SW WALKWAY FROM HWY Benefit Description � 3 a a _ = a Q-1 E This project would improve pedestrian safety. Install sidewalk along 236th St. SW from Hwy 99 to 76th Ave. W. This project rankec #10 in Long Walkway List of the 2015 Transportation Plan. Estimated Project Cost $2,054,000 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $0 $0 $0 $0 $0 $293,000 Right of Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $0 $1,761,000 Expense Total $0 $0 $0 $0 $0 $0 $2,054,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $2,054,000 Funding Source Total $0 $0 $0 $0 $0 $0 $2,054,000 Packet Pg. 97 PWT-32 84TH AVE W WALKWAY FROM Lutheer`hr an - Perk and Church 238TH ST SW TO Ride m 0 234TH ST SW N $ 3 9L a x 238TH ST SW Benefit This project would improve pedestrian safety. Description The walkway project proposed approximately 1,000 LF of new sidewalk on the east side of 84th Ave W with ADA compliant pedestrian curb ramps. Estimated Project Cost $3,325,000 'includes prior year expenditures Budget Project Cost Design ROW Construction Expense Total Fund 126 - REET Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $100,000 $0 $0 $296,000 $0 $0 $0 $0 $0 $0 $329,000 $0 $0 $0 $0 $0 $0 $0 $2,550,000 $0 $0 $100,000 $0 $0 $625,000 $2,550,000 $0 $0 $100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $625,000 $2,550,000 $0 $0 $100,000 $0 $0 $625,000 $2,550,000 $0 $0 Packet Pg. 98 PWT-33 80TH AVE W WALKWAY FROM 212TH ST SW TO 206TH ST SW College Place Elementary College Place Middle LYNNWOOD,00TH sr EDMONDS Edmc Pub Edmonds Woodway Woy . 12TH ST SW / High School Benefit The improvements will improve active transportation safety (including for school kids due to proximity of several schools). Description Install sidewalk along 80th Ave. W from 206th St. SW to 212th St. SW with curb and gutter. This project ranked #1 in Long Walkway List of the 2015 Transportation Plan Estimated Project Cost $1,677,000 Includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $117,000 $127,000 $0 $0 $0 $0 $0 $0 $0 $1,433,000 $0 $0 $0 $0 $117,000 $127,000 $1,433,000 $0 $0 $0 $0 $117,000 $127,000 $1,433,000 $0 $0 $0 $0 $117,000 $127,000 $1,433,000 $0 Packet Pg. 99 PWT-34 80TH AVE W WALKWAY FROM 188TH ST SW TO OLYMPIC VIEW DR Fo �� MONO�'O 3� LYNNWOOD s 1871n p% S" I 1881h Benefit This project would improve pedestrian safety. Description Install sidewalk along 80th Ave. W from 188th St. SW to OVD. This project ranked #1 in Long Walkway List of the 2015 Transportation Plan. Estimated Project Cost $2,473,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $511,000 $0 $0 $0 $0 $0 $0 $0 $1,962,000 $0 $0 $0 $0 $0 $511,000 $1,962,000 $0 $0 $0 $0 $0 $511,000 $1,962,000 $0 $0 $0 $0 $0 $511,000 $1,962,000 $0 $0 Packet Pg. 100 PWT-35 218TH ST SW WALKWAY FROM 76TH AVE W TO 84TH AVE W Chase Lake Elementary tamonas vwooaway nign Swedish 3 - School Edmo w 3 > Chase Lake -- Q School W � a00 c Edmonds ESPERANCE Church of God 220TH ST SW Benefit The improvements will improve pedestrian safety. Description Install sidewalk along 218th St. SW from 76th Ave. W to 84th Ave. W with curb and gutter. This project ranked #2 in Long Walkway List of the 2015 Transportation Plan Estimated Project Cost $1,843,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $280,000 $0 $0 $0 $0 $0 $0 $0 $1,563,000 $0 $0 $0 $0 $0 $280,000 $1,563,000 $0 $0 $0 $0 $0 $280,000 $1,563,000 $0 $0 $0 $0 $0 $280,000 $1,563,000 $0 $0 I Packet Pg. 101 PWT-36 WALNUT ST WALKWAY FROM 6TH AVE S TO 7TH AVE S No a m OEM t Benefit This project will improve pedestrian safety along this stretch. Description Install sidewalk on the south side of Walnut St. from 6th Ave. S to 7th Ave. S. This project is ranked #9 in the Short Walkway List (from 2015 Transportation Plan). Estimated Project Cost $308,000 "includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $53,000 $0 $0 $0 $0 $0 $0 $255,000 $0 $0 $0 $0 $0 $0 $308,000 $0 $0 $0 $0 $0 $0 $308,000 $0 $0 $0 $0 $0 $0 $308,000 $0 $0 $0 Packet Pg. 102 PWT-37 216TH ST SW WALKWAY FROM HWY 99 TO 72ND AVE W F--" Benefit To provide a safe and desirable walking route. Description Install 150' sidewalk on north side of 216th St. SW from Hwy. 99 to 72nd Ave. W (completing a missing link on north side of 216th St. SW). This project is ranked #3 in the Short Walkway List (from 2015 Transportation Plan). Estimated Project Cost $233,000 `includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $35,000 $0 $0 $0 $0 $0 $0 $198,000 $0 $0 $0 $0 $0 $0 $233,000 $0 $0 $0 $0 $0 $0 $233,000 $0 $0 $0 $0 $0 $0 $233,000 $0 $0 $0 Packet Pg. 103 PWT-39 CITYWIDE BICYCLE IMPROVEMENTS PROJECT Benefit This project will create new bike connections to various destination points throughout the City (such as schools, parks, Downtown, Sound Transit Station). Sound Transit awarded the grant to fund improvements that will provide more convenient access so that more people can use Sound Transit services. Description The project added bike lanes or sharrows on the following streets: • 100th Ave/9th Ave from 244th St to Walnut St • Walnut/Bowdoin Way from 9th Ave to 84th Ave • 228th St. from 76th Ave to 80th Ave • Bike sharrows on 80th Ave from 228th St. to 220th St. Pedestrian crossing improvements including curb ramps, rectangular rapid flashing beacons (RRFB) and signing were installed at 100th Ave & 224th St, 9th Ave & Pine St, Bowdoin Way& 96th Ave and Bowdoin Way & Pioneer Way. The construction waE completed in 2024 and project close-out is scheduled for 2025. Estimated Project Cost $2,800,000 Includes prior year expenditures Budget Project Cost Construction Expense Total Fund 125 - REET Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $10,000 $0 $0 $0 $0 $0 $0 $10,000 $0 $0 $0 $0 $0 $0 $10,000 $0 $0 $0 $0 $0 $0 $10,000 $0 $0 $0 $0 $0 $0 Packet Pg. 104 PWT-40 MAPLEWOOD DR WALKWAY FROM MAIN ST TO 200TH ST SW a - U a a Benefit Create pedestrian connection between Maplewood Elementary School on 200th St. S and Main St., by encouraging kids to use non -motorized transportation to walk to / froi school. Description Construct sidewalk on Maplewood Dr. from Main St. to 200th St. SW (- 2,700'). A sidewalk currently exists on 200th St. SW from Main St. to 76th Ave. W, adjacent to Maplewood Elementary School (rated #18 in the Long Walkway list of the 2015 Transportation Plan). Estimated Project Cost $3,128,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $233,000 $233,000 $0 $0 $0 $0 $0 $0 $0 $2,662,000 $0 $0 $0 $0 $233,000 $233,000 $2,662,000 $0 $0 $0 $0 $233,000 $233,000 $2,662,000 $0 $0 $0 $0 $233,000 $233,000 $2,662,000 $0 Packet Pg. 105 220TH ST SW 95TH PL W WALKWAY �" i �' �� �7 i ZQ 9 FROM 224TH ST Westgate SW TO Elementary /. j,� O �a � aF sw $c C W 121"ys • /+ 3 j i s ` y ^ � h � ` �♦ 4t 220TH ST SW �R i a • 31.. •' L �� a �( w P ys` $ ♦ �r� � 1` t i C -a lb �r so a _rt t-awn' .. = 2241n SW I f Benefit This project would improve pedestrian safety. ; y Description Install sidewalk along 95th PI. W from 224th St. SW to 220th St. SW with curb and gutter. This project ranked #8 in the Long Walkway List of the 2015 Transportation Plan. Estimated Project Cost $914,000 `includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $139,000 $0 $0 $0 $0 $0 $0 $0 $775,000 $0 $0 $0 $0 $0 $139,000 $775,000 $0 $0 $0 $0 $0 $139,000 $775,000 $0 $0 $0 $0 $0 $139,000 $775,000 $0 $0 Packet Pg. 106 PWT-43 s.a:clo � Baptist w Lake SR-104 & 76TH NOW �OM° Church Q Ballinger MOTORIZED �T �q °"0SWA TRANSPORTATION N 205TH ST Z • N 205TH ST �z P ��04TH PL a�F wIMPROVEMENTS Z z a 0 a � � w All l 2 Benefit Improve active transportation safety along this section of the Interurban Trail and across SR-104. Description Extend bike lanes within proximity of the intersection in northbound and southbound directions. Install APS on all corners and new ADA curb ramps. Estimated Project Cost $1,666,000 "includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $277,000 $0 $0 $0 $0 $0 $0 $0 $1,389,000 $0 $0 $0 $0 $0 $277,000 $1,389,000 $0 $0 $0 $0 $0 $277,000 $1,389,000 $0 $0 $0 $0 $0 $277,000 $1,389,000 $0 $0 Packet Pg. 107 PWT-45 SR-104 WALKWAY HAWK TO PINE/PINE FROM SR-104 TO 9TH Edmonds Marsh Edmonds Marsh City Perk Qo Fa 0o y�tios 3 0 W Benefit This project will improve pedestrian connectivity between the residential areas along 3rd Ave. S to Downtown Edmonds and City Park. Description Installation of sidewalk with ADA curb ramps along SR-104 from the HAWK signal to Pine St and along Pine St from SR-104 to 9th Ave S Estimated Project Cost $3,473,000 "includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $579,000 $0 $0 $0 $0 $0 $0 $2,894,000 $0 $0 $0 $0 $0 $0 $3,473,000 $0 $0 $0 $0 $0 $0 $3,473,000 $0 $0 $0 $0 $0 $0 $3,473,000 $0 Packet Pg. 108 PWT-46 Sierre 191 ST ST SW FROM Perk 80TH AVE W TO 76TH 0 00 Zo AVE W oz �J I 192nd PI CW Benefit This project would improve pedestrian safety. Description Install sidewalk along 191th St. SW from 80th Ave. W to 76th Ave., with curb and gutter. This project ranked #8 in Long Walkway List of the 2015 Transportation Plan. Estimated Project Cost $762,000 'includes prior year expenditures Budget Project Cost Design, ROW, and Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $762,000 $0 $0 $0 $0 $0 $0 $762,000 $0 $0 $0 $0 $0 $0 $762,000 $0 $0 $0 $0 $0 $0 $762,000 Packet Pg. 109 PWT-47 104TH AVE W / ROBINHOOD LN FROM 238TH ST TO 106TH AVE W £ R Salem 5 Edmonds Lutheran Heights Church K-12 Wach�isea Rd Q y Scriber Lake L QO High School £ O:i 3 i 3 0 c i Hickman o Perk S Edmonds Faith Memorial Community / Cemetery Church y Benefit This project would improve pedestrian safety. £ Description Install sidewalk along 104th Ave. W from 238th ST. SW to 106th Ave. W, with curb al gutter. This project ranked #10 in the Long Walkway List of the 2015 Transportation z Plan. "o u Estimated Project Cost $1,192,000 'includes prior year expenditures i Budget Project Cost Design, ROW, and Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $1,192,000 $0 $0 $0 $0 $0 $0 $1,192,000 $0 $0 $0 $0 $0 $0 $1,192,000 $0 $0 $0 $0 $0 $0 $1,192,000 ; Packet Pg. 110 PWT-48 80TH AVE W FROM 218TH ST SW TO 220TH ST SW 3 bdEd "a Lid` au M E7 a' m Nlit -- 219th St '- 220TH ST SW Edmonds Church of God ESPERANCE 718!h St Benefit This project would improve pedestrian safety. Description Install sidewalk along 80th Ave. W from 218th ST. SW to 220th ST. SW, with curb an gutter. This project ranked #7 in the Short Walkway List of the 2015 Transportation z Plan. "o u Estimated Project Cost $365,000 C. 'includes prior year expenditures 11 Budget Project Cost Design, ROW, and Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $365,000 $0 $0 $0 $0 $0 $0 ; $365,000 $0 $0 $0 $0 $0 $0 $365,000 $0 $0 $0 $0 $0 $0 $365,000 Packet Pg. 111 PWT-49 84TH AVE W FROM 188TH ST SW TO 186TH ST SW seeview aeth St SW a 187th St SW R O L a - m E Benefit This project would improve pedestrian safety. a Description Install sidewalk along 84th Ave. W from 188th St. SW to 186th St. SW., with curb anc gutter. This project ranked #5 in Short Walkway List of the 2015 Transportation Plan Estimated Project Cost $369,000 'includes prior year expenditures Budget Project Cost Design, ROW, and Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $369,000 $0 $0 $0 $0 $0 $0 $369,000 $0 $0 $0 $0 $0 $0 $369,000 $0 $0 $0 $0 $0 $0 $369,000 Packet Pg. 112 1 PWT-50- 238TH ST SW FROM HWY 99 TO 76TH AVE W ...100000 _ r :t it T ;gnrh SI SWMethey Bellinger I Perk Benefit This project would improve pedestrian safety. Description Install sidewalk along 238th St. SW from Hwy 99 to 76th Ave. W. This project rankec #10 in Long Walkway List of the 2015 Transportation Plan. - Estimated Project Cost $1,445,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $211,000 $0 $0 $0 $0 $0 $0 $0 $1,234,000 $0 $0 $0 $0 $0 $211,000 $1,234,000 $0 $0 $0 $0 $0 $211,000 $1,234,000 $0 $0 $0 $0 $0 $211,000 $1,234,000 $0 $0 Packet Pg. 113 1 PWT-55 ELM WAY WALKWAY FROM 8TH AVE. S TO 9TH AVE. S flm St N A& W _ a 0 0 a d a 0 Benefit The project will improve pedestrian safety and provide a missing link of sidewalk on Elm Way between 8th Ave and 9th Ave. Description The walkway project is ranked #6 on the short walkway list from the 2015 Transportation Plan. The project constructed approximately 700 feet of new sidewalk; o six pedestrian curb ramps and modify the existing stormwater system on Elm Way U between 8th Ave. S and 9th Ave. S. Construction was completed in 2024. Project closeout in 2025. 0 c Estimated Project Cost $1,000,000 'includes prior year expenditures Budget Project Cost Construction Expense Total Fund 126 - REET Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $5,000 $0 $0 $0 $0 $0 $0 $5,000 $0 $0 $0 $0 $0 $0 $5,000 $0 $0 $0 $0 $0 $0 c $5,000 $0 $0 $0 $0 $0 $0 Packet Pg. 114 PWT-60 PEDESTRIAN SAFETY PROGRAM Benefit Improve safety at pedestrian crossings. Description This program started in 2019 and will provide pedestrian safety improvements, such additional signage / stripng, flashing LED's around stop signs, or other improvements These improvements will improve the safety of the City's transportation system. Estimated Project Cost $20,180 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 126 - REET Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $1,000 $1,000 $0 $0 $0 $0 $0 $19,180 $19,180 $0 $0 $0 $0 $0 $20,180 $20,180 $0 $0 $0 $0 $0 $20,180 $20,180 $0 $0 $0 $0 $0 $20,180 $20,180 $0 $0 $0 $0 $0 Packet Pg. 115 1 PWT-66 4TH AVENUE CULTURAL CORRIDOR Benefit The corridor improvements in the public right of way will encourage pedestrian traffic and provide a strong visual connection between the ECA and downtown retail. Improvements will enhance connectivity as an attractive walking corridor and contribu to the economic vitality in downtown. The project has been supported by the commun in the 2014 Community Cultural Plan and in the goals and priorities for the State certified Creative District. This project is supported by the 2022 Parks, Recreation anc Open Space (PROS) Plan. Description Final design of 4th Avenue Cultural Corridor to include site design and construction documents for a safe, pedestrian friendly, and art enhanced corridor in the public righ of way which provides a strong visual connection along 4th Avenue N between Main Street and Edmonds Center for the Arts. Interim work on this project since the concei was developed includes a 2015 temporary light artwork "Luminous Forest", as well as preliminary design development through 2020-21. Funding for this project has not be( secured at this time. The 4th Avenue Cultural Corridor Project is managed by the Community Services/Economic Development Department. Estimated Project Cost $9,206,600 Includes prior year expenditures Budget Project Cost Design Right of Way Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $1,000,000 $500,000 $0 $0 $0 $0 $0 $0 $500,000 $0 $0 $0 $0 $0 $0 $0 $6,000,000 $0 $0 $0 $0 $1,000,000 $1,000,000 $6,000,000 $0 $0 $0 $0 $1,000,000 $1,000,000 $6,000,000 $0 $0 $0 $0 $1,000,000 $1,000,000 $6,000,000 $0 Packet Pg. 116 2.1.b New- 2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS PWT-51 Olympic Railroad Sno-Isle) Beech Park Station Dayton Lib FERRY STORAGE St Edmlazaonds Hazel Christian Pugel Sound City Edmonds Miller Science Port d Treatment Plant Plaza Church Edmonds IMPROVEMENTS FROM Wildlife Refuge PINE ST TO DAYTON ST a a Edmonds Marsh a Edmonds Marsh Marina Beach city Perk i 0 Benefit Reduce conflicts between ferry storage and access to local driveways. Description Modify existing lane channelization on SR104 to add vehicle storage for ferry users. Estimated Project Cost $403,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $61,000 $0 $0 $0 $0 $0 $0 $342,000 $0 $0 $0 $0 $0 $0 $403,000 $0 $0 $0 $0 $0 $0 $403,000 $0 $0 $0 $0 $0 $0 $403,000 $0 $0 $0 Packet Pg. 118 2.1.b / S ! C BUMP 15 M P H Packet Pg. 119 PWT-52 TRAFFIC CALMING PROGRAM Benefit Reduce vehicle speeds on City streets that qualify under the City's Traffic Calming Policy. Description Install traffic calming devices along selected stretches throughout the City with speeding issues (through completion of detailed evaluation). This ongoing annual program started in 2015 and is included in the City's 6-year Transportation Improvement Program (TIP) and Capital Improvement Program (CIP). Estimated Project Cost $80,650 '`includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 126 - REET Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $10,000 $10,000 $2,000 $2,000 $2,000 $2,000 $30,000 $70,650 $70,650 $20,000 $20,000 $20,000 $20,000 $300,000 $80,650 $80,650 $22,000 $22,000 $22,000 $22,000 $330,000 $80,650 $80,650 $22,000 $22,000 $22,000 $22,000 $330,000 $80,650 $80,650 $22,000 $22,000 $22,000 $22,000 $330,000 Packet Pg. 120 TRAFFIC PLANNINI r i wL t 1,2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS PWT-53 ADA TRANSITION PLAN (RIGHT-OF-WAY) UPDATE Benefit Inventories and prioritizes ADA issues in the City right of way, as well as City building: and parks facilities. Description The 2017 Transition Plan completed an ADA evaluation and prioritization of the City's street right-of-way. This decision package will update the 2017 plan and expand the evaluation to include City Buildings and Parks facilities. The Plan will inventory physical barriers preventing accessibility and develop actions and preliminary cost estimates to address ADA non-compliance. Estimated Project Cost $440,000 Includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $0 $0 $440,000 $0 $0 $0 Expense Total $0 $0 $0 $440,000 $0 $0 $0 Unsecured Funding $0 $0 $0 $440,000 $0 $0 $0 Funding Source Total $0 $0 $0 $440,000 $0 $0 $0 Packet Pg. 122 PWT-54 TRANSPORTATION PLAN UPDATE Benefit Based upon existing and projected future land use and travel patterns, the Transportation Plan describes roadway pedestrian, bicycle and transit infrastructure and services and provides an assessment of existing and projected future transportation needs. The Plan will establish the transportation priorities and guides & development of the six -year Transportation Improvement Program (TIP), Capital Improvement Program (CIP), Capital Facilities Plan (CFP) and introduce Multimodal Level of Service (MMLOS). Description The Transportation Plan serves as the transportation element of the City's Comprehensive Plan and is being updated in coordination with the 2024 Comprehensive Plan Update. The plan was last updated in 2015. The Transportation Plan Update will be completed in Fall 2024. The funding in 2025 will develop the new multi -modal impact fee and provide staff training on implementin, the program on private development projects. Estimated Project Cost $406,000 "includes prior year expenditures Budget Project Cost 2025 Planning $35,000 Expense Total $35,000 Fund 112 - Street (Gas Tax & $35,000 Multi -Modal) Funding Source Total $35,000 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 A $0 $0 $0 $0 Packet Pg. 123 GREEN STREET; Iy Ap _ >•.t w ++r +� �.. ems- . - � �+���•` yr -f r - i I. \ �- � mow• ( - '7 .C.,r '�ry, ��=. .. 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS PWT-64w� dw. aF V f�s I i 4 = a a GREEN STREETS IV 236TH ST SW - 84TH AVE W TO HIGHWAY 99 "��� " ry Benefit Incorporating green streets into the urban fabric of the City of Edmonds is intended to demonstrate how trees, vegetation, engineered green stormwater solutions, physical and visual narrowing of vehicular lane widths, and shortening pedestrian crossings wii curb bulbs help to slow traffic, ameliorate climate change impacts, and reinforce desired land use and transportation patterns on appropriate street rights -of -way. This project is intended to increase the livability of a diverse, growing city. Description The City of Edmonds proposes the development of this project to demonstrate how green infrastructure can both address stormwater flows and enhance the streetscape to benefit the Hwy 99 neighborhood and the downtown core. This project includes the following elements: • Roadway narrowing to reduce traffic speeds and to reduce impervious surface (vehicular capacity retained) • Sidewalks and planting strips added • Bioretention cells collect runoff from the road through curb cuts • Bioretention cells collect runoff directly from sidewalks • Public private partnership potential with Housing Hope and Terrace Place developments. Estimated Project Cost $3,710,000 Includes prior year expenditures Budget Project Cost Design Construction Expense Total Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $371,000 $0 $0 $0 $0 $0 $0 $3,339,000 $0 $0 $0 $0 $0 $0 $3,710,000 $0 $0 $0 $0 $0 $0 $3,710,000 $0 $0 $0 $0 $0 $0 $3,710,000 $0 Packet Pg. 125 WAT E •� _ B Ste' • --mow . •� .. .ice � - -. — tea.. k l r -cam 'i•, i � •w 47 kC. � 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS WATER PWW-01 Annual Waterline Overlay (2024) PWW-02 2027 Water Comprehensive Plan Update PWW-03 Phase 14 Annual Replacement Program (2024) PWW-04 Phase 15 Annual Replacement Program (2025) PWW-05 Phase 16 Annual Replacement Program (2026) PWW-06 Phase 17 Annual Replacement Program (2027) PWW-07 Phase 18 Annual Replacement Program (2028) PWW-08 Phase 19 Annual Replacement Program (2029) PWW-10 Phase 20 Annual Replacement Program (2030) PWW-11 Yost & Seaview Reservoir Repairs & Upgrades PWW-20 Phase 21 Annual Replacement Program (2031) & Future Projects EXPENSE TOTAL Fund 421 - Water Utility FUNDING TOTAL .. TotalCL M $500 $0 $0 $0 $0 $0 $500 $0 $500 v c M $0 $150,000 $350,000 $0 $0 $0 $500,000 $0 $500,000 E- LL U $15,000 $0 $0 $0 $0 $0 $15,000 $0 $15,000 c a $3,533,000 $0 $0 $0 $0 $0 $3,533,000 $0 $3,533,000 m r $547,000 $3,289,000 $0 $0 $0 $0 $3,836,000 $0 $3,836,000 LL $0 $569,000 $3,966,000 $0 $0 $0 $4,535,000 $0 $4,535,000 a $0 $0 $592,000 $4,124,000 $0 $0 $4,716,000 $0 $4,716,000 v O M O $0 $0 $0 $616,000 $4,289,000 $0 $4,905,000 $0 $4,905,000 ,Nn N O $0 $0 $0 $0 $641,000 $4,460,000 $5,101,000 $0 $5,101,000 v U- $4,760,000 $3,850,000 $0 $0 $0 $0 $8,610,000 $0 $8,610,000 G $0 $0 $0 $0 $0 $666,000 $666,000 $106,764,000 $107,430,000 v $8,855,500 $7,858,000 $4,908,000 $4,740,000 $4,930,000 $5,126,000 $36,417,500 $106,764,000 $143,181,500 a $8,855,500 $7,858,000 $4,908,000 $4,740,000 $4,930,000 $5,126,000 $36,417,500 $106,764,000 $143,181,500 $8,855,500 $7,858,000 $4,908,000 $4,740,000 $4,930,000 $5,126,000 $36,417,500 $106,764,000 $143,181,500 Packet Pg. 127 PWW-01 ANNUAL WATERLINE OVERLAY (2024) Benefit Improve overall pavement condition in locations that were excavated and patched duE to the Annual Waterline Replacement Projects. Description Road pavement overlays will cover areas of roadways that were excavated and patched in previous years as part of the Waterline Replacement Projects. Estimated Project Cost $295,000 (2024) 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction $500 $0 $0 $0 $0 $0 $0 Expense Total $500 $0 $0 $0 $0 $0 $0 Fund 421 - Water Utility $500 $0 $0 $0 $0 $0 $0 Funding Source Total $500 $0 $0 $0 $0 $0 $0 Packet Pg. 128 PWW-02 2027 WATER COMPREHENSIVE PLAN UPDATE Benefit Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of breakages and leakage, improve fire flows, and decrease overall day to day maintenance costs. Description The existing water comprehensive plan was last updated in 2017 and is required to bi updated by the State Dept of Health (DOH) every 10 years. This project would be a comprehensive evaluation of the City's drinking water system, its replacement progra and its operations and with include recommendations for improvements or adjustmen and recommended priorities for selecting future capital maintenance projects. Estimated Project Cost $500,000 "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $150,000 $350,000 $0 $0 $0 $0 Expense Total $0 $150,000 $350,000 $0 $0 $0 $0 Fund 421 - Water Utility $0 $150,000 $350,000 $0 $0 $0 $0 Funding Source Total $0 $150,000 $350,000 $0 $0 $0 $0 Packet Pg. 129 PWW-03-09,20 PHASE 14-35 WATER REPLACEMENT PROJECTS (2024-45) Benefit Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of breakages and leakage, improve fire flows, and decrease overall day to day maintenance costs. Description Per the approved 2017 Water Comprehensive Plan, the projects will replace/maintain pipe and related appurtenances at various locations throughout the City due to old ag being undersized, need to increase flow or pressure, or more prone to breakage due its material properties. Estimated Project Cost $4.2 to $9.2 million/year 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 421 - Water Utility Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $590,100 $569,000 $592,000 $616,000 $641,000 $666,000 $13,873,000 $3,504,900 $3,289,000 $3,966,000 $4,124,000 $4,289,000 $4,460,000 $92,891,000 $4,095,000 $3,858,000 $4,558,000 $4,740,000 $4,930,000 $5,126,000 $106,764,000 $4,095,000 $3,858,000 $4,558,000 $4,740,000 $4,930,000 $5,126,000 $106,764,000 $4,095,000 $3,858,000 $4,558,000 $4,740,000 $4,930,000 $5,126,000 $106,764,000 Packet Pg. 130 PWW-11 YOST & SEAVIEW RESERVOIR REPAIRS & UPGRADES Benefit Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of leakage, retrofit structures so that they meet current structural codes to improve their resiliency during earthquakes, and decrease overall day to day maintenance costs. Description This work is being done to provide structural upgrades, repair leakages, and upgrade to our two underground potable water storage reservoirs. Preliminary findings completed in early 2023 were used to determine order of magnitude/preliminary costs and next steps for the now planned repairs and upgrades project. The Yost Reservoi report shows that it will need a major structural and seismic retrofit, plus repairs to address leakage from the reservoir. The report for the Seaview Reservoir shows similar issues as the Yost Reservoir, with a less serious leakage issue. Estimated Project Cost $9,659,000 "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $260,000 $0 $0 $0 $0 $0 $0 Construction $4,500,000 $3,850,000 $0 $0 $0 $0 $0 Expense Total $4,760,000 $3,850,000 $0 $0 $0 $0 $0 Fund 421 - Water Utility $4,760,000 $3,850,000 $0 $0 $0 $0 $0 Funding Source Total $4,760,000 $3,850,000 $0 $0 $0 $0 $0 Packet Pg. 131 STORMWATEI �10 n Jai Sk { -� ��;. fJ �� y� .�9e S' - - - ► d.� , +, if���,��Y � � .wit S,�'`--- 'k f r _ 4 s +'• �' '� �` '•yr v �, it -- _` - � ,, � '• ' _•r" T� r y7, 1> •�ys 1i 1 T �,�'� 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS STORMWATER PWD-11 Phase 4 Storm Maintenance Project (2024) PWD-12 Phase 5 Storm Maintenance Project (2025) PWD-13 Phase 6 Storm Maintenance Project (2026) PWD-14 Phase 7 Storm Maintenance Project (2027) PWD-15 Phase 8 Storm Maintenance Project (2028) PWD-16 Phase 9 Storm Maintenance Project (2029) PWD-18 Phase 10 Annual Storm Replacement (2030) PWD-07 Phase 11 Storm Maintenance Project (2031) & Future Projects PWD-19 Annual SD Overlays (2024) '►►B 1 Wfi PWD-24 2025 2026 2027 2028 2029 2030 2u25-su 2031-45 Grand To Total $10,000 $0 $0 $0 $0 $0 $10,000 $0 $10,( c M $1,597,000 $0 $0 $0 $0 $0 $1,597,000 $0 $1,597,( a LL U $249,000 $981,000 $0 $0 $0 $0 $1,230,000 $0 $1,230,( _ a $0 $351,000 $1,825,000 $0 $0 $0 $2,176,000 $0 $2,176,( r $0 $0 $365,000 $1,898,000 $0 $0 $2,263,000 $0 $2,263,( LL $0 $0 $0 $380,000 $1,974,000 $0 $2,354,000 $0 $2,354,( a $0 $0 $0 $0 $395,000 $2,053,000 $2,448,000 $0 $2,448,( c M O $0 $0 $0 $0 $0 $411,000 $411,000 $51,280,000 $51,691,( ,Nn N O $500 $0 $0 $0 $0 $0 $500 $0 $° v U- a EDMONDS MARSH ESTUARY RESTORATION a 0 Edmonds Marsh Water Quality Improvements (phase 1) $321,928 $0 $0 $0 $0 $0 $321,928 $0 $321,f v a Edmonds Marsh Water Quality Improvements (phase 2) $386,708 $0 $0 $0 $0 $0 $386,708 $0 $386,1 L) Edmonds Marsh Estuary Planning Study PERRINVILLE CREEK BASIN PWD-03 Perrinville Creek Flow Management Projects PWD-04 Lower Perrinville Creek Restoration Project PWD-23 Perrinville Creek Basin Analysis Update STORivi urcHuv uL nvn-t<uVEMENT PWD-06 Lake Ballinger Regional Facility Design & Construction L $89,000 $0 $0 $0 $0 $0 $89,000 $0 $89,( 0 L) a $104,000 $108,000 $112,000 $116,000 $120,000 $125,000 $685,000 $2,641,000 $3,326,( M 0 N $350,000 $1,520,000 $2,122,500 $0 $0 $0 $3,992,500 $0 $3,992,° N 0 N $468,343 $0 $0 $0 $0 $0 $468,343 $0 $468,i m E .r $0 $0 $200,000 $3,000,000 $0 $0 $3,200,000 $0 $3,200,6u Packet Pg. 133 STORMWATER ProjectDP 20252026 2027 20281 • 20301 1 1 PWD-22 7317 Lake Ballinger Way Floodplain Purchase &Structure $256,000 $5,000 $0 $0 $0 $0 TotalC. $261,000 $0 $261,( Removal c c� c;OMPLIANCE RELATED U_ U PWD-17 Storm and Surface Water Comprehensive Plan $213,000 $0 $0 $0 $0 $0 $213,000 $0 $213,( c 0 ANNUAL TOTAL $4,045,479 $2,965,000 $4,624,500 $5,394,000 $2,489,000 $2,589,000 $22,106,979 $53,921,000 $76,027,S L a� • • • 1 1 • 1 1 1 • 2030 1 1 1 U � • • LL Total Citizen Cash Donation $25,000 $0 $0 $0 $0 $0 $25,000 $0 $25,( v City of Lynnwood $30,086 $0 $0 $0 $0 $0 $30,086 $0 0 $30,( N Federal Grants $35,000 $0 $0 $0 $0 $0 $35,000 $0 $35,( N Fund 422 - Stormwater Utility $3,081,476 $1,825,000 $3,032,625 $3,144,000 $2,489,000 $2,589,000 $16,161,101 $53,921,000 $70,082,1 Q Marsh Preservation Fund $29,000 $0 $0 $0 $0 $0 $29,000 $0 $29,( a U_ U Secured Grants $582,417 $0 $0 $0 $0 $0 $582,417 $0 $582,� a_ U Unsecured Grants $262,500 $1,140,000 $1,591,875 $2,250,000 $0 $0 $5,244,375 $0 $5,244,i L FUNDING TOTAL $4,045,479 $2,965,000 $4,624,500 $5,394,000 $2,489,000 $2,589,000 $22,106,979 $53,921,000 0 $76,027,9 a 0 M 0 N LO N O N C d E t U f� Q Packet Pg. 134 PWD-07,11-16,18 PHASE 4-25 STORM MAINTENANCE PROJECTS (2025-45) Benefit Improve system reliability and capacity, decrease breakages, and decrease overall d2 to day maintenance costs. Description Annual storm drain replacement/maintenance projects. Projects propose to replace o rehab storm drain infrastructure in several locations throughout the City. Locations of work identified by City crews and staff via firsthand knowledge or video inspection results. Much of Edmonds stormwater infrastructure is past its useful lifespan and requires routine replacement or repair to preserve the function of the storm drain system. Failure to conduct annual maintenance projects will increase chances of ston drain system failures. Estimated Project Cost $1.2 to $4.4 million/year 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $249,000 $351,000 $365,000 $380,000 $395,000 $411,000 $8,539,000 Construction $1,607,000 $981,000 $1,825,000 $1,898,000 $1,974,000 $2,053,000 $42,741,000 Expense Total $1,856,000 $1,332,000 $2,190,000 $2,278,000 $2,369,000 $2,464,000 $51,280,000 Fund 422 - Stormwater Utility $1,856,000 $1,332,000 $2,190,000 $2,278,000 $2,369,000 $2,464,000 $51,280,000 Funding Source Total $1,856,000 $1,332,000 $2,190,000 $2,278,000 $2,369,000 $2,464,000 $51,280,000 Packet Pg. 135 PWD-19 ANNUAL SD OVERLAYS (2024) Benefit Description s Improve overall pavement condition in locations that were excavated and patched due to the Annual Storm Replacement Projects. Road pavement overlays to cover areas of roadways that were excavated and patche in previous years as part of the Annual Storm Maintenance Projects. Estimated Project Cost $35,000 (2024) *includes prior year expenditures Budget Project Cost Construction Expense Total Fund 422 - Stormwater Utility Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $500 $0 $0 $0 $0 $0 $0 $500 $0 $0 $0 $0 $0 $0 $500 $0 $0 $0 $0 $0 $0 $500 $0 $0 $0 $0 $0 $0 Packet Pg. 136 1 EDMONDS MARSH ESTUARY RESTORAT101 r . 1, ��1�t � �3,+,� � +•" .�• 1t:', it ``,,r ' •'• �+` t� •ate _ r H 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS PWD-01 Wildlife .i Refuge Wal ut t EDMONDS MARSH WATER QUALITY LLJ IMPROVEMENTSEdmonds Marsh �• 0 (PHASEI) 3 M 0 City Perk Z O � I w Benefit Improve water quality of stormwater discharging into the Edmonds Marsh from the we portions of SR-104 located near the marsh. The improvements will provide better habitat for the return of salmon to the marsh. Description The project will be improving water quality of stormwater runoff by replacing existing catch basins along the west side of SR-104 funded via a DOE grant. The catch basir will be replaced with catch basins that include water filter cartridges. Staff proposes this effort in order to provide water quality mitigation for all discharges that directly enter the marsh from these locations. Estimated Project Cost $418,000 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction $321,928 $0 $0 $0 $0 $0 $0 Expense Total $321,928 $0 $0 $0 $0 $0 $0 Fund 422 - Stormwater Utility $80,482 $0 $0 $0 $0 $0 $0 Secured Grants $241,446 $0 $0 $0 $0 $0 $0 Funding Source Total $321,928 $0 $0 $0 $0 $0 $0 Packet Pg. 138 PWD-05 wildlife .i Refuge Wal ut t EDMONDS MARSH WATER QUALITY wool, LLJ IMPROVEMENTS �� Edmonds Marsh Q (PHASE 2) 3 M fn 0 City Park Z O � I w Benefit Improve water quality of stormwater discharging into the Edmonds Marsh from the we portions of SR-104 located near the marsh. The improvements will provide better habitat for the return of salmon to the marsh. Description The project will be improving water quality of stormwater runoff by replacing existing catch basins along the east side of SR-104 via a state funded appropriation. The cats basins will be replaced with catch basins that include water filter cartridges. Staff proposes this effort in order to provide water quality mitigation for all discharges that directly enter the marsh from these locations. Estimated Project Cost $458,000 Includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $39,868 $0 $0 $0 $0 $0 $0 Construction $346,840 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $0 $0 Expense Total $386,708 $0 $0 $0 $0 $0 $0 Fund 422 - Stormwater Utility $386,708 $0 $0 $0 $0 $0 $0 Secured Grants $0 $0 $0 $0 $0 $0 $0 Unsecured Grants $0 $0 $0 $0 $0 $0 $0 Funding Source Total $386,708 $0 $0 $0 $0 $0 $0 Packet Pg. 139 PWD-24 EDMONDS MARSH ESTUARY PLANNING STUDY Benefit Aid for future planning of Marsh Restoration. Description This study will include completing a gap analysis of existin data, hydrologic evaulatior hydraulic modeling, listing restoration alternatives, minimizing the potential for exposure to contamination, listing permits and approvals required for restoration, evaluating project land purchase and restoration funding options, identifying a proces that defines community goals for the marsh, and producing scoping documents that li the tasks required to complete the restoration plan. Estimated Project Cost $204,000 `includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $89,000 $0 $0 $0 $0 $0 $0 Expense Total $89,000 $0 $0 $0 $0 $0 $0 Federal Grants $35,000 $0 $0 $0 $0 $0 $0 Marsh Preservation Fund $29,000 $0 $0 $0 $0 $0 $0 Citizen Cash Donation $25,000 $0 $0 $0 $0 $0 $0 Funding Source Total $89,000 $0 $0 $0 $0 $0 $0 Packet Pg. 140 PERRINVILLE CREEK BASII lz ir+ f ; _ ram` \ r�- r •�. tia t ! _ 4 say "•� - . •� - � �'. / , {� _- � -:p.� - � f V. .. _ Ao J �t w- 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS PWD-03 PERRINVILLE CREEK FLOW MANAGEMENT PROJECTS Benefit The project will reduce peak flows in Perrinville creek, improve fish passage and decrease creek bed scour during peak flow events. Description Reducing scouring flows to reduce sediments load in Perrinville Creek was identified a previous basin report completed in 2015 as a critical element of restoring this creek which has been significantly impacted by urban development. The projects funded by this program are incremental steps toward recovering this stream run as adequate fis habitat. These efforts have become even more critical given recent challenges arounc the Perrinville Creek outfall area. This program is a fund for implementing projects within the Perrinville Creek basin to reduce scour flows in the creek. It allows staff flexibility to respond to ad -hoc opportunities such as rain garden cluster projects, or ensure matching funds are available for chasing grant applications for flow reductions projects. Estimated Project Cost $100,000 to $229,000 per year Includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $10,400 $10,800 $11,200 $11,600 $12,000 $12,500 $300,000 Construction $93,600 $97,200 $100,800 $104,400 $108,000 $112,500 $2,341,000 Expense Total $104,000 $108,000 $112,000 $116,000 $120,000 $125,000 $2,641,000 Fund 422 - Stormwater Utility $104,000 $108,000 $112,000 $116,000 $120,000 $125,000 $2,641,000 Funding Source Total $104,000 $108,000 $112,000 $116,000 $120,000 $125,000 $2,641,000 Packet Pg. 142 PWD-04 LOWER PERRINVILLE CREEK RESTORATION PROJECT Benefit The project will reduce City maintenance needs in the future and improve fish passag� Description The purpose of this project is to improve the environmental health of the creek necessary to support fish habitat, and to restore the storm water capacity. The projec consists of the modifications to three structures that currently prevent fish passage ar are undersized for the flows on the creek, (1) the culvert at the BNSF track, remove and replace with a fish -friendly culvert or bridge with adequate flow capacity, which W be led and funded by BNSF and the Tulalip Tribes using grant funds, (2) return flow t( the creek between the high flow bypass structure and the BNSF culvert by blocking tY structure and restoring creek capacity and (3) culvert at Talbot Road, will be removed and replaced with a fish -friendly culvert or bridge that provides adequate fish passagE and storm water flow capacity. This project will increase the resiliency of the watershE by building the structures that mimic the natural channel performance necessary for fish habitat and stormwater flow capacity. The project also includes time and effort to research and apply for supplemental/additional funding sources for construction of thl Edmonds portions of the work (Items 2 & 3). Due to the project complexity and numbf of stakeholders, the planning and design phase is estimated to be 2-years. Estimated Project Cost $4,500,000 "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $350,000 $450,000 $0 $0 $0 $0 $0 Construction $0 $1,070,000 $2,122,500 $0 $0 $0 $0 Expense Total $350,000 $1,520,000 $2,122,500 $0 $0 $0 $0 Fund 422 - Stormwater Utility $87,500 $380,000 $530,625 $0 $0 $0 $0 Unsecured Grants $262,500 $1,140,000 $1,591,875 $0 $0 $0 $0 Funding Source Total $350,000 $1,520,000 $2,122,500 $0 $0 $0 $0 Packet Pg. 143 PWD-23 J PERRINVILLE CREEK t ` BASIN ANALYSIS ",1J UPDATE Pertinvdle Cr�. Lynnwood i f/Cdricr�'c � Benefit Improve overall basin and stream health, by using green stormwater infrastructure methods. This will make it so that rainfall is not simply collected and conveyed downstream and instead behaves as close as possible to natural conditions. This includes infiltrating rainfall runoff as close as possible to where it fell. This will also decrease stream peak flows, which will decrease stream erosion and improve the overall stream habitat for aquatic life. Description City of Edmonds and Lynnwood joint project to supplement/update the Perrinville Creek 2015 basin analysis that determined possible locations for projects that would help decrease the peak storm flows during high rain events. Project will be updated tc reflect projects completed and also determine if there are other locations within the basin to aid in the reduction of peak flows in the basin. Estimated Project Cost $649,200 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $468,343 $0 $0 $0 $0 $0 $0 Expense Total $468,343 $0 $0 $0 $0 $0 $0 Fund 422 - Stormwater Utility $97,286 $0 $0 $0 $0 $0 $0 Secured Grants $340,971 $0 $0 $0 $0 $0 $0 City of Lynnwood $30,086 $0 $0 $0 $0 $0 $0 Funding Source Total $468,343 $0 $0 $0 $0 $0 $0 Packet Pg. 144 2.1.b .lr IPAfjU i �- � Packet Pg. 145 PWD-22 P I 7317 LAKE BALLINGER WAY FLOODPLAIN PURCHASE & STRUCTURE REMOVAL r Benefit Improve the health and water quality of Lake Ballinger by removing hard surfaces and home that is generally uninhabitable. Project will also provide a future location to trea stormwater runoff from portions SR-104. Description The project purchases an existing single family residential property in 2023 located within the Lake Ballinger flood plain. The City secured a $500,000 Department of Ecology grant to aid in this process. The home is the lowest property on the lake and is badly damaged from previous flooding to the point it is generally uninhabitable. The City intends to remove the home and any pollution generating surfaces from the site in 2024 as part of the initial 2023 purchase. The grant has restrictions that prever this parcel to be used for public use. After demolition of the structures and imperviouE surfaces, the planned site use would be for public utility benefit only. Because the Cit. storm drain line for SR-104 cuts through in an easement immediately adjacent to this parcel, the City plans to pursue a future project to split appropriate flows from the City storm drain system and provide water quality treatment to the maximum extent feasible. The future project would provide water quality treatment for a very heavily trafficked highway (SR-104) and would make significant improvement in water quality to Lake Ballinger and its downstream course to Lake Washington via McAleer Creek. Estimated Project Cost $940,000 Includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $43,000 $0 $0 $0 $0 $0 $0 Construction $213,000 $5,000 $0 $0 $0 $0 $0 Expense Total $256,000 $5,000 $0 $0 $0 $0 $0 Fund 422 - Stormwater Utility $256,000 $5,000 $0 $0 $0 $0 $0 Funding Source Total $256,000 $5,000 $0 $0 $0 $0 $0 Packet Pg. 146 2.1.b ' VIA It V4 1�lj v I .L7 to Al Packet Pg. 147 PWD-17 STORM AND SURFACE WATER COMPREHENSIVE PLAN Benefit A holistic summary of the City's Stormwater system with recommended priorities for selecting future capital maintenance and improvements projects. Description The City of Edmonds (City) owns and operates an extensive system of drainage pipe! ditches, and other assets to convey stormwater runoff into streams, lakes, and Puget Sound to prevent and minimize damage to private property, streets, and other infrastructure. The City is faced with the challenge of conveying this runoff safely and cost-effectively while preventing or minimizing the adverse impacts of high flows (erosion, flooding, and sediment deposition) and of stormwater pollutants on water quality and aquatic habitat. In addition, recent state and federal stormwater regulatior make it technically and financially challenging to address these issues while balancinc utility ratepayer costs. To proactively address these challenges and remain in compliance with the State -mandated National Pollutant Discharge Elimination Systerr Western Washington Phase II Municipal Stormwater Permit (NPDES Phase II permit; and other increasing regulatory requirements, the City is updating its current comprehensive storm and surface water management plan. This permit has and will continue to have a significant impact on the workload and operational budget of both the Engineering Division and the Storm Crews within the Public Works Department. Per the State Department of Ecology, the plan will also include the work findings from their required (Stormwater Management Action Plan) SMAP process of City drainage watersheds. Project will also include recommendations for stormwater utilities rates t be adjusted at the discretion of Council. Estimated Project Cost $733,000 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $213,000 $0 $0 $0 $0 $0 $0 Expense Total $213,000 $0 $0 $0 $0 $0 $0 Fund 422 - Stormwater Utility $213,000 $0 $0 $0 $0 $0 $0 Funding Source Total $213,000 $0 $0 $0 $0 $0 $0 Packet Pg. 148 SEWEI LA �e '000, 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS SEWER PWS-01 Annual Sanitary Sewer Replacement Overlays (2024) PWS-02 2027 Sanitary Sewer Comprehensive Plan Update PWS-03 Phase 11 Sewer Replacement (2024) PWS-04 Phase 12 Sewer Replacement (2025) PWS-05 Phase 13 Sewer Replacement (2026) PWS-06 Phase 14 Sewer Replacement (2027) PWS-07 Phase 15 Sewer Replacement (2028) PWS-08 Phase 16 Sewer Replacement (2029) PWS-12 Phase 17 Sewer Replacement (2030) PWS-13 Phase 18 Sewer Replacement (2031) & Future Projects PWS-10 Annual Citywide CIPP Sewer Rehabilitation PWS-11 Lake Ballinger Sewer Fund 423 - Sewer Utility EXPENSE TOTAL FUNDING TOTAL Total Total CL $500 $0 $0 $0 $0 $0 $500 $0 $500 L) $0 $150,000 $350,000 $0 $0 $0 $500,000 $0 $500,000 c� a LL U $10,000 $0 $0 $0 $0 $0 $10,000 $0 $10,000 $2,302,000 $0 $0 $0 $0 $0 $2,302,000 $0 $2,302,000 a $378,000 $2,126,000 $0 $0 $0 $0 $2,504,000 $0 $2,504,000 Z U- $0 $393,000 $2,210,000 $0 $0 $0 $2,603,000 $0 $2,603,000 ; a M $0 $0 $409,000 $2,299,000 $0 $0 $2,708,000 $0 $2,708,000 c M O $0 $0 $0 $425,000 $2,391,000 $0 $2,816,000 $0 $2,816,000LO N O $0 $0 $0 $0 $442,000 $2,487,000 $2,929,000 $0 $2,929,000 U- $0 $0 $0 $0 $0 $460,000 $460,000 $61,348,000 $61,808,000 0 $0 $0 $587,000 $611,000 $636,000 $662,000 $2,496,000 $13,735,000 $16,231,000 v a $0 $0 $1,000,000 $6,000,000 $0 $0 $7,000,000 $0 $7,000,000 U $2,690,500 $2,669,000 $4,556,000 $9,335,000 $3,469,000 $3,609,000 $26,328,500 $75,083,000 $101,411,500 y L $2,690,500 $2,669,000 $4,556,000 $9,335,000 $3,469,000 $3,609,000 $26,328,500 $75,083,000 $101,411,500 < L $2,690,500 $2,669,000 $4,556,000 $9,335,000 $3,469,000 $3,609,000 $26,328,500 $75,083,000 $101,411,500 < Packet Pg. 150 PWS-01 ANNUAL SANITARY SEWER REPLACEMENT OVERLAYS (2024) Benefit Improve overall pavement condition in locations that were excavated and patched duE to Sanitary Sewer Replacement Projects. Description Road pavement overlays to cover areas of roadways that were excavated and patche in previous years as part of the Sanitary Sewer Replacement Projects. Estimated Project Cost $30,000 'includes prior year expenditures Budget Project Cost Construction Expense Total Fund 423 - Sewer Utility Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $500 $0 $0 $0 $0 $0 $0 $500 $0 $0 $0 $0 $0 $0 $500 $0 $0 $0 $0 $0 $0 $500 $0 $0 $0 $0 $0 $0 Packet Pg. 151 PWS-02 2027 SANITARY SEWER COMPREHENSIVE PLAN UPDATE Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. Description The existing sewer comprehensive plan was last updated in 2013 and is in need of ar update. This project would be a comprehensive evaluation of the City's sewer systen its replacement program and operations, with recommendations for improvements or adjustments and recommended priorities for selecting future capital maintenance projects. Estimated Project Cost $500,000 'includes prior year expenditures Budget Project Cost Design Expense Total Fund 423 - Sewer Utility Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $150,000 $350,000 $0 $0 $0 $0 $0 $150,000 $350,000 $0 $0 $0 $0 $0 $150,000 $350,000 $0 $0 $0 $0 $0 $150,000 $350,000 $0 $0 $0 $0 Packet Pg. 152 PWS-03-08,12,13 PHASE 11-30 SEWER REPLACEMENT (2025- 45) Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. Description Per the approved 2013 Sewer Comprehensive Plan, the projects will replace/rehab pipe and related appurtenances at various locations throughout the City due to old ag being undersized, need to increase capacity, or more prone to breakage due to its material properties. Estimated Project Cost $2.7 to $5.3 million/year 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 423 - Sewer Utility Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $378,000 $393,000 $409,000 $425,000 $442,000 $460,000 $9,568,000 $2,312,000 $2,126,000 $2,210,000 $2,299,000 $2,391,000 $2,487,000 $51,780,000 $2,690,000 $2,519,000 $2,619,000 $2,724,000 $2,833,000 $2,947,000 $61,348,000 $2,690,000 $2,519,000 $2,619,000 $2,724,000 $2,833,000 $2,947,000 $61,348,000 $2,690,000 $2,519,000 $2,619,000 $2,724,000 $2,833,000 $2,947,000 $61,348,000 Packet Pg. 153 PWS-10 ANNUAL CITYWIDE CIPP SEWER REHABILITATION tit Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. Description Per the approved 2013 Sewer Comprehensive plan and current video inspections of sewer mains, the project will line existing sewer mains that are subject root intrusion, infiltration and inflow, and damage that can be repaired by this trenchless method. 2025 and 2026 funds will be combined with the Annual Sewer Replacement Program This is because the annual replacement rehab program for these years will be focusir on pipe lining as well thereby requiring only 1 design and 1 construction contract to administer. Estimated Project Cost $587,000 to $662,000/year "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $0 $88,000 $92,000 $96,000 $100,000 $2,070,000 Right of Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $499,000 $519,000 $540,000 $562,000 $11,665,000 Expense Total $0 $0 $587,000 $611,000 $636,000 $662,000 $13,735,000 Fund 423 - Sewer Utility $0 $0 $587,000 $611,000 $636,000 $662,000 $13,735,000 Funding Source Total $0 $0 $587,000 $611,000 $636,000 $662,000 $13,735,000 Packet Pg. 154 FACILITIE 010 �_ fr • �� w .r R 4Q • LLj - H I S T O R I C A L - MUSEUM ,019 1 U • / / wi tt� ry i 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS 2.1.b FACILITIES Project. -Total w Totala M PWF-01 Boys and Girls Club $27,733 $37,453 $32,077 $15,101 $20,000 $0 $132,364 $0 $132,364 v PWF-02 Cemetery Building $8,414 $3,377 $818 $1,000 $5,000 $2,500 $21,109 $0 $21,109 a U- U PWF-03 City Hall $25,000 $25,000 $258,628 $150,949 $65,000 $50,000 $574,577 $0 $574,577 PWF-04 Fishing Pier/Beach Ranger Station $2,918 $5,628 $1,043 $1,500 $3,000 $5,000 $19,089 $0 $19,089 IL PWF-05 Frances Anderson Center $20,000 $30,000 $98,892 $385,274 $113,029 $80,000 $727,195 $0 $7275195 Z U- PWF-06 Fire Station 16 $35,000 $40,000 $69,388 $30,107 $31,631 $35,000 $241,126 $0 $241,126 a M PWF-07 Fire Station 17 $30,000 $25,000 $221,922 $27,575 $122,245 $45,000 $471,742 $0 $4715742 v 0 M 0 PWF-08 Fire Station 20 $5,000 $5,500 $94,248 $69,782 $23,765 $20,000 $218,295 $0 $218,295 N 0 PWF-09 Historic Log Cabin $1,000 $30,000 $6,469 $1,500 $2,000 $1,500 $42,469 $0 $425469 u- PWF-10 Historical Museum $3,000 $45,000 $10,000 $4,621 $10,199 $5,000 $77,820 $0 $77,820 0 PWF-11 Library $160,000 $100,000 $53,325 $45,038 $35,000 $25,000 $418,363 $0 $4185363 v a PWF-12 Meadowdale Club House $7,985 $4,446 $1,159 $5,000 $5,000 $5,000 $28,590 $0 $28,590 c� N PWF-13 Old Public Works $25,000 $25,000 $25,000 $25,000 $24,519 $25,000 $149,519 $0 $1495519 L 0 PWF-14 Parks Maintenance Building $9,349 $5,177 $69,228 $20,000 $10,000 $10,000 $123,754 $0 $123,754 a PWF-15 Public Safety $50,000 $10,000 $55,169 $151,481 $515,071 $80,000 $861,721 $0 $8615721 M 0 N PWF-16 Public Works 0&M $524,000 $1,017,000 $80,315 $79,348 $43,821 $50,000 $1,794,484 $0 $1,794,484 N 0 N PWF-17 Wade James Theater $3,000 $45,000 $43,880 $115,734 $21,872 $25,000 $254,486 $0 $2545486 a� E PWF-18 Yost Pool House $5,000 $8,409 $19,127 $30,389 $30,000 $25,000 $117,925 $0 $117,925 0 PWF-23 ✓ Library Plaza Deck Waterproofing Project $0 $0 $0 $0 $0 $4,900,000 $45900,000 $0 $4,900,000 a EXPENSE TOTAL $942,399 $1,461,990 $1,1405688 $15159,399 $1,081,152 $5,3895000 $115174,628 $0 Packet Pg. 556 FACILITIES Fund 016 (2021 Facilities Bond) $450,000 $350,000 $0 $0 $0 $0 $800,000 $0 Fund 016 (non -bond) $93,399 $134,813 $151,159 $70,949 $0 $0 $450,320 $0 Fund 421 -Water Utility $133,000 $324,000 $0 $0 $0 $0 $457,000 $0 Fund 422 - Stormwater Utility $133,000 $324,000 $0 $0 $0 $0 $457,000 $0 Fund 423 - Sewer Utility $133,000 $324,000 $0 $0 $0 $0 $457,000 $0 Unsecured Funding $0 $5,177 $989,529 $1,088,450 $1,081,152 $5,389,000 $8,553,308 $0 FUNDING TOTAL $942,399 $1,461,990 $1,140,688 $1,159,399 $1,081,152 $5,389,000 $11,174,628 $0 ind Total M. La $800,000 v ca $450,320 a a_ v $457,000 = c� a $457,000 w $457,000 .5 LL $8,553,308 a $11,174,628 V 0 M O N LO N O N Packet Pg. 157 PWF-01 BOYS AND GIRLS CLUB Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This building built in 1900 was the original field house for Edmonds High School. The property is located at Civic Field and not part of the large Civic Field Park restoration project. The building is solely operated by the Snohomish County Boys and Girls Clut in partnership with the City's Parks and Recreation department. The building has sustained some interior settling that will require immediate repair to back hallway floor and the back stairway. It has significant need for major renovations if it is expected to be in operation for another 10 years. Renovation and deferred maintenance may eclipse the building value in its current location. Floor stabilization work was completed, and building is now on a run to fail model waiting replacement of building through a private public partnership. Building will be maintained in operational readiness to support the Boys and Girls Club, until their new building is constructed. Projects: Exterior plumbing access, Window replacement, Roof replacement, Siding replacement, ADA Access, Plumbing replacement, Front entry door replacement, FirE Alarm System new installation, Fire Sprinkler updates, Baseboard heating replaceme If the Boys and Girls Club builds a new facility in the future, then maintenance fundinc programmed for the building will be adjusted to align with the project schedule. Estimated Project Cost $27,733 (2025) 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 Construction\Professional $27,733 $37,453 $32,077 $15,101 $20,000 Services Expense Total $27,733 $37,453 $32,077 $15,101 $20,000 Fund 016 (non -bond) $27,733 $37,453 $0 $0 $0 Unsecured Funding $0 $0 $32,077 $15,101 $20,000 Funding Source Total $27,733 $37,453 $32,077 $15,101 $20,000 2030 2031-45 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Packet Pg. 158 PWF-02 CEMETERY BUILDING Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This small structure houses the Edmonds Cemetery funerary services and the cemetery Sextant office. The building is in relatively good condition and has little deferred maintenance backlog. Minor security and communications updates will be needed as technology dictates. Projects: Minor repair and maintenance Estimated Project Cost $8,414 (2025) "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction\Professional $8,414 $3,377 $818 $1,000 $5,000 $2,500 $0 Services Expense Total $8,414 $3,377 $818 $1,000 $5,000 $2,500 $0 Fund 016 (non -bond) $8,414 $3,377 $0 $0 $0 $0 $0 Unsecured Funding $0 $0 $818 $1,000 $5,000 $2,500 $0 Funding Source Total $8,414 $3,377 $818 $1,000 $5,000 $2,500 $0 Packet Pg. 159 1 PWF-03 CITY HALL Benefit V, a Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description City Hall was built in 1979 and was operated as a private business office center until the City purchased and renovated the building in the 1990s. The City has operated Edmonds City Hall from this location since the renovations were completed. The building is in near original condition and needs substantial repair and maintenance. Projects: All Mechanical, Electrical and Plumbing systems need replacement, Restroom remodels w/gender neutral consideration, Center Stairway Code updates and replacement, Lobby remodel, Entry Awning re -glazing, Interior Painting, ADA accessibility improvements. Estimated Project Cost $25,000 (2025) 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction\Professional $25,000 $25,000 $258,628 $150,949 $65,000 $50,000 $0 Services Expense Total $25,000 $25,000 $258,628 $150,949 $65,000 $50,000 $0 Fund 016 (2021 Facilities $25,000 $25,000 $0 $0 $0 $0 $0 Bond) Fund 016 (non -bond) $0 $0 $150,000 $70,949 $0 $0 $0 Unsecured Funding $0 $0 $108,628 $80,000 $65,000 $50,000 $0 Funding Source Total $25,000 $25,000 $258,628 $150,949 $65,000 $50,000 $0 Packet Pg. 160 PWF-04 FISHING PIER/BEACH RANGER STATION Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description The Pier was recently renovated and is generally in good condition. The Beach Rangl Office is a 1200 square foot office and restroom facility located near the east end of the pier. There are season programs and visitor support functions that operate out of this facility. Projects: Electrical panel clean up and safety inspection, minor repairs, and maintenance, Beach Ranger Station/restroom roof replacement. Estimated Project Cost $2,971 (2025) "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction\Professional $2,918 $5,628 $1,043 $1,500 $3,000 $5,000 $0 Services Expense Total $2,918 $5,628 $1,043 $1,500 $3,000 $5,000 $0 Fund 016 (non -bond) $2,918 $5,628 $0 $0 $0 $0 $0 Unsecured Funding $0 $0 $1,043 $1,500 $3,000 $5,000 $0 Funding Source Total $2,918 $5,628 $1,043 $1,500 $3,000 $5,000 $0 Packet Pg. 161 PWF-05 FRANCES ANDERSON CENTER Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description The Frances Anderson Center serves as the City's main recreation center offering ari athletic and cultural programing year round. Due to the age and high usage of the building there are many building systems that are in need of replacement or restoration. Projects: Replacement of Heating Boilers with Electric alternatives that wi add ventilation, cooling and heating Investment grade audit approved by City Council, Replacement of all exterior doors scheduled for 2024/25, ADA accessible door closures, Plumbing drainage collector, Restroom remodels (w/ gender neutral consideration), Replacement of all plumbing fixtures, Addition of building security car( readers, Building HVAC controls to maximize efficiency, Fire Sprinkler replacement, and clean building act compliance efforts will be addresses by IGA.) Estimated Project Cost $20,000 (2025) 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction\Professional $20,000 $30,000 $98,892 $385,274 $113,029 $80,000 $0 Services Expense Total $20,000 $30,000 $98,892 $385,274 $113,029 $80,000 $0 Fund 016 (2021 Facilities $20,000 $30,000 $0 $0 $0 $0 $0 Bond) Unsecured Funding $0 $0 $98,892 $385,274 $113,029 $80,000 $0 Funding Source Total $20,000 $30,000 $98,892 $385,274 $113,029 $80,000 $0 Packet Pg. 162 M"b PUBLIC WORKS - FACILITIES =. FIRE STATION 16 Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This facility is operated by South Snohomish County Fire and Rescue and was built it 2003 and has a building area of 10,700 square feet. The building is in fair condition and will require some infrastructure updates or replacements to remain operationally ready for the needs of the City. Projects: Roll -up Bay door controller replacements, HVAC unit assessment, Gutter replacement, interior coatings updates. Estimated Project Cost $35000 (2025) *includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 ConstructionTrofessional $35,000 $40,000 $69,388 $30,107 $31,631 $35,000 $0 Services Expense Total $35,000 $40,000 $69,388 $30,107 $31,631 $35,000 $0 Fund 016 (2021 Facilities $35,000 $40,000 $0 $0 $0 $0 $0 Bond) Unsecured Funding $0 $0 $69,388 $30,107 $31,631 $35,000 $0 Funding Source Total $35,000 $40,000 $69,388 $30,107 $31,631 $35,000 $0 Packet Pg. 163 PWF-07 FIRE STATION 17 MMMMMM� 40 '6qW Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This building is operated by South Snohomish County Fire and Rescue, was built in 1999 and has a building area of 9,800 square feet. This building has had some updates but will need some infrastructure upgrades to remain operationally ready. Projects: Bay Door assessment, Electrical infrastructure updates, roof soffit enclosurE interior painting. Estimated Project Cost $30,000 (2025) "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction\Professional $30,000 $25,000 $221,922 $27,575 $122,245 $45,000 $0 Services Expense Total $30,000 $25,000 $221,922 $27,575 $122,245 $45,000 $0 Fund 016 (2021 Facilities $30,000 $25,000 $0 $0 $0 $0 $0 Bond) Unsecured Funding $0 $0 $221,922 $27,575 $122,245 $45,000 $0 Funding Source Total $30,000 $25,000 $221,922 $27,575 $122,245 $45,000 $0 Packet Pg. 164 Not 2.1.b PUBLIC WORKS - FACILITIES =. FIRE STATION 20 Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This building is the eldest of the City's three fire stations and is operated by South County Fire and Rescue. This station serves Esperance and supports the other two fi stations in Edmonds. The building is 6400 square feet and was built in 1990. The building has had significant updates to the exterior envelope and is in need of interior and HVAC system updates. Projects: interior painting, restroom fixture replacement Estimated Project Cost $5000 (2025) "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction\Professional $5,000 $5,500 $94,248 $69,782 $23,765 $20,000 $0 Services Expense Total $5,000 $5,500 $94,248 $69,782 $23,765 $20,000 $0 Fund 016 (non -bond) $5,000 $5,500 $0 $0 $0 $0 $0 Unsecured Funding $0 $0 $94,248 $69,782 $23,765 $20,000 $0 Funding Source Total $5,000 $5,500 $94,248 $69,782 $23,765 $20,000 $0 Packet Pg. 165 PWF-09 fx HISTORIC LOG CABIN Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This Historic log cabin is home to the Edmonds Chamber of Commerce visitor center; the structure was a purpose built cabin from the turn of the century. The structure is professionally maintained on a three year cycle by a log cabin specialist and requires only minor maintenance and upkeep annually. Projects: new thick cut shingle replacement, chinking of exterior log finish, interior lighting. Estimated Project Cost $1000 (2025) "includes prior year expenditures Budget Project Cost Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond) Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $1,000 $30,000 $6,469 $1,500 $2,000 $1,500 $0 $1,000 $30,000 $6,469 $1,500 $2,000 $1,500 $0 $0 $30,000 $0 $0 $0 $0 $0 $1,000 $0 $0 $0 $0 $0 $0 $0 $0 $6,469 $1,500 $2,000 $1,500 $0 $1,000 $30,000 $6,469 $1,500 $2,000 $1,500 $0 Packet Pg. 166 PWF-10 HISTORICAL MUSEUM Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description The 110-year-old original Carnegie Library building is home to the Edmonds Museum The building is on the State of Washington Historic registry and has been well maintained over the last several years. Buildings of this age require specialized maintenance and coordination with the state historic architect to maintain the historic status. Structural stabilization, weatherproofing, and updating the restroom to meet ADA compliance are the most significant priorities to maintain this facility. Projects: minor structural reinforcement, entry fagade masonry repair, lower entry restoration Estimated Project Cost $3000 (2025) 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction\Professional $3,000 $45,000 $10,000 $4,621 $10,199 $5,000 $0 Services Expense Total $3,000 $45,000 $10,000 $4,621 $10,199 $5,000 $0 Fund 016 (2021 Facilities $0 $45,000 $0 $0 $0 $0 $0 Bond) Fund 016 (non -bond) $3,000 $0 $0 $0 $0 $0 $0 Unsecured Funding $0 $0 $10,000 $4,621 $10,199 $5,000 $0 Funding Source Total $3,000 $45,000 $10,000 $4,621 $10,199 $5,000 $0 Packet Pg. 167 PWF-11 LIBRARYpow Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description The Edmonds Library is operated by the Sno-Isle Library system with exception of the Second floor Plaza room rental space. The library is a 19,000 square foot building bul in 1982. The building hosts special event rentals and daily Library programming and community services. This is one of the City's most heavily used buildings by the publil and has significant deferred maintenance needs, including the building fagade, roof and plaza deck waterproofing. Projects: window replacement, ADA access device upgrades or replacement, gender inclusive public restroom creation, Plaza Room restroom/changing facilities, Plaza Room AN installation, building masonry restoration or building cladding, exterior stairway restoration, HVAC ventilation fan assessment, building breezeway remodel, flood damage restoration, and plaza level green roof now on CIP. Estimated Project Cost $160,000 (2025) *includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction\Professional $160,000 $100,000 $53,325 $45,038 $35,000 $25,000 $0 Services Expense Total $160,000 $100,000 $53,325 $45,038 $35,000 $25,000 $0 Fund 016 (2021 Facilities $160,000 $100,000 $0 $0 $0 $0 $0 Bond) Unsecured Funding $0 $0 $53,325 $45,038 $35,000 $25,000 $0 Funding Source Total $160,000 $100,000 $53,325 $45,038 $35,000 $25,000 $0 Packet Pg. 168 PWF-12 MEADOWDALE CLUB HOUSE Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This 4000 square foot facility was built in 1965 as a community theater facility and latf was transformed into the Meadowdale community club house. The building is currentl owned and maintained by the City of Edmonds and houses the City operated Meadowdale pre-school and the 1500 square foot Meadowdale club house rental facility. This facility while dated has been well maintained and only requires minor maintenance and repairs. Projects: minor maintenance and repairs, interior flooring and painting, and bath fixtui replacement. Estimated Project Cost $7,985 (2025) 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction\Professional $7,985 $4,446 $1,159 $5,000 $5,000 $5,000 $0 Services Expense Total $7,985 $4,446 $1,159 $5,000 $5,000 $5,000 $0 Fund 016 (non -bond) $7,985 $4,446 $1,159 $0 $0 $0 $0 Unsecured Funding $0 $0 $0 $5,000 $5,000 $5,000 $0 Funding Source Total $7,985 $4,446 $1,159 $5,000 $5,000 $5,000 $0 Packet Pg. 169 PWF-13 OLD PUBLIC WORKS Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This facility was built in 1965 to house the City's Public Works Department, the buildir was converted in 1995 to tenant space and City storage, as well as Edmonds Police large evidence storage. This is a vital piece of property adjacent to the Waste Water Treatment Plant, and could be converted for utility use if regulatory requirements dictate. Building is primarily used as storage and will need some updates to maintain current operational readiness. Projects: HVAC updates, roll -up door replacement, security camera system Estimated Project Cost $25000 (2025) "includes prior year expenditures Budget Project Cost Construction\Professional Services Expense Total Fund 016 (non -bond) Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $25,000 $25,000 $25,000 $25,000 $24,519 $25,000 $0 $25,000 $25,000 $25,000 $25,000 $24,519 $25,000 $0 $25,000 $25,000 $0 $0 $0 $0 $0 $0 $0 $25,000 $25,000 $24,519 $25,000 $0 $25,000 $25,000 $25,000 $25,000 $24,519 $25,000 $0 Packet Pg. 170 PWF-14 PARKS MAINTENANCE BUILDING Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This facility was built in 1967 by Ed Huntley who at the time was the City Facilities supervisor. The 4800 square foot facility now houses all City Facility Operations staff(11) and all of Park and Rec Parks Maintenance Staff(12+ seasonal help) This Facility is home to the City Carpentry Shop, Key Shop, City Flower program, Parks engine repair shop and Parks and Facilities maintenance supply storage as well as Parks and Facilities Manager offices. This Facility is near end of life and is undersizec to support the departmental staffing that are assigned to this facility. Projects: maintenance and repair to maintain operational capacity, ADA restroom updates, shop floor replacement, Pine St. facility exit, exterior painting. Estimated Project Cost $9,349 (2025) 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction\Professional $9,349 $5,177 $69,228 $20,000 $10,000 $10,000 $0 Services Expense Total $9,349 $5,177 $69,228 $20,000 $10,000 $10,000 $0 Fund 016 (non -bond) $9,349 $0 $0 $0 $0 $0 $0 Unsecured Funding $0 $5,177 $69,228 $20,000 $10,000 $10,000 $0 Funding Source Total $9,349 $5,177 $69,228 $20,000 $10,000 $10,000 $0 Packet Pg. 171 PWF-15 PUBLIC SAFETY _ _ •.�..:: Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description The Public Safety building houses Edmonds Police Department, Edmonds Municipal Court and the City Council Chambers. The building was built in 1999 encompassing 30,000 square feet of office, court and municipal government uses. The building houses one of the City emergency operations centers, large police training, simulator facilities and evidence processing and storage. The building has had minimal system updates over it's life and has a significant amount of deferred maintenance and shoul be retrofitted with new fire sprinklers. Projects: air handler and outdoor ventilation unit replacements, new solar plant installation, parking lot reconfiguration to meet current usage, fire sprinkler installatior interior hallway renovation and painting, sleeping room remodel and gender specific/neutral accommodations, gender inclusive public restrooms, operable windov is specific locations, courts flat roof replacement. Estimated Project Cost $50000 (2025) "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 Construction\Professional $50,000 $10,000 $55,169 $151,481 $515,071 $80,000 Services Expense Total $50,000 $10,000 $55,169 $151,481 $515,071 $80,000 Fund 016 (2021 Facilities $50,000 $10,000 $0 $0 $0 $0 Bond) Unsecured Funding $0 $0 $55,169 $151,481 $515,071 $80,000 Funding Source Total $50,000 $10,000 $55,169 $151,481 $515,071 $80,000 2031-45 $0 $0 $0 $0 $0 Packet Pg. 172 1 PWF-16 PUBLIC WORKS O&M E a� O AI a m E Q 0 L Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This building built in 1995 houses four Public Works divisions and the auxiliary City Emergency Operations Center. This building is 28,000 square feet and is capable of operations 24/7 during weather emergencies and natural disasters. The building has significant deferred maintenance needs and infrastructure updates. Projects: vehicle yard leveling, HVAC unit replacements, roof system for material bunkers, ventilation fan replacements, fire alarm system replacement, lobby remodel, restroom remodel with gender inclusivity considerations, electric vehicle charging and maintenance infrastructure, emergency communications updates, interior hallway flooring thresholds, utility bay HVAC replacement, water main replacement (building connection). Estimated Project Cost $125000 (2025) "includes prior year expenditures Budget Project Cost Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Unsecured Funding Fund 421 -Water Utility Fund 422 - Stormwater Utility Fund 423 - Sewer Utility Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $524,000 $1,017,000 $80,315 $79,348 $43,821 $50,000 $0 $524,000 $1,017,000 $80,315 $79,348 $43,821 $50,000 $0 $125,000 $45,000 $0 $0 $0 $0 $0 $0 $0 $80,315 $79,348 $43,821 $50,000 $0 $133,000 $324,000 $0 $0 $0 $0 $0 $133,000 $324,000 $0 $0 $0 $0 $0 $133,000 $324,000 $0 $0 $0 $0 $0 $524,000 $1,017,000 $80,315 $79,348 $43,821 $50,000 $0 N Packet Pg. 173 PWF-17 WADE JAMES THEATER Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This community theater was built by the Driftwood Players theater group in 1967 and was deeded to City ownership at a later date. The facility is 6,300 square feet in size and houses the Driftwood Players theatrical performances and City meetings. The City's maintenance responsibilities are limited to large infrastructure, parking lot, roofing, and grounds. Projects: parking lot repair and recoating, minor repair, and maintenance Estimated Project Cost $3000 (2025) "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction\Professional $3,000 $45,000 $43,880 $115,734 $21,872 $25,000 $0 Services Expense Total $3,000 $45,000 $43,880 $115,734 $21,872 $25,000 $0 Fund 016 (2021 Facilities $0 $0 $0 $0 $0 $0 $0 Bond) Fund 016 (non -bond) $3,000 $45,000 $0 $0 $0 $0 $0 Unsecured Funding $0 $0 $43,880 $115,734 $21,872 $25,000 $0 Funding Source Total $3,000 $45,000 $43,880 $115,734 $21,872 $25,000 $0 Packet Pg. 174 PWF-18 now 2.1.b YOST POOL HOUSE Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. Description This recreational facility houses the City's aquatic programing and some Parks and Recreation programs. Built in 1971 the pool house historically was only operated seasonally. The tenant run aquatic programing is currently expanding to year round IE and team aquatic activities and will continue to support summer open swim programing. The facility requires minimal maintenance to remain operational and is subject to tenant lease terms of use. Projects: security updates, roof replacement, gutter replacement, plumbing fixture updates, exterior door replacements, operational repair and maintenance to accommodate 365 operations. Estimated Project Cost $5000 (2025) 'includes prior year expenditures Budget Project Cost Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond) Unsecured Funding Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $5,000 $8,409 $19,127 $30,389 $30,000 $25,000 $0 $5,000 $8,409 $19,127 $30,389 $30,000 $25,000 $0 $5,000 $0 $0 $0 $0 $0 $0 $0 $8,409 $0 $0 $0 $0 $0 $0 $0 $19,127 $30,389 $30,000 $25,000 $0 $5,000 $8,409 $19,127 $30,389 $30,000 $25,000 $0 Packet Pg. 175 PWF-23 LIBRARY PLAZA DECK WATERPROOFING PROJECT Benefit Maintaining building in operational and safe condition, in order to maintain partnership with Sno-Isle Library system. Preservation of the City's physical assets in appropriate condition vs. the age of the facility and historic capital investment. Description The Library Plaza Deck is essentially a green roof on the second floor of the Edmond Sno-Isle Library. The deck surface was waterproofed and remodeled in 2003, since that project continuous water intrusion has occurred through the waterproof membrane. This water intrusion has been successfully mitigated over the years and has not been deemed a project of significance previously. In 2018 Western Specialty Contractors inspected the water intrusion and offered an initial ROM price to demolisl• and waterproof the existing plaza deck. Rebuilding the plaza deck and replacement o landscape, planters, grass, pavement, flashing and hand railings would be a separatE construction project. The Parks Director in 2018 offered an estimate to replace landscaping and irrigations systems. In 2021 a draft structural report was performed t MLA Engineering to discover any structural consequences from the years of water intrusion, building was deemed structurally sound and water intrusion not factoring in building structural stability. Estimated Project Cost $4,900,000 (2030) Includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 Construction\Professional $0 $0 $0 $0 $0 $4,900,000 Services Expense Total $0 $0 $0 $0 $0 $4,900,000 Unsecured Funding $0 $0 $0 $0 $0 $4,900,000 Funding Source Total $0 $0 $0 $0 $0 $4,900,000 2031-45 $0 $0 $0 $0 Packet Pg. 176 _ Q � � Packet Pg. 177 WASTEWATER TREATMENT PLANT Project.- 1 2026 1 1 1 • 2030 ' ' 1 PWP-01 WWTP Annual Capital Replacement In -House $100,000 $0 $1,000,000 $1,250,000 $1,250,000 $1,300,000 Total $4,900,000 $19,500,000 CL M $24,400,C Projects PWP-04 Nutrient Removal Project $100,000 $650,000 $5,000,000 $5,000,000 $0 $0 $10,750,000 $0 ca $10,750,C li PWP-08 Gasification Bypass (Class A Solids Production) $0 $0 $300,000 $0 $0 $0 $300,000 $0 LL $300,C v c� PWP-10 VFD Upgrades $250,000 $250,000 $0 $0 $0 $0 $500,000 $0 $500,Q - a� PWP-11 Primary Clarifier 2 Rehab $0 $0 $0 $0 $0 $0 $0 $0 c� PWP-12 Primary Clarifier 3 Rehab $0 $0 $0 $0 $0 $0 $0 $950,000 $950,Q LL ca PWP-13 ODS (Primary Sludge) Pump Replacement $0 $350,000 $250,000 $0 $0 $0 $600,000 $0 $600,Q M PWP-14 Chlorine Contact Channel Sluice Gates $0 $0 $0 $375,000 $0 $0 $375,000 $0 $375,a N Replacement PWP-15 Screw Press Feed System Rehab $150,000 $0 $0 $0 $0 $0 $150,000 $0 0 $150,a c N PWP-16 NPW Pumping System Improvements $75,000 $0 $0 $0 $0 $0 $75,000 $0 $75,a LL PWP-17 600 Bldg Air Quality Evaluation $50,000 $0 $0 $0 $0 $0 $50,000 $0 $50,a p PWP-18 LPA Blower 303 Rehab $35,000 $0 $0 $0 $0 $0 $35,000 $0 a $35,a v a PWP-19 600 Bldg Electrical Rehab $0 $250,000 $0 $0 $0 $0 $250,000 $0 $250,a ) Y L PWP-20 600 Bldg Air Quality Rehab/Upgrade $0 $250,000 $0 $0 $0 $0 $250,000 $0 $250,a 0 PWP-21 Secondary Clarifier 2 Rehab $0 $450,000 $0 $0 $0 $0 $450,000 $0 2 $450,a EXPENSE TOTAL $760,000 $2,200,000 $6,550,000 $6,625,000 $1,250,000 $1,300,000 $18,685,000 $20,450,000 $39,135,a c M I I O N Funding Source 20251 127 2028 20292030 TotalN 1 • ToI City of Shoreline $72,124 $208,780 $621,595 $628,712 $118,625 $123,370 $1,773,206 $1,940,705 O $3,713,9N Fund 423 - Sewer Utility $386,005 $1,117,380 $3,326,745 $3,364,838 $634,875 $660,270 $9,490,113 $10,386,555 $19,876,E Mountlake Terrace $176,092 $509,740 $1,517,635 $1,535,013 $289,625 $301,210 $4,329,315 $4,738,265 t $9,067,E w Olympic View Water Sewer District $125,779 $364,100 $1,084,025 $1,096,437 $206,875 $215,150 $3,092,366 $3,384,475 w $6,476,8_< FUNDING TOTAL $760,000 $2,200,000 $6,550,000 $6,625,000 $1,250,000 $1,300,000 $18,685,000 $20,45n nnn itza 11C nnn Packet Pg. 178 PWP-01 WWTP ANNUAL CAPITAL REPLACEMENT IN- HOUSE PROJECTS Benefit This project ensures that critical infrastructure is maintained and equipment is replace in order to reduce risk to the City. Description The WWTP Annual Capital Replacement In -House Projects is intended to maintain infrastructure and equipment to ensure that the treatment plant is well maintained. Estimated Project Cost $100,000 (2024) 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $0 $200,000 $250,000 $250,000 $300,000 $4,875,000 Construction $100,000 $0 $800,000 $1,000,000 $1,000,000 $1,000,000 $14,625,000 Expense Total $100,000 $0 $1,000,000 $1,250,000 $1,250,000 $1,300,000 $19,500,000 Fund 423 - Sewer Utility $50,790 $0 $507,900 $634,875 $634,875 $660,270 $9,904,050 Mountlake Terrace $23,170 $0 $231,700 $289,625 $289,625 $301,210 $4,518,150 Olympic View Water Sewer $16,550 $0 $165,500 $206,875 $206,875 $215,150 $3,227,250 District City of Shoreline $9,490 $0 $94,900 $118,625 $118,625 $123,370 $1,850,550 Funding Source Total $100,000 $0 $1,000,000 $1,250,000 $1,250,000 $1,300,000 $19,500,000 Packet Pg. 179 AEEEL��� PWP-04 NUTRIENT REMOVAL PROJECT Benefit To meet new permit requirements and increase capacity for projected 20-year service area expansion. Description The WA Dept of Ecology has imposed the Puget Sound Nutrient General Permit upoI us. It is anticipated that our current process will not be able to meet these new permi requirements. This decision package will allow us to team with an engineering firm tc study our current process and design a solution that will allow our plant to meet the new PSNGP requirements as well as accommodate projected service area growth ov the next decade. Estimated Project Cost $10,750,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 423 - Sewer Utility Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $100,000 $650,000 $0 $0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000 $0 $0 $0 $100,000 $650,000 $5,000,000 $5,000,000 $0 $0 $0 $50,790 $330,135 $2,539,500 $2,539,500 $0 $0 $0 $23,170 $150,605 $1,158,500 $1,158,500 $0 $0 $0 $16,550 $107,575 $827,500 $827,500 $0 $0 $0 $9,490 $61,685 $474,500 $474,500 $0 $0 $0 $100,000 $650,000 $5,000,000 $5,000,000 $0 $0 $0 Packet Pg. 180 PWP-08 GASIFICATION BYPASS (CLASS A SOLIDS PRODUCTION) Benefit Allow solids handling system redundancy and the ability to run the dryer unit independently in the event of a gasification system failure or repair. The dryer is capable of producing Class A biosolids, which would negate the need for temporary hauling and disposal of wet cake at a rate of up to $200,000/month. Description This allows the ability to continue production of class A solids if/when the gasification system is shut down for repairs or preventative maintenance. The ability to produce and haul class A solids will eliminate a temporary but substantial cost increase haulini, as this product is essentially the same in volume as biochar or concentrated minerals and is accepted at the local transfer station whereas if this option is not available, sludge will need to be loaded into trailers and hauled to Oregon as was done during the Carbon Recovery Project at a cost of up to $200,000 per month. This redundant solids processing mode was an option to add to the Carbon Recovery Project and wa rejected by previous administration. Along with the savings in hauling costs, there wil be no additional odor issues or daily sludge truck traffic in the adjacent neighborhood Estimated Project Cost $300,000 *includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $0 $50,000 $0 $0 $0 $0 Construction $0 $0 $250,000 $0 $0 $0 $0 Expense Total $0 $0 $300,000 $0 $0 $0 $0 Fund 423 - Sewer Utility $0 $0 $152,370 $0 $0 $0 $0 Mountlake Terrace $0 $0 $69,510 $0 $0 $0 $0 Olympic View Water Sewer $0 $0 $49,650 $0 $0 $0 $0 District City of Shoreline $0 $0 $28,470 $0 $0 $0 $0 Funding Source Total $0 $0 $300,000 $0 $0 $0 $0 Packet Pg. 181 PWP-10 VFD UPGRADES Benefit To keep critical equipment reliable and in working condition. Description The WWTP has several VFD's (variable frequency drives) on various critical equipment influent pumps, effluent pumps, RAS/WAS pumps, aeration blowers, etc. These VFD's have an expected useful life of 15-20 years. Several of the VFD's here the plant range in age between 20-30 years old. There have already bees some failures and replacements made. These outdated VFD's need to be replaced to avoic a catastrophic failure event that could happen to these weakened state VFD's for any number of reasons, including abrupt starting and stopping due to power bumps/loss, switching from grid to generator power supply or just a parts failure. If multiple critical components fail simultaneously, then the plant may lose it's ability to treat wastewater that meets NPDES permit requirements resulting in pollution of our receiving waters and possible fines by our governing agency. Estimated Project Cost $250,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 423 - Sewer Utility Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $50,000 $50,000 $0 $0 $0 $0 $0 $200,000 $200,000 $0 $0 $0 $0 $0 $250,000 $250,000 $0 $0 $0 $0 $0 $126,975 $126,975 $0 $0 $0 $0 $0 $57,925 $57,925 $0 $0 $0 $0 $0 $41,375 $41,375 $0 $0 $0 $0 $0 $23,725 $23,725 $0 $0 $0 $0 $0 $250,000 $250,000 $0 $0 $0 $0 $0 Packet Pg. 182 PWP-11 PRIMARY CLARIFIER 2 REHAB 2.1.b 41 `. - - U VC\ Benefit Improve reliability of critical infrastructure as it is in a state of imminent failure. Ensur( WWTP's ability to treat wastewater up to its rated capacity and meet discharge permit requirements. Description Primary Clarifier #2 cage, center column, feedwell, corner sweeps, weir, counterweigl skimming device and rake arms need replacement due to severe corrosion. The stee has not been replaced since the original construction. The limited access will require that pieces be assembled inside the tank. The concrete structure also needs to be inspected and repaired as needed as corrosion of the concrete in spots has led to exposed rebar and may have compromised the structural integrity of the clarifier. Th( project was delayed in 2024 and a carryforward budget amendment will move funds ti 2025 to complete project. Estimated Project Cost $600,000 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $0 $0 Expense Total $0 $0 $0 $0 $0 $0 $0 Fund 423 - Sewer Utility $0 $0 $0 $0 $0 $0 $0 Mountlake Terrace $0 $0 $0 $0 $0 $0 $0 Olympic View Water Sewer $0 $0 $0 $0 $0 $0 $0 District City of Shoreline $0 $0 $0 $0 $0 $0 $0 Funding Source Total $0 $0 $0 $0 $0 $0 $0 Packet Pg. 183 PWP-12 PRIMARY CLARIFIER 3 REHAB Benefit Improve reliability of critical infrastructure as it is approaching a state of imminent failure. Ensure WWTP's ability to treat wastewater up to its rated capacity and meet discharge permit requirements. Description Primary Clarifier #3 (dual drive) cages, center columns, feedwells, corner sweeps, weirs, counterweights, skimming devices and rake arms need replacement due to severe corrosion. The steel is in a highly corrosive environment and has not been replaced since the original construction approximately 30 years ago. The limited access will require that pieces be assembled inside the tank. The concrete structure also needs to be inspected and repaired as needed as corrosion of the concrete in spots has led to exposed rebar and may have compromised the structural integrity of the clarifier. After recent evaluation od PC 3 it was determined, based on the current condition of the clarifier, this rehab can occur after 2030. Estimated Project Cost $950,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 423 - Sewer Utility Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $0 $0 $0 $0 $0 $150,000 $0 $0 $0 $0 $0 $0 $800,000 $0 $0 $0 $0 $0 $0 $950,000 $0 $0 $0 $0 $0 $0 $482,505 $0 $0 $0 $0 $0 $0 $220,115 $0 $0 $0 $0 $0 $0 $157,225 $0 $0 $0 $0 $0 $0 $90,155 $0 $0 $0 $0 $0 $0 $950,000 Packet Pg. 184 PWP-13 ODS (PRIMARY SLUDGE) PUMP REPLACEMENT Benefit Improve reliability, redundancy and efficiency of the primary sludge and scum pumps by replacing 30+ year old pumps and improving piping system. Description The ODS pumps are over 30 years old and are at the end of their useful life. The maintenance, reliability and efficiency of the primary sludge pumping system would bE greatly improved by replacing the current diaphragm pumps with progressive cavity pumps. During this pump replacement, piping modifications would also be done to allow pumps to support more than one clarifier, improving system redundancy along with reliability. Estimated Project Cost $600,000 "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $100,000 $0 $0 $0 $0 $0 Construction $0 $250,000 $250,000 $0 $0 $0 $0 Expense Total $0 $350,000 $250,000 $0 $0 $0 $0 Fund 423 - Sewer Utility $0 $177,765 $126,975 $0 $0 $0 $0 Mountlake Terrace $0 $81,095 $57,925 $0 $0 $0 $0 Olympic View Water Sewer $0 $57,925 $41,375 $0 $0 $0 $0 District City of Shoreline $0 $33,215 $23,725 $0 $0 $0 $0 Funding Source Total $0 $350,000 $250,000 $0 $0 $0 $0 IN Packet Pg. 185 PWP-14 CHLORINE CONTACT CHANNEL SLUICE GATES REPLACEMENT Benefit To replace problematic, yet critical valves with more reliable technology that helps to ensure disinfection system functionality and the ability to continue to meet NPDES discharge permit requirements. Description Replace two gate valves and actuators at the inlets of the two chlorine contact channels. These gates have repeatedly failed. Repair is often expensive and time consuming, as access is an issue, so it is necessary to rent scaffolding and other equipment to make repairs. When a gate fails, it effectively cuts the disinfection capacity of the plant in half. These are critical pieces of equipment and need to be replaced with a different technology to improve performance and reliability. Estimated Project Cost $375,000 "includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $0 $0 $75,000 $0 $0 $0 Construction $0 $0 $0 $300,000 $0 $0 $0 Expense Total $0 $0 $0 $375,000 $0 $0 $0 Fund 423 - Sewer Utility $0 $0 $0 $190,463 $0 $0 $0 Mountlake Terrace $0 $0 $0 $86,888 $0 $0 $0 Olympic View Water Sewer $0 $0 $0 $62,062 $0 $0 $0 District City of Shoreline $0 $0 $0 $35,587 $0 $0 $0 Funding Source Total $0 $0 $0 $375,000 $0 $0 $0 Packet Pg. 186 1 PWP-15 SCREW PRESS FEED SYSTEM REHAB Benefit Description Replacing these pumps allows for consistent and reliable operation of the sludge dewatering system which supplies dewatered biosolids to the new gasification system Replace two sludge feed pumps and three polymer pumps that are reaching the end i their useful life and are often down for repairs. Estimated Project Cost $150,000 'includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction $150,000 $0 $0 $0 $0 $0 $0 Expense Total $150,000 $0 $0 $0 $0 $0 $0 Fund 423 - Sewer Utility $76,185 $0 $0 $0 $0 $0 $0 Mountlake Terrace $34,755 $0 $0 $0 $0 $0 $0 Olympic View Water Sewer $24,825 $0 $0 $0 $0 $0 $0 District City of Shoreline $14,235 $0 $0 $0 $0 $0 $0 Funding Source Total $150,000 $0 $0 $0 $0 $0 $0 Packet Pg. 187 1 PWP-16 NPW PUMPING SYSTEM IMPROVEMENTS Benefit Description Current NPW system in non-functional as currently built. Only current one pump provides the needed system pressure to allow the standby generator to function. In th event of that pump failing, the standby generator (which is required as a backup powE source per our NPDES permit) is not operable. This project will allow for much needec NPW redundancy. Relocate one NPW pump, replace one NPW pump and modify piping as needed to achieve system functionality. Estimated Project Cost $75,000 Includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction $75,000 $0 $0 $0 $0 $0 $0 Expense Total $75,000 $0 $0 $0 $0 $0 $0 Fund 423 - Sewer Utility $38,093 $0 $0 $0 $0 $0 $0 Mountlake Terrace $17,378 $0 $0 $0 $0 $0 $0 Olympic View Water Sewer $12,412 $0 $0 $0 $0 $0 $0 District City of Shoreline $7,118 $0 $0 $0 $0 $0 $0 Funding Source Total $75,000 $0 $0 $0 $0 $0 $0 Packet Pg. 188 1 PWP-17 600 BLDG AIR QUALITY EVALUATION Benefit After rehab/upgrade project is complete (2026-part 2 of this project), it will improve performance and reliability as well as lowering operational and maintenance costs for the systems mentioned above. Description Evaluate the AQ issues within the 600 Bldg with a focus on the lower level where H2S gas appears to be accumulating at levels that are high enough to do damage to sensitive electronic equipment such as VFD's, control boards and relay switches. These electronic failures cause shutdowns in the primary sludge pumping system, hic pressure plant aie system and sludge dewatering system. Estimated Project Cost $50,000 Includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $50,000 $0 $0 $0 $0 $0 $0 Expense Total $50,000 $0 $0 $0 $0 $0 $0 Fund 423 - Sewer Utility $25,395 $0 $0 $0 $0 $0 $0 Mountlake Terrace $11,585 $0 $0 $0 $0 $0 $0 Olympic View Water Sewer $8,275 $0 $0 $0 $0 $0 $0 District City of Shoreline $4,745 $0 $0 $0 $0 $0 $0 Funding Source Total $50,000 $0 $0 $0 $0 $0 $0 Packet Pg. 189 1 PWP-18 LPA BLOWER 303 REHAB .71 Benefit As this is our medium sized blower, it allows for more efficient and cost -saving = operation of the LPA system. s Description Blower is currently running at 75% capacity as it is at the end of it's useful life (30,000 i hrs, put in service in 2017) and is due for a rebuild. c Estimated Project Cost $35,000 "includes prior year expenditures i Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Construction $35,000 $0 $0 $0 $0 $0 $0 Expense Total $35,000 $0 $0 $0 $0 $0 $0 Fund 423 - Sewer Utility $17,777 $0 $0 $0 $0 $0 $0 Mountlake Terrace $8,110 $0 $0 $0 $0 $0 $0 Olympic View Water Sewer $5,792 $0 $0 $0 $0 $0 $0 District City of Shoreline $3,322 $0 $0 $0 $0 $0 $0 Funding Source Total $35,000 $0 $0 $0 $0 $0 $0 Packet Pg. 190 PWP-19 600 BLDG ELECTRICAL REHAB Benefit Rehab of the 600 bldg electrical system will result in a tremendous increase in the reliability of the critical systems within the 600 bldg including sludge dewatering, primary sludge pumping, high-pressure air, chemical disinfection pumps and several others. Description Both the high and low voltage electrical systems are in a degraded state and have funtionality issues during periods of high demand, often resulting in equipment failure due to MCC or breaker failures. This is a critical system and is at the end of it's usefu life, being well over thirty years old. Estimated Project Cost $250,000 "includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 423 - Sewer Utility Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $50,000 $0 $0 $0 $0 $0 $0 $200,000 $0 $0 $0 $0 $0 $0 $250,000 $0 $0 $0 $0 $0 $0 $126,975 $0 $0 $0 $0 $0 $0 $57,925 $0 $0 $0 $0 $0 $0 $41,375 $0 $0 $0 $0 $0 $0 $23,725 $0 $0 $0 $0 $0 $0 $250,000 $0 $0 $0 $0 $0 Packet Pg. 191 PWP-20 600 BLDG AIR QUALITY REHAB/UPGRADE '"NW Benefit Improve performance and reliability as well as lowering operational and maintenance costs for the systems mentioned above. Description Perform AQ system repairs and modifications from the prior years' AQ Evaluation Project to resolve the AQ issues within the 600 bldg with a focus on the lower level where 1-12S gas appears to be accumulating at levels that are high enough to do damage to sensitive electronic equipment such as VFD's, control boards and relay switches. These electronic failures cause shutdowns in the primary sludge pumping system, high pressure plant aie system and sludge dewatering system. Estimated Project Cost $250,000 Includes prior year expenditures Budget Project Cost 2025 2026 2027 2028 2029 2030 2031-45 Design $0 $50,000 $0 $0 $0 $0 $0 Construction $0 $200,000 $0 $0 $0 $0 $0 Expense Total $0 $250,000 $0 $0 $0 $0 $0 Fund 423 - Sewer Utility $0 $126,975 $0 $0 $0 $0 $0 Mountlake Terrace $0 $57,925 $0 $0 $0 $0 $0 Olympic View Water Sewer $0 $41,375 $0 $0 $0 $0 $0 District City of Shoreline $0 $23,725 $0 $0 $0 $0 $0 Funding Source Total $0 $250,000 $0 $0 $0 $0 $0 Packet Pg. 192 PWP-21 SECONDARY CLARIFIER 2 REHAB E� Benefit This will increase reliability/redundancy in the secondary system and help ensure the final effluent meets NPDES discharge permit standards. Description Secondary Clarifier 2 has reached the end of useful life as it's components are over 3 years old and need to be replaced. Clarifier drive, drive motor and steel structure have corroded and need repair or replacement. Concrete needs to be evaluated and repaired if necessary. Estimated Project Cost $450,000 'includes prior year expenditures Budget Project Cost Design Construction Expense Total Fund 423 - Sewer Utility Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total 2025 2026 2027 2028 2029 2030 2031-45 $0 $50,000 $0 $0 $0 $0 $0 $0 $400,000 $0 $0 $0 $0 $0 $0 $450,000 $0 $0 $0 $0 $0 $0 $228,555 $0 $0 $0 $0 $0 $0 $104,265 $0 $0 $0 $0 $0 $0 $74,475 $0 $0 $0 $0 $0 $0 $42,705 $0 $0 $0 $0 $0 $0 $450,000 $0 $0 $0 $0 $0 Packet Pg. 193 CFP/CIP COMPARISION 2024-20 2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS 2.1.b CFP / CIP COMPARISON (2024 TO 2025 PROJECTS ADDED Project Name Description]1[ Transportation Safety Action Plan Secured federal grant to complete plan. Water 2027 Water Comprehensive Plan Update Estimated costs for update to existing water comprehensive plan Water Phase 21 Annual Replacement Program (2031) Estimated future costs for waterline replacements. Storm Edmonds Marsh Water Quality Improvements (Phase 2) Estimated future costs for road repairs due to storm replacements Storm Phase 11 Storm Maintenance (2031) Estimated future costs for stormline replacements Storm Edmonds Marsh Estuary Planning Study Estimated future costs for Marsh Planning Study Sewer 2027 Sewer Comprehensive Plan Update Estimated costs for update to existing sewer comprehensive plan Sewer Phase 18 Annual Sewer Replacement/Rehab (2031) Estimated future costs for sewerline replacements WWTP Screw Press Feed System Rehab Estimated future costs for waste water treatment plant project. WWTP NPW Pumping System Improvements Estimated future costs for waste water treatment plant project. WWTP 600 Bldg air Quality Evaluation Estimated future costs for waste water treatment plant project. WWTP LPA Blower 303 Rehab Estimated future costs for waste water treatment plant project. WWTP 600 Bldg Air Quality Rehab/Upgrade Estimated future costs for waste water treatment plant project. WWTP Secondary Clarifier 2 Rehab Estimated future costs for waste water treatment plant project. Facilities Boys and Girls Club Estimated and future costs for facilities project. w a U a U- U_ c a as U U- Q M U O M O N LO N O N 0 a U- U a_ U N L 0 ci a 0 co O N LO N O N C d E t U Q Packet Pg. 195 2.1.b CFP / CIP COMPARISON (2024 TO 2025 PROJECTS REMOVED Transportation Name jK 76th Ave. Overlay from 196th to OVD DescriptionProject completed in 2024 Transportation 2024 Traffic Signal Upgrades to be completed in late 2024 Transportation 2024 Pedestrian Safety Program to be completed in late 2024 Water Phase 13 Annual Replacement Program Completed Sewer Phase 10 Annual Sewer Replacement/Rehab Completed Sewer Citywide CIPP Sewer Rehabilitation Phase 4 Completed Facilities Landmark 99 Six -year cost and funding (2025-2030) removed Facilities Fire Life Safety Communications Six -year cost and funding (2025-2030) removed WWTP WWTP Asset Criticality Ranking and Condition Assessment to be completed in late 2024 WWTP Primary Clarifier Completed WWTP Joint Sealant Completed WWTP Vacuum Filter lCompleted w a U a U- U_ _ a as U .Q M U 0 M O N LO N O N Packet Pg. 196 2.1.b CFP / CIP COMPARISON (2024 TO 2025 PROJECTS REVISED Transportation Puget Dr. @ OVD Signal Upgrades Cost and funding moved from 2027-2028 to 2028-2029 Transportation Signal Upgrades - 100th Ave @ 238th St. SW Cost and funding moved from 2027-2028 to 2028-2029 Transportation Main St. @ 3rd Signal Upgrades Cost and funding moved from 2027-2028 to 2028-2029 Transportation 228th St. SW from Hwy 99 to 95th PI. W Corridor Cost and funding revised, moved from 2027-2029 to 2028-2030 Transportation Hwy 99 Revitalization & Gateway Project - Stage 3 Cost and funding revised, moved from 2022-2028 to 2022-2029 Transportation Hwy 99 Revitalization & Gateway Project - Stage 4 Cost and funding revised, moved from 2022-2028 to 2022-2029 Transportation SR 524 (196th St. SW) / 88th Ave. W - Intersection Improvements Cost and funding moved from 2027-2028 to 2028-2030 Transportation Main St. @ 9th Ave. Intersection Improvements Cost and funding revised, moved from 2027-2028 to 2028-2029 Transportation 76th Ave. W @ 220th St. SW - Intersection Improvements Cost and funding revised, moved from 2023-2027 to 2023-2029 Transportation SR-104 Adaptive System - 236th to 226th Cost and funding revised, moved from 2023-2027 to 2024-2028 Transportation SR-104 @100th Ave W. Intersection Improvements Cost and funding revised, moved from 2027-2029 to 2028-2030 Transportation SR-104 @ 95th PI. W Intersection Improvements Cost and funding revised, moved from 2027-2028 to 2028-2029 Transportation SR-104 @ 238th St. SW Intersection Improvements Cost and funding revised, moved from 2027-2028 to 2028-2029 Transportation SR-104 @ 76th Ave. W Intersection Improvements Cost and funding revised, moved from 2027-2028 to 2028-2029 Transportation Olympic View Dr @ 76th Ave. W Intersection Improvements Cost and funding revised, moved from 2030-2044 to 2031-2045 Transportation 175th St SW Slope Repair Construction cost moved from 2027 to 2028 Transportation 232nd St. SW Walkway from 100th Ave. to SR-104 Cost and funding revised, moved from 2028-2029 to 2029-2030 Transportation 236th St. SW Walkway from Madrona Elementary to 97th Ave. W Cost and funding revised, moved from 2027-2028 to 2028-2029 Transportation 84th Ave. W Walkway from 238th St. SW to 234th St. SW Cost and funding revised, moved from 2024-2025 to 2025-2029 Transportation 80th Ave. W Walkway from 212th St. SW to 206th St. SW Cost and funding revised, moved from 2027-2029 tto 2028-2030 Transportation 80th Ave. W Walkway from 188th St. SW to Olympic View Dr. Cost and funding revised, moved from 2027-2029 to 2028-2030 Transportation 218th St. SW Walkway from 76th Ave. W to 84th Ave. W Cost and funding revised, moved from 2027-2029 to 2028-2030 Transportation Walnut St. Walkway from 6th Ave. S to 7th Ave S Cost and funding revised, moved from 2027 to 2028 Transportation 216th St. SW Walkway from Hwy. 99 to 72nd Ave W Cost and funding revised, moved from 2027 to 2028 Transportation Maplewood Dr. Walkway from Main St. to 200th St. SW Cost and funding revised, moved from 2027-2029 to 2028-2030 Transportation 95th PI. W Walkway from 224th St. SW to 220th St. SW Cost and funding revised, moved from 2027-2028 to 2028-2029 Transportation SR-104 @ 76th Ave. W Non -Motorized Trans Improvements Cost and funding revised, moved from 2027-2028 to 2028-2029 Transportation SR-104 Walkway: HAWK to Pine / Pine from SR-104 to 9th Cost and funding revised, moved from 2029 to 2030 Transportation Ferry Storage Improvements from Pine St. to Dayton St. Moved from 2027 to 2028 Transportation Transportation Plan Update Cost and funding revised, extended to 2025 Transportation Green Streets 236th St SW - 84th Ave W to Highway 99 Cost and funding revised, moved from 2029 to 2030-2045 w a U IL LL U_ c CU IL a) U LL Q M U 0 M 0 N LO N O N Packet Pg. 197 2.1.b Type Storm Project Name Lower Perrinville Creek Restoration Project Change Cost and Funding Revised Storm 7317 Lake Ballinger Way Purchase & Structure Removal Costs of building demolishment added to 2025 with 2026 closeout Storm Lake Ballinger Regional Facility Design and Construction Moved project funding from 2026-2027 to 2027-2028 Storm Storm and Surface Water Comprehensive Plan $213,000 in 2024 funds moved to 2025 Sewer Annual Citywide CIPP Sewer Rehabilitation Cost and funding (2025-2030) revised Sewer Lake Ballinger Sewer Cost and funding shifted from 2026-2027 to 2027-2028 WWTP Nutrient Removal Project Six -year cost and funding (2025-2030) revised WWTP VFD Upgrades Six -year cost and funding (2025-2030) revised WWTP Gasification Bypass (Class A Solids Production) Project postponed to 2027 WWTP Primary Clarifier 3 Rehab Six -year cost and funding (2025-2030) revised WWTP ODS (Primary Sudge) Pump Replacement Six -year cost and funding (2025-2030) revised WWTP Chlorine Contact Channel Sluice Gates Replacement Six -year cost and funding (2025-2030) revised Facilities Cemetery Building Six -year cost and funding (2025-2030) revised Facilities City Hall Six -year cost and funding (2025-2030) revised Facilities Fishing Pier/Beach Ranger Station Six -year cost and funding (2025-2030) revised Facilities Frances Anderson Center Six -year cost and funding (2025-2030) revised Facilities Fire Station 16 Six -year cost and funding (2025-2030) revised Facilities Fire Station 17 Six -year cost and funding (2025-2030) revised Facilities Fire Station 20 Six -year cost and funding (2025-2030) revised Facilities Historic Log Cabin Six -year cost and funding (2025-2030) revised Facilities Historical Museum Six -year cost and funding (2025-2030) revised Facilities Library Six -year cost and funding (2025-2030) revised Facilities Library Plaza Deck Waterproofing Six -year cost and funding (2025-2030) revised Facilities Meadowdale Club House Six -year cost and funding (2025-2030) revised Facilities Old Public Works Six -year cost and funding (2025-2030) revised Facilities Parks Maintenance Building Six -year cost and funding (2025-2030) revised Facilities Public Safety Six -year cost and funding (2025-2030) revised Facilities Public Works O&M Six -year cost and funding (2025-2030) revised Facilities Wade James Theater Six -year cost and funding (2025-2030) revised Facilities Yost Pool House Six -year cost and funding (2025-2030) revised �a Q M U La a LL U a U_ �a a c� t) 0 M O N Ln N O N U_ Q 0 a UL U a_ tU 0 Y L 0 3 a 0 M 0 N Ln N 0 N m E t 0 c� w. w Q Packet Pg. 198 A ,!P�EDMONDS 0, PARKS, RECREATION & HUMAN SERVICES 2025-2030 PROPOSED CAPITAL FACILITIES PLAN & CAPITAL IMPROVEMENT PROGRAM c) 04 Q 04 LL a. u- Q N Lo (N Q cq E 0- 0 m ow DRAFT SEPTEMBER 2024 "EDMONDS PARKS, RECREATION & HUMAN SERVICES Table of Contents Director's Letter................................................................ 2 CIP/CFP Worksheets.......................................................3-6 Project Distribution Map ................................................. 7 Project Descriptions......................................................8-26 Program Descriptions...................................................27-29 Acquisition Descriptions...............................................30-31 FundDetail..................................................................... 32 Fund 332 (Capital Const. & Impact Fee) Detail ............33-34 Fund 125 (REET 11) Detail ................................................ 35 Fund 126 (REET 1) Detail ................................................. 36 Fund 143 (Tree) Detail .................................................... 37 Fund 137 (Cemetery) Detail ........................................... 38 Annual Project Comparison ............................................ 39 A&I r 4 �" V ee� t 2.1.c EDMONDS PARKS, RECREATION & HUMAN SERVICES September 30, 2024 Members of the City Council, Parks & Planning Board, Staff and Citizens of Edmonds, The Parks, Recreation & Human Services Department presents the City of Edmonds Parks 6-year Parks Capital Improvement Program (CIP) and Capital Facilities Plan (CFP). The CIP/CFP serve as a planning guide identifying parks capital projects and related funding sources. It reflects the priorities established in the 2022 Parks, Recreation and Open Space (PROS) Plan priorities as well as unforeseen opportunities and demands. The CIP/CFP is updated annually through a public process including presentations and Public Hearings hosted by both the Parks & Planning Board and the City Council during the budget process. Highlights of the 2024 parks capital project accomplishments through August include: 1. Acquisition of the Mee property expands the Mathay Ballinger Park by 50% and the purchase and related costs were 80% grant funded ($880,000 grant). 2. Demolition of unusable structures, removal of invasive plants and site security of the 1-acre parcel donated by Shirley Johnson adjacent to Yost was completed. 3. Improvements to the McAleer Lake Ballinger Access area. 4. Installation of automated door locks on all park restrooms to decrease damage and vandalism. 5. Standardization of park entry signage. 6. Replacement of the outdoor shower, an additional foot wash station and installation of ADA compliant water bottle filler to replace a non -working drinking fountain. The remaining 2024 capital projects in process include: 1. Improvements continue at Mathay Ballinger Park with installation of a permanent restroom and remaining improvements including ADA accessible pathway, parking improvement, picnic shelter and additional park amenities. 2. Completing open space improvements to meet a 2008 State of Washington grant non-compliance issue. 3. Installation of "No Boating" buoys along the Waterfront as resulting from US Coast Guard audit. Currently, the focus of our capital work is on deferred maintenance throughout the city's existing parks system and recreation facilities. With an aging system and lack of adequate asset management through Edmonds' parks and facilities, amenities are reaching the end of their useful life and require significant repairs or replacement. Some of which require significant permitting due to proximity to salmon -bearing waterways. Another priority in our capital work is addressing ADA accessibility compliance issues both during renovation and repair work as well as stand-alone new projects to address the issue. Ensuring our parks, trails, open spaces and recreation facilities and amenities are inclusive and welcoming and equitability available to all Edmond's residents and visitors is an emphasis of all our parks capital work. Your Parks, Recreation & Human Services Department strives to keep our parks safe, accessible, and enjoyable for all and we are proud to continue to implement the parks capital program to better serve the Edmonds community. Sincerely, Ii \X Angie Feser, Edmonds Parks, Recreation & Human Services Director 425-771-0256 Angie.Feser@EdmondsWA.gov Page 2 Packet Pg. 201 2025-2030 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN 2.1.c Costs inflated at 3% per year Project CFP Project Site & Description 2025 2026 2027 2028 2029 2030 6-Year Total # Shell Creek Restoration Phase 2 R19 Project to provide improved environmental health and erosion control of Shell $ 380,000 $ $ $ $ $ $ 380,00( Creek in Yost Park, may include trail, bridge and boardwalk repair or relocation. Lake Ballinger Park Mountlake Terrace ILA *CARRYFORWARD* D19 Funding to support City of Mountlake Terrace Ballinger Park Phase III $ 200,000 $ $ $ $ $ $ 200,00( Development. Payment due upon completion of project. Columbarium Expansion - Phase II D8 Expansion of the current columbarium. Funding provided through the Cemetery $ 175,000 $ $ $ $ $ $ 175,00( Trust Fund 137. Mee Property X P2 Master plan and future development providing expansion of the Mathay $ 80,000 $ $ 250,000 $ $ $ $ 330,00( D13 Ballinger neighborhood park. Property purchased in 2024. Johnson Property X Master plan for future use and expansion of Yost Park. Site development not $ $ 100,000 $ $ $ $ $ 100,00( P5 included in estimate. Demolition, debris removal and site security completed in - - 2023. Parks & Facilities Maintenance and Operations Building X P1 Replace and/or renovate Parks & Facilities Maintenance Shop located in City $ $ 250,000 $ 875,500 $ 4,700,000 $ $ $ 5,825,50( D2 Park. Preliminary design in 2026. Marsh Boardwalk Replacement D21 Renovation and replacement of northwest Edmonds Marsh boardwalk to include $ $ 75,000 $ 750,000 $ - $ $ $ 825,00( R20 ADA upgrades. Yost Pool Upgrades & Renovation R11 Repairs and renovations of 50+year old pool as needed to include a complete $ $ - $ 350,000 $ $ $ $ 350,00( replaster of the pool. Woodway Campus Athletic Complex - Phase I - Lighting X D20 In cooperation with the Edmonds School District, complete a community park $ $ $ 1,500,000 $ $ $ $ 1,500,00( and athletic complex at Former Woodway High School to include lighting and future construction of two additional fields. Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) to U C IL IL U_ c ltf IL W W LL Q ca U O CM O N u7 N O N H LL ILL C] a U I a U W Y M IL O Cl) O N N O N c W E s U M r Q Page 3 Packet Pg. 202 2.1.c 2025-2030 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN Costs inflated at 3% per year Project CFP Project Site & Description 2025 2026 2027 2028 2029 2030 6-Year Total # Sierra Park R8 Replacement of a 25+ year old playground and related improvements to included $ $ $ 50,000 $ 350,000 $ $ $ 400,00( ADA compliance. D10 Pine Street Park D11 Park enhancements to include the addition of a small shelter with picnic tables, $ $ $ $ 100,000 $ 60,000 $ 200,000 $ 360,00( D12 canopy shade trees and a paved connecting pathway. Maplewood Hill Park R12 Replacement of a nearly 40 year old playground for improved play experience $ $ $ $ 50,000 $ 350,000 $ - $ 400,00( and ADA compliance. Neighborhood Park SR99 X D15 Master plan and development of a new neighborhood park in Southeast $ $ $ $ $ 80,000 $ 850,000 $ 930,00( Edmonds (funding is in Parkland Acquisition program for purchase). D16 Elm Street Park D17 Park enhancements to include the addition of a nature playground, small shelter $ $ $ $ $ 105,000 $ 385,000 $ 490,00( R14 with picnic tables, habitat restoration and possible addition of a dog park. Neighborhood Park SE 2 X Master plan and development of a new neighborhood park in Southeast $ $ $ $ $ $ 82,000 $ 82,00( D18 Edmonds (funding is in Parkland Acquisition program for purchase). Pool Replacement X R15 Replacement of the existing Yost pool due to end of life cycle. Design, location, $ $ $ $ $ $ 24,000,000 $ 24,000,00( and funding TBD and consideration of possible partnerships. Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Master Plan development and implementation of the Edmonds Marsh to P4 daylight the waterway connection of Puget Sound to the Edmonds Marsh and X D9 two fresh water creeks providing restoration of fresh water/salt water estuary TBD TBD TBD TBD TBD TBD $ - D1 and natural tidal exchange. (All expenses are TBD per Council direction in December 2022). Property acquisition identified in Parkland Acquisition program. (A) SUBTOTAL PARKS CIP/CFP PROJECTS $ 835,000 $ 425,000 $ 3,775,500 $ 5,200,000 $ 595,000 $ 25,517,000 $ 36,347,50( Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) R ..1 R U C a LL U_ C CU IL N LL Q ca U O M O N u7 N O N H LL Q 0 a LL U I a_ U Y M IL 0 M 0 N u7 N O N C N E s c� co r Q Page 4 Packet Pg. 203 2.1.c 2025-2030 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN Costs inflated at 3% per year Project PARKS CIP PROGRAMS 2025 2026 2027 2028 2029 2030 6-Year Total Citywide Park Improvements / Capital Replacement Program Ongoing program of funding allocation for regular, major and deferred R17 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 2,700,00( maintenance, repair and replacement of parks amenities, structures and equipment. ADA Improvements & Replacement R16 Ongoing replacement or improvements to meet ADA standards within park $ $ 200,000 $ 300,000 $ $ $ $ 500,001 system. (Example is of the Seaview Park restroom replacement and - - - - improvements to pathway). Debt Service and Interfund Transfers Debt service on Civic Park $1.6M bond (2021), Marina Beach Acquisition and $ 412,518 $ 416,188 $ 410,438 $ 416,350 $ 407,912 $ 414,225 $ 2,477,631 Interfund transfers to Engineering for Capital Project Support. (B) SUBTOTAL - PARKS CIP PROGRAMS $ 862,518 $ 1,066,188 $ 1,160,438 $ 866,350 $ 857,912 $ 864,225 $ 5,677,631 Costs inflated at 3% per year Project PARKLAND ACQUISITION 2025 2026 2027 2028 2029 2030 6-Year Total X A3 Neighborhood Park SR99 $ $ $ $ 900,000 $ - $ $ 900,00( Acquisition of parkland near SR 99 to fill park system gaps. X A4 Neighborhood Park SE 2 $ - $ - $ - $ - $ 900,000 $ - $ 900,001 Acquisition of parkland in South Edmonds to fill park system gaps. Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) X Al Acquisition of the Unocal property in support of greater Edmonds Marsh TBD TBD TBD TBD TBD TBD $ restoration project. (C) SUBTOTAL - PARKLAND ACQUISITION 1 $ - $ - $ $ 900,000 $ 900,000 1 $ $ 1,800,001 R .r .Q m U C a LL U_ C IL rn N LL M .Q La U O M 0 N LO N O N H LL 0 a LL UI a_ U rn Y L M IL 0 M O N LO (D) TOTAL PARKS CIP/CFP EXPENDITURES (A+B+C) $ 1,697,518 $ 1,491,188 $ 4,935,938 $ 6,966,350 $ 2,352,912 $ 26,381,225 $ 43,825,131 N Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) N E s c� La r Page 5 Q Packet Pg. 204 2.1.c 2025-2030 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN PARKS CIP REVENUE 2025 2026 2027 2028 2029 2030 6-Year Total Real Estate Excise Tax (REET) I - Fund 126 $ 512,518 $ 516,188 $ 510,438 $ 516,350 $ 507,912 $ 514,225 $ 3,077,63( Real Estate Excise Tax (REET) II - Fund 125 $ 1,110,000 $ 1,075,000 $ 1,150,000 $ 950,000 $ 910,000 $ 950,000 $ 6,145,00( Park Impact Fees - Fund 332-100 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,200,00( Tree Fund 143 - Land Acquisition $ 84,192 $ 60,419 $ 58,419 $ 61,140 $ 63,997 $ 56,997 $ 385,16- Cemetery Trust Fund 137 - Columbarium Expansion $ 175,000 $ 175,00( Investment Interest (3%) $ 7,870 $ 8,220 $ 35,132 $ 34,363 $ 46,081 $ 54,385 $ 186,051 Donations $ $ $ $ $ $ $ Bond Proceeds $ $ $ $ $ $ $ Secured Grants $ $ $ $ $ $ $ Unsecured Grants/Funding - non -land acquisition $ $ $ 3,125,000 $ 4,700,000 $ 55,000 $ 24,167,000 $ 32,047,001 (E) TOTAL PARKS CIP REVENUE $ 2,089,580 $ 1,859,827 $ 5,078,988 1 $ 6,461,853 1 $ 1,782,990 $ 25,942,607 $ 43,215,84, Parks Fund 6-Year Overview 2025 2026 2027 2028 2029 2030 (F) Beginning Fund Balance $ 1,458,932 $ 1,846,994 $ 2,211,633 $ 2,350,684 $ 1,842,187 $ 1,268,265 (E) Revenue $ 2,089,580 $ 1,859,827 $ 5,078,988 $ 6,461,853 $ 1,782,990 $ 25,942,607 (D) Expenditures $ 1,701,518 $ 1,495,188 $ 4,939,938 $ 6,970,350 $ 2,356,912 $ 26,385,225 (G) Ending Fund Balance (F+E-D) $ 1,846,994 $ 2,211,633 $ 2,350,684 $ 1,842,187 $ 1,268,265 $ 825,647 Restricted Land Acquisition Funds: $ 1,352,583 $ 1,509,002 $ 1,663,421 $ 920,561 $ 180,557 $ 333,554 Available Funding (assuming $2001(in PIF+Interest): $ 494,411 $ 702,631 $ 687,263 $ 921,626 $ 1,087,707 $ 49ZO93 R .r .Q R U C a ILL. U_ c a W N LL Q ca U O M O N u7 N O FI Page 6 Packet Pg. 205 I 2.1.c I 2025-2030 Parks Capital Improvement Program & Capital Facilities Plan PROJECTS t v EDMONDS PARKS, RECREATION & HUMAN SERVICES r LL Li a LL U I a_ U L a 0 M 0 N LO N O N C d E U a Page 8 Packet Pg. 207 1 2.1.c Parks & Recreation Shell Creek Restoration Phase 2 - R19 O Driftwood PWyers Yost Park Trails City of Edmonds Bridge — Boardwalk ---- Trail Creek Park Boundary _ Service Road — pavement 0 100 200 Feet Main St NlghlineTrall Existing Conditions Area ; 1 1 �hP��cePk Bzl( Approximate Project Outline -'-` V+�_ ate, • �, , ' `I Cedar Loop Trail—� IM I cl ` �\ tti ❑ \� Crow's Nest Loop \ ENTRANCE Project Summary: The goal of this project is the restoration of the northern portion of Yost Park and may include habitat and environmental protection and enhancement, mitigation opportunities, bridge, trail and boardwalk replacement/relocation and concrete structure removal or modification. After completion of the Existing Conditions Analysis, funding is needed for the next phase which includes scope of work development and may include architecture, engineering and ecological design, document development to support and start the permit process and potential construction estimates. Project Justification: The 45-acre Yost Park, containing a portion of Shell Creek, is experiencing environmental degradation to the creek's ecosystem and the bridges are nearing end of life cycle. Shell Creek is identified as a salmon -bearing stream and erosion and silting issues within Yost Park impact stream bed conditions and spawning habitat within the park and downstream. This erosion has caused the closure of a pedestrian bridge in the upper creek corridor, resulting in significant impact to trail users by lack of ability to cross the creek to access both sides of the park. Additional pedestrian bridges are deteriorating and will require replacement or repair. 2022 Parks, Recreation & Open Space (PROS) Plan - Goal 3: Parks, Trails & Open Space, Objectives 3.7, 3.8 and 3.9; Goal 4: Waterfront Use & Access, Objectives 4.2 and 4.4; Goal 5: Natural Resource & Habitat Conservation Objectives, 5.1, 5.3 and 5.4; Goal 6: Climate Change, Adaptation & Resiliency, Objective 6.5; and Goal 9: Park Operations & Administration Objectives 9.1 and 9.2. PROS Plan Recommendations 3.1, 3.10. 5.2 and 6.2. Estimated Cost: Phase 1- $250,000 & Phase 2 - $380,000 = $630,000 total Page 9 Packet Pg. 208 2.1.c Parks & Recreation Lake Ballinger Park/Mountlake Terrace ILA - D19 Interurban Trail Improved Park Entry Proposed Crossing by the U.S. Army Corps of Engineers Senior Center l Proposed Channel by the )halt Path y U.S. Army Corps of Engineers �r 6 ft Wood Chips Path 4k r y 6 ft Gravel Path -rsAW Proposed Boardwalk by the U.S. Army Corps of Engineers Boardwalk & Viewing Platform Lake Ballinger Lake Ballinger Park, City of Mountlake Terrace Project Summary: Through an Interlocal Agreement (ILA) with the City of Mountlake Terrace, the City of Edmonds will cat support the construction of the planned improvements in the northwest area of Lake Ballinger Park including a pedestrian c entry, pathways and access to Lake Ballinger. The ILA was executed in 2023, with the project underway and payment is due upon completion. LL Q Project Justification: This western boundary of the park is Edmonds city limits, and these improvements will provide better o access to Lake Ballinger Park for Edmonds residents. The revenue contribution supports the construction of the LL improvements which will benefit the City of Edmonds. This project is supported by the 2022 Parks, Recreation and Open vl a Space (PROS) Plan including a goal, three objectives and three recommendations. PROS Goal 3, Objectives 3.2, 3.8 and v 3.11. Recommendation 1.2 Expand partnerships and agreements with other nearby jurisdictions. Recommendation 3.6 ,0 L Explore options for access to Lake Ballinger with the City of Mountlake Terrace to include possible joint development and consideration of a fishing pier. Recommendation 5.2 Repair and improve or extend trails and boardwalks to allow M improved public access to natural areas for nature/wildlife viewing, hiking and outdoor experience. N LO N Estimated Cost: $200,000 c N Construction (D19) — ILA 1 126 $200,000 2027 20281 1 1 Total $200,000 Total Expenses $200,000 $200,000 Real Estate Excise Tax II - Fund 125 $200,000 $200,000 Total Revenue Unsecured Funding $200,000 so $200,000 $0 d E U .r a Page 10 Packet Pg. 209 2.1.c Parks & Recreation Columbarium Expansion Phase 2 - D8 LL 820 15th St SW, Edmonds Memorial Cemetery a Project Summary: Expansion of the existing Edmonds Memorial Cemetery Columbarium. Funding is provided through the LS) Cemetery Trust Fund 137 which is designated for capital projects such as this. This accumulated fund balance is generated c from revenue collected through ongoing cemetery sales and services. LO Project Justification: As the existing columbarium continues to fill up, it is appropriate to begin planning for the Phase 2 N expansion to accommodate additional inurnments. The project design was developed with the original design and LL therefore, could be relatively simple to implement. 0 a u_ U Estimated Cost: $159,100 a U L a 0 M O N LO N O N a Page 11 Packet Pg. 210 2.1.c Parks & Recreation Mee Property - P2, D13 24024 76th Ave. Project Summary: This project is the Master Planning process supporting development of the recently acquired Mee Property adjacent to and expanding Mathay Ballinger Park. This planning effort is the next step to providing improvements to expand the adjacent park and address park services gap and inequities in geographic distribution in underserved areas of Edmonds. The Master Plan relies on community engagement and will be developed in collaboration with Edmonds community. Opening this property to the public requires site improvements determined by a community -based Master Plan. Project Justification: The addition of new parkland and amenities is supported by the 2022 Parks, Recreation and Open Space (PROS) Plan including Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8, 3.9 and 3.10; Goal 5, Objectives 5.1, 5.3, and 5.4; and Goal 6, Objectives 6.1, 6.3, and 6.4. Recommendations include 6.2 which supports development of a new park and recommendations 3.2 and 3.5. Estimated Cost: $330,000 Planning —Neighborhood Park SE 1 (P2) 2025 $80,000 20261 128 2029 2030, $80,000 Construction — Neighborhood Park SE 1 (D13) $250,000 $250,000 Total Expenses $80,000 $250,000 $330,000 Real Estate Excise Tax II - Fund 125 $80,000 $80,000 Park Impact Fees — Fund 332-100 $250,000 $250,000 Total Revenue $80,000 $250,000 $330,000 Unsecured Funding i 1 i *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) u_ Q o: 0 a u_ tU a� U N L a 0 M O N LO N O N c m E s v M Q Page 12 Packet Pg. 211 2.1.c Parks & Recreation Johnson Property - P5 9309 Bowdoin Way Project Summary: This project is for the first phase of design including a Master Plan for the 1-acre property donated by Shirley Johnson in 2021. The house, outbuildings and invasive plants material were removed in 2023 and the site is currently secured with fencing. The master planning process uses a combination of park system -wide goals (PROS Plan), property opportunities and constraints, property donation conditions and community input on future design and usage for the space as well as providing documentation for grant opportunities for future improvements. Project Justification: This project is supported by five goals and 11 related objectives and a recommendation of the 2022 Parks, Recreation and Open Space (PROS) Plan. They include Goal 1, Objective 1.1; Goal 3, Objectives 3.7, 3.8 and 3.10; Goal 5, Objective 5.1; Goal 6, Objectives 6.1, 6.4 and 6.5; Goal 9, Objectives 9.1, 9.3 and 9.5 support this project. In addition, Plan Recommendation 3.1 - Maintain, renovate, or replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety applies to this work. Estimated Cost: $100,000 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) U_ Q o: 0 a U_ U a_ U N L c� a 0 M O N LO N O N C d E s 0 c� w Q Page 13 Packet Pg. 212 2.1.c Parks & Recreation Parks & Facilities Maintenance Building - P1 & D2 6003 d Avenue South, City Park Project Summary: Replacement of 40+ year old Parks and Facilities Maintenance building and renovation of the yard area in City Park. Currently undersized to accommodate staff, vehicles and equipment, mechanical workspaces and employee facilities and the facility is reaching the end of its useful life. Project Justification: Parks and Facilities Divisions have long outgrown this existing facility and need additional work areas and fixed equipment storage to more efficiently maintain City parks and Capital facilities. The city's small equipment repair garage is used as the Park Maintenance locker room, daily meeting room, computer access (two for 17 FTEs) and work preparation space. It is insufficient for work efficiency and creates a conflicting workspace of small machinery repair and gathering space. This project is supported by a Goals and three Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan including Goal 9, Objectives 9.1, 9.3 and 9.9. Estimated Cost: $5,825,000 Planning & Design (P1) 2025 20261 $250,000 $875,000 128 2029 2030 Total $1,125,000 Construction (D2) $4,700,000 $4,700,000 Total Expenses $250,000 $875,000 $4,700,000 $5,825,000 Real Estate Excise Tax II - Fund 125 $250,000 $250,000 Bond Proceeds Operating Contribution —General Fund Park Donations Total Revenue $250,000 $250,000 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) u_ Q o: 0 a u_ tU I a_ U N L c� a 0 M O N LO N O N c m E t 0 M w Q Page 14 Packet Pg. 213 2.1.c Parks & Recreation Marsh Boardwalk Replacement - D21, R20 S •at�r •twe -� il� 180 West Dayton, Edmonds Marsh Project Summary: Initial work for repair and possible replacement of the failing Marsh Boardwalk. Work may include evaluation of existing structure, architecture and engineering design for repair or replacement, development of construction drawings and the start of a complex permitting process. Project Justification: The deck of the wooden boardwalk is nearing the end of its useful life and the supporting structure and footings may be starting to settle into the underlying marsh. If this repair/replacement is not completed, there may need to be closed to the public due to unsafe surface conditions and trip hazards. 2022 Parks, Recreation & Open Space (PROS) Plan - Goal 3: Parks, Trails & Open Space, Objectives 3.4, 3.7, 3.8 and 3.9; Goal 4: Waterfront Use & Access, Objectives 4.2 and 4.4; Goal 5: Natural Resource & Habitat Conservation Objectives, 5.1, 5.3 and 5.4; Goal 6: Climate Change, Adaptation & Resiliency, Objective 6.1, 6.4 and 6.5; and Goal 9: Park Operations & Administration Objectives 9.1 and 9.5. PROS Plan Recommendations 3.1 and 3.10, 5.2 and 6.2. Estimated Cost: $825,000 1 1 120281 1 1 Planning & Design (D21) $75,000 $75,000 Construction (R20) $750,000 $750,000 Total Expenses $75,000 $750,000 $825,000 Real Estate Excise Tax II - Fund 125 $75,000 $75,000 Total Revenue FundingUnsecured $75,000 000 $75,000 OOO u_ 0 a u_ U I a_ U a 0 M 0 N LO N 0 N c m E U a Page 15 Packet Pg. 214 2.1.c Parks & Recreation Yost Pool Upgrades & Renovation - R11 96th Ave W & Bowdoin Way, Yost Park Project Summary: Future pool repair and maintenance to include a full replaster project. Project Justification: The outdoor Yost Pool, built in the early 1970's, is more than 50 years old and has numerous maintenance needs to enable the pool to remain operational and meet safety requirements. These repairs and amenity replacements are supported in the 2022 Parks, Recreation and Open Space (PROS) Plan including Goal 1, Objective 1.4; Goal 2, Objective 2.1, Goal 3, Objectives 3.6, 3.8 and 3.9; Goal 4, Objective 4.4; Goal 6, Objective 6.3; Goal 7, Objectives 7.2 and 7.4; Goal 9, Objectives 9.1 and 9.5 and Recommendation 3.1, and 6.2. Estimated Cost: $350,000 Construction (1111) 2025 20261 128 2029 $350,000 2030 Total $350,000 Total Expenses $350,000 $350,000 Real Estate Excise Tax II - Fund 125 $350,000 $350,000 Total Revenue Unsecured Funding $350,000 1 $350,000 1 Page 16 Packet Pg. 215 2.1.c Parks & Recreation Woodway Campus Athletic Complex Phase 1 Lighting - D20 23200 100th Ave. W Project Summary: This project consists of two components: Phase 1 lighting addition, Phase 2 renovation of existing underdeveloped athletic field and would be coordinated with the property owner, Edmonds School District. Project Justification: By adding lighting to the renovated Phase 1 year-round field, usage of the multi -use facility would significantly increase. Phase 2 would renovate a currently poorly maintained and underutilized large athletic field to provide community significantly more multi -sport use of an existing facility. This Athletic Complex serves a densely populated area of more than 150,000 residents within 5-mile radius. Future maintenance costs could be offset by user fees. Phase I without lighting installation was completed in 2015 for $4.2M, Phase II estimated at $6-8M with funding and timing undetermined. This partnership improvement is supported by a Recommendation, 2 Goals and 5 Objectives in the 2022 PROS Plan including Recommendation 3.2 "expand partnerships and agreements with Edmonds School District ... to provide public access and opportunities for outdoor recreation". And PROS Plan Goal 3, Objectives 3.3, 3.9, 3.10 and 3.11; and Goal 9, Objective 9.4. Estimated Cost: Phase 1 Lighting: $1,500,000; Phase 2: $6 — 8M 2025 20261 Construction (D20) - Lighting $1,500,000 128 2029 2030 Total $1,500,000 Total Expenses $1,500,000 $1,500,000 Real Estate Excise Tax II - Fund 125 7 Park Impact Fees — Fund 332-100 Total Revenue Unsecured Funding $0 MIM11IM111111MI $0 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Page 17 I— LL Q 0 a LL U I a_ U �a a 0 M O N L! N O N r.+ c a) E t v R a Packet Pg. 216 2.1.c Parks & Recreation Sierra Park - R8 81st Ave W & 190th St SW Project Summary: Replacement of the playground and fall surfacing at Sierra Park. The playground is 27 years old and is currently the smallest and most limited playground in the park system. The new playground will be ADA accessible and could be an inclusive level design. Project Justification: These improvements are supported by three Goals and Objectives and two Recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan. The improvement project is supported by Goal 1, Objective 1.1; Goal 3, Objective 3.8, Goal 9, Objective 9.1 and Recommendation 3.1. In addition, Recommendation 3.4 states "replace the playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park". Estimated Cost: $400,000 Construction (R8) — Playground Replacement 125 � 2026 20271 1 $50,000 $350,000 2030 Total $400,000 Total Expenses $50,000 $350,000 $400,000 Real Estate Excise Tax II - Fund 125 $50,000 $350,000 $400,000 Total Revenue Unsecured Funding $50,000 $350,000 1 1 $400,000 so u_ a 0 a u_ U I a_ U L a 0 M 0 N LO N 6 N c d E U a Page 18 Packet Pg. 217 2.1.c Parks & Recreation Pine Street Park - D10, D11 & D12 6th and Pine Street Project Summary: Park improvements to include the addition of a small shelter with picnic tables, canopy shade trees and a paved interior connecting pathway. Project Justification: These improvements are supported by 2 Recommendations, 2 Goals and 2 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.5 is to add amenities to existing parks, such as picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park and paved pathway connections in Mathay Ballinger Park and Pine Street Park. PROS Plan Goal 3, Objective 3.8; Goal 9, Objective 9.1 and Recommendation 6.2 also align with these improvements. Estimated Cost: $360,000 Construction (D10) — Shelter w/Picnic Tables $100,000 030 Total $100,000 Construction (D11) — Paved Pathway $35,000 $200,000 $235,000 Construction (D12) — Canopy Shade Trees $25,000 $25,000 Total Expenses $100,000 $60,000 $200,000 $360,000 Real Estate Excise Tax II - Fund 125 $100,000 $60,000 $200,000 $360,000 Total Revenue $100,000 $60,000 $200,000 $360,000 Page 19 Packet Pg. 218 2.1.c Parks & Recreation Maplewood Hill Park — R12 19800 89th PI W Project Summary: Replacement of the existing playground installed in 1985. This playground is 38 years old and is the oldest in the park system. Project Justification: This improvement is supported by three Goals and Objectives as well as two Recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan. PROS Plan Goal 1, Objective 1.1; Goal 3, Objective 3.8; Goal 9, Objective 9.1 and Recommendation 3.1 also align with this improvement. Recommendation 3.4 specifically states "replace the playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park". Estimated Cost: $400,000 Construction (R12) — Playground Replacement 2025 20261 128 $50,000 L 2029 $350,000 2030 Total $400,000 Total Expenses $50,000 $350,000 $400,000 Real Estate Excise Tax II - Fund 125 $50,000 $350,000 $400,000 Total Revenue $50,000 $350,000 $400,000 Unsecured Funding 1 1 a Page 20 Packet Pg. 219 2.1.c Parks & Recreation Neighborhood Park SR 99 - P6 & D15 Project Summary: Design and development of an additional neighborhood park in the SR 99 area to address an existing gap in park services and inequities in parkland distribution. Once an acquisition has been authorized (see Land Acquisition Section for details) a Master Plan should be developed in collaboration with the surrounding community. Eventual development of the park will be based on the Master Plan. Project Justification: The addition of a new park is supported by three Goals and 11 Objectives two recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan. PROS Plan Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 also align with the development of a new park. Recommendation 1 states "to fill the park system gaps ... 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor". Estimated Cost: $930,000 + Parkland Acquisition Planning —Neighborhood Park SR99 (P6) 2025 20261 128 2029 $80,000 2030 Total $80,000 Construction — Neighborhood Park SR 99 (D15) $850,000 $850,000 Total Expenses $80,000 $850,000 $930,000 Real Estate Excise Tax II - Fund 125 Park Impact Fees — Fund 332-100 $80,000 $850,000 $930,000 Total Revenue Unsecured Funding $80,000 $850,000 $930,000 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Page 21 Packet Pg. 220 2.1.c Parks & Recreation Elm Street Park - D16, D17 & R14 7th & Elm Street Project Summary: Park enhancements to include the addition of a nature playground, small shelter with picnic tables, habitat restoration and public process to consider possible off -leash dog park area. Project Justification: These improvements are supported by two Goals and Objectives and two Recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan. PROS Plan Goal 6, Objective 6.5; Goal 9, Objective 9.1; and Recommendation 3.5 support these improvements. Recommendation 3.1 is to "add amenities to existing parks, such as picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park". Estimated Cost: $490,000 Construction (R14) — Habitat Restoration 2025 20261 128 2029 $55,000 2030- $55,000 Construction (D16) — Nature Play & Dog park $50,000 $300,000 $350,000 Construction (D17) — Shelter w/Picnic Tables $85,000 $85,000 Total Expenses $105,000 $385,000 $490,000 Real Estate Excise Tax II - Fund 125 1 1 $50,000 $300,000 $3501,000 Total Revenue Unsecured Funding $50,000 111 $300,000 111 $350,000 41 111 F_ u_ a 0 a u_ U I a_ U a 0 M 0 N LO N 0 N C d E M U a Page 22 Packet Pg. 221 2.1.c Parks & Recreation Neighborhood Park SE 2 - P7, D18 Project Summary: Design and future development of an additional neighborhood park in the SE Edmonds area to address an existing gap in park services and inequities in parkland distribution. Once an acquisition (see Land Acquisition Section for details) has been authorized a Master Plan will be developed in collaboration with the surrounding community. Development of the park will be based on the Master Plan. Project Justification: The addition of a new park is supported by three Goals and 11 Objectives and two Recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan including Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 support the development of a new park. Recommendation 1 states "to fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor". Estimated Cost: $82,000 + Parkland Acquisition 2025 20261 128 2029 2030 Total Planning — Neighborhood Park SE 2 (P7) $82,000 $82,000 Construction — Neighborhood Park SE 2 (D18) Total Expenses $82,000 $82,000 Real Estate Excise Tax II - Fund 125 Total Revenue Unsecured Funding 111 111 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Page 23 Packet Pg. 222 2.1.c Parks & Recreation Yost Pool Replacement - R15 96th Ave W & Bowdoin Way, Yost Park Project Summary: Yost Pool was built nearly 50 years ago and continues to provide recreational opportunities for many residents and visitors. In addition to teaching youth lifesaving water safety, the pool serves as an opportunity for community members of all ages to lead healthy and active lifestyles. Funding for this project has not been identified, may need partnerships and would likely require voter approval. Project Justification: Replacing Yost Pool is supported by four Goals and six Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan lists Goal 1, Objective 1.1; Goal 3, Objectives 3.7, 3.8 and 3.9; Goal 7, Objective 7.4; Goal 9, Objective 9.1 and Recommendations 3.1, 4.1, 4.2 and 6.2. Recommendation 4 actually states "replace Yost Pool". Estimated Cost: $24,000,000 Planning & Construction (1115) 2025 2026 2027is 2029 2030 Total $24,000,000 $24,000,000 Total Expenses $24,000,000 $24,000,000 Real Estate Excise Tax II - Fund 125 Fund 332 Balance + Park Impact Fees Secured Grants Bonds Total Revenue Unsecured Funding $0 $0 ($24,000,000) ($24,000,000) *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) u_ Q G a u_ tU I a_ U N a 0 M 0 N LO N 0 N c m E t t� ca w Q Page 24 Packet Pg. 223 2.1.c Parks & Recreation Edmonds Marsh -Estuary Expansion & Restoration - Al, P4, D9 & D1 Edmonds Marsh - City of Edmonds Marsh, Marina Beach Park and property owned by Unocal (Chevron) Project Summary: Reconnect the Puget Sound with the Edmonds Marsh near -shore estuary by restoring the natural tidal exchange. This project will impact the existing Marina Beach Park and its proposed renovation including daylighting of Willow Creek within the park and the Edmonds Marsh. In addition, this project encompasses the possible acquisition or use of the adjacent 21-acre parcel known as the Unocal property to support a larger estuary restoration project. Once acquired, an integrated restoration plan can be developed to restore functioning conditions of the tidal wetland for salmon recovery, wildlife conservation and improved public access for recreational use, environmental education and wildlife viewing. Project Justification: The marsh estuary restoration project will allow for and provide a natural tidal exchange, allow salmon to again migrate into Willow Creek, support migratory birds and waterfowl, provide a natural redistribution of saltwater -freshwater flora and fauna and address sea level rise impacts. This project is supported by 3 Recommendations, 5 Goals and 8 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 2.2 — Expand the Edmonds Marsh/Estuary to include the Unocal property. Develop funding strategy for purchase of the Unocal property or negotiate with the State of Washington to have the property become part of the Edmonds Marsh/Estuary. PROS Plan Goal 1, Objective 1.1; Goal 4, Objective 4.3; Goal 5, Objectives 5.1, 5.3 and 5.4; Goal 6, Objective 6.5 and 6.7; Goal 9, Objective 9.1; Recommendation 2.1 and 3.11 also align with this project. Estimated Cost: TBD Acquisition and Planning + Restoration + Marina Beach Park renovation Continued on next page. U_ Q o: 0 a U_ tU a_ U N L c� a 0 M O N LO N O N m E t 0 c� w Q Page 25 Packet Pg. 224 2.1.c Edmonds Marsh -Estuary Expansion & Restoration— continued. Land Acquisition (Al) TBD TBD TBD TBD TBD 030 TBD Total TBD Master Plan (P4) TBD TBD TBD TBD TBD TBD TBD Master Plan Implementation (D9) TBD TBD TBD TBD TBD TBD TBD Restoration (D1) - TBD TBD TBD TBD TBD TBD TBD TBD Total Expenses TBD TBD TBD TBD TBD TBD TBD Real Estate Excise Tax II - Fund 125 Real Estate Excise Tax I — Fund 126 Fund 332 Balance + Park Impact Fees Bond Proceeds Secured Grants Tree Fund 143 — Land Acquisition Park Donations Operating Contribution —General Fund Stormwater— Fund 422 Total Revenue Unsecured Funding TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD Project Accounting #M070 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Expense estimates and funding sources changed to TBD per Council direction December 2022. Page 26 Packet Pg. 225 I 2.1.c I 2024-2029 Parks Capital Improvement & Capital Facilities Plan PROGRAMS Y EDMONDS PARKS, RECREATION & HUMAN SERVICES a Page 27 Packet Pg. 226 1 2.1.c Parks & Recreation Citywide Park Improvements / Capital Replacement Program - R17 1< t hLzf Project Summary: The 2022 Parks, Recreation & Open Space (PROS) plan identified a significant list of deferred park maintenance projects. With the addition of a Parks Capital Project Manager, hired in 2022 and the Job Order Contracting program, the Parks Department will continue to make progress on the numerous system -wide repairs, renovations and replacements of an aging parks infrastructure and ADA accessibility. Project Justification: Insufficiently maintained parks and related assets lead to higher deferred maintenance costs, increased City liability and decreased level of service and community satisfaction. This program is supported by six Goals and 21 Objectives and five Recommendations in the 2022 Parks, Recreation and Opens Space (PROS) Plan. These include Goal 2, Objectives 2.1 and 2.3; Goal 3, Objectives 3.6, 3.7, 3.8 and 3.9; Goal 4, Objectives 4.1, 4.2, and 4.4; Goal 5, Objectives 5.1, 5.3, and 5.4; Goal 6, Objectives 6.1, 6.3, 6.4, 6.5 and 6.7; and Goal 9, Objectives 9.1, 9.2, 9.3 and 9.9. Recommendation 3.1 is "Maintain, renovate, or replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety' and additional recommendations are found in 3.7, 6.2, 6.3 and 6.4. Estimated Cost: $2,700,000 (6-year total) 2025 20261 128 2029 2030 Total Repair & Maintenance $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $1,800,000 Professional Services $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $900,000 Total Expenses $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,700,000 Real Estate Excise Tax II - Fund 125 $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,700,000 Total Revenue 1 $450,000 1 Unsecured Funding 1 $450,000 1 $450,000 1 1 1 $450,000 1 1 $450,000 1 $450,000 1 so 1 $2,700,000 1 u_ Q G a u_ tU I a U N L c� IL 0 M O N LO N 0 N c m E t v M Q Page 28 Packet Pg. 227 2.1.c Parks & Recreation ADA Improvements / Replacement - R16 Project Summary: Systemic accessibility installations, upgrades, replacements and or renovations are needed throughout the City of Edmonds parks, open spaces, trails and recreation facilities and amenities. Examples of projects include Seaview Park restroom access and pathway to the playground, ADA compliant access in the Marina Beach Park dog park and Edmonds Marsh viewing pier and platform and among other numerous projects throughout the city parks and city -owned public spaces. This funding to be used for professional design, permits and arranging construction of these projects. Project Justification: In addition to building code compliance and ADA requirements, these improvements are supported by three goals and objectives and three recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan. Included are Goal 2, Objective 2.1; Goal 3, Objectives 3.3, 3.7, 3.8 and 3,9; and Goal 9, Objective 9.1. Recommendations 3.1 "ensuring public accessibility" and 6.2 includes "improvements to park facilities to conform with American with Disabilities Act (ADA) and ensure universal accessibility". In addition, recommendation 6.3 is to replace or renovate restrooms at Olympic Beach, Seaview Park and Brackett's Landing North. Estimated Cost: $500,000 I — a_ Q o: 0 a U_ U I a U N L c� IL 0 M O N LO N O N C d E L 0 �4 w Q Page 29 Packet Pg. 228 I 2.1.c I 2024-2029 Parks Capital Improvement & Capital Facilities Plan PARKLAND ACQUISITION EDMONDS PARKS, RECREATION & HUMAN SERVICES Page 30 Packet Pg. 229 1 2.1.c Parks & Recreation Parkland Acquisition - Neighborhood Park SR 99 & SE 2 - A3 & A4 Project Summary: Acquisition of parkland that will benefit the Edmond community and support the priorities identified in the PROS Plan. Currently, $1,140,625 is reserved for parkland and open space acquisition. These funds were accumulated from 2019 through 2024. There is no specific request to purchase a particular parcel as opportunities are somewhat limited in a mostly built -out city, but staff continues to search for, develop and negotiate opportunities. Project Justification: Parkland acquisitions are supported by two Goals and five Objectives (land purchase only, see previous projects for development) and a Recommendation in the 2022 Parks, Recreation & Open Space (PROS) Plan. Those include Goal 2, Objective 2.1; Goal 3, Objectives 3.1, 3.2, 3.3 and 3.9 also support the acquisition of parkland. Recommendation 1 is to "Fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor". Estimated Cost: $1,800,000 Acquisition — Neighborhood Park SR99 (A3) 2025 2026 2027 2028 2029 2030 $900,000 Total $900,000 Acquisition — Neighborhood Park SE 2 (A4) $900,000 $900,000 Total Expenses $900,000 $900,000 $1,800,000 Real Estate Excise Tax I - Fund 126 $900,000 $700,000 $1,600,000 Tree Fund 143 - land acquisition - TBD $200,000 $200,000 Snohomish County Conservation Futures Total Revenue $900,000 $900,000 $1,800,000 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Page 31 Packet Pg. 230 I 2.1.c I 2024-2029 Parks Capital Improvement & Capital Facilities Plan FUND DETAIL { EDMONDS PARKS, RECREATION & HUMAN SERVICES Page 32 Packet Pg. 231 1 2.1.c Fund 332 Costs inflated at 3% per year Fund 332 Expenditures 2025 2026 2027 2028 2029 2030 6-Year Total D9 Edmonds Marsh Estuary Restoration (Master Plan Implementation) $ D1 Edmonds Marsh Estuary Restoration (Restoration) $ - R14 Elm Street Park Habitat Restoration $ 55,000 $ 55,000 D17 Elm Street Park (Shelter w/Picnic Tables) $ 85,000 $ 85,000 R20 Marsh Boardwalk Replacement $ 750,000 $ 750,000 D13 Mee Property (Park Development) $ 250,000 $ 250,000 D15 Neighborhood Park - SR99 (Park Development) $ 80,000 $ 850,000 $ 930,000 D18 Neighborhood Park - SE2 (Park Development) $ 82,000 $ 82,000 R15 Pool Replacement $24,000,000 $ 24,000,000 P1 Parks Facilities M&O Building (Design) $ 875,500 $ 875,500 D2 Parks Facilities M&O Building (Construction) $ 4,700,000 $ 4,700,000 D20 Woodway Campus Athletic Complex - Phase I - Lighting $ 1,500,000 $ 1,500,000 (C) TOTAL Fund 332 Expenditures $ $ $ 3,375,500 $ 4,700,000 $ 135,000 1 $25,017,000 $33,227,500 Fund 332 Revenue 2025 2026 2027 2028 2029 2030 6-Year Total Park Impact Fees (Fund 332-100) $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,200,000 Miscellaneous Park Donations $ - Bond Proceeds $ - Park Impact Fees - Mee Property (Park Development) $ 250,000 $ 250,000 Park Impact Fees - Neighborhood Park SR99 (Development) $ 80,000 $ 850,000 $ 930,000 Unsecured Funding - Woodway Campus Athletic Complex Phase 1 $ 1,500,000 $ 1,500,000 Unsecured Grants - Marsh Estuary Restoration $ - Unsecured Grants - Elm Street Park Habitat Restoration & Shelter $ 55,000 $ 85,000 $ 140,000 Unsecured Grants - Neighborhood Park SE 2 (Development) $ 82,000 $ 82,000 Unsecured Funding (Bonds, Levy, Misc.) Pool Replacement $ 24,000,000 $ 24,000,000 Unsecured Funding Park Facilities M&O Building $ 875,000 $ 4,700,000 $ 5,575,000 Unsecured Grants - Marsh Walkway Replacement $ 750,000 $ 750,000 (D) TOTAL Fund 332 Revenue $ 200,000 $ 200,000 $ 3,575,000 $ 4,900,000 $ 335,000 $25,217,000 $37,357,000 Fund 332 Parks Fund 6-Year Overview 2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance (332) $ 106,309 $ 110,729 $ 115,349 $ 120,617 $ 126,648 $ 132,980 (F) Investment Interest (5%) $ 4,420 $ 4,620 $ 5,767 $ 6,031 $ 6,332 $ 6,649 (D) Revenue - Non Park Impact Fees $ - $ - $ 3,375,000 $ 4,700,000 $ 135,000 $25,017,000 (C) Expenditures $ $ - $ 3,375,500 $ 4,700,000 $ 135,0010 $25,017,000 (H) Ending Fund Balance (E+F+D-C) $ 110,729 1 $ 115,349 $ 120,617 $ 126,648 $ 132,980 $ 139,629 Q Page 33 Packet Pg. 232 Fund 332 2.1.c Fund 332-100 Fund Park Impact Fee 6-Year Overview 2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance (332-100) - Park Impact Fees $ 180,232 $ 383,682 $ 587,282 $ 566,646 $ 794,978 $ 954,727 (F) Investment Interest (5%) $ 3,450 $ 3,600 $ 29,364 $ 28,332 $ 39,749 $ 47,736 (D) Revenue - Park Impact Fees Only $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 (C) Expenditures $ - $ $ 250,000 $ - $ 80,000 $ 850,000 (1) Ending Fund Balance (E+F+D-C) $ 383,682 $ 587,282 $ 566,646 $ 794,978 $ 954,727 $ 352,464 Project Type: A Acquisition P Master Planning D Development - New R Replacement / Upgrade Page 34 Packet Pg. 233 REET II Fund 125 2.1.c Costs inflated at 3% per year REET II(Fund 125)Expenditures 2025 2026 2027 2028 2029 2030 6-Year Total P4 Edmonds Marsh Estuary Restoration (Master Plan) $ - D16 Elm Street Park (Nature Playground & Dog Park) $ 50,000 $ 300,000 $ 350,000 P5 Johnson Property (Master Plan) $ 100,000 $ 100,000 R12 Maplewood Hill Park (Playground Replacement) $ 50,000 $ 350,000 $ 400,000 R20 Marsh Boardwalk Replacement (Design) $ 75,000 $ 75,000 D19 Mountlake Terrace ILA (Lake Ballinger Park)* $ 200,000 $ 200,000 P2 Mee Property - (Master Plan) $ 80,000 $ 80,000 P1 Parks Facilities M&O Building (Design) $ 250,000 $ 250,000 D10 Pine Street Park (Shelter w/Picnic Tables) $ 100,000 $ 100,000 D11 Pine Street Park (Paved Connecting Pathway) $ 35,000 $ 200,000 $ 235,000 D12 Pine Street Park (Canopy Shade Trees) $ 25,000 $ 25,000 R19 Shell Creek Restoration Phase 2 (Yost Park) $ 380,000 $ 380,000 R8 Sierra Park (Playground Replacement) $ 50,000 $ 350,000 $ 400,000 R11 Yost Pool Upgrades & Renovation $ 350,000 $ 350,000 R16 ADA Improvements (Seaview Restroom & Pathway) $ 200,000 $ 300,000 $ 500,000 R17 Citywide Park Improvements / Capital Replacement Program $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 2,700,000 (C) TOTAL PARKS REET II (Fund 125) Expenditures $ 1,110,000 $ 1,075,000 $ 1,150,000 $ 950,000 $ 910,000 $ 950,000 $ 6,145,000 REET II(Fund 125)Revenue 2025 2026 2027 2028 2029 2030 6-Year Total Real Estate Excise Tax (REET) II - Fund 125 $ 1,110,000 $ 1,075,000 $ 1,150,000 $ 950,000 $ 910,000 $ 950,000 $ 6,145,000 (D) TOTAL PARKS REET I (Fund 126) Revenue $ 1,110,000 $ 1,075,000 $ 1,150,000 $ 950,000 $ 910,000 $ 950,000 $ 6,145,000 REET II (Fund 125) Parks Fund 6-Year Overview 2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance $ - $ - $ - $ - $ - $ - (D) Revenue $ 1,110,000 $ 1,075,000 $ 1,150,000 $ 950,000 $ 910,000 $ 950,000 (C) Expenditures $ 1,110,000 $ 1,075,000 $ 1,150,000 $ 950,000 $ 910,000 $ 950,000 (G) Ending Fund Balance (E+D-C) $ - $ - $ - $ - $ - $ *Project added via Council amendment in 2023 Page 35 Packet Pg. 234 REET I Fund 126 2.1.c Costs inflated at 3% per year REET I(Fund 126)Expenditures 2025 2026 2027 2028 2029 2030 6-Year Total Al Edmonds Marsh Estuary Restoration (Acquisition) $ A2 Neighborhood Park - SE1 (Acquisition) $ - A3 Neighborhood Park - SR99 (Acquisition) $ 900,000 $ 900,000 A4 Neighborhood Park -SE2 (Acquisition) $ 700,000 $ 700,000 Debt Interest & Principal (Civic & Marina Beach) $ 412,518 $ 416,188 $ 410,438 $ 416,350 $ 407,912 $ 414,225 $ 2,477,630 (C) TOTAL PARKS REET I (Fund 126) Expenditures $ 412,518 $ 416,188 $ 410,438 $ 1,316,350 $ 1,107,912 $ 414,225 $ 4,077-630 REET I(Fund 126)Revenue 2025 2026 2027 2028 2029 2030 6-Year Total Real Estate Excise Tax (REET) I - Fund 126 - Land Acquisition $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 600,000 Real Estate Excise Tax (REET) I - Fund 126 - Debt Interest & Principal $ 412,518 $ 416,188 $ 410,438 $ 416,350 $ 407,912 $ 414,225 $ 2,477,630 (D) TOTAL PARKS REET I (Fund 126) Revenue $ 512,518 $ 516,188 $ 510,438 $ 516,350 $ 507,912 $ 514,225 $ 3,077,630 REET I (Fund 126) Parks Fund 6-Year Overview 2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance $ 1,140,625 $ 1,240,625 $ 1,340,625 $ 1,440,625 $ 640,625 $ 40,625 (D) Revenue $ 512,518 $ 516,188 $ 510,438 $ 516,350 $ 507,912 $ 514,225 (C) Expenditures $ 412,518 $ 416,188 $ 410,438 $ 1,316,350 $ 1,107,912 $ 414,225 (G) Ending Fund Balance (E+D-C) $ 1,240,625 $ 1,340,625 $ 1,440,625 $ 640,625 $ 40,625 $ 140,625 R Lo U Z3 C a LL U_ c Lo a N LL .r Q U O M O N L0 N O N H LL Q d' 0 a LL U I a_ U Y L M IL O M O N LO N O N C N E t 0 LC r Q Page 36 Packet Pg. 235 TREE Fund 143 2.1.c Costs inflated at 3% per year TREE (Fund 143)Expenditures 2025 2026 2027 2028 2029 2030 6-Year Total Park and Open Space Acquisition Program $ Mee Property Acquisition $ - A4 Neighborhood Park -SE2 (Acquisition) $ 200,000 $ 200,000 Tree Board Supplies and Minute Taker $ 4,000 $ 4,000 $ 4,000 $ 4,000 $ 4,000 $ 4,000 $ 24,000 (C) TOTAL TREE (Fund 143) Expenditures 1 $ 4,0001 $ 4,000 1 $ 4,0001 $ 4,000 1 $ 204,000 1 $ 4,000 1 $ 224,000 TREE (Fund 143)Revenue 2025 2026 2027 2028 2029 2030 6-Year Total Tree - Fund 143 $ 70,152 $ 45,749 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 315,901 Investment Interest (@5%) $ 14,040 $ 14,670 $ 8,419 $ 11,140 $ 13,997 $ 6,997 $ 69,262 (D) TOTAL TREE (Fund 143) Revenue $ 84,192 $ 60,419 $ 58,419 $ 61,140 $ 63,997 $ 56,997 $ 385,163 TREE (Fund 143) 6-Year Overview 2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance $ 31,766 $ 111,958 $ 168,377 $ 222,796 $ 279,936 $ 139,932 (D) Revenue $ 84,192 $ 60,419 $ 58,419 $ 61,140 $ 63,997 $ 56,997 (C) Expenditures $ 4,000 $ 4,000 $ 4,000 $ 4,000 $ 204,000 $ 4,000 (G) Ending Fund Balance (E+D-C) $ 111,958 $ 168,377 $ 222,796 $ 279,936 $ 139,932 $ 192,929 to U C a ur U_ c Lo a rn d u_ .r Q LC U O M O N LO N O H u_ Q 0 a ur U I a_ U rn Y L M IL O M O N LO N O N C N E t t) LC r Q Page 37 Packet Pg. 236 CEMETERY Trust Fund 137 2.1.c Costs inflated at 3% per year CEMETERY Trust (Fund 137) Expenditures 2025 2026 2027 2028 2029 2030 6-Year Total D8 lColumbarium Expansion -Phase II $ 175,000 $ 175,000 Repair & Maintenance $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 150,000 (C) TOTAL CEMETERY Trust(Fund 137) Expenditures $ 200,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 325,000 CEMETERY Trust (Fund 137) Revenue 2025 2026 2027 2028 2029 2030 6-Year Total Cemetery Trust - Fund 137 Investment Interest (@5%) $ 77,880 $ 81,400 $ 70,091 $ 73,145 $ 76,352 $ 79,720 $ 458,588 Cemetery Trust - Fund 137 Sales Revenue $ 18,540 $ 19,096 $ 16,000 $ 16,000 $ 16,000 $ 16,000 $ 101,636 (D) TOTAL CEMETERY Trust (Fund 137) Revenue $ 96,420 $ 100,496 $ 86,091 $ 89,145 $ 92,352 $ 95,720 $ 560,224 CEMETERY Trust (Fund 137) 6-Year Overview 2025 2026 2027 2028 2029 2030 (E) Beginning Fund Balance $ 1,429,895 $ 1,326,315 $ 1,401,811 $ 1,462,902 $ 1,527,047 $ 1,594,399 (D) Revenue $ 96,420 $ 100,496 $ 86,091 $ 89,145 $ 92,352 $ 95,720 (C) Expenditures $ 200,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 (G) Ending Fund Balance (E+D-C) $ 1,326,315 $ 1,401,811 $ 1,462,902 $ 1,527,047 $ 1,594,399 $ 1,665,119 R to U C a ur U_ C tC a N LL C. LC U O M O N LO N O N I- LL ILL a U I a_ U Y L M IL O M O N LO N O N C N E t t) LC r Q Page 38 1 Packet Pg. 237 2.1.c PARKS CIP /CFP COMPARISON 2025 - 30 vs. 2024-29 PROJECTS ADDED Type PROJECT NAME CFP DESCRIPTION Parks ADA Improvements & Replacement Ongoing replacement or improvements to meet ADA Standards. Parks Marsh Boardwalk Replacement Renovation and replacement of NW Edmonds Marsh Boardwalk to include ADA upgrades. Parks Mee Property Master Plan X Was part of Parkland Acquisition, now stand alone project. PROJECTS REMOVED Type PROJECT NAME CFP DESCRIPTION Parks Interurban Trail Extension Removed due to lack of available funding. Parks Mathay Ballinger Park Project completion scheduled for 2024. Parks Neighborhood Park SE 1 Mee Property Purchased in 2024. Master Plan listed above as new item. Parks Olympic Beach Park Restroom Interior renovation completed. Parks Parkland Acquisition Support Removed, will be requested if/when potential acquisition is identified. Parks Signage & Wayfinding Project completion scheduled for 2024. Parks Waterfront Walkway (missing link) Removed due to lack of available funding and other capital priorities. Parks Yost Park Playground Improvements Project expenses deemed replacement as not feasible at this time. PROJECTS REVISED Type PROJECT NAME CFP CHANGE Parks Elm Street Park Improvements Moved to 2029-30 vs. 2028-29. Parks Johnson Property Master Plan X Expenditure estimate updated to reflect more current pricing. Parks Lake Ballinger Park Mountlake Terrace ILA ILA completed in 2023; payment due upon construction completion estimated for 2025, carryforward. Parks Maplewood Hill Park Improvements Moved to 2028-29 vs. 2027. Parks Neighborhood Park SE 2 X Acquisition moved to 2029 vs. 2026 and Master Plan moved to 2030 vs. 2027. Parks Neighborhood Park SR 99 X Acquisition moved to 2028 vs. 2025 and Master Plan/Construction moved to 2029-30 vs. 2026-27. Parks Parks & Facilities Maintenance Building X Construction shifted to 2028 vs. 2027; preliminary design funded via REST Fund 125. Parks Pine Street Park Improvements Moved to 2028, 29 & 30 vs. 2025-26. Parks Pool Replacement X Moved to 2030 vs. 2029. Parks lSeaview Park Restroom Replacement lMoved into ADA Improvements & Replacement Program 2026-2027 vs. 2028. Parks Sierra Park Improvements Moved to 2027-28 vs. 2026. Parks Woodway Campus Athletic Complex Phase 1 X Moved to 2027 vs. 2025 due to required ESD partnership development and coordination. Parks Yost Pool Upgrades & Renovation Moved to 2027 vs. 2025. Parks Yost Pool Replacement X Replacement of existing pool - moved to 2030 vs. 2029. Page 39 Packet Pg. 238